A04_-_SOW_-_Metal_Roof_Removal.pdf
PDF 2 MB Posted
- Solicitation number
- 140FS225Q0142
About this file
This Scope of Work (SOW) details a metal roof removal and debris disposal project for the Winnie Depot Wash Bay, located at 1035 West Buccaneer Drive in Winnie, Texas. The objective is to secure a qualified and licensed contractor to remove the existing metal roof from a 60 by 50 foot building, which is showing significant rust on main supports and poses a potential safety hazard. The contractor will be responsible for completely demolishing and removing the roof, including panels, fasteners, and flashing, while ensuring underlying structural elements remain undamaged.
Key requirements include properly disposing of all roof materials in compliance with federal, state, and local environmental regulations, conducting a site cleanup, and adhering to OSHA safety standards. The contractor must provide a site-specific safety and demolition plan prior to starting work and coordinate with the on-site point of contact. The project timeline specifies work must begin within 10 days of Notice to Proceed and be completed within 30 calendar days, with work hours limited to 7:30am-4:00pm, Monday through Friday, excluding federal holidays. A mandatory site visit is scheduled for July 7, 2025 at 9AM CT, and final project acceptance will be based on a walk-through inspection by a government representative.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140FS225Q0142_Amd_0001.pdf | ||
| Sol_140FS225Q0142.pdf | ||
| B03_-_Service_Contract_Act_WD___2015-5233_-_Rev_30.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work (SOW)
Project Title: Metal Roof Removal and Debris Disposal Winnie Depot Wash Bay
Location: 1035 West Buccaneer Drive, Winnie, Texas, 77665
1. Objective
The objective of this project is to secure a qualified and licensed contractor to remove the existing metal roof from the Winnie Depot Wash Bay, including the complete disposal of all materials and debris. The building measures approximately 60 feet by 50 feet. The roof is showing significant signs of rust on the main supports, which could become compromised during storm events. If left unaddressed, this poses a potential safety hazard.
2. Description of Work
The contractor shall provide all labor, tools, equipment, transportation, and supervision required to perform the following tasks:
• Demolition and Removal:
o Safely demolish and remove the existing metal roof, including but not limited to panels, fasteners, flashing, and any roof-mounted materials.
o Ensure all structural elements beneath the roof remain undamaged.
• Debris Disposal:
o Properly collect, remove, and dispose of all roof materials and related debris off-site in accordance with federal, state, and local environmental regulations.
• Site Cleanup:
o Clear all debris and materials from the work area.
o Leave the site in a clean and safe condition suitable for subsequent inspection and follow-on work.
3. Contractor Requirements
• Shall comply with all OSHA safety regulations.
• Shall hold appropriate state and local licenses for demolition and debris hauling.
• Shall provide a site-specific safety plan and demolition plan prior to starting work.
• Shall coordinate with the on-site point of contact prior to mobilization.
4. Work Schedule
• Work shall begin within 10 days of Notice to Proceed.
• All work shall be completed within 30 calendar days.
• Work hours are 7:30am-4:00pm, Monday through Friday, excluding federal holidays.
5. Site Access & Conditions
• Contractor is responsible for visiting the site prior to providing a quote to assess conditions, and logistical considerations.
• Attendance of site visit prior to quoting this requirement is mandatory and is scheduled for:
July 7, 2025 9AM CT
6. Government-Furnished Property/Services
• None. The contractor is responsible for providing all tools, materials, dumpsters, and disposal services necessary to complete the work.
7. Acceptance Criteria
• Final acceptance will be based on a walk-through inspection by the government representative.
• All demolition and cleanup shall meet contract specifications and safety requirements.
Points of Contact:
Technical POC:
Steve Baker
Faculties Manager
409-284-9459 cell number steve_baker@fws.gov
Alternate POC:
Doug Head
Refuge Manager
409-284-1360 doug_head@fws.gov mailto:steve_baker@fws.gov mailto:doug_head@fws.gov darnold Highlight
File details come from the government source that posted it. Updated .