Statement of Work Summary: Fish Hauling Tanker Repair

This is a Statement of Work (SOW) issued by the United States Department of the Interior, US Fish and Wildlife Service (USFWS), for the repair of a rolled 5,000-gallon fish hauling tanker currently located at Eagle Truck Shop in Eagle, Idaho. The contractor shall provide all labor, equipment, materials, and supervision necessary to evaluate, repair, or dispose of the tanker in accordance with applicable federal, state, and local regulations. The work consists of conducting a detailed inspection of the tanker structure and systems, preparing a written Inspection and Assessment Report detailing observed damage, repair feasibility, and itemized costs for parts and labor, and removing and replacing electrical and airlines associated with the subframe. Additionally, the contractor must replace the 2-23K axles and brakes with loaded axles and a new air ride system, remove and replace the tanker walking platform and oxygen lines with 12-volt wire trough, and remove passenger side exterior tank skin panels to expose the tanker structure.

Upon written authorization from the Government, the contractor shall complete all approved repairs necessary to return the tanker to safe, serviceable condition, including structural straightening, welding, replacement of damaged components, skin replacement, system reinstallation, and functional testing. All repairs must meet or exceed industry standards for fish hauling tankers and be suitable for operational use by the USFWS and Lower Snake River Compensation Plan (LSRCP). The performance period is 180 days after Notice to Proceed issuance. Work will be conducted at the vendor's shop, with delivery and pickup provided if the facility is within 50 miles of Eagle Truck Shop; contractors outside 50 miles are responsible for transportation. The Contracting Officer's Representative is Brian Devlin, and the technical contact at Eagle Truck Shop is John McKernan of Idaho Fish and Game (IDFG). Contractor qualifications must include expertise in working with large trucks and tankers, rebuilding subframes including axles and brakes, and air ride suspensions.

View the file

Other files

File Type Posted
Sol_140FS126Q0098.pdf PDF
A06_-_Bid_Schedule.pdf PDF
B08_-_140FS126Q0098_Full_Solicitation_Package.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior

US Fish and Wildlife Service

Lower Snake River Compensation Plan

Eagle Truck Shop 1800 Trout Road

Eagle, Idaho 83616 Phone: 208-939-8380 Attn: John McKernan

Subject: Repair of 5,000-gallon fish hauling tanker

1. GENERAL

1. Any vendor wishing to submit a bid for this work is encouraged to view the 5,000-gallon fish hauling tanker to be repaired currently located at the Eagle Truck Shop. Vendors may also inspect a “repaired” 5,000-gallon fish hauling tank at the same location for reference.

2. The 5,000-gallon fish hauling tanker will be delivered to and picked up from the Vendor’s shop if within 50 miles of the Eagle Truck Shop. If your facility is outside of 50 miles, the contractor is responsible for transportation.

3. Performance Period is 180 days after the vendor is given Notice to Proceed, set forth in the awarded contract.

2. DEFINITIONS

USFWS United States Fish and Wildlife Service LSRCP Lower Snake River Compensation Plan IDFG Idaho Fish and Game

3. SCOPE

The Contractor shall provide all labor, equipment, materials, and supervision necessary to evaluate, repair, or dispose of a rolled fish hauling tanker. Work shall be performed in accordance with applicable federal, state, and local regulations. The project consists of the following:

1. Conduct a detailed inspection of the tanker, including but not limited to the tank shell, internal structure, frame, subframe, mounts, and associated systems.

2. Prepare and submit a written Inspection and Assessment Report that includes:

• Description of observed damage

• Determination of repair feasibility

• Itemized list of repair costs (parts and labor)

• Identification of safety, structural, or regulatory concerns

3. Remove and replace all electrical and airlines associated with the tanker subframe.

4. Replace the 2-23K axles and brakes with loaded axles, along with new air ride system with associated parts.

5. Remove and Replace the Tanker walking platform and O2 lines—12 volt wire trough.

6. Remove the passenger side exterior tanker skins panels, and associated components as necessary to fully expose the tanker structure.

1. Complete Repairs (Once Authorized)

a. Upon written authorization from the Government, complete all approved repairs necessary to return the tanker to safe, serviceable condition.

b. Repairs may include structural straightening, welding, replacement of damaged components, skin replacement, system reinstallation, and functional testing

c. All repairs shall meet or exceed industry standards for fish hauling tankers and be suitable for operational use by the USFWS and LSRCP.

4. DELIVERABLES

1. The vendor will provide an Inspection Report detailing the work needed and the parts and labor needed.

2. The vendor shall supply all labor, equipment, and materials and supplies necessary to perform the work and dispose of any work debris.

3. The vendor shall coordinate and perform the work to the satisfaction of the USFWS, LSRCP and IDFG in accordance with the Scope of this project.

4. The vendor shall comply with Federal and State OSHA regulations, environmental regulations, and other local authorities having jurisdiction.

5. INSPECTION AND ACCEPTANCE

1. The vendor in coordination with the COR will discuss and document work activities on a weekly basis and review all final work upon completion of the project.

2. Qualifications: Expertise in working with large trucks and tankers, rebuilding subframes, including axles and brakes, air ride suspensions.

6. PLACE AND PERIOD OF PERFORMANCE:

1. All work will be conducted at the vendor’s shop.

2. Period of Performance will be 180 days after Notice to Proceed is issued.

7. TECHNICAL COORDINATORS

1. COR, Brian Devlin U.S. Fish and Wildlife Service Lower Snake River Compensation Plan 1387 S. Vinnell Way, Ste 343 Boise, Idaho 83709

Mobile: (986) 210-6445 Email: brian_devlin@fws.gov

2. John McKernan, Manager Eagle Truck Shop (IDFG) 1800 Trout Rd, Eagle, Idaho 83616 208-939-8380 john.mckernan@idfg.idaho.gov