A04_-_SOW.pdf

PDF 4 MB Posted

Attached to
NC-MACKAY ISLAND NWR-HVAC REPLACEMENT AMENDMENT
Solicitation number
140FC126Q0014
Issued by

About this file

This Statement of Work outlines requirements for replacing an existing 2-ton air conditioning and furnace system at Mackay Island National Wildlife Refuge, Quarters #30 in Knotts Island, North Carolina. The project scope includes removal of existing equipment, installation of a new 2-ton Trane air conditioner on a concrete pad, installation of a 2-ton Trane evaporator, installation of a 2-ton 45,000 BTU propane furnace with emergency drain pan, performance of an R-11 flush on refrigerant lines, and installation of a propane conversion kit. All work must comply with OSHA standards, local building codes, and environmental regulations for proper disposal of old equipment.

The contractor must provide all necessary equipment and materials, maintain proper state licenses, and ensure a clean and safe worksite. The government will provide worksite access and a clear path for equipment transportation. The period of performance is 90 days from contract award, with normal work hours Monday through Thursday, 7:00 am to 4:30 pm, with no work on federal holidays. Project completion requires all equipment to be installed and operational with no leaks or obstructions, successful system testing confirming efficient operation, and proper cleanup and disposal of all debris. The contractor will provide a one-year warranty on all labor and materials, addressing any defects or issues at no additional cost to the client.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work Replacement of 2-Ton Air Conditioner and

Furnace with Specified Equipment For

Mackay Island National Wildlife Refuge, Quarters #30

684 Knotts Island Road, Knotts Island, NC 27950

Date: 03/09/2026

Project Overview This Statement of Work (SOW) outlines the requirements and deliverables for replacing an existing 2-ton air conditioner and furnace with new equipment, specified as a 2-ton Trane air conditioner with pad, 2-ton Trane evaporator, 2-ton 45,000 BTU propane furnace, emergency drain pan, R-11 flush, and a propane conversion kit. The unit to be replaced is the upstairs unit in a house at the Mackay Island National Wildlife Refuge, Currituck County, NC. The work will ensure compliance with all applicable safety, environmental, and building codes.

Scope of Work The following tasks will be undertaken as part of this project:

1. Removal of Existing Equipment

• Disconnect and remove the existing 2-ton air conditioner and furnace.

• Properly dispose of the old equipment in accordance with local regulations and environmental guidelines.

2. Installation of New Air Conditioner

• Install a new 2-ton Trane air conditioner to a new concrete pad.

• Connect the air conditioner to the existing ductwork and electrical systems.

• Ensure proper refrigerant charge and system pressure.

• Test the air conditioner to confirm it is operating efficiently and effectively.

3. Installation of New Evaporator

• Install a new 2-ton Trane evaporator in the existing air handling unit.

• Connect the evaporator to the air conditioner's refrigerant lines.

• Ensure proper alignment and secure mounting of the evaporator.

• Conduct a thorough inspection to verify there are no leaks or obstructions.

4. Installation of New Furnace

• Install a new 2-ton 45,000 BTU propane furnace.

• Connect the furnace to the existing ductwork, gas line, and electrical systems.

• Install the emergency drain pan beneath the furnace to prevent water damage in case of leaks.

• Conduct a thorough inspection to verify all connections are secure and there are no gas leaks.

• Test the furnace to confirm it is operating efficiently and providing adequate heating.

5. R-11 Flush

• Perform an R-11 flush on the refrigerant lines to remove any residual contaminants or debris.

• Ensure that the lines are clean and ready for the new refrigerant charge.

Deliverables The following deliverables are expected upon completion of the project:

• Fully installed and operational 2-ton Trane air conditioner with pad.

• Fully installed and operational 2-ton Trane evaporator.

• Fully installed and operational 2-ton 45,000 BTU propane furnace.

• Installed emergency drain pan.

• Completed R-11 flush with clean refrigerant lines.

• Propane conversion kit successfully installed and tested.

Period of Performance The period of performance will be 90 days from the time of award of the contract. Normal work hours are Monday – Thursday, 7 am to 4:30 pm. No work will be done on federal holidays.

Responsibilities

Contractor Responsibilities

• Provide all necessary equipment and materials for the installation.

• Ensure all work is performed in accordance with local codes and regulations.

• Maintain a clean and safe worksite throughout the duration of the project.

• Dispose of all debris and old equipment properly.

• Possess and maintain for the duration of the project any state licenses as required.

Government Responsibilities

• Provide access to the worksite during the scheduled installation dates.

• Provide a clear and safe path for the transportation of equipment and materials.

Compliance and Safety All work will adhere to OSHA standards, local building codes, and environmental regulations for disposal.

Acceptance Criteria The project will be considered complete when:

• All equipment is installed and operational.

• All connections are secure, and there are no leaks or obstructions.

• The system is tested and confirmed to be operating efficiently and effectively.

• The worksite is cleaned, and all debris is properly disposed of.

Warranty The contractor will provide a one-year warranty on all labor and materials used in the installation. Any defects or issues arising from the installation will be addressed promptly and without additional cost to the client.

I

',J f

I

Project Overview
Scope of Work
1. Removal of Existing Equipment
2. Installation of New Air Conditioner
3. Installation of New Evaporator
4. Installation of New Furnace
5. R-11 Flush
Deliverables
Period of Performance
Responsibilities
Contractor Responsibilities
Government Responsibilities
Compliance and Safety
Acceptance Criteria
Warranty

File details come from the government source that posted it. Updated .