A04_SOW.pdf
PDF 840 KB Posted
- Solicitation number
- 140P8325R0022
About this file
This Statement of Work (SOW) details a roof replacement project for the Ohana Maintenance Garage (Building O-208) at Mount Rainier National Park. The project involves a full tear-off and replacement of the existing 3-ply SBS torch-applied roofing system on a 3,285 square foot gable roof with a 3/12 pitch. Key scope elements include mobilization, removal and disposal of the existing roof, deck inspection and repair, installation of a new 2-ply SBS roofing system, perimeter and penetration flashings, and site cleanup.
The project is located in the Ohanapecosh area of the park, with a restricted work window from May to October. Critical requirements include compliance with various standards and codes (ASTM, NFPA, IBC, OSHA), preservation of the non-contributing structure's aesthetic, and adherence to safety protocols. Deliverables include pre-installation meeting minutes, weekly progress reports, deck inspection logs, water-tightness test records, and final documentation. Acceptance criteria mandate no ponding or leaks, weathertight flashings, and final sign-off by MORA Safety and Facilities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Construction_Contract_Administration.docx | DOCX document | |
| Sol_140P8325R0022.pdf | ||
| B03_Davis-Bacon_Act_WD___WA20250111_SAM.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 | P a g e
Mount Rainier National Park Facilities Maintenance Division
Statement of Work (SOW)
Replacement of 3-Ply SBS Torch-Applied Roof – Ohana Maintenance Garage (O-208) PMIS Project No.: 323461 Prepared by: Frances Holmgren, Facilities Operations Specialist Date: July 31, 2025
1. Project Description
Furnish all labor, materials, equipment, and supervision to perform a full tear-off and replacement of the existing 3-ply SBS torch-applied roofing system on the 3285 SF roof of Ohana Maintenance Garage (Building O-208). Work includes substrate preparation, membrane installation, perimeter and penetration flashings, site cleanup, testing, and close-out documentation.
2. Location & Access
• Site Address: Located in the southeast corner of the park, Ohanapecosh - 3 miles (4.8 km) north of the park boundary on State Route 123 and 42 miles ( 68 km) east of the Nisqually Entrance
• Roof Area: Approx. 3285 SF, Gable roof with approximately 3/12 roof pitch. There is a 32-inch x 64-inch block chimney penetrating through the roof in addition to plumbing vents. The rooftop is insulated with exception to the overhang creating approximately a 4-inch step around the perimeter on 3 sides, 1 gable side transitions with roof to Block wall flashing on the south slope and an existing metal roof that will require a transition flashing on the north slope. (South slope approximately 35 feet 61 feet, North slope approximately 18 feet x 61feet.
• Access Constraints: May–October work window; steep, narrow roads; materials staged at grade; limited rooftop storage.
3. Scope of Work
A. Mobilization
1. Coordinate site access with MORA Facilities and Safety Officer.
2. Deliver and assemble fall-protection systems, pedestrian barricades, signage, and job staging.
3. Provide site laydown area with weather-protected tarping.
B. Removal & Disposal
1. Tear off existing torch-down membrane, flashings, fasteners, and underlayment down to deck.
2. Haul away all waste off-site; recycle where feasible per NPS waste policies.
C. Deck Inspection & Repair
2 | P a g e
1. Inspect roof deck and structural framing, document conditions in report.
2. NPS will perform minor repairs with NPS-provided materials for any rotten or previously damaged framing or wooden roof decking; report any major defects.
D. New Roofing System Installation
1. Install substrate primer and leveling asphalt where required.
2. Torch-apply new 2-ply SBS system (base sheet + cap sheet) per ASTM D6162 Type III.
3. Ensure adhesion continuous; maintain minimum overlap per manufacturer.
E. Perimeter & Penetration Flashings
1. Fabricate and install SBS-compatible flashings at ridge, eaves, parapets, chimneys, vents, and penetrations.
2. Integrate metal terminations and drip edges per code.
F. Underlayment (Optional)
1. Furnish and install air/vapor barrier underlayment in high-moisture zones as directed.
G. Site Cleanup & Close-Out
1. Remove all debris, clean gutters, and inspect roof surface.
2. Perform water-tightness flood test; record and correct any leaks.
3. Provide as-built drawings, warranties, O&M manuals, and final report.
4. Standards & Codes
• ASTM D6162 Type III – SBS Torch-Applied Roofing
• NFPA 101 – Life Safety Code (building envelope integrity)
• IBC 2018 §1507 – Roof Assemblies
• OSHA 29 CFR 1926 – Fall Protection
• NEPA CE A.9 – Routine Maintenance
• EPA RRP – Lead-Safe Work Practices
• NPS Preservation Brief 10 – Least-Aggressive Removal Methods
5. Preservation Requirements
• Structure is non-contributing; removal methods must be reversible and non-destructive.
• Flashing materials to match existing aesthetic; color-matched SBS flashings.
6. Safety Requirements
• Comply with OSHA fall protection, guardrails, personal protective equipment, and NPS safety plan.
• Maintain pedestrian and vehicle exclusion zones at ground level; flag authorized access.
3 | P a g e
7. Submittals & Deliverables
• Pre-installation progress meeting minutes.
• Shop drawings for membrane and flashings.
• Weekly progress reports with photos.
• Deck inspection report and repair logs.
• Water-tightness test records.
• As-built drawings, warranties, O&M manuals, and final acceptance letter.
8. Schedule & Sequencing
Please provide the park for approval once awarded.
9. Exclusions
• Structural framing replacement beyond minor patching.
• Roof hatch replacement, interior alterations, new utility penetrations.
• Crane rental (panels < 50 lbs, torch applied by crew).
10. Acceptance Criteria
• No ponding or leaks observed during flood test.
• All flashings weathertight and integrated.
• Submissions complete and approved by COR.
• Final acceptance sign-off by MORA Safety and Facilities.
4 | P a g e
5 | P a g e
6 | P a g e