Text version
Mojave National Preserve
San Bernardino County, California
STATEMENT OF WORK:
Clean Storage Tanks at Hole-in-the-Wall Public Water System
DATED:
May 20, 2021
Prepared By: Debra Hughson
NATIONAL PARK SERVICE
Mojave National Preserve
MOJA – Clean Storage Tanks at Hole-in-the-Wall Public Water System
STATEMENT OF WORK (SOW) TO CLEAN WATER STORAGE TANKS
1. BACKGROUND
The Mojave National Preserve Hole-in-the-Wall facility is located approximately 20 miles north of the Essex Road offramp from Interstate 40 on Black Canyon Road, Eastern San Bernardino County. The work site is 35° 3.397'N 115° 23.718'W.
2. OBJECTIVES/BACKGROUND:
This project will clean and remove all sand, sediment, flocculated material, lime, and silt from two concrete water storage tanks of approximately 30,0000-gallon total capacity using a method that does not require draining the tanks while maintaining potable water standards. All material will be removed from the preserve and properly disposed of. Test results of water samples taken after cleaning will be presented demonstrating the stored water is potable.
3. PLACE OF PERFORMANCE:
Hole-in-the-Wall, Mojave National Preserve.
Permitted Work Hours: Monday through Friday, 7:00am – 5:00pm
4. PERIOD OF PERFORMANCE:
All tasks and deliverables for this contract must be completed within 21 of days after award.
Days listed herein refer to calendar days.
5. SCOPE:
1. Clean two tanks removing all sand, sediment, flocculated material, lime, and silt. The tanks must not be drained. The tanks must stay online to the public water system providing potable water during the cleaning operation.
2. Collect and test water samples to demonstrate stored water is still potable after the tank cleaning operation has been completed.
3. Remove all sediment, materials, and debris generated by tank cleaning from the preserve and dispose of properly.
Bid Option. Provide a video of the entire tank interior.
All work will be completed to applicable code including a current state licenses.
6. TASKS:
Under this contract, the contractor shall complete the following tasks and requirements:
• Schedule tank cleaning with COR or NPS point of contact at least 48 hours in advance.
• Perform tank cleaning without draining the tanks. The tanks must stay online to the public water system providing potable water during the cleaning operation.
• Collect water samples and deliver to a state certified drinking water analysis laboratory.
• Provide water sample test results to NPS.
• Remove all sediment, trash, and debris generated by the project from the preserve and dispose of properly.
Bid Option. Provide a video of the entire tank interior.
8. DELIVERABLES:
• Water sample test results.
Bid Option. Provide a video of the entire tank interior.
9. GOVERNMENT-FURNISHED PROPERTY, MATERIAL, EQUIPMENT, OR INFORMATION
(GFP, GFM, GFE, OR GFI):
• As constructed drawing of storage tanks.
10. SAFETY:
This contractor is to follow at a minimum all OHSA rules and procedures. A required safety plan must be submitted and approved before any work is to begin. This plan shall identify any hazards related to the work and provide measures to follow to mitigate risk.
11. SECURITY:
Work sites will be secure at the end of the day. Gates will be closed and locked at night. The contractor will be responsible for the hazmat clean-up of any equipment fluid leaks or spills.
12. TRAVEL:
Contractor shall be responsible for all travel related expenses for this project, including mobilization of equipment, tools, materials, manpower, lodging, meals, and per diem.
13. SPECIAL MATERIAL REQUIREMENTS: N/A
14. OTHER UNIQUE REQUIREMENTS:
Contractors will asked to watch a video on Desert Tortoise awareness.
15. QUALITY ASSURANCE REQUIREMENT:
The contractor shall develop and maintain a quality assurance program to ensure services are performed in accordance with commonly accepted standard practices and in compliance with all applicable code. The contractor shall develop and implement procedures to identify and prevent defective workmanship. As a minimum the contractor shall develop quality control procedures addressing the critical areas identified in this statement of work. The government will periodically evaluate the contractor’s performance in accordance with the statement of work.
While performing work, the contractor shall comply with the latest applicable versions of the following:
• Safe Drinking Water Act
• California Title 22 Drinking Water Requirements
• Stage 2 Disinfection Byproducts Rule and Lead and Copper Rule
• Unregulated Contaminant Monitoring Rule
• AWWA Standard C65c-02
• Occupational Safety and Health Administration (OSHA) requirements
• EPA Drinking Water Regulations
Additional Requirements:
• Installers shall hold current applicable California licenses,
• Contractor must provide documentation of 3 previous projects with positive feedback.
Projects must have been completed within the last five years and be of similar nature and complexity.
• All affected areas must be left in a clean and tidy condition. Any damages to government property will be fixed and repaired at no cost to the government.