A04_SOW_Attch_1_FORA_Mx_septic_layout_(1).pdf

PDF 596 KB Posted

Attached to
Cape Hatters NS Fort Raleigh: SEPTIC SYSTEM Federal contract opportunity
Solicitation number
140P5324R0020
Issued by
Department of the Interior National Park Service Southeast Region

About this file

This document package includes plans and specifications for replacing the septic system at Fort Raleigh Maintenance in Manteo, North Carolina. The project involves demolishing the existing septic tank, distribution box, and drainfield before installing a new 1,000 gallon septic tank, distribution box, and two drainfield trenches with infiltration chambers that are each 32 feet long and 3 feet wide. The drawings provide details on disconnecting the existing septic drain line, excavating for the new drainfield, and maintaining separation from existing buildings and utilities. The related federal contract opportunity was issued by the National Park Service Southeast Region under solicitation number 140P5324R0020 to replace the septic system at the Fort Raleigh Maintenance Area in support of PMIS project 329246.

View the file

Other files for this federal contract opportunity

Other files attached to Cape Hatters NS Fort Raleigh: SEPTIC SYSTEM, newest first.
File Type Posted
A04_SOW__Replace_Septic_System_at_Ft_Raleigh_Maintenance.doc DOC document
B08_Relevant_Prior_Experience.pdf PDF
Sol_140P5324R0020.pdf PDF
A03_-_Construction_Contract_Administration.docx DOCX document
A04_SOW_Attch_2_FORA_Mx_septic_details.pdf PDF
B03_DOL_Wage_Determination__NC20240069.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

w w w w w w

X X

X X

X X

X X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

XXXXXXXXXXXXXXXXXXXXXXXXXXX

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

S

SSSSSSSSS

SSSSSSSSS

SSSSSSSSS

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S S S S

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

EEEEEEEEEEEEEEEEEEEEEE

E

E E

E E

E E

E E

E

E E

E E

E E E E E E E E

LOC

LOC

LOC

LOC

LOC

LOC

LO

C

LO

C

LO

C

LO

C

LO

C

X X

X X

X X

X X

X X

X X

X X

X X

S S

S S

S S

S S

S S

S S

S S

S S

SSSSSSSS

SSSSSSSS

S

E E

E E

E E

E E

E E

E E

EEEEEEEEEEEEEEEEEEEEE

E

LOC

LOC

LOC

LOC

LOC

LOC

LO

C

LO

C

LO

C

LO

C

S S w w w w w w w w

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

XXXXXXXXXXXXXXXXXXXXXXXXXX

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

S

SSSSSSSSS

SSSSSSSSS

SSSSSSSSS

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

EEEEEEEEEEEEEEEEEEEEEE

E

E E

E E

E E

E E

E

E E

E E

E E E E E E E E

LOC

LOC

LOC

LOC

LOC

LOC

LO

C

LO

C

LO

C

LO

C

LO

C

DISCONNECT EXISTING

SEPTIC DRAIN LINE

APPROX 10 FT FROM

THE EDGE OF

PAVEMENT.

EXISTING

ELECTRIC

PANEL

SCALE:

EXISTING FORT RALEIGH VIP PADS SEPTIC SYSTEM2 1:200

SCALE:

PROPOSED FT RALEIGH VIP SEPTIC TANK AND DRAINFIELD3 1:100

SCALE:

AERIAL PHOTO FORT RELEIGH VIP PADS1 1:400

EXISTING TREELINE

FT RALEIGH

MAINTENANCE

BUILDING

EXISTING SEPTIC DRAINLINE.

DEMO EXISTING SEPTIC TANK,

DISTRIBUTION BOX, AND DRAINFIELD

PIPE

EDGE OF

PAVEMENT

EXISTING

FENCELINE

LIMITS OF

CONSTRUCTION

PROVIDE 2 EACH DRAINFIELD

TRENCHES AND INFILTRATION

CHAMBERS, 32 FT LONG, 3 FT

WIDE, AND 9 FT ON CENTEREXISTING

FUEL TANK

TO REMAIN

EXISTING

SHEDS

EMERGENCY

GENERATOR

PROVIDE 1000 GAL SEPTIC TANK

AND DISTRIBUTION TANK

INSTALLATION NOTES:

1. INSTALL NEW SEPTIC DRAINLINES WITH POSITIVE SLOPE

TOWARD SEPTIC TANK, DISTRIBUTION BOX, AND DRAINFIELD

TRENCHES. DO NOT INSTALL DRAINLINES AT 0 PERCENT OR

UPHILL SLOPE. SET TANK, DISTRIBUTION BOX, AND TRENCHES

AT ELEVATION TO ENSURE DOWNHILL SLOPE OF ALL

DRAINLINES.

CONNECT EX

DRAINLINE TO NEW

SEPTIC TANK

DEMOLITION NOTES:

1. PRIOR TO DIGGING, LOCATE EXISTING

UTILITIES IN THE PROJECT AREA.

2. DIG UP AND TURN SOIL IN THE NEW

DRAINFIELD AREAS. REMOVE ROOTS OR

UNSUITABLE SOIL.

32'-0"

3'-0"

10'-0"

EXISTING

SHEDS

MUSEUM

RESOURCE

CENTER

EXISTING CMU

BLOCK SHED

TO REMAIN

9'-0"

MAINTAIN 5 FT

SEPARATION

FROM BUILDING

AutoCAD SHX Text Sheet

AutoCAD SHX Text Scale

AutoCAD SHX Text Project

AutoCAD SHX Text Date

AutoCAD SHX Text Revision/Issue

AutoCAD SHX Text Project Name and Address

AutoCAD SHX Text Firm Name and Address

AutoCAD SHX Text No.

AutoCAD SHX Text Date

AutoCAD SHX Text General Notes

AutoCAD SHX Text

REPLACE SEPTIC SYSTEM

AutoCAD SHX Text

AT FT RALEIGH MAINTENANCE

AutoCAD SHX Text

1403 PEAR PAD ROAD

AutoCAD SHX Text

MANTEO, NC 27954

AutoCAD SHX Text

PMIS 329246

AutoCAD SHX Text 1/9/2024

AutoCAD SHX Text As Noted

AutoCAD SHX Text C1

Sheets and Views
FORA Mx septict-FORA MX Prop

File details come from the government source that posted it. Updated .