A04_-_SoW_Alarm_testing.docx
DOCX document 26 KB Posted
- Attached to
- PROVIDE FIRE PANEL AND SENSOR TESTING AT GRAND TET Federal contract opportunity
- Solicitation number
- 140P1423Q0066
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B08_-_Attachment_3_GRTE_Fire_Alarm_Points_List_0001.xlsx | XLSX spreadsheet | |
| Sol_140P1423Q0066_Amd_0001.pdf | ||
| B03_-_WD___2015-5409.pdf | ||
| Sol_140P1423Q0066.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
PROVIDE FIRE PANEL AND SENSOR TESTING AT GRAND TETON NATIONAL PARK
MARCH 2023
1.1 BACKGROUND
The purpose of this Statement of Work is to enter into an annual fire panel/sensor testing agreement with a licensed alarm company according to table 14.4.3.2 of NFPA 72.
1.2 SPECIFIC REQUIREMENTS
A. As part of this service agreement, offeror shall include any and all costs associated with travel, labor, parts or subcontractors needed to test as necessary all current alarm panels and sensors listed on this contract.
B. This contract does not allow for the repair of any existing equipment, but should a problem be identified during testing or additional sensors not listed be identified, the trouble or discrepancy is to be noted so the park may have it repaired either with on staff personnel or via a repair contractor at a later time.
C. This contract shall allow for the addition or removal of individual sensors and locations as the needs of the park changes.
D. There are a total of 21 alarm panels and 2 elevator phones. The 2 elevators reside in the same building as 1 alarm panel. There are two locations that utilize 2 panels for fire and intrusion. All other alarm panels reside in unique locations with a single panel for either fire or both fire and intrusion. This provides for a total of 21 physical locations to be tested. All panels are located within a 40 mile radius of the parks headquarters located in Moose, Wyoming.
1.3 PERIOD OF PERFORMANCE and additional bid options
A. Base PoP - 1 September 2023 to 31 August 2024. Testing shall occur within 3 months of contract award (September-November).
B. Option year 1 - 1 September 2024 to 31 August 2025. Testing shall occur within 3 months of contract award (September-November).
C. Option year 2 - 1 September 2025 to 31 August 2026. Testing shall occur within 3 months of contract award (September-November).
D. Option year 3 - 1 September 2026 – 31 August 2027. Testing shall occur within 3 months of contract award (September-November).
1.4 EQUIPMENT TYPES REQUIREMENTS
A. Able to access and test fire alarm systems and all components. All programming access codes and locations will be presented to winning bidder.
· BOSCH D9412GV2
· BOSCH D9412GV4
· BOSCH FPA-1000-UL
· GAMEWELL FCI-7100 series 1D
· BOSCH D7412G
· VISTA 128FBPT
· FIRELITE MS9200
· GAMEWELL S3
· Elevator emergency phone
B. Winning bidder shall factor into their costs all labor, travel, per diem and any other costs associated with the testing of all Grand Teton National Park alarm panels such that all testing is completed within 3 months following contract award.
1.6 GENERAL INFORMATION
C. Hours of Work. All onsite work will be coordinated by the park's Contracting Officers Representative (COR). All work shall be done during normal business hours unless otherwise approved by the COR.
D. Place of Performance. The testing shall occur on all Grand Teton National Park fire systems during the period of performance.
E. Coordination of Trades. The offeror shall coordinate work so that any interruptions in the alarm monitoring and building and apartment access will be previously planned.
F. Licenses. All personnel engaged in the contract activities specified herein must be licensed by the state, local authority, and/or the city local authority in those trades, crafts or professions which require licensing by such jurisdictions. The license must be of a grade or other level consistent with the requirement of the work being performed and/or as established by the above jurisdictions.
G. Changes. Any changes affecting this statement of work shall originate from and be approved by the Contracting Officer (CO) and coordinated with the park's COR. Any work, not in this statement of work, performed without approval shall be at the offeror's expense.