A04_SOW_ABC_Gravel.pdf
PDF 665 KB Posted
- Attached to
- ABC GRAVEL FOR FWS ALLIGATOR RIVER NWR
- Solicitation number
- 140FS326Q0007
About this file
This Statement of Work (SOW) is for the Alligator River National Wildlife Refuge (NWR) to procure and deliver approximately 500 tons of ABC Road Base gravel. The project aims to repair severely damaged roads from recent flood events, improve public access, and maintain fire breaks within the refuge. The contractor will deliver the gravel to 13518 Miltail Road, East Lake, NC 27953, with delivery expected from the award date during normal business hours (7:00 AM to 3:30 PM), Monday through Friday. Delivery outside these hours may be permitted with prior staff coordination. The contractor must provide weigh tickets for all deliveries and unload the gravel at specific locations as directed by refuge personnel. The job will be considered complete once the full amount of material has been received and deposited on refuge roads as specified by staff.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140FS326Q0007.pdf | ||
| Sol_Clauses_Q1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Alligator River National Wildlife Refuge (NWR)
3518 Miltail Road, East Lake NC 27953
STATEMENT OF WORK
Supply and Deliver ABC Road Base
1. GENERAL: Alligator River National Wildlife Refuge (NWR) is procuring ABC Road base gravel. The Refuge is in the process of repairing severely damaged roads from recent flood events to keep these areas accessible to the public. This project will add gravel to key areas around the refuge to improve the ability to access and maintain recreational opportunities on the refuge. In addition, the roads are considered fire breaks and as such it is important that the roads are properly maintained with gravel.
2. DEFINITIONS: ABC Road Base an industry standard that is familiar to quarries. See attachment listed Attachment 1- Material Specifications
3. SCOPE: The contractor shall provide approximately 500 tons of ABC Road Base gravel to be delivered.
Refuge personnel will provide guidance and instructions to the contractor drivers as to the specific locations within the refuge where the gravel is to be unloaded. The contractor shall present a record of weigh tickets with and without material loaded to refuge to record the amount of tons present on all deliveries to the Refuge for records and invoicing purposes.
4. DELIVERY AND PERIOD OF PERFORMANCE: Delivery dates: From award date. Material is expected to be delivered from 7:00 AM through 3:30 PM. Later hours and weekends may be permitted with prior coordination with refuge staff on delivery.
5. PERFORMANCE LOCATION: - 13518 Miltail Road, East Lake NC 27953
6. INSPECTION AND ACCEPTANCE: Job will be deemed complete once the full amount of material has been received and deposited on refuge roads as directed by refuge staff.
7. GOVERNMENT FURNISHED EQUIPMENT: NONE
8. AVAILABILITY: All work will be completed during normal business hours, Monday through Friday from
07:00 AM to 3:30 PM.
9. TECHNICAL COORDINATOR: Refuge Manager will be the technical coordinator for this project.
Attachment 1: Material Specifications
Material Specifications Typical:
Aggregate Base Course (ABC) - When ABC is placed on the roadway as part of the pavement structure it is defined in the Standard Specifications as “a base composed of an approved aggregate material hauled to the road, placed on the road, mixed, compacted, and shaped to conform to the lines, grades, depths, and typical sections shown in the plans or established by the Engineer”.
Photo of Physical Material onsite