The document is a Schedule of Items for the Sand Wash Parking Area project, detailing a comprehensive site improvement effort for the Bureau of Land Management (BLM) in Colorado. The project scope includes 15 line items covering site preparation, construction, and infrastructure development, with an estimated performance period of 90 days from August 1, 2025, to November 1, 2025. Key elements include earthworks, aggregate surfacing (650 tons), installation of a precast concrete single-vault toilet, placement of boulders, construction of concrete parking and walkway slabs, installation of 2 cabanas, 17 parking stops, trailer parking delineators, and a 3-panel kiosk.

The solicitation is set aside for small businesses under NAICS code 237990 (Other Heavy and Civil Engineering Construction), with a size standard of $45 million and an estimated price range between $250,000 and $500,000. The project is located near Craig, Colorado, with a pre-bid site tour scheduled for Monday, June 2nd, 2025, at 1 PM. The federal agency overseeing the project is the Department of the Interior Bureau of Land Management Colorado Region, with a point of contact for site tour questions being Isabel Bergemann. The solicitation package is anticipated to be issued around May 22, 2025, with updates available on SAM.gov.

View the file

Other files for this federal contract opportunity

Other files attached to BLM-CO SAND WASH IMPROVEMENTS, newest first.
File Type Posted
A06_Specifications_1.pdf PDF
A06_Drawings_1.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF ITEMS

Request for Proposal No. Contract No.

Job Title: Sand Wash Parking Area

Estimated Start Date: August 1, 2025 Estimated Completion Date: November 1, 2025 Performance Time: 90 days

Item Pay Est. Unit Unit Total No. Item Description Quantity Price Amount

1 Stakeout Plan/Construction Staking 1 LS $ $

2 Mobilization 1 LS $ $

3 Earthworks 1 LS $ $

4 Aggregate Surfacing 650 Ton $ $

5 Precast Concrete Toilet-Single Vault 1 EA $ $

6 Boulders 100 EA $ $

7 Precast Concrete Tables 4 EA $ $

8 20x20 Cabanas 2 EA $ $

9 Parking Stops 17 EA $ $

10 Trailer Parking Delineators 8 EA $ $

11 Lignosulfonates - stabilization 3450 SY $ $

12 Concrete 6in slab with reinforcement - Parking 1 LS $ $

13 Concrete 4in slab - Walkway 1 LS $ $

14 18 in 30 ft culvert with flared end sections 2 EA $ $

15 Kiosk - 3 Panel 1 EA $ $

Total Bid: $ (all or none)