A04_Rip_Rap_SOW_Cross_Creeks_NWR.pdf
PDF 161 KB Posted
- Attached to
- RIP RAP MATERIALS FWS CROSS CREEKS NWR
- Solicitation number
- 140FS326Q0037
About this file
This is a Statement of Work (SOW) from the U.S. Fish and Wildlife Service for the supply and delivery of rip rap limestone material to Cross Creeks National Wildlife Refuge in Dover, Tennessee. The Refuge is completing a boat ramp replacement project along the Cumberland River and requires approximately 500 tons of 12-inch to 16-inch rip rap limestone to armor the new boat ramp structure. The material will protect the ramp from flood events and wave action while facilitating shoreline stabilization and soil conservation. The contractor must supply all labor necessary to deliver the material and spot dump it at the gravel parking area associated with the Iron Bridge Boat Ramp (coordinates: 36.4761° N, 87.7345° W) at the direction of refuge staff.
The contract performance period extends from the award date through June 30, 2026. Material deliveries must occur Monday through Friday between 7:00 a.m. and 3:30 p.m., excluding recognized federal holidays. The contractor may request prior coordination with refuge staff for deliveries outside regular business hours or on weekends. The federal agency responsible for this procurement is the U.S. Department of the Interior, Fish and Wildlife Service.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140FS326Q0037.pdf | ||
| Sol_Clauses_Q2.pdf | ||
| Map.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior
FWS CROSS CREEKS NWR
643 WILDLIFE ROAD
DOVER TN 37058-6136
Statement of Work (SOW)
Supply and delivery of 12-inch to 16-inch Rip Rap limestone for Cross Creeks National Wildlife
Refuge
1.0 Background
The U.S. Fish and Wildlife Service Cross Creeks National Wildlife Refuge (Refuge) located at
643 Wildlife Road, Dover, TN is in the final stages of a boat ramp replacement project along the
Cumberland River. The Refuge is in the process of replacing an aged and damaged boat ramp that provides access to the Cumberland River and Lake Barkley. This project is critical keep this asset available to the public and facilitate accessibility. The final step is to armor the side of the new ramp with Rip Rap material to protect the ramp from future flood events and wave action from the Cumberland River. Armoring will also facilitate shoreline stabilization and soil conservation.
2.0 Scope
The Refuge expects to use approximately 500 tons of 12-inch to 16-inch Rip Rap limestone material to armor the boat ramp. The Contractor shall supply and deliver this material and supply all labor to deliver the material which is to be spot dumped at the direction of the refuge staff on site at the time of delivery. Delivery location is in the gravel parking area associated with the Iron Bridge Boat Ramp (36.4761° N, 87.7345° W).
3.0 Period of Performance
The Performance Period of this contract is from award date through June 30, 2026. Material is expected to be delivered Monday – Friday from 7:00 AM through 3:30 PM. Later hours and weekends may be permitted with prior coordination with refuge staff on delivery.
3.1 Hours of Operations
Delivery shall be during regular business hours which are as 7:00 a.m. to 3:30 p.m. Monday thru
Friday except recognized Federal holidays. Later hours and weekends may be permitted with prior coordination with refuge staff on delivery.