This is a Statement of Work for the installation of a non-motorized swing gate at Imperial National Wildlife Refuge in Martinez Lake, Arizona. The project is classified under NAICS 238990 (All Other Specialty Trade Contractors) and aims to improve access management, site security, and operational control at the refuge through installation of a durable, low-maintenance swing gate consistent with refuge infrastructure standards.
The contractor shall fabricate and install one 20-foot swing gate using 3-inch square steel tubing with maintenance-free bearing-style hinges, excavate and construct a concrete footing for a 6-inch square steel hinge post, ensure smooth and unrestricted gate movement, install lock and latch components per drawing details, and maintain a clean and safe worksite while complying with refuge access protocols. The contractor must possess experience in steel fabrication, gate construction, concrete footing installation, welding, and steel fabrication, and hold any legally required state or local construction licensing. The period of performance runs from October 1, 2026 to March 15, 2027, with normal duty hours Monday through Friday from 7:00 a.m. to 4:30 p.m. Work must be scheduled to avoid sensitive wildlife activity periods, extreme heat conditions, and conflicts with other refuge projects while accounting for concrete curing times. The government will provide gate design drawings and lock-cap/hinge details, and the contractor must return all government-furnished information upon project completion. Acceptance is contingent upon compliance with fabrication drawings, smooth and secure gate operation, correct dimensions and concrete footing installation, and quality of welding, alignment, and finish, with the government reserving the right to inspect all work prior to acceptance. The contractor must submit final as-built notes in electronic format, manufacturer or fabricator specifications for hinges and steel tubing, and warranty documentation for supplied materials.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B12_Letter_of_Commitment.pdf | ||
| Sol_140FS226Q0198.pdf | ||
| B03_Wage_Determination_2015-5475__revision_28__Yuma_County__AZ.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Type of Service or Construction (NAICS): 238990 – All Other Specialty Trade Contractors
Title of Project: Installation of Non-Motorized Swing Gate
1. General
1.1 Installation of a non-motorized gate at the Imperial National Wildlife Refuge, 12812 Wildlife
Way, Martinez Lake, Arizona 85365 at specified location within the refuge boundaries.
1.2. The purpose of this project is for the construction/installation of one (1) non-motorized swing gate to improve access management, site security, and operational control at the Refuge by installing a durable, low-maintenance swing gate consistent with refuge infrastructure standards.
The gate supports ongoing facility and habitat management needs.
1.3 Contractor Qualifications:
Contractor shall:
• Possess experience in steel fabrication, gate construction, and concrete footing installation.
• Employ staff knowledgeable in welding, steel fabrication, and hinge alignment.
• Hold any legally required state or local construction licensing.
2. Place of Performance and Period of Performance
2.1 Place of Performance: Imperial National Wildlife Refuge, Martinez Lake, Arizona 85365, Mesquite Overlook (33.016941, -114.498887).
2.2 Period of Performance
Start Date: October 1st, 2026
End Date: March 15th, 2027
Work must be scheduled to avoid sensitive wildlife activity periods, extreme heat conditions, or conflicts with other refuge projects. Concrete curing times must be accounted for
2.3 Normal duty hours Monday through Friday 7:00 a.m. - 4:30 p.m. In the event of emergencies, Contractor shall provide contact information.
2.4 Non duty hours include week nights, weekends, and Government holidays (New Year’s
Day, Martin Luther King JR.s’ Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day, Christmas Day).
3. Scope
3.1 Technical Requirements
Contractor shall
• Fabricate a 20’ swing gate using 3” square steel tubing
• Install maintenance-free bearing-style hinges.
• Excavate and construct a concrete footing suitable for a 6” square steel hinge post.
• Install and plumb the hinge post and mount gate ensuring smooth, unrestricted movement.
• Install lock and latch components consistent with drawing details.
• Attend a pre-construction coordination meeting with refuge staff.
• Maintain a clean and safe worksite; comply with refuge access protocols.
• Provide all equipment, materials, tools, and incidentals required.
While recommended specifications are provided for reference, we invite vendors to propose the most suitable non-motorized gate solution for the project. Vendors are encouraged to recommend products, designs, or configurations that best meet the operational needs, site conditions, and long-term durability requirements of the Refuge BAR Project Site Gate. Please include supporting rationale, technical details, and any relevant references that demonstrate the effectiveness of your proposed solution.
Key Points to Address:
• Why your recommended gate is optimal for this site and purpose
• Materials, design features, and installation requirements
• Maintenance, longevity, and cost-effectiveness
• Compliance with applicable standards and site constraints
We value innovative and practical recommendations that enhance project outcomes. Your proposal should clearly articulate the advantages of your suggested gate solution compared to standard options.
4. Deliverables and Delivery Schedule
4.1 Deliverables
• Completed installation of non-motorized 20’ swing gate.
• Installed 6” square post in concrete footing.
• Properly aligned, functional hinges and locking hardware.
• Site restored and cleared construction debris.
4.2 Documentation
Contractor shall provide:
• Final as-built notes (electronic format).
• Manufacturer or fabricator specifications for hinges and steel tubing.
• Warranty documentation for supplied materials.
5. Government-Furnished Equipment (GFE) / Government-Furnished Information (GFI)
5.1 GFE/GFI
• Refuge will provide gate design drawings and lock-cap/hinge details.
• No GFE equipment will be provided.
5.2 Limitations: Contractor must protect all GFI drawings and return them upon project completion.
6. Evaluation and Acceptance
6.1 The contractor will be evaluated as detailed herein. Government acceptance is contingent upon:
• Compliance with fabrication drawings
• Smooth and secure gate operation
• Correct dimensions and concrete footing installation
• Quality of welding, alignment, and finish
Government reserves right to inspect all work prior to acceptance.
7. Quality Control / Quality Assurance
7.1 QC Requirements
Contractor shall maintain QC procedures meeting industry standards including weld inspection, hardware alignment verification, and concrete installation quality.
7.2 QA Measures
• Government inspection of footing, post placement, gate installation, hinges, and lock operation.
• Corrections must be completed at contractor expense if work does not meet specifications.
9. Technical Coordinator
9.1 Primary
Name: Matt Miles
Title: Facilities Operator Specialist
Address: Imperial National Wildlife Refuge, Yuma, AZ 85364
Phone: (928) 276-5024
Email: matthew_miles@fws.gov
9.2 Secondary
Name: Annalily Lopez
Title: Wildlife Refuge Specialist
Address: Imperial National Wildlife Refuge, Yuma, AZ 85364
Phone: 928-430-0701
Email: annalily_lopez@fws.gov
Current site photos: