A04_RFQ_SOW_Gravel.pdf

PDF 98 KB Posted

Attached to
OK-DEEP FORK NWR-LEVEE GRAVEL SUPPLY, DELIVERY, AN
Solicitation number
140FS226Q0149
Issued by

About this file

This is a Statement of Work (SOW) for furnishing and delivering approximately 900 tons of road base material to Deep Fork National Wildlife Refuge in Okmulgee, Oklahoma. The material requirements consist of 600 tons of 1.5" limestone crusher run and 300 tons of #57-2" limestone clean aggregate, which must conform to State Department of Transportation Standard Specifications for Road and Bridge Construction. Material substitutions are prohibited without prior written approval from the Contracting Officer. The material shall be free of clay, organic matter, debris, asphalt, brick, concrete, and other deleterious substances.

Delivery must occur at 21680 HWY 75, Okmulgee, OK 74447, with the contractor using end dump type trailers and maintaining absolutely no turnarounds except in designated areas. The contractor must provide a price per ton that includes all labor, equipment, materials, weighing, testing, transportation, overhead, profit, and taxes. Material shall be weighed on platform scales at the contractor's expense or on public scales by certified weighmasters, with weight tickets accompanying each load. A written notice of at least 14 calendar days before delivery is required, with all deliveries to be completed within 10 calendar days of the requested delivery date and no later than October 9, 2026. Contractor activities are limited to refuge hours of operation (7:00 a.m. to 3:30 p.m., Monday through Friday), and contractors must comply with OSHA Safety and Health Standards (29 CFR Part 1926), maintain designated roads, obey posted speed limits, and perform daily housekeeping. The government reserves the right to reject material that does not meet specifications, contains excessive fines or oversized rock, is contaminated, or is delivered without certified weight tickets; rejected material must be removed and replaced within five calendar days at no additional cost. The contractor must demonstrate sufficient production capacity and transportation resources at quote submission to perform the contract within the required schedule.

View the file

Other files

File Type Posted
B06_Supplier_commitment_Verification_Form.pdf PDF
Sol_140FS226Q0149.pdf PDF
A04_Map_GravelDropOffLocation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL INFORMATION AND EQUIREMENT’S PART 1: GENERAL

1.1 PROJECT DESCRIPTION

A. Furnish, deliver and stockpile approximately 900 tons of road base material, including:

1. 600 tons of 1.5” limestone crusher run.

2. 300 tons of #57-2” limestone clean.

Material substitutions are not permitted without prior written approval from the Contracting Officer.

The material shall conform to the applicable State Department of Transportation Standard Specifications for

Road and Bridge Construction for 1.5 inch Limestone Crusher Run and No.57 Limestone Clean Aggregate.

Material shall be free of class, organic matter, debris, asphalt, brick, concrete, or other deleterious substances.

Delivery Location:

Deep Fork National Wildlife Refuge (NWR) approximately 40 miles from Tulsa, Ok on HWY 75 (See Delivery

Location Map).

B. Deliver and stockpile material at 21680 HWY 75, Okmulgee, OK 74447.

C. Delivery POC: Site Visit. Contact Mike Hames (918) 752-7255. Mike_Hames@fws.gov.

D. Delivery Vehicles. Contractors must use end dump type trailers. Absolutely no turnarounds except in designated areas.

E. Delivery Schedule. A written notice at least fourteen (14) calendar days before the requested delivery date will be provided with a completion date no later than October 9, 2026.

Contractor shall complete all deliveries within ten (10) calendar days after the requested delivery date unless otherwise approved by the Contracting Officer.

1.2 PRICE.

A. Contractor must provide a price per ton.

B. Costs of all required work including labor, equipment, materials, weighing, testing, transportation, overhead, profit, and contractor owed taxes, are to be included in the prices bid in the schedule for which the work is required.

C. Measurement for Payment: Material shall be weighed on platform scales furnished at the Contractor’s expense or on public scales, provided that weight tickets are prepared by certified weighmasters. Weight tickets shall include, at a minimum, the date, truck number, gross weight, tare weight, net weight, time of weighing, and signature of certified weighmaster. Payment will be made for gravel at the unit price bid per ton in the schedule. Payment will be made for only quantities listed in the schedule.

1.3 CODE COMPLIANCE

Comply with the following listed codes and standards.

OSHA Safety and Health Standards for the Construction Industry (29 CFR Part 1926).

1.4 PERMITS

Contractor is responsible for any other permits needed.

1.5 UTILITIES

Power and water is not available at the site. The Contractor shall make all arrangements to provide power and water if needed for its operations.

1.6 USE OF PREMISES

A. Contractor activities are limited to Refuge hours of work: 7:00 a.m. to 3:30 p.m., Monday through Friday.

Work outside these hours or on weekends or Federal holidays is not permitted unless approved in writing by

Mike Hames.

B. Remove surplus waste materials, trash, and debris, and legally dispose of them off Refuge's property.

C. Daily housekeeping is required to ensure trash and debris do not leave site or affect nearby areas.

D. Contractors must stay on designated roads.

E. Contractor must obey all posted speed limits while on the Refuge property.

mailto:Mike_Hames@fws.gov

1.7 SUBMITTALS

A. Product data for base material.

B. Weight tickets for all materials. Tickets shall accompany each individual truckload at the time of delivery.

PART 2 - PRODUCTS

2.1 BASE MATERIAL

A. Provide hard, durable particles or fragments of crushed stone, crushed slag, or crushed gravel.

B. Crushed concrete is not acceptable.

C. Provide weight tickets to the on-site Government representative with each load of gravel delivered for the work. Weight tickets shall include, at a minimum, the date, truck number, gross weight, tare weight, net weight, time of weighing, and signature of certified weighmaster.

PART 3 - EXECUTION

3.1 COMPLIANCE

A. Comply with specified codes and standards to ensure safe and satisfactory project completion.

3.2 INSPECTION AND ACCEPTANCE

A. Government inspection at delivery does not constitute final acceptance.

The government reserves the right to reject material that:

• Does not meet specification

• Contains excessive fines

• Contains oversized rock

• Is contaminated

• Is delivered without certified weight tickets

Rejected material shall be removed and replaced within five (5) calendar days at no additional cost.

3.3 PERFORMANCE

A. The Contractor shall have sufficient production capacity and transportation resources available at the time of quote submission to perform this contract within the required schedule. Failure to obtain material from a proposed supplier after award shall not relieve the Contractor of its obligation to perform.

End.