This Statement of Work (SOW) details a geothermal repair project for the Rocky Mountain Arsenal (RMA) Visitor Center, located at 6550 Gateway Road in Commerce City, Colorado. The project involves repairing two identified leaks in the mechanical room of the 12,467 sq ft building, which has a Geothermal Heat Pump system comprising 25 Vertical Well Loop Lines (400' deep). The contractor will be required to replace flange gaskets and insulation around the leaking pipes, and conduct a flush/purge and charging of the geothermal system.

The project is scheduled for 60 calendar days, with key milestones including an initial kickoff conference within 7 days of contract award, a written investigation report due 45 days after the initial conference, and final document execution by day 60. Designated officials include the Project Architect Carl Loescher, Alternate Project Engineer Eddie Dunn, and RMA Refuge Manager Davids Lucas. Attached documents include site maps, floor plans, photos of leaking pipes, a pressure test report, and mechanical drawings. The project is being managed by the U.S. Fish and Wildlife Service Region 6.

View the file

Other files

File Type Posted
Sol_140FS225Q0100.pdf PDF
A04_RFQ_Photos.pdf PDF
B12_Pricing_submisssion.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

US FISH AND WILDLIFE SERVICE REGION 6

Rocky Mountain Arsenal Visitor Center Geothermal Repair of the Geothermal Heating Systems

Project #25-028 April 18, 2025

I. PROJECT BACKGROUND

The Rocky Mountain Arsenal (RMA) National Wildlife Refuge is one of the largest urban refuges in the country, 14,904 acres. It is a sanctuary away from the hustle and bustle of busy urban life where time moves at nature's pace. With its expansive views, wildlife viewing opportunities, and recreation activities, it's easy to take a nature escape. RMA National Wildlife Refuge was established in 2004, in part, to protect our national symbol, the bald eagle. The land has a unique story - it has survived the test of time and transitioned from farmland to war-time manufacturing site, to wildlife sanctuary. It may be one of the finest conservation success stories and a place where wildlife thrives.

The RMA Visitor Center is a 12,467 Sq Ft building built in 2011 and has a Geothermal Heat Pump system comprised of (25) Vertical Well Loop Lines (400’ deep) located on the North side of the building (Re: attached drawings).

A recent pressure test of the system identified (2) leaks inside the mechanical room (Re:

Photos and Pressure Test results) and determined that a flush and purge of the system is required.

II. PROJECT SCOPE

The contractor shall repair the (2) identified leaks inside the mechanical room by replacing the flange gaskets and insulation around the (2) leaking pipes as needed and conduct a flush / purge and charging of the geothermal system.

Site Location:

1. Rocky Mountain Arsenal (RMA) Visitor Center: 6550 Gateway Road, Commerce City, CO 80222.

III. ADDITIONAL INFORMATION

Access to site will be arranged with the Refuge Manager. Utility locates are the responsibility of the contractor.

IV. CONFERENCES AND REVIEWS

The Initial Conference shall be held within seven (7) days of Notice to Proceed as directed by the Contracting Officer.

VI. SCHEDULE

Milestone Estimated Interval/ Duration in Calendar Days

Cumulative Time

Award Contract Task Order Award Date (Time 0) 0 Initial Kickoff Conference 7 days after Award Date 7 Title I: Investigation and Document Preparation Written Report with Investigation and Analysis Findings Received by USFWS

38 days after Initial Kickoff Conference

Written Report Review Conference

7 days after Written Report Received by USFWS

Final Documents Executed 8 days after Final Design Documents Completed

TOTAL 60 days

VII. DESIGNATED OFFICIALS

A. U.S. Fish and Wildlife Service, Contracting Officer Phone: TBD E-Mail: TBD

B. Project Architect

Carl Loescher Phone: 303-335-6651 E-Mail: carl_loescher@fws.gov

Alternate Project Engineer Eddie Dunn Phone: 719-225-5014

E-Mail: edward_dunn@fws.gov

C. RMA Refuge Manager Davids Lucas Phone: 303-729-2202 E-Mail: david_c_lucas@fws.gov

VIII. ATTACHMENTS

1. RMA Visitor Center Site Map

2. Visitor Center Floor Plan

3. Photos of leaking pipes in Mechanical Room

4. Pressure Test Report

5. Visitor Center Mechanical Drawings

END OF STATEMENT OF WORK

Binder1.pdf
A04 SOW - RMA VC Geothermal Repair.pdf
Milestone:
Award Contract:
0:
7:
Title I Investigation and Document Preparation:
38 days after Initial Kickoff Conference:
45:
52:
60:
Final Documents ExecutedRow1:
60 days: