A04_Project_Specifications.pdf

PDF 13 MB Posted

Attached to
Maintain Culverts & Guardrails, Lake Mead, NV, AZ
Solicitation number
140P8122Q0037
Issued by

View the file

Other files

File Type Posted
Sol_140P8122Q0037_Amd_0001.pdf PDF
B09_Clarifications_0001.pdf PDF
B11_Site_Visit_Sign_In_Sheet_0001.pdf PDF
B08_Site_Visit_Map.pdf PDF
B08_Contract_Bid_Schedule.pdf PDF
B08_Invoice_Payment_Request.docx DOCX document
Sol_140P8122Q0037.pdf PDF
B03_General_Decision_AZ_20220008.pdf PDF
B08_Release_of_Claims.pdf PDF
B03_General_Decision_NV20220012.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LAKE MEAD NATIONAL RECREATION AREA

BOULDER CITY, NEVADA

MAINTAIN PARKWIDE BRIDGES, CULVERTS AND GUARDRAILS

LAKE – 307191

PROJECT SPECIFICATIONS

NATIONAL PARK SERVICE

March 30, 2022

LAKE 317191 Page 2 of 46

DIVISION 1 GENERAL REQUIREMENTS

SECTION 01110 SUMMARY OF WORK

1.1 EXISTING CONDITIONS

The Project location is in the Lake Mead National Recreation Area. The sites are located in the Katherine Landing area, Arizona, along Lakeshore and Northshore Roads in Nevada and in Willow Beach in Arizona.

This project will repair damaged guardrail sections that have been damaged by errant vehicles. This project will also remove vegetation growing within the roadway corridor that can block a driver field of vision. This project will repair erosion issues caused by drainage.

This project will clean out clogged pipes resulting from flood conditions.

1.2 GENERAL PROJECT STATEMENT

A. The project requires construction services to repair 2 sections of damaged guardrail.

B. This project requires services to remove vegetation from the roadway medians and shoulders.

C. This project requires the services to repair 2 shoulder washouts from drainage failures

D. This project requires the cleanout of 3 drainage pipe clogged from flood debris.

E. All associated tools, transportation, traffic control and material disposal shall be included.

F. A site visit will be scheduled for a pre-bid visit with the interested respondents to show a representative sample of the work. Every location is not expected to be visited.

1.3 SCOPE OF WORK

The scope of work for this contract consists of:

A. See pictures at the end of these specifications for existing site conditions and visual site conditions.

B. See Location Maps at the end of the specifications for locations of the sites.

C. Onsite – Clear the site and mobilize.

D. Work on the Guardrails consists of the following:

1. Northshore Road

i. Remove and replace 8 treated wood posts.

ii. Remove and replace 8 treated wood offset blocks.

iii. Remove and replace 6 sections of Corten W-beam guardrails.

iv. Replace guardrail reflectors as needed

LAKE 317191 Page 3 of 46

2. Davis Dam Road

i. Remove and replace end unit to match existing.

ii. Steel to be Corten or dipped galvanized W-beam guardrails

iii. End units use wooden posts. Damaged wooden posts to be removed.

Replace guardrail reflectors as needed

E. Work on cleaning brush from the Medians and Guardrails consist of the following:

1. Remove all vegetation in the median locations shown on the location maps. This is mainly the brush, trees and larger vegetation. Removed, not trimmed.

2. Remove vegetation around the guardrails from the face of guardrail to 3 feet behind the guardrail. Removed, not trimmed.

3. Contractor to dispose of the materials outside of the park boundaries.

4. See locations maps and photos for locations and site examples.

F. Work on repairing the slope erosion consists of the following:

1. Repair the slope erosion by placing soil and riprap in the eroded areas. Properly sized riprap shall be placed on the surface to prevent further erosion. Place the final elevation of the riprap higher than the existing gabion basket slope protection to promote the water flowing in the designed channel.

2. Remove the vegetation that is blocking the flow of water down the channel.

3. Vegetation shall be properly disposed of outside the park boundaries.

4. Sections of guardrail may be removed to allow easier access to the project site.

G. Work on cleaning out the pipes at Willow Beach consists of the following:

1. Three of the existing Four pipe crossing are clogged with flood debris mainly rocks. All the pipes shall be cleaned out of the pipes.

2. The Pipes are 36” diameter reinforced concrete pipes with concrete headwalls at each end.

3. The pipes are 72’ in length.

4. Access to the channels is available.

5. Temporary lane closures will be allowed following the standard closures as defined.

6. The debris in the transported to the Jumbo Wash area and disposed of. Jumbo Wash is the side road as you enter the Willow Beach developed area before the Paddlecraft beach. Proceed approximately ¼ mile up that road and dispose of the material with other piles of material.

LAKE 317191 Page 4 of 46

H. Contractor shall provide all equipment and staff to conduct safe traffic control operations while performing the needed work. Lane closures will be allowed with the proper flagging operation and work zone warning signs. Stoppage of traffic should not exceed 15 minutes.

I. Materials and Equipment: The Contractor shall provide all materials, equipment, and labor required to perform the work described in this specification. All materials and equipment shall be NEW and Contractor furnished from outside the park. A schematic, equipment plans and equipment specifications shall be submitted to the NPS for approval before construction and installation. Follow the included approval submittal process.

Construction shall follow those approved submittals. Submit to the COR for review and approvals.

J. All excess material that have been removed/demolished or was unused shall be disposed of outside of the park boundaries.

K. Other Items related to the Installation:

1. Items shown on the plans may vary in quantity and location. Field verify all items.

2. Notify the COR of construction phasing.

1.4 LOCATION

A. Project Location: Northshore and Lakeshore Roads in Nevada, Clark County, Willow Beach Developed area east of Hoover Dam in Mohave County, Arizona and Katherine Landing near Bullhead City Arizona in Mohave County; within Lake Mead National Recreation Area

(LAKE NRA).

1.5 PERFORMANCE PERIOD: The project schedule is based on calendar days from the "Notice to Proceed" (NTP) date.

The total performance period for this project is 120 calendar days. On Site Construction work to be started within 10 days of the NTP.

1.6 FIELD VERIFICATION

A. The Contractor shall field verify all new and existing dimensions affecting the work in this contract before ordering any materials, equipment, or parts.

1.7 CONTRACTOR'S USE OF PREMISES

A. The sites are located in public areas.

B. Contractor shall at all times conduct his operations to ensure the least inconvenience to the recreation area visitors and employees.

C. The contractor shall at all times make the job site safe to the public.

D. Traffic control shall be provided by the contractor. Flaggers and Advance warning signs shall be used when performing work in the roadway or along the roadway edge.

LAKE 317191 Page 5 of 46

E. Preservation of Natural Features: Confine all operations to work limits of the project.

Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.

F. Hauling Restrictions: Comply with all legal load restrictions in the hauling of materials. Load restrictions on park roads are identical to the state load restrictions with such additional regulations as may be imposed by the Park Superintendent.

G. Work Limits: The Contractor shall be confined to conduct his work to job site area and work limits as shown on drawings or approved by the Contracting Officer. Contractor shall be responsible to pay for rehabilitation work for any resource damage outside authorized work limits.

H. Care shall be taken to ensure that fuel, oil and other spills do not occur. If spills occur, cleanup will be completed at no additional expense to the Government.

1.8 HOURS OF OPERATION

A. Hours of operation shall be Monday through Friday between the hours of 7:00 AM and 5:00 PM unless alternate hours are approved by the Contracting Officer and the Contracting Officers Representative (COR). Requests for changes shall be submitted to the COR.

B. Due to the location of the construction sites and vicinity of the public, these hours should be adhered to including idling of equipment, starting of equipment, backup alarms of equipment and delivery of equipment in hours outside of the approved times.

1.9 SPECIAL PROVISIONS

A. Time Constraints:

1. Quiet Hours in the park are from 10:00 PM until 6:00 AM. The Contractor shall not operate equipment or make loud noise between these hours.

2. No work will be performed on weekends or on federal holidays without the advanced, written authorization of the CO.

3. Any request to work outside of normal working days and hours shall be submitted to the CO and COR at least 3 business days before the requested event for authorization.

B. Park Entry:

1. The contractor shall furnish a list of personnel with phone contact information.

Vehicles associated with the contractor shall be waived entrance fee upon entering in a marked company vehicle or by providing the names of employees entering in personal vehicles. The entrance fee is waived only for the purpose of reporting directly to a specific work location. Any deviation for recreational purposes is subject to payment of required entrance fees.

C. Park Regulations:

LAKE 317191 Page 6 of 46

1. Ensure all personnel (contractors, subcontractors, and vendors) entering or working in the park are familiar with and obey all park regulations. Law enforcement rangers will intervene if they perceive any unsafe or unlawful activity.

D. Emergency Medical and Accident Reporting:

1. All accidents and incidents shall be reported to the CO and COR.

a. The Contractor or subcontractor shall contact Park Dispatch for any medical emergency or traffic accident occurring within the Park.

Emergency number: Dial 911 as needed.

Park Dispatch: 702-293-8932 EMERGENCY Park Dispatch is called so that the entrance station will be prepared should any emergency vehicles (e.g. ambulance) need to enter the Park and so that any available Emergency Medical Services personnel in the Park might respond until such time as the ambulance arrives.

b. The Contractor or subcontractor is required to report ANY personal injury and / or property damage incident occurring within the park. This report must be made to a Law Enforcement Ranger at the first available opportunity before leaving the park:

Park Dispatch: 702-293-8998 NON-EMERGENCY

E. Logistics:

1. The public access in the public areas shall always be maintained. NPS Employee access should be maintained to all facilities during construction.

2. The Contractor shall be responsible for the security of all materials staged/stored on LAKE NRA property.

3. Roads shall remain opened to the public. Traffic delays shall be limited to a maximum stopped time of 15 minutes.

F. Environmental Compliance Requirements:

1. The Contractor and all employees working on the Project will be required to take “Desert Tortoise Awareness Training” which will be provided by the Government at no cost to the Contractor. This training will take approximately 30 minutes or less.

2. The Contractor’s employees shall never handle a desert tortoise.

3. The Contractor and employees shall immediately report the presence of any desert tortoise to the COR.

4. Herbicides shall not be used in or around the Project site.

5. The tortoise training contact for this project is listed below. For questions or additional information, contact Clayton Merrill or Kelly Wallace:

Clayton Merrill Cell Phone: 702-371-7548

LAKE 317191 Page 7 of 46

Kelly Wallace Cell Phone: 702-371-9673

G. Equipment Washing:

1. Equipment washing is required to preclude the introduction and spread of non-native species into the Park. Therefore, all equipment shall be cleaned outside of the Park before entering the Park. Equipment leaving the park for any reason must be re-washed before returning to the job site. Equipment that is moved from the job site, but remains within the original developed area, need not be re-washed prior to returning to the job site. It is also known that there are areas inside the Park that have non-native plants and weed species infestation. Therefore, before equipment can be moved from one developed area to another, it must be washed at the location identified on the Site Plan (see attached site plan and mileage table) to ensure weeds are not spread from one developed area to another.

2. The Contractor shall clean all equipment prior to the equipment entering Lake Mead National Recreation Area. It is recommended that cleaning be accomplished by hot water, pressure washing, using water only. All equipment surfaces shall be cleaned, with special emphasis given to the undercarriage. This includes, but is not limited to:

wheel wells, bumpers, radiator grills, springs, shock absorbers, wire harnesses, skid plates, oil pans, axles, frame ledges, buckets, tracks, belly pans, etc. Cleaning shall also include all dirt and debris inside the cab, or operator area. A Shop-Vac or commercial car wash vacuum system may be used for operator compartments, provided the method used effectively removes all visible debris. Equipment cleaning is for the purpose of removing any seed and soil accumulations to prevent the potential spread of non-native plant and weed species from outside the park to locations inside the park. Cleaning shall be performed in a manner that will reasonably remove all visible soil, plant and other foreign material. All equipment that requires washing shall be inspected by government personnel, or contractors/partners assigned to this duty, to ensure compliance.

3. Equipment that requires washing is generally defined as track or rubber-tired machinery intended for use primarily off-road. Examples include backhoes, loaders, earthmovers, graders, rollers, bulldozers, water trucks, etc; or four wheel drive or passenger vehicles that are driven in off road areas. Equipment may also be stationary, such as a material screening plant, conex storage containers, or a mobile office (mobile offices may be cleaned in the same manner as operator compartments as outlined in paragraph 2). The equipment is generally under the direct control of the contractor or sub-contractors, is likely to remain on the construction site for an extended period of time, and may contain adhered soil and seed from other project sites.

4. Equipment/Vehicles that do not require washing are defined as those normally used for highway driving only, and travel primarily on paved surfaces and well maintained service roads and parking areas (this includes approved staging areas). Examples include semi-tractor trailers, dump trucks, concrete trucks, pickup trucks, fuel trucks, LAKE 317191 Page 8 of 46 service trucks, etc. These delivery and passenger vehicles are generally not under the direct control of the contractor, have no earth-moving function, and do not remain on the project site. These vehicles have a low probability of carrying adhered soil and seed from other projects. However, every vehicle and piece of equipment is subject to rejection from entering the park if there are obvious signs (covered in mud, plant material adhered to it, etc.) that it could be transporting non-native species into the Park.

H. Post Equipment Washing Inspections:

1. All equipment subject to inspection will be inspected by government, or other authorized personnel prior to leaving the paved surface or designated washing area identified on the Site Plan. Equipment determined to be free of soil or mud based on visual examination by government personnel will be cleared to enter the project area, or proceed to other areas of the park as appropriate. The Contractor shall arrange for needed inspections by contacting the NPS inspection office no less than 5 working days prior to the inspection. Such contact shall provide sufficient time to accommodate scheduling and travel to the site. Equipment not passing initial inspection must be rewashed outside the park at no additional expense to the government.

2. A list of government Inspectors for this project will be provided by:

Kelly Wallace Cell Phone: 702-371-9673

Clayton Merrill Cell Phone: 702-371-7548

1.10 DESIGNATED OFFICIALS

A. The NPS Project Manager (PM) and Contracting Officer's Representative (COR) will be:

Carl Bush PE, Lake Mead NRA Telephone: 702-293-8735 (w) 702-859-0194 (cell) E-mail: carl_bush@nps.gov

B. The Contracting Officer (CO) will be:

TBD

END OF SECTION 01010

LAKE 317191 Page 9 of 46

LAKE MEAD NATIONAL RECREATION AREA

FIGURE 1

Project Sites

LAKE 317191 Page 10 of 46

LAKE MEAD NRA DISTANCE CHART

FIGURE 2

LAKE 317191 Page 11 of 46

SECTION 01270 DEFINITION OF BID ITEMS

1.1 DESCRIPTION

A. The intent of this section is to explain, in general, what is and what is not included in a bid item, and the limits or cut-off points where one bid item ends and another begins.

B. If no bid item exists for a portion of the work, include the costs in a related bid item.

1.2 LIST OF ANTICIPATED BID ITEMS

A. Contract Price Item No.0010 – (Guardrails at Northshore Rd).

1. This price item consists of all necessary material, labor, and equipment required to replace guardrails, and associated civil material, labor and equipment.

2. No separate measurement will be made.

3. Payment will be made at the contract unit price.

B. Contract Price Item No.0020 – (Guardrails at Davis Dam Rd).

replace guardrails, and associated civil material, labor, and equipment.

C. Contract Price Item No.0030 – (Vegetation Removal along Lakeshore and Northshore Roads).

remove and dispose of vegetation and associated labor and equipment.

D. Contract Price Item No.0040 – (Repairing slope erosion on Northshore Road).

repair the erosion washout and provide associated labor, equipment and materials.

E. Contract Price Item No.0050 – (Pipe cleanout at Willow Beach).

repair the erosion washout and provide associated labor, equipment and materials.

END OF SECTION 01270

LAKE 317191 Page 12 of 46

Contract Bid Schedule

Contract Line Item Number

(CLIN)

Contract Line Item Title Quantity Unit of

Measure Total Price

0010 Repair Guardrails on Northshore Road 1 LS

0020 Repair Guardrails on Davis Dam Road 1 LS

0030 Vegetation removal along Lakeshore and Northshore Roads 1 LS

0040 Repairing slope erosion on Northshore Road 1 LS

0050 Pipe Cleanout at willow Beach 1 LS

Total Price for Bid 0010, 0020, 0030, 0040, LAKE 317191 Page 13 of 46

SECTION 01310 PROJECT MANAGEMENT AND COORDINATION

1.1 SUMMARY

A. This Section includes administrative provisions for coordinating construction operations on this project including, but not limited to the following:

1. Supervisory and administrative personnel.

2. Project meetings.

3. Coordination procedures.

1.2 SUPERVISORY AND ADMINISTRATIVE PERSONNEL

A. General: In addition to the project superintendent, the Contractor shall provide other supervisory and administrative personnel as required for proper work performance. This may include special personnel required for coordination of operations with subcontractors and material suppliers.

B. Staff roster:

1. Within 14 days after the NTP, the Contractor shall submit a list of staff assignments, including subcontractor personnel (if applicable), working at the job site. Identify each individual and their duties and responsibilities.

1.3 PROJECT MEETINGS

A. Submittals required prior to the Preconstruction Conference.

1. Letter designating the Project Superintendent.

2. Proposed construction schedule.

3. Schedule of values.

4. Accident prevention plan.

5. A list of Subcontractors for this project.

6. Written statements from subcontractors certifying compliance with applicable labor standard clauses.

7. Satisfactory evidence of liability insurance coverage and workman’s compensation for the Contactor and all subcontractors.

B. Preconstruction Conference: Once the contract is awarded, an initial orientation meeting will be scheduled for a time and date that is agreeable to the Government and Contractor and will be conducted in the Lake Mead Maintenance Building. Lake Mead personnel will be present to go over park specific requirements of the project with the Contractor and the Contractor’s supervisory and administrative team. The Notice to Proceed date will also be established at the Preconstruction Conference.

LAKE 317191 Page 14 of 46

1. Agenda: Items to be discussed will include but not be limited to:

1. Park Rules and Regulations.

2. General correspondence procedures.

3. Labor standards provisions.

4. Payroll reports.

5. Payments to the Contractor.

6. Acceptance/rejection of work.

7. Progress Meetings.

8. Subcontractors.

9. Documents required under contract.

10. Local emergency phone number.

11. Specifications and drawings.

2. Once the Notice to Proceed date has been established, the Contractor shall submit the proposed work schedule to the Government for approval.

1.4 COORDINATION PROCEDURES

A. Coordination: Coordinate the construction operations identified in the various Sections of this Specification to ensure the efficient installation of all materials and equipment.

1. Schedule construction operations in the proper sequence required to obtain the best results where installation of one part of the Work depends on installation of other components before or after its own installation.

2. Coordinate installation of different components with subcontractors and Government personnel to ensure maximum accessibility for required maintenance, service, and repair.

3. Make adequate provisions to accommodate items scheduled for later installation.

1.5 INSTALLATION SCHEDULE REQUIREMENT

A. Installation Baseline Schedule: Prepare Installation Baseline Schedule using computerized scheduling software.

1. Installation Baseline Schedule shall show submittal review, installation start date, work activities / staff resources, activity durations, major milestones, inspection dates, closeout activities, and project end date.

2. Establish procedures for updating Installation Baseline Schedule and for reporting progress. Coordinate procedures with progress meeting and payment request dates.

LAKE 317191 Page 15 of 46

3. Contracting Officer may request an updated Installation Schedule at any time to confirm progress of the work.

1.6 SCHEDULE OF VALUES

A. Submit a schedule of dollar values based on the Contract Bid Schedule. Include bond costs, mobilization, general condition costs, overhead, and profit in the total dollar value of unit price items and in the component parts of Work for each lump-sum item as described below. Do not include mobilization, general condition costs, overhead, or profit as separate items; however, payment for bond premiums can be made based upon evidence of payment to the surety. Bond premiums may be shown as a separate item.

B. Break down each lump sum Bid Item into component parts of Work for which progress payments may be requested. The total costs for the component parts of work shall equal the bid amount for the lump-sum item. The Contracting Officer may request data to verify accuracy of dollar values.

C. The total cost of all items shall equal the contract total, or 100%. The Schedule of Values will form the basis for progress payments. Each progress payment request shall include the overall percentage complete to that date.

END OF SECTION 01310

LAKE 317191 Page 16 of 46

SECTION 01330 SUBMITTALS

A. The intent of this section is to explain submittal requirements before and during construction.

B. This section also includes the requirements for properly handling "Substitutions" and

"Comparable Products" the Contractor submits as being "equal" to the product that has been specified.

1.2 SUBMITTAL AND APPROVAL PROCEEDURES

A. All submittals shall be transmitted to the COR, as original and three (3) copies, using National Park Service form CM-16, dated 4/00.

1. A copy of the form is included at the end of this Section.

2. No action will be taken on a submittal unless it is accompanied by a transmittal form.

3. All submittals shall be carefully reviewed by the Contractor prior to submission to the

Government to eliminate errors.

B. Content of the RFI or Submittal: Include a detailed, legible description of item needing information or interpretation and the following:

1. RFI/Submittal number, numbered sequentially.

2. Date.

3. RFI subject.

4. Specification Section number and title and related paragraphs, as appropriate.

5. Drawing number and detail references, as appropriate.

6. Contractor's suggested resolution. If Contractor's suggested resolution impacts the

Contract Time or the Contract Sum, Contractor shall state impact in the RFI.

7. Contractor’s signature.

8. Requested date for response.

9. Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.

a. Include dimensions, thicknesses, and details of affected materials, assemblies, and attachments on attached sketches.

C. Manufactures' Catalog Sheets: Submit only pertinent pages and mark each copy of standard printed data to identify products proposed for use. Submittal forms with attached Manufactures' Catalog Sheets that are not marked to identify products proposed for use will be disapproved by the COR and shall be resubmitted by the Contractor.

D. Manufactures' Installation Instructions: Provide one (1) complete set of instructions to the

COR and keep another complete set of instructions at the job site until substantial completion.

E. The Contractor shall forward submittals to the COR in accordance with the milestones.

LAKE 317191 Page 17 of 46

F. Lake Mead personnel will review and approve or disapprove and provide comment to submittals in as short a timeframe as possible, but not to exceed 7 calendar days.

G. Contracting Officer will not respond to RFIs submitted by other entities controlled by

Contractor.

H. Coordinate and submit RFIs in a prompt manner to avoid delays in the work.

1.3 REQUIREMENTS FOR APPROVED EQUALS

A. For each "Substitution" or "Comparable Product" the Contractor submits as being "equal" to the product that has been specified, the Contractor shall submit supporting documentation that includes:

1. Statement indicating why specified material or product cannot be provided.

2. Detailed comparison of the characteristics of the proposed item with that specified.

3. Changes required in other elements of the work because of the substitution.

4. Name, address, and telephone number of vendors.

5. Product data, including drawings, descriptions, fabrication, and samples as appropriate.

6. Manufacturer's literature regarding installation, operation and maintenance, schematics for electrical systems, and parts lists.

a. Describe availability of maintenance service and state a source of replacement parts and materials.

B. A request for approval constitutes a representation that the Contractor:

1. Has investigated the proposed item and determined that it is equal to or superior in all respects to that specified.

2. Shall provide the same warranties for the proposed item as for the item specified.

3. Has determined the proposed item is compatible with interfacing items.

4. Shall coordinate the installation of the alternate item and make all changes required in other elements of the work because of the substitution.

5. Wavier all claims for additional expenses the may be incurred as a result of the substitution.

C. If all of the requirements listed above are not met by the Contractor, the COR will disapprove the "Substitution" or "Comparable Product" request.

END OF SECTION 01330

LAKE 317191 Page 18 of 46

TRANSMITTAL - NATIONAL PARK SERVICE

LAKE 317191 Page 19 of 46

TRANSMITTAL CONTINUATION - NATIONAL PARK SERVICE

LAKE 317191 Page 20 of 46

SECTION 01360 ACCIDENT PREVENTION

A. After contract award and before the Pre-Construction conference, submit for review an

Accident Prevention Plan. The Contracting Officer will review the proposed Plan. If the plan requires any revisions or corrections, the Contractor shall resubmit the Plan within ten

(10) days. No progress payments will be made until the Plan is accepted.

1.2 SUBMITTALS

A. Accident Prevention Plan - The Plan shall be written to comply with OSHA and project requirements including but not limited to the following information/topics:

1. The name of the responsible supervisor who shall carry out the program.

2. Documentation of the personnel training program; both initial and continuing.

3. Weekly and monthly safety meetings.

4. First aid procedures.

5. Outline the work, associated hazards, protective measures, and the methods proposed to ensure property protection, safety of the public, National Park Service personnel, and Contractor's employees.

6. Planning and checklists for possible emergency situations.

7. A fire protection plan.

8. And a fall protection plan.

B. Daily Submittals: Submit Daily Quality Control Report showing all inspections and tests on the first workday following the date covered by the report.

C. Tests: Submit triplicate copies of complete test results not later than three calendar days after the test was performed. Submit failing test results and proposed remedial actions within four hours of noted deficiency.

D. Off Site Inspection Reports: Submit prior to shipment.

E. Progress Payments: If the CQC plan and Daily Quality Control Reports are not submitted in a timely manner, the Contracting Officer may retain an appropriate amount of the applicable progress payment.

1.3 QUALIFICATION OF EMPLOYEES

A. Ensure that employees are physically qualified to perform assigned duties in a safe manner.

LAKE 317191 Page 21 of 46

B. Do not allow employees to work whose ability or alertness is impaired because of drugs, fatigue, illness, intoxication, or other conditions that may expose themselves or others to injury.

C. Operators of vehicles, mobile equipment, hoisting equipment, and hazardous plant equipment shall be able to understand signs, signals, and operating instructions, and be capable of operating such equipment. Provide operating instructions for all equipment.

1.4 ACCIDENT REPORTING

A. Reportable Accidents: A reportable accident is defined as death, occupational disease, traumatic injury to employees or the public, fires, and property damage by accident in excess of $100. Notify Contracting Officer immediately in the event of a reportable accident. Within 7 days of a reportable accident, fill out and forward to Contracting Officer an Accident/Property Damage Report (Form CM-22). Form may be obtained from the Contracting Officer.

B. All Other Accidents: The Contractor shall report all other accidents to the Contracting Officer as soon as possible and assist the Contracting Officer and other officials as required in the investigation of the accident.

1.5 PERSONNEL PROTECTIVE EQUIPMENT

A. Meet requirements of National Institute for Occupational Safety and Health (NIOSH) and

OSHA.

B. Inspect personal protective equipment daily and maintain in a serviceable condition.

Clean, sanitize, and repair, as appropriate, personal items before issuing them to another individual.

C. Inspect and maintain other protective equipment and devices before use and on a periodic basis to ensure safe operation.

D. It is the Contractor's responsibility to require all those working on or visiting the site to wear necessary protective equipment at all times.

1.6 EMERGENCY INSTRUCTIONS

A. Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.

1.7 FIRST AID FACILITIES

A. Provide adequate facilities for the number of employees and the hazards associated with the types of ongoing construction work at the site.

1.7 SAFETY MEETINGS

A. As a minimum, conduct weekly 15-minute "toolbox" safety meetings. These meetings shall be conducted by a foreman and attended by all construction personnel at the worksite.

LAKE 317191 Page 22 of 46

B. Conduct monthly safety meetings for all levels of supervision. Notify the COR of meeting dates and times. These meetings shall be used to review the effectiveness of the Contractor's safety effort, to resolve current health and safety problems, to provide a forum for planning safe construction activities, and for updating the accident prevention program.

END OF SECTION 01360

LAKE 317191 Page 23 of 46

SECTION 01510 TEMPORARY SERVICES

A. The work of this section consists of providing temporary services required for Contractor's performance of the work of this contract.

1.2 GENERAL REQUIREMENTS

A. Temporary materials may be new or used but must be adequate in capacity for the required usage, must not create unsafe conditions, and must not violate requirements of applicable codes and standards.

1.3 SANITARY FACILITES

A. Provide and maintain temporary toilet facilities in accordance with State Health Department and National Park Service requirements.

B. Sufficiently lighted and ventilated toilet facilities in weatherproof, sight-proof, handicap accessible, sturdy enclosures with privacy locks.

1.4 FIRE PROTECTION EQUIPMENT

A. Extinguisher shall have a minimum UL rating of 2-A: 10-B:C.

1.5 TELEPHONE

A. No telephone service is available on site for Contractor's use. Make arrangements with Telephone Company and pay all costs.

1.6 WATER

A. Non-potable water for construction activity is available at no charge to the Contractor from Lake Mead and/or Lake Mohave. The Contractor shall provide all equipment and personnel required to draw water from the lake and transport it to the work site as part of the basic bid, at the Contractors expense. The Contractor shall coordinate the access point to the lake with the COR.

B. The Contractor may also request access to construction water from a park fire hydrant or yard hydrant. All such requests must be approved by the COR and comply with the following requirements/restrictions:

1. Only an approved spanner wrench shall be used to operate any fire hydrant. Any other type of wrench is strictly forbidden. Hydrants must be opened and closed slowly with an approved fire hydrant wrench. The Contractor shall be responsible for any damage to a fire hydrant caused by contractor personnel operating the hydrant, and shall be responsible for the cost of all repairs.

2. When filling any/all water trucks from a park fire hydrant, the Contractor shall ensure there is an air gap between the hose attached to the hydrant and the tank on the water truck. The air gap separation can be achieved by a metallic pipe permanently installed

LAKE 317191 Page 24 of 46 on the water transporting vehicle which will serve as the fill line or an air gap between the end of the fill line from the hydrant and the water transporting vehicle.

3. If the Contractor chooses not to use an air gap then a reduced pressure principle backflow assembly shall be required. The backflow unit shall be tested by a Licensed Tester and provided at the Contractors expense.

C. The Contractor shall furnish cool, potable water for construction personnel in locations convenient to work site.

1.7 SANITARY FACILITIES

A. Place portable toilets in approved locations secluded from public observation and convenient to the work site. Relocate as work progress requires.

B. Maintain and clean toilet facilities at least weekly.

C. Completely remove sanitary facilities on completion of work.

1.8 FIRE PREVENTION AND PROTECTION

A. Responsible person: A capable and qualified person shall be placed in charge of fire protection. The responsibilities shall include locating and maintaining fire protective equipment and establishing and maintaining safe torch cutting and welding procedures.

B. Hazard Control: Take all necessary precautions to prevent fire during construction. Do not store flammable or combustible liquids in existing buildings. Provide adequate ventilation during use of volatile or noxious substances.Spark Arresters:

1. Written determinations of periods and areas of potential fire hazard will be issued by Contracting Officer.

2. Equip all gasoline or diesel-powered equipment used during periods of potential fire hazards or in potential forest and grass fire locations with spark arresters approved by the U. S. Forest Service.

C. Service and Refueling Areas: Locate areas a minimum of 50 feet from buildings. Shut down equipment before refueling.

D. Smoking: Smoking within buildings or temporary storage sheds is prohibited.

E. Welding: Cutting by torch or welding shall be performed only when adequate fire protection is provided.

1.9 PROTECTION EQUIPMENT REQUIRED

A. Vehicles and Equipment: Provide one extinguisher on each vehicle or piece of equipment.

END OF SECTION 01510

LAKE 317191 Page 25 of 46

SECTION 01570 TEMPORARY CONTROLS

A. This Section includes administrative and procedural requirements for providing temporary controls.

1.2 HOUSEKEEPING

A. Keep project site neat, orderly, and in a safe condition at all times.

B. Provide enough containers for collecting construction debris and construction materials to be recycled.

C. Keep volatile wastes in covered containers.

1.3 DISPOSAL

A. Unless otherwise specified, all removed material becomes the property of the Contractor and shall be disposed of outside the park.

B. Immediately remove hazardous rubbish from project site. Place other construction debris in refuse containers at least daily. Dispose of refuse at least weekly, in a legal manner, at public or private dumping areas outside the park. Do not burn or bury refuse inside the park.

1.4 FIRE PROTECTION EQUIPMENT

A. Extinguisher shall have a minimum UL rating of 2-A: 10-B: C.

1.5 AIR AND WATER POLLUTION CONTROL

A. Take all necessary reasonable measures to reduce air and water pollution by any material or equipment used during construction.

B. Do not dispose of volatile wastes or oils in storm or sanitary drains.

C. Do not allow waste materials to be washed into streams or bodies of water.

1.6 WATER

A. Potable water is available nearby to the site. Make connections to existing facilities as needed. Facilities must be cleaned and maintained in a condition acceptable to the NPS.

At Substantial Completion, restore these facilities to condition existing before initial use.

Coordinate with COR for locations.

B. Toilets: Use of existing park toilet facilities will not be permitted.

LAKE 317191 Page 26 of 46

1.7 SECURITY AND PROTECTION FACILITIES INSTALLATION

A. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.

B. Cleaning of Equipment: The Contractor shall ensure that prior to moving on to the Project Area, all equipment, is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. Ensure that all equipment has been pressure washed and is free of exotic species prior to start-up of operations and moving of equipment to Project Area.

Equipment shall be considered free of soil, seeds, and other debris when a visual inspection does not disclose such material. Disassembly of equipment components or specialized inspection tools are not required.

END OF SECTION 01570

LAKE 317191 Page 27 of 46

SECTION 01600 PRODUCT REQUIREMENTS

A. This Section includes administrative and procedural requirements for selection of products for use in this Project; product delivery, storage, and handling; manufacturers' standard warranties on products; special warranties; product substitutions; and comparable products.

1.2 DEFINITIONS

A. Products: are items purchased for incorporating into the Work, whether purchased for this Project or taken from previously purchased stock. The term "product" includes the terms "material," "equipment," "system," and terms of similar intent.

1. Named Products: are items identified by manufacturer's product name, including make or model number or other designation shown or listed in manufacturer's published product literature that is current as of date of the Contract Documents.

2. New Products: are items that have not previously been incorporated into another project or facility, except that products consisting of recycled-content materials are allowed, unless explicitly stated otherwise. Products salvaged or recycled from other projects are not considered new products.

3. Comparable Products: are a product that is demonstrated and approved through the submittal process outlined in Section 01330 and have been proven to have the indicated qualities related to type, function, dimension, in-service performance, physical properties, appearance, and other characteristics that equal or exceed those of the specified product.

B. Substitutions: Changes in products, materials, equipment, and methods of construction from those required by the Contract Documents and proposed by Contractor that have been approved through the submittal process outlined in Section 01330.

C. Basis-of-Design Product Specification: Where a specific manufacturer's product is named and accompanied by the words "basis of design," including make or model number or other designation, to establish the significant qualities related to type, function, dimension, in-service performance, physical properties, appearance, and other characteristics for purposes of evaluating comparable products of other named manufacturers that have been approved through the submittal process outlined in Section 01330.

D. Manufacturer's Warranty: Preprinted written warranty published by individual manufacturer for a particular product and specifically endorsed by manufacturer to the Government.

E. Special Warranty: Written warranty required by or incorporated into the Contract Documents, either to extend time limit provided by manufacturer's warranty or to provide more rights for the Government.

1.3 PRODUCT DELIVERY, STORAGE, AND HANDLING

A. Deliver, store, and handle products using means and methods that will prevent damage, deterioration, and loss, including theft. Comply with manufacturer's written instructions.

LAKE 317191 Page 28 of 46

B. Delivery and Handling:

1. Schedule delivery to minimize long-term storage at Project site and to prevent overcrowding of construction spaces.

2. Coordinate delivery with installation time to ensure minimum holding time for items that are flammable, hazardous, easily damaged, or sensitive to deterioration, theft, and other losses.

3. Deliver products to Project site in an undamaged condition in manufacturer's original sealed container or other packaging system, complete with labels and instructions for handling, storing, unpacking, protecting, and installing.

4. Inspect products on delivery to ensure compliance with the Contract Documents and to ensure that products are undamaged and properly protected.

C. Storage:

1. Store products to allow for inspection and measurement of quantity or counting of units.

2. Store materials in a manner that will not endanger Project structure.

3. Store products that are subject to damage by the elements, under cover in a weather-tight enclosure above ground, with ventilation adequate to prevent condensation.

4. Store foam plastic from exposure to sunlight, except to extent necessary for period of installation and concealment.

5. Comply with product manufacturer's written instructions for temperature, humidity, ventilation, and weather-protection requirements for storage.

6. Protect stored products from damage and liquids from freezing.

1.4 PRODUCT WARRANTIES

A. Warranties specified in other Sections shall be in addition to, and run concurrent with, other warranties required by the Contract Documents. Manufacturer's disclaimers and limitations on product warranties do not relieve Contractor of obligations under requirements of the Contract Documents.

B. Special Warranties: Prepare a written document that contains appropriate terms and identification, ready for execution. Submit a draft for approval before final execution.

1. Manufacturer's Standard Form: Modified to include Project-specific information and properly executed.

END OF SECTION 01600

LAKE 317191 Page 29 of 46

SECTION 01770 CLOSEOUT PROCEDURES

1.1 DESCRIPTION

A. This Section includes administrative and procedural requirements for contract closeout, including, but not limited to, the following:

1. Inspection procedures.

2. Project Record Documents.

3. Operation and maintenance manuals.

4. Warranties.

5. Instruction of Government’s personnel.

6. Final cleaning.

B. Related Sections include the following:

1. Division 1, Section "Payment Procedures" for requirements for Applications for Payment for Substantial and Final Completion.

2. Division 1, Section "Construction Progress Documentation" for submitting Final Completion construction photographs and negatives.

1.2 SUBSTANTIAL COMPLETION

A. Preliminary Procedures: Before requesting inspection for determining date of Substantial Completion, complete the following. List items below that are incomplete in request.

1. Prepare a list of items to be completed and corrected (punch list), the value of items on the list, and reasons why the Work is not complete.

2. Advise Government of pending insurance changeover requirements.

3. Submit specific warranties, workmanship bonds, maintenance service agreements, final certifications, and similar documents.

4. Obtain and submit releases permitting Government unrestricted use of the Work and access to services and utilities. Include occupancy permits, operating certificates, and similar releases.

5. Prepare and submit Project Record Documents, operation and maintenance manuals, damage or settlement surveys, property surveys, and similar final record information.

6. Deliver tools, spare parts, extra materials, and similar items to location designated by Government. Label with manufacturer's name and model number where applicable.

7. Make final changeover of permanent locks and deliver keys to Government. Advise Government’s personnel of changeover in security provisions.

LAKE 317191 Page 30 of 46

8. Complete startup testing of systems.

9. Submit test/adjust/balance records.

10. Terminate and remove temporary facilities from Project site, along with mockups, construction tools, and similar elements.

11. Advise Government of changeover in heat and other utilities.

12. Submit changeover information related to Government’s occupancy, use, operation, and maintenance.

13. Complete final cleaning requirements, including touchup painting.

14. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual defects.

B. Inspection: Submit a written request for inspection for Substantial Completion. On receipt of request, Contracting Officer's Representative will either proceed with inspection or notify Contractor of unfulfilled requirements. Contracting Officer's Representative will prepare the Certificate of Substantial Completion after inspection or will notify Contractor of items, either on Contractor's list or additional items identified by Contracting Officer's Representative that must be completed or corrected before certificate will be issued.

1. Re-inspection: Request re-inspection when the Work identified in previous inspections as incomplete is completed or corrected.

2. Results of completed inspection will form the basis of requirements for Final Completion.

1.3 FINAL COMPLETION

A. Preliminary Procedures: Before requesting final inspection for determining date of Final Completion, complete the following:

1. Submit a final Application for Payment according to Division 1, Section "Payment Procedures."

2. Submit certified copy of Contracting Officer's Representative's Substantial Completion inspection list of items to be completed or corrected (punch list), endorsed and dated by Contracting Officer's Representative. The certified copy of the list shall state that each item has been completed or otherwise resolved for acceptance.

3. Submit evidence of final, continuing insurance coverage complying with insurance requirements.

B. Inspection: Submit a written request for final inspection for acceptance. On receipt of request, Contracting Officer's Representative will either proceed with inspection or notify Contractor of unfulfilled requirements. Contracting Officer's Representative will prepare a final Certificate for Payment after inspection or will notify Contractor of construction that must be completed or corrected before certificate will be issued.

1. Re-inspection: Request re-inspection when the Work identified in previous inspections as incomplete is completed or corrected.

LAKE 317191 Page 31 of 46

1.4 LIST OF INCOMPLETE ITEMS (PUNCH LIST)

A. Preparation: Submit three copies of list. Include name and identification of each space and area affected by construction operations for incomplete items and items needing correction including, if necessary, areas disturbed by Contractor that are outside the limits of construction.

1. Organize list of spaces in sequential order, starting with exterior areas first.

2. Organize items applying to each space by major element, including categories for ceiling, individual walls, floors, equipment, and building systems.

3. Include the following information at the top of each page:

a. Project name.

b. Date.

c. Name of Contracting Officer's Representative and Construction Manager.

d. Name of Contractor.

e. Page number.

1.5 FINAL CLEANING

A. General: Provide final job site cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations.

B. Cleaning: Clean equipment surfaces to comply with manufacturer's written instructions.

1. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion for entire Project or for a portion of Project:

2. Clean Project site, yard, and grounds, in areas disturbed by construction activities, including landscape development areas, of rubbish, waste material, litter, and other foreign substances.

3. Sweep paved areas broom clean. Remove petrochemical spills, stains, and other foreign deposits.

4. Rake grounds that are neither planted nor paved to a smooth, even-textured surface.

5. Remove tools, construction equipment, machinery, and surplus material from Project site.

6. Remove labels that are not permanent.

7. Touch up and otherwise repair and restore marred, exposed finishes and surfaces.

Replace finishes and surfaces that cannot be satisfactorily repaired or restored or that already show evidence of repair or restoration.

LAKE 317191 Page 32 of 46

8. Do not paint over "UL" and similar labels,…

This is the start of the file's text. The full file is on GovTribe.