This Statement of Work (SOW) details broadband internet service requirements for Red Rock Canyon National Conservation Area's temporary administrative trailer offices. The contract calls for installing a 500/200 Mbps asymmetrical broadband internet circuit at 1000 Scenic Loop Drive in Las Vegas, NV, including site assessment, equipment provision, infrastructure installation, and 24/7 technical support. The Period of Performance spans one base year (September 1, 2025 - August 31, 2026) with two optional extension periods through August 31, 2027.

Key deliverables include complete internet service installation, service activation confirmation, network documentation, and monthly performance reports. Work is restricted to 8:00 am to 4:00 pm, requires advance coordination with the Bureau of Land Management Contracting Officer Representative, and must comply with environmental protection and safety regulations. The solicitation (140L3925Q0059) is issued by the Department of the Interior Bureau of Land Management Nevada Region, focusing on establishing reliable internet connectivity for the conservation area's administrative operations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RED ROCK CANYON NATIONAL CONSERVATION AREA BROADBAND INTERNET SERVICE

STATEMENT OF WORK (SOW)

1.0 PROJECT INTRODUCTION

Red Rock Canyon National Conservation Area is housed in temporary administrative trailer offices. To ensure uninterrupted administrative and operational activities, reliable broadband internet service is essential for the functioning of these temporary offices. The primary objective of this SOW is to outline the requirements for the provision of high-speed broadband internet service to both administrative trailer offices to facilitate communication, data management, and operational efficiency.

2.0 CONTRACT REQUIREMENTS

The contract will be for 1000 Scenic Loop Drive Las Vegas, NV 89161 and must include but is not limited to all labor, equipment, materials, and overhead to install and provide high-speed broadband internet service to these facilities. It will also need to include all equipment and labor to terminate the broadband network within these two temporary administrative office trailers. The broadband internet service shall consist of the following:

· Install 500/200 Mbps asymmetrical broadband internet circuit capable of supporting wi-fi and ISP access throughout these office trailers as shown in the site map (Enclosure).

· Site assessment to determine the best connectivity options.

· Required equipment (e.g., routers, modems) must be provided by the service provider.

· All cabling and necessary infrastructure to be installed in compliance with local regulations and safety standards.

· 24/7 technical support during the service period.

· Regular maintenance checks should be scheduled monthly to ensure optimal service performance.

2.1 Deliverables

· Installation of broadband internet service at both trailer offices.

· Confirmation of service activation prior to the operational start date.

· Documentation of network settings and service contract.

· Monthly performance reports detailing service uptime and speeds.

3.0 PERFORMANCE REQUIREMENTS

3.1 Period of Performance

The Period of Performance is listed for one (1) base year with up to two (2) options as shown in the following table:

Base Year
September 1, 2025 through August 31, 2026
Option Period 1
September 1, 2026 through February 28, 2027
Option Period 2
March 1, 2027 through August 31, 2027

3.2 Working Hour Restrictions

All work shall be limited to the hours of 8:00 am to 4:00 pm unless otherwise approved by the Contracting Officer Representative. Coordination for site access needs to be scheduled with Bureau of Land Management COR in advance. No work shall occur on federal holidays or weekends without prior approval.

3.3 Smoking

Smoking within temporary administrative office trailers is prohibited and smoking areas are in open areas and will be away from entrances at least fifty feet away.

3.4 Protection

Protect any areas adjacent to the project site from any debris. Comply with governing regulations pertaining to environmental protection. Ensure safety of people in the work area. Provide temporary barricades as required to protect personnel and public from injury due to water sampling.

4.0 ENCLOSURE

4.1 Red Rock Canyon National Conservation Area Site Map with BLM Temporary Administration Office Trailers Location.