This document is a Performance Work Statement (PWS) for upgrading the CCTV system at the Bureau of Land Management's (BLM) Palomino Valley Wild Horse and Burro Center in Nevada.
The key objectives are to install a new, upgraded CCTV camera system to provide enhanced situational awareness across the entire facility. The PWS requires the contractor to provide and install new Avigilon cameras, networking equipment, and a new network video recorder (NVR) to replace the facility's outdated and malfunctioning system. The contractor will be responsible for all labor, materials, licenses, and services to complete the installation. The period of performance is 180 days from the notice to proceed, with work to be completed within 7 days once started. The contract is contemplated to be a fixed-price acquisition. A pre-site visit is recommended before proposal submission. The selected contractor will be required to coordinate installation with the government to avoid disrupting the facility's daily operations.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L3924Q0118_Amd_0001.pdf | ||
| Sol_140L3924Q0118.pdf | ||
| A15_PVC_CCTV_Upgrade_A16_JOFOC_under_SAT_iaw_FAR_13_Redacted.pdf | ||
| A06_PVC_Site_Layout_Graphic.pdf | ||
| B03_Wage_Determinations_Washoe_County.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bureau of Land Management Nevada State Office
Palomino Valley Wild Horse & Burro Center CCTV Enhancements Performance Work Statement
07/18/2024
Document Revision History
| Mod. No. |
| Description of Changes |
| Requested By |
| Approved By |
| Date |
| None |
| Initial version |
| Bianca Acosta |
| Bianca Acosta |
| 07/18/2024 |
0X
0Y
0Z
Table of Contents
| 1.0 | General | 3 | |
| 2.0 | Specific Requirements/Tasks | 5 | |
| 3.0 | Contractor Quality Assurance. | 6 | |
| 4.0 | Delivery or Deliverables | 6 | |
| 5.0 | Meetings | 6 | |
| 6.0 | Required Travel and Other Direct Costs (ODCs) | 7 |
Note that while, as a matter of policy, some agencies require the government to prepare the PWS, the guidance at FAR 37.602(a) stipulates that “a Performance work statement (PWS) may be prepared by the Government or result from a Statement of objectives (SOO) prepared by the Government where the offeror proposes the PWS.”
Performance Work Statement (PWS)
1.0 General
1.1 Introduction
The mission of the Bureau of Land Management (BLM) is to sustain the health, diversity, and productivity of public lands for the use and enjoyment of present and future generations. The BLM Nevada Palomino Valley Wild Horse and Burro Center is the largest BLM preparation and adoption facility in the country and serves as a preparation center for wild horses and burros gathered from the public lands in Nevada and other nearby states. This acquisition will lead to improved security at the Palomino Valley Wild Horse and Burro Center.
1.2 Objective
To install an upgraded camera system that will provide enhanced situational awareness of the entire compound at the Palomino Valley Wild Horse and Burro Center. The site currently has an Avigilon CCTV system that is outdated and only partially operational.
1.3 Scope of Work
The contractor is responsible for providing and installing new CCTV cameras for outdated units, new point to point ethernet devices, as needed, and a new Avigilon Network Video Recorder (NVR). A total of four Avigilon cameras at the site will be retained, and a total of ten cameras will be replaced; see list below for specific details. The vendor will also supply licenses for all cameras, and any necessary services required to establish connections for supporting the cameras. Contractor is to provide a complete solution. A pre-site visit is being hosted and is highly recommended before submitting a proposal.
| Location |
| Camera Number |
| Name |
| Current |
| New Model# |
| INT |
| 1 |
| Retain |
| Lobby |
| 3.0W-H3-D1 |
| NA |
| EXT |
| 2 |
| Retain |
| Admin Front Door |
| 2.0W-H3-BO1-IR |
| NA |
| EXT |
| 3 |
| Replace |
| Staff Parking / Visitor Wildlife Interface |
| 8L-H4PRO-B |
| 8.0C-H6A-BO2-IR |
| EXT |
| 4 |
| Retain |
| New Pedestrian Entrance |
| 5.0-H3-BO1-IR |
| NA |
| EXT |
| 5 |
| Retain |
| New Public Parking Area |
| 8L-H4PRO-B |
| NA |
| EXT |
| 6 |
| Replace |
| Propane Tank |
| 5.0-H3-BO1-IR |
| 6.0C-H6A-BO1-IR |
| EXT |
| 7 |
| Replace |
| Diesel Tank |
| 5.0-H3-BO1-IR |
| 6.0C-H6A-BO1-IR |
| EXT |
| 8 |
| Replace |
| Workshop Door 1 |
| 2.0W-H3-BO1-IR |
| 4.0C-H6A-BO1-IR |
| EXT |
| 9 |
| Replace |
| Workshop Door 2 |
| 2.0W-H3-BO1-IR |
| 4.0C-H6A-BO1-IR |
| EXT |
| 10 |
| Replace |
| Bay Doors |
| 2.0W-H3-BO1-IR |
| 4.0C-H6A-BO1-IR |
| EXT |
| 11 |
| Replace |
| Vehicle Gate |
| 8L-H4PRO-B |
| 8.0C-H6A-BO1-IR |
| EXT |
| 12 |
| Replace |
| North West Gate |
| 2.0W-H3-BO1-IR |
| 4.0C-H6A-BO1-IR |
| EXT |
| 13 |
| Replace |
| Pump House Door |
| 2.0W-H3-BO1-IR |
| 4.0C-H6A-BO1-IR |
| EXT |
| 14 |
| Replace |
| Generator |
| 2.0W-H3-BO1-IR |
| 4.0C-H6A-BO1-IR |
Camera and NVR Guide:
*Camera numbers correspond with the numbers identified on the site layout graphic* Replacement NVR Specifications:
Model #:
NVR6-STD-FORM-D-24TB-W10 [NVR6StandardFormD24 TB(32TBRaw)withWindows10IoTEnterpriseLTSC2021andACC7]
1.4 Background
The BLM Palomino Valley Wild Horse and Burro Center has an outdated Avigilon security camera system and network video recorder in place that has had many of the cameras and point to point ethernet devices malfunction. The site needs the malfunctioned equipment replaced and the NVR upgraded to provide robust storage and the ability to accept the latest Avigilon ACC Server software. The goal is to provide greater situational awareness throughout the entire compound.
1.5 Type of Contract Contemplated
Contract to be a fixed-price acquisition.
1.6 Period of Performance
The period of performance of this contract is 180 days from the date a notice to proceed is provided to the contractor. Work is to be completed within a seven-day period once work has begun.
1.7 Place of Performance
Project work is to take place at the Bureau of Land Management Palomino Valley Wild Horse and Burro Center (PVC). The PVC is located at 15780 Pyramid Hwy, Ironwood Rd., Reno NV 89510. PVC’s Coordinates are:
39°79'19.6"N 119°66'51.0"W The contractor is to perform work during normal business hours, 8-4, Monday to Friday, excluding Federal Holidays.
Contractor to notify the Contracting Officer’s Representative (COR) five business days before beginning work.
1.8 Applicable Documents
Contractor to provide technical specifications for all commercial items provided with this acquisition. Warranties provided by manufacturer must apply to this acquisition. All manufacturer’s instructions are to be followed.
2.0 Specific Requirements/Tasks
The selected vendor shall supply all labor and supplies necessary to complete the system installation and configuration. This includes the Avigilon cameras and Network Video Recorder as well as point-to-point ethernet devices, documents, wiring, mounts, covers, wall plates as well as all other hardware, incidentals, and final installation notes. The selected vendor will coordinate installation of cameras and equipment with the BLM after the award of the contract to ensure locations are accurate and that the install does not cause a service interruption to the BLM PVC daily operations.
| 2.1 | Tasks |
| 2.1.1 | Subtask, Camera Licenses |
Contractor to provide licenses for use with cameras. Licenses should be a one-time fee for these items. If subscription-based licenses are required, the BLM will coordinate that purchase outside the cost of this contract. Life-cycle cost will be considered during selection.
2.1.2 Camera Avigilon Network Video Recorder Integration
Contractor to connect existing cameras to replacement NVR in addition to new Avigilon cameras.
3.0 Contractor Quality Assurance.
Contractor to adjust camera views to provide the best coverage available of the compound. Cameras to be integrated with the replacement Avigilon Network Video Recorder and include any necessary software licenses. All work is to be warrantied for 1 year from date of written acceptance by the government.
4.0 Delivery or Deliverables
All deliverables shall be shipped to the Palomino Valley Wild Horse and Burro Center, 15780 Pyramid Hwy, Ironwood Rd., Reno NV 89510.
Notice to contractors:
All information and data related to this project that the contractor gathers or obtains shall be both protected from unauthorized release and considered the property of the government. The contracting officer will be the sole authorized official to release verbally or in writing, any data, the draft deliverables, the final deliverables, or any other written or printed materials pertaining to this contract. [Press releases, marketing material, or any other printed or electronic documentation related to this project, must not be publicized without the written approval of the contracting officer.]
5.0 Meetings
For all meetings, the contractor shall be responsible for providing meeting materials, and administrative and facilitation support. Meetings will be conducted at the Nevada State Office 1340 Financial Blvd. Reno NV 89502, or through an alternative method of communication (such as a Microsoft Teams, Zoom etc), as approved by the Contracting Officer.
5.1 Post-award Kickoff Meeting
Within __7___ business days of contract award, the Government will conduct a post-award kickoff meeting at the Nevada State Office or via alternate methods of communication. The selected vendor shall visit the site to discuss installation details and timelines before beginning the project.