A04_-_FWS_Statement_of_Work_for_Asbestos-Lead.pdf

PDF 358 KB Posted

Attached to
HAZARD MATERIAL TESTING Federal contract opportunity
Solicitation number
140FGA23Q0028
Issued by
Department of the Interior Fish and Wildlife Service

About this file

This statement of work describes asbestos, lead, and hazardous materials building assessment surveys required at multiple buildings within three national wildlife refuges. The U.S. Fish and Wildlife Service is soliciting quotes to inspect structures for asbestos, lead paint, and hazardous materials prior to renovation or demolition. Inspections must be performed by certified inspectors according to EPA, OSHA and state regulations. Surveys will identify friable and non-friable asbestos, components with lead, and hazardous materials. Inspections are needed at various buildings totaling over 35,000 square feet located at Alamosa NWR, Baca NWR, and Monte Vista NWR in Colorado. Inspectors will collect samples, provide a written report within 60 days including locations and quantities of materials identified, and cost estimates for any required remediation or abatement. The solicitation number is 140FGA23Q0028 and will be awarded to the bidder with the lowest price who is qualified to perform the work.

View the file

Other files for this federal contract opportunity

Other files attached to HAZARD MATERIAL TESTING, newest first.
File Type Posted
Attachment_-_Price_Schedule.pdf PDF
Attachment_-_Monte_Vista_Site_Map.pdf PDF
Attachment_-_Alamosa_Site_Map.pdf PDF
Sol_140FGA23Q0028.pdf PDF
Attachment_-_Baca_Test_Locations.pdf PDF
Attachment_-_Baca_Site_Map.pdf PDF
Attachment_-_Alamosa_Test_Locations.pdf PDF
B08_-_Combined_Synopsis_Solicitation.pdf PDF
Attachment_-_Monte_Vista_Test_Locations.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior

U.S. FISH AND WILDLIFE SERVICE

San Luis Valley Refuge Complex Rio Grande, Saguache, and Alamosa Counties, Colorado

STATEMENT OF WORK

ASBESTOS, LEAD BASED PAINT, AND HAZARDOUS MATERIALS BUILDING

ASSESSMENT SURVEYS

AT

ALAMOSA NWR, MONTE VISTA NWR, AND BACA NWR

1. SCOPE

The U.S. Fish & Wildlife Service (USFWS) San Luis Valley Refuge Complex (Alamosa, Monte Vista, and Baca National Wildlife Refuges) in Rio Grande, Saguache, and Alamosa Counties, Colorado is requesting a Request For Quote (RFQ) to perform all work necessary for and incidental to the inspection of structures prior to building renovations, demolition and/or deconstruction to determine the presence of asbestos, lead, and hazardous materials until (INSERT TIME) Mountain time on (Day, Date INSERT). Any Request for Proposals received after that time will be rejected for consideration. The Request for Quote will be awarded to the bidder who is qualified and has the lowest price.

This Scope of Work is requested to provide sufficient sampling, testing and an assessment for Asbestos Containing Material (ACM), Lead Based Paint (LBP), and hazardous material prior to the demolition of building(s) and/or to perform repairs or maintenance to building(s) that are occupied.

Building Locations: An asbestos assessment survey, a lead-based paint assessment survey, and a Hazardous Material Survey will be performed at the following locations.

Refuge Building Testing Type

Approx.

Building

Size

(SQFT)

Alamosa

NWR

Old Visitor Center Lat: 37°26'19.49"N Long: 105°49'59.50"W

Destructive Testing 3024

Alamosa

NWR

QTRS #1, Mobile Home Double Wide Lat: 37°27'27.75"N Long: 105°49'55.10"W

Destructive Testing 1800

Alamosa

NWR

QTRS #5, Mobile Home Single Wide Lat: 37°27'30.50"N Long: 105°48'10.91"W

Destructive Testing 938

Alamosa

NWR

HQ Office Old HQ Complex Lat: 37°27'29.84"N Long: 105°49'56.82"W

Destructive Testing 3760

Alamosa

NWR

QTRS #014 Single Family Residence Lat: 37°26'17.66"N Long: 105°48'22.17"W

Non-Destructive Testing 1461

Alamosa

NWR

QTRS #014 Detached Garage Lat: 37°26'17.66"N Long: 105°48'22.17"W

Non-Destructive Testing 432

Baca

NWR

Ranch HQ – Historic East Residence Lat: 37°58'42.79"N Long: 105°43'23.07"W

Destructive Testing 2058

Baca

NWR

QTRS #000 Cattle HQ East Residence Lat: 37°58'58.80"N Long: 105°45'42.48"W

Destructive Testing 2295

Baca

NWR

White Ranch Storage Building Lat: 37°48'6.78"N Long: 105°48'37.80"W

Destructive Testing 756

Baca

NWR

Cattle HQ Bunkhouse 100 Lat: 37°58'59.09"N Long: 105°45'46.80"W

Destructive Testing 696

Baca

NWR

Cattle HQ Bunkhouse 200 Lat: 37°58'58.58"N Long: 105°45'47.16"W

Destructive Testing 696

Baca

NWR

Ranch HQ Metal Storage Lat: 37°58'41.29"N Long: 105°43'27.83"W

Non-destructive Testing 3572

Monte Vista

NWR

QTRS #000, Olsen House Lat: 37°29'2.82"N Long: 106° 8'58.28"W

Destructive Testing 1075

Monte Vista

NWR

QTRS #001, SW House Lat: 37°29'11.19"N Long: 106° 8'54.63"W

Destructive Testing with Repair 1377

Monte Vista

NWR

Monte Vista Office/Visitor Center Lat: 37°29'9.76"N Long: 106° 8'54.87"W

Destructive Testing with Repair 2156

Monte Vista

NWR

QTRS #001, Bunkhouse Lat: 37°27'43.50"N Long: 106° 9'54.66"W

Destructive Testing with Repair 1016

Monte Vista

NWR

QTRS #002, NW House Lat: 37°29'12.26"N Long: 106° 8'54.63"W

Non-destructive Testing 1259

Monte Vista

NWR

QTRS #003, NE House Lat: 37°29'12.14"N Long: 106° 8'53.03"W

Non-destructive Testing 1259

The assessment surveys will consist of a comprehensive sampling of the entire structures as required for future demolition permitting with the state and determining any needed remediation work.

Except for the QTRS#002, NW House and QTRS#003, NE House, all buildings listed above are scheduled for demolition. The QTRS#002, NW House and QTRS#003, NE House will either be extensively remodeled/repaired or demolished depending on the scope and cost of the work.

When Destructive testing is required, limit the testing impacts to the minimum size and number of tests necessary to complete the analysis and reporting. Only take samples using small diameter bore holes, paint scraps, and other pre-approved methods. Under no circumstances should the testing impacts have a detrimental impact to the building and its historic character. When repair is needed on the building, repair the test site and seal it to protect it from the elements. The final repairs on the exterior of the building shall be weather and waterproof.

The Monte Vista Office/Visitor Center and QTRS #001, Bunkhouse walls are masonry block construction. The assessment shall include the testing of any masonry fill insulation for asbestos materials.

Buildings calling for non-destructive testing are currently inhabited. To the maximum extent possible, take tests in locations not visible to the primary living areas. Patch any test locations in finished rooms. Limit the testing impacts to the minimum size and number of tests necessary to complete the analysis and reporting.

The survey shall be performed in applicable safe working conditions as defined by State of Colorado, Occupational Safety and Health Administration (OSHA) and the United States Environmental Protection Agency (EPA).

The RFQ(s) are being solicited from qualified firms to perform site inspections on the Alamosa, Monte Vista, and Baca National Wildlife Refuges. The site inspection will entail inspecting both the interior and exterior of each building for asbestos, lead, and hazardous materials as needed, and supplying the refuges with a written report indicating the presence of asbestos, lead, and hazardous materials. The report will identify the type of material, condition, location, and accurate square and/or linear footage. Cost estimates for removing any confirmed asbestos containing materials, lead impacted areas, and hazardous material shall be provided for each type. Two (2) written reports (one (1) to the refuges, one (1) to the Regional Environmental Compliance Coordinator (RECC)) and electronically submitted report to the following people.

1) USFWS San Luis Valley NWR Complex Project Leader, Sharon Vaughn, Sharon_Vaughn@fws.gov

2) USFWS Regional Environmental Compliance Coordinator (RECC), Markham Kearns, markham_kearns@fws.gov

3) USFWS Civil Engineer: Doug Smith, Douglas_Smith@fws.gov

The building surveys shall be performed in accordance with Regulatory Agencies:

1) Environmental Protection Agency (EPA) mailto:Sharon_Vaughn@fws.gov mailto:markham_kearns@fws.gov mailto:Douglas_Smith@fws.gov

2) Occupational Safety and Health Agency (OSHA)

3) Colorado Department of Public Health and Environment (CDPHE)

The building surveys shall be performed in accordance with:

a) Asbestos

1) NESHAP - 40 CFR Part 61, Subpart M – National Emission Standard for Asbestos

2) TSCA - 40 CFR Subpart D, Section 763 – Asbestos

3) 29 CFR 1910.1001: General Industry Occupational Safety and Health Standards

4) 29 CFR 1926.1101: Safety and Health Regulations for Construction

5) CDPHE Regulations

6) All other applicable Colorado laws and regulations

b) Lead

1) TSCA - 40 CFR Subpart D, Section 745 – Lead-Based Paint Hazard

2) 29 CFR 1910.1025: General Industry Occupational Safety and Health Standards

3) 29 CFR 1926.62: Safety and Health Regulations for Construction

4) CDPHE Regulations

5) All other applicable Colorado laws and regulations

2. PERIOD & PLACE OF PERFORMANCE

Period of Performance: The Contractor shall have 60 days to complete the survey.

3. GUIDELINES

The inspector's primary contact will be the Project Leader located at the San Luis Valley NWR Complex. The Project Lead may delegate day to day coordination to another Refuge staff member.

Sharon Vaughn Email: Sharon_Vaughn@fws.gov Phone: 719-480-9151

Address: 7824 El Rancho Lane Alamosa CO 81101

The inspector shall take sufficient samples of all suspected ACM building materials and commercial products, components with lead (e.g. Lead Pipe) and/or lead-based paint (LBP) in accordance with guidance provided in this document or stricter state regulations and have them analyzed by a Colorado certified laboratory.

Suspect asbestos and lead based paint samples shall be collected following professional protocols with appropriate sampling tools and leak-tight containers.

Each suspect sample shall be individually numbered, recorded on a sample log, description of material, quantified, and submitted under chain-of-custody to a laboratory certified under the Environmental Laboratory Accreditation Program.

mailto:Sharon_Vaughn@fws.gov

Any sampling debris (i.e. protective clothing, contaminated wipes, respiratory cartridges, etc.) will be the responsibility of the contractor. As such the contractor assumes all liability for the correct disposal of suspect ACM, ACBM waste, and lead waste.

A) ASBESTOS

The building assessment surveys will identify friable and non-friable asbestos-containing-materials (ACM) and asbestos containing commercial products. The survey shall consist of the identification, measuring, quantifying, testing and estimating the cost of removal of Regulated Asbestos-Containing Material ( RACM), Category I and Category II non-friable asbestos containing building materials, and commercial products that contain asbestos material. This survey shall be performed by a Colorado Certified Asbestos Building Inspector

1) INSPECTION PROCEDURE

I. Proper bulk sampling methods for suspect ACM will be followed. Proper bulk sampling methods are defined as wetting with amended water, encapsulation after sample collection, and clean-up of debris associated with sample collection.

II. Obtain randomly distributed samples from each homogeneous area as listed in Table I. A material may be assumed to be ACM without sampling or based on the analytical results of fewer samples.

III. Locate and quantify all homogeneous areas of surfacing materials, thermal system insulation (including masonry fill insulation), miscellaneous materials, and asbestos commercial products in areas to be demolished or renovated. Note any possible asbestos debris that is present due to deterioration or damage in the above areas. Unless assumed to be ACM, all types of floor tiles in all layers must be inspected and sampled. Whenever necessary, destructive sampling must be done to access ducts and/or pipes in walls or chases and in areas above suspended ceilings to determine if ACM is present for buildings scheduled for demotion. In buildings that are not scheduled for demolition, the report shall identify areas where destructive testing was not conducted.

IV. Analysis of suspect ACM bulk samples through Polarized Light Microscopy (PLM) shall be performed by persons or laboratories with proficiency demonstrated by current successful participation in a nationally recognized testing program such as the National Voluntary Laboratory Accreditation Program (NVLAP) or the National Institute for Standards and Technology (NIST) or the Round Robin for bulk samples administered by the American Industrial Hygiene Association (AIHA) or an equivalent nationally recognized round robin testing program.

V. The laboratory should delineate sample layers (i.e. VAT and mastic; drywall, mud, and tape; cloth wrap and mag; etc.).

VI. Tabulate results by property address. Show the location and square or linear footage of each homogeneous area. Quantify all assumed materials such as floor tile and resilient roofing and siding as ACM (note multiple layers). If ducts and pipes inside walls could not be visually inspected, they must be assumed ACM.

The inspector's name, address, phone number, certification number and date of inspection must appear on each report.

VII. Provide and estimate for remediation of asbestos containing material.

2) ACM sample material shall be analyzed and retained by the laboratory for 30 days in case the Service requests follow on point count analysis.

TABLE I - Minimum Sampling Requirements for Asbestos Containing Materials (The materials listed in this table are provided as common examples and are not a complete list of building components or equipment that require testing.)

Quantities of samples to be obtained per homogeneous area are:

(NOTE: Discretion shall be exercised when defining homogeneous areas, giving consideration to all factors which could reduce the number of samples required.)

Material Type Number of Samples Size of Homogenous Area

Surfacing materials 3 <= 1,000 square feet 5 > 1,000 square feet and <=5,000 square feet 7 > 5,000 square feet

Thermal System Insulation -Including masonry fill insulation

3 each homogeneous area

1 Each homogenous area of patch less than 6 linear or 6 square feet

3 Each homogeneous group valves, fittings, elbow tees, hangers

0*

Inspector has determined that the thermal system insulation is fiberglass, foam glass, rubber, or other non-ACBM. * Need to note on inspection that location of material was seen.

Miscellaneous Material*

- Each layer of floor tile,

- Resilient sheet goods,

- Paper backing of sheet flooring,

- Mastic,

- Resilient roofing,

- Siding materials

- Each homogeneous areas of ceiling tiles,

- Slate flooring and roofing.

- Slate or transite siding,

- Drywall/drywall joint compound systems,

- Etc.

3 The minimum of three samples

Additional sample may be obtained at the discretion of the inspector based upon the square footage of the homogenous area:

3 <= 1,000 square feet

5 > 1,000 square feet and <=5,000 square feet

7 > 5,000 square feet

Other – Asbestos Containing Products:

- Asbestos Gloves

- Fireproof Safes

- Asbestos Gasket

- Etc.

1* Material that are labeled asbestos containing do not need to be sampled but shall be inventoried.

Note: When debris is identified that corresponds with identifiable suspect ACM or ACBM, utilize the correct Homogeneous Area Numbers corresponding with the suspect material.

B) LEAD

The building assessment surveys will identify components with lead (e.g. lead piping) and lead-based paints on concrete, masonry, wood, drywall, and metal surfaces found at specific buildings located at Bear River MBR. This assessment is to include the interior and exterior of all structures specified for the survey to be performed. This survey shall be performed by a Colorado Lead Inspector or Risk Assessor.

1) INSPECTION PROCEDURE

I. Locate and quantify all homogeneous areas of lead-based paint and components with lead (e.g. lead pipe) in areas to be demolished or renovated. Note the condition of the lead-based paint. Note any possible lead-based paint debris that is present due to deterioration or damage in the above areas.

II. All layers of paint to include the substrate shall be analyzed III. Bulk samples shall be of sufficient material to provide Total Threshold Limit

Concentrations (TTLC) IV. Analysis of samples shall be performed by persons or laboratories:

1) Accredited by National Lead Laboratory Accreditation Program (NLLAP), or

2) An XRF Lead Analyzer that

a) Registered for use in the State of Colorado

b) Part of a National Leal Laboratory Accreditation Program (NLLAP)

c) Annually calibrated (Certification on Site)

d) Daily calibration checks

e) Check against standard every 20th sample.

V. Tabulate results by property address. Show the location and square or linear footage of each homogeneous area. The inspector's name, address, phone number, certification number and date of inspection must appear on each report.

VI. Provide an estimate for remediation of lead-based paint containing material.

C) HAZARDOUS MATERIAL SURVEY

The building assessment surveys will identify all hazardous materials found at specific buildings located at Bear River MBR. This assessment is to include the interior and exterior of all structures specified for the survey to be performed. This survey shall use Table 2 – Pre-Renovation/Demolition Environmental Checklist – Hazardous Material Survey.

TABLE 2

Pre-Renovation/Demolition Environmental Checklist

Hazardous Material Survey

U.S. Fish and Wildlife Service requires that a hazardous material survey for items below before starting a renovation or demolition project, and then manage and recycle or dispose of them correctly. This checklist is provided to help manage the project

Project Information

Contractor Information Name:

Address:

Structure information Building name:

Address/Location:

City, State, Zip:

City, State, Zip:

Contact name: Age of bldg (yrs): Size of bldg (sq ft):

Phone number: Present use of bldg:

Prior use of bldg:

Dates of renovation, demolition, or fire training burn:

Start date: End date:

(mm/dd/yy) (mm/dd/yy)

Mercury Qty Qty Qty Batteries Firestats:

Smoke detectors: Manometers: Boiler insulation:

Emergency lighting systems: Thermometers: HVAC duct insulation:

Elevator control panels: Boilers, furnaces, heaters, Ductwork flexible fabric Exit signs: and tanks connections:

Security systems and alarms: Mercury flame sensors by Fireproofing materials:

Lighting pilot lights: Fire doors:

Fluorescent lights: Manometers, thermometers, Flooring:

High intensity discharge gauges: Vinyl floor tile:

Metal halide: Pressure-trol: Vinyl sheet flooring:

High pressure sodium: Float or level controls: Asphalt tile:

Mercury vapor: Space heater controls: Linoleum paper backing:

Neon: Electrical systems Mastic/glue (floor tile, carpet, etc.)

Switches for lighting using Load meters & supply relays: Electrical mercury relays (look for any Phase splitters: Electrical panels:

control associated with exterior Micro relays: Electrical wiring insulation:

or automated lighting systems): Mercury displacement relays: Heating and electrical

“Silent” wall switches: Asbestos ducts/conduit:

Heating, ventilating, and Boiler rooms Pipe and other insulation air conditioning systems Boilers, furnaces, fireplaces, Aircell (corrugated cardboard):

Thermostats: and their components: Millboard:

Aquastats: Cement sheets near heating Preform:

Pressurestats: equipment: Joint compound:

Asbestos (continued) Qty Qty Qty

Spray applied insulation: ChloroFluoroCarbons Lead-acid batteries (lighting, exit Blown-in insulation: Fire extinguishers (both portable signs, security systems):

Block: and installed halon suppression Lead flashing molds and

Surfacing materials systems): roof vents:

Acoustical plaster: Air conditioners (rooftop, room, Lead pipes and solder:

Decorative plaster: and central): Lead-lined X-ray rooms:

Textured paints & coatings: Walk in coolers (refrigeration

Spray-applied materials or cold storage areas): Other

(acoustical, decorative, or insulative): Water fountains and Solid waste (all non-building

Roofing dehumidifiers: components such as unattached

Roofing shingles: Refrigerators/freezers/chillers: carpet, files, books, trash, desks, Roofing felt: Heat pumps: chairs, etc.) must be removed

Base flashing: Vending machines/food prior to demolition:

Cement materials (Transite) display cases: Hazardous waste (including

Cement pipes (flues & vents): household) must be properly

Cement wallboard: Poly-Chlorinated handled and disposed of prior

Cement siding: BiPhenyls (PCBs) to demolition:

Pegboard: Transformers: Oil (used oil, hydraulic oils in door

Ceiling materials Transistors: closers, elevator shafts, etc.)

Ceiling titles: Capacitors: must be collected and properly

Ceiling tile adhesives (pucks): Heat transfer equipment: disposed of prior to demolition:

Lay-in ceiling panels: Light ballasts: Tanks (no evidence of former

Acoustical tiles: heating tanks or storage tanks

Miscellaneous Lead exist):

Taping, joint, and spackling Lead-based paint (woodwork, Appliances must be recycled compound: metal equipment, interior/ by an appliance recycler:

Caulking/putties: exterior uses): Electronics:

Fire curtains and blankets:

Laboratory hoods, table tops, gloves, etc.:

Gaskets:

If you have questions or comments about this checklist, identify any additional items not found in this list, or would like to discuss an individual project, contact the Station Project Leader or Regional Environmental Compliance Coordinator.

Important Note:

Examples in this guidance document do not represent an exhaustive listing of type of materials that may be required to be removed from a building prior to renovation/ demolition Contractor shall follow additional state and local regulations.

Affiliation with project: Title:

Printed name: Date:

3) ASBESTOS, LEAD AND HAZARDOUS MATERIAL BUILDING INSPECTION REPORT

A) Following laboratory identification of the suspect samples:

1) The report findings shall adhere to professional standards and contain at a minimum:

a. Company name, building inspector name(s), report preparer name (if different from inspector), company mailing address, and company telephone number.

b. Station Name, Name of Building (if any), and street address, city, state, zip code for structure(s) inspected.

c. Date of inspection, and date of report preparation (if different).

d. Printed name and signature of each individual involved in the inspection.

e. Asbestos Building Inspector License number and expiration date for each individual

f. Lead Inspector or Lead Assessor License number and expiration dated for each individual

g. Provide a separate, detailed discussion for each building inspected, if multiple buildings are included in the same report.

h. For each building, identify and provide a detailed description of all exterior and interior building materials. Indicate how samples locations and/or materials are labeled/identified in the building to assist with abatement. Document sample locations and areas that were not accessible during the inspection.

i. Provide an estimated square or linear footage for asbestos or lead of suspect building material.

This may be calculated by room size or actual measurement.

j. Clearly state the number of samples collected for each type of suspect material based on the estimated or actual square or linear footage.

k. Discuss the type, amount (square or linear footage) and condition of all suspected material testing positive or assumed positive for asbestos, lead exceeding regulatory standard, and hazardous materials.

l. Include a written recommendation for disposition of all identified asbestos-containing materials (ACM) or presumed asbestos-containing materials (PACM), Lead Paint, and Hazardous Material and a cost estimate for each activity.

m. Include photographs, building drawings or sketches.

n. A map of the building indicating sample location and locations of other hazardous waste identified in the report.

o. Provide a copy of all sample collection data, chain of custody form(s), and lab analysis reports.

p. Copy of the inspector’s certification card for lead and asbestos.

B) The report findings shall also contain recommendations for any actions needing to be completed prior to demolition and an estimate cost. A draft electronic report shall be provided to the Service for a five working day review/comment period prior to issuing the final report.

C) Final Reports shall be provided:

1) Contractor must submit and electronic copy of each report via email to the U.S. Fish and Wildlife

Service, (Insert Station) Project Leader and Regional Environmental Compliance Coordinator.

Reports must be submitted in either Microsoft Word Document or PDF Format.

2) Contractor must submit a hard copy of the report the U.S. Fish and Wildlife Service, (Insert Station) Project Leader and Regional Environmental Compliance Coordinator. Reports must be submitted in either Microsoft Word Document or PDF Format.