This statement of work outlines thermal spray restoration services for two AN/BPS-15 radar masts from different submarine classes. The contractor must refurbish the outer surfaces of the radar masts using thermal spray deposition processes at their NAVSEA-certified facility in accordance with specified military standards and engineering documents. Key deliverables include a completed thermal spray job control record and objective quality evidence record for each radar mast. The services support the Naval Supply Systems Command and involve oversight of SUBSAFE and non-destructive testing requirements by the Trident Refit Facility in Bangor. The period of performance is from August to December 2023, with incremental delivery of the first radar mast no later than 49 days after receipt and the second mast 49 days after acceptance of the first.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SERVICE CONTRACT
STATEMENT OF WORK (SOW)
WORKSHEET
REV-B DTD 6/27/2023
CHECK ALL BELOW THAT APPLY:
HIGH RISK JUSTIFICATION: Service supports the restoration of one SSBN726 Class variant and one SSN 688I Class variant of the AN/BPS-15 radar masts to enable ready issue spare assets for the naval supply system of which currently zero ready issue spare assets are available for either submarine class. Delays to timely procurement and accomplishment of the service directly affect availability schedules and potential to delay the underway of combatant strategic submarine units.
SUBSAFE
DSS/SOC
LOCATION OF WORK IS WITHIN AN AREA THAT REQUIRES NAVSEA REVIEW
JML #: N/A - LDS System @ TRF-B; Requisition: N684383072DB01 DD2276 #: (Request for Contractual Procurement (RCP) required for services over $2500 or services with terms and conditions.) – Received from Funds Administrator Ship/Activity: TRF BANGOR RADAR DEPOT Title: AN/BPS-15 RADAR MAST THERMAL SPRAY RESTORATION SERVICES Place of Performance: Vendor Facility - CONUS Period of Performance: From 8 AUG 2023 to 22 DEC 2023; contingent on Award 28 JUL 2023
1. BACKGROUND
1.1 The Trident Refit Facility Bangor (TRF-B) Radar Depot performs restoration of SSN688 Class, SSN 688I Class, and SSBN 726 Class variants of the AN/BPS-15 radar mast for the US Navy.
During restoration of radar masts, the outer surfaces of each radar mast requires surface finish restoration using NAVSEA certified thermal spray deposition processes and facilities. Reference 2.1, Enclosure (2), paragraph 1 specifies refurbishment of the outer surfaces of the three variants of the AN/BPS-15 radar mast using thermal spray deposition processes identified of Reference 2.2.
1.2 Radar masts are used in critical end-use applications and as such are subject to additional process controls as and traceability requirements by NAVSEA for SUBSAFE and Level 1 materials.
Radar masts must maintain their SUBSAFE/Level 1 certifications at all time, and as such, TRF- B, the NAVSEA qualified “SUBSAFE Certifying Activity”, will oversight the repair process required by contract for SUBSAFE/Level 1 work performed by contractors not previously certified to perform SUBSAFE work by NAVSEA.
1.3 Two AN/BPS-15 radar masts, one SSBN 726 Class variant and one SSN 688I Class variant, require refurbishment by thermal spray. The SSBN 726 Class AN/BPS-15 radar masts described in paragraph 5.3.1 requires thermal spray repairs of the surfaces IAW sheet 5 of 5 from Enclosure 3 of Reference 2.1. The SSN 688I Class AN/BPS-15 radar masts described in paragraph 5.3.2 requires thermal spray repairs of the surfaces IAW sheet 3 of 5 from Enclosure 3 of Reference
2.1. Each radar mast is listed in paragraph 11.2.3 in order of priority, critical needs listed first.
2. REFERENCES
2.1 TRF Bangor Engineering Memorandum 410/316M-19 Rev-C, SUBSAFE; Flame Spray BPS-15
Mast Components by Non-SUBSAFE Qualified Contractor
2.2 NAVSEA T9074-AA-GIB-010/1687 dtd 12 JUN 2017; Thermal Spray Process for Naval Ship
Machinery and Non-Skid Applications
2.3. MIL-STD-1687A; Thermal Spray Processes for Naval Ship Machinery Applications, includes
Notice 2 dtd 12 JUN 2017; Notice of Cancellation
2.4 NAVSEA T9074-AS-GIB-010/271 Rev-1 dtd 11 SEP 2014; Requirements for Non-Destructive
Test Methods
2.5 DWG 7226178 Rev-D, SSBN Trident Class AN/BPS-15 Navigation Radar Mast Assembly &
Details
2.6 DWG 6640200 Rev-D, SSN 688 I Class AN/BPS-15 Navigation Radar Mast Assembly &
Details
2.7 ASNT SNT-TC-1A 2020 Edition, Personnel Qualification and Certification in Nondestructive
Testing
3. WORK REQUIREMENTS
3.1 Contractor Work Requirements:
3.1.1 For consideration under this contract, the contractor’s thermal spray facility, quality assurance program, and the thermal spray procedures used in support of these services shall be previously NAVSEA certified in accordance with (IAW) paragraphs 5.1 and 5.2 of Reference 2.2 and documented proof thereof shall be provided at solicitation with their proposal for technical review and consideration; see Technical Exhibit 1 Deliverables Table.
3.1.1.1 Reference 2.3 is the previous approved military specification for thermal spray processes for naval ship machinery applications, which was superseded by Reference 2.2 as detailed in “Notice 2” of Reference 2.3. Contractors who were previously NAVSEA certified to perform machinery restorative thermal spray processes, along with any previously approved machinery restorative thermal spray procedures under Reference 2.3 are satisfactory for performance and contract award per NAVSEA Thermal Spray In-Service Engineering Agent (ISEA) representatives via email communication.
3.1.2 The contractor shall not use any sub-contractor to perform any work associated with this service, the only exception permitted is the use of a sub-contractor to perform nondestructive liquid dye penetrant testing (NDT PT). When subcontracting NDT PT, all work shall be conducted at the facility of, and under direct supervision of, the primary contractor. All handling of the components (e.g., lifting, positioning, and/or transporting) shall be performed by the primary contractor.
3.1.3 For consideration under this contract, the contractor, or sub-contractor if used, must meet all
NAVSEA requirements for NDT PT, to include Reference 2.4 and Reference 2.7. Prior to consideration for award, the contractor, or sub-contractor if used, will be evaluated by the NAVSEA activity, TRF-B, to the requirements of Reference 2.4 and Reference 2.7. For this service the TRF-B nondestructive testing division, code 630, NDT Level III Examiner will perform the review.
3.1.3.1 The contractor, or sub-contractor if used, shall provide the NDT Vendor Qualification
Documentation, items a. through e. listed below, at solicitation with their proposal for technical review and consideration; see Technical Exhibit 1 Deliverables Table.
a. Contractor’s/Sub-Contractor’s Written Practice.
b. NDT LP procedure meeting requirements of Reference 2.4 Chapter 5.
c. NDT Personnel Certification Records meeting requirements of Reference 2.4 paragraphs
1.6, 1.6.2.1, 1.6.4 and 1.6.8, as well as Reference 2.7 paragraph 9.4.
d. Summary of the Contractor’s/Sub-Contractor’s NDT surveillance program.
e. Any other documentation regarding the NDT program when requested.
3.1.3.2 As determined by the TRF-B nondestructive testing division, code 630, NDT Level III
Examiner the conduct of an initial, and potential follow-on, site visits may be required to verify compliance with the requirements of Reference 2.4 and Reference 2.7. The contractor shall permit TRF-B nondestructive testing division (code 630) personnel, access to the work site(s) to observe the performance of the NDT PT to verify NDT PT written practice and NDT PT surveillances comply with Reference 2.4 and Reference 2.7 requirements.
3.1.3.2.1 The contractor shall provide a minimum of seven workdays notification to the TRF-B
COR and NDT Level III Examiner points-of-contact listed in paragraph 9 prior to conduct of any and all NDT PT. Notification is required to enable sufficient time for travel arrangements for the site visits for NDT PT performance review(s).
3.1.3.2.2 Initial, and potential follow-on, site visits for NDT PT performance review may not excessively impede or delay the contractor, or subcontractor, such to prevent meeting delivery milestone dates or otherwise extend the period of performance of the contract.
3.1.3.2.3 The TRF-B nondestructive testing division (code 630) personnel performing the NDT PT performance review may initiate a stoppage of follow-on work from the NDT PT, for not more than forty-eight hours, to enable identifying and communicating potential NDT PT certification discrepancies. Communication of any noted NDT PT performance discrepancies shall be made to the TRF-B COR and Planning points-of-contact listed in paragraph 9 not later than twenty-four hours of discrepancy discovery.
3.1.4 Upon award of contract and prior to commencement of work on SUBSAFE AN/BPS-15 radar mast, the contractor shall permit the “qualified SUBSAFE activity” representatives, TRF-B, access to their work site(s) to verify compliance with SUBSAFE requirements through an initial and follow-on periodic site visits IAW Reference 2.1 Enclosure (1) paragraphs 3 through 3.f.
3.1.4.1 When TRF-B has conducted a site visit of the contractor’s facility for similar SUBSAFE maintenance within the past twenty-four months from the contract award, only follow-on site visits are required prior to the conclusion of the twenty-four month periodicity requirement IAW Reference 2.1 Enclosure (1) paragraph 3.a.
3.1.5 Upon award of contract and prior to commencement of any work on SUBSAFE AN/BPS-15 radar mast, the contractor shall enter into a Memorandum of Agreement (MOA) with TRF-B to assign responsibilities and actions required by both parties for the conduct of SUBSAFE work under the oversight of TRF-B IAW Reference 2.1 Enclosure (1) paragraph 2. The MOA will not modify or change any requirement imposed herein by the Statement of Work or the awarded contract.
3.1.6 Reference 2.2 paragraph 3.1.3 requires written records for AN/BPS-15 radar masts in the accomplishment of thermal spray repairs, which are satisfied by Reference 2.1 Enclosure (5);
Thermal Spray Job Control Record (TSJCR). The contractor shall provide a completed
TSJCR for each radar mast; see Technical Exhibit 1 Deliverables Table. If the TSJCR is lost or illegible upon receipt, contact the TRF-B COR and Planning points-of-contact listed in paragraph 9 for a replacement.
3.1.6.1 Reference 2.1 Enclosure (5) provides a “blank” sample of the TSJCR, and includes instructions on the use of, and completion of, the TSJCR. Data required to be entered on the TSJCR by the contractor are identified by “(Spray Activity)” and “(Spray Activity) Quality Assurance (QA)”.
3.1.6.2 The Contractor shall generate and assign a unique thermal spray serial number for each
AN/BPS-15 radar mast IAW Reference 2.1 Enclosure (5). The contractor shall communicate the unique thermal spray serial numbers to the TRF-B COR and planning points-of-contact listed in paragraph 9 listed no later than three workdays following contract award such to provide time for the application of the thermal spray serial number markings by TRF-B prior to shipping a AN/BPS-15 radar mast to the contractor.
3.1.7 The contractor shall use and complete the Objective Quality Evidence (OQE) Records, Reference 2.1 applicable Enclosure (9) or (10), during the refurbishment of the AN/BPS-15 radar masts IAW Reference 2.1 paragraph 2. The contractor shall provide the completed OQE Record, Reference 2.1 applicable Enclosures (9) or (10), for each radar mast; see Technical Exhibit 1 Deliverables Table. If an OQE Record is lost or illegible upon receipt, contact the TRF-B COR and Planning points-of-contact listed in paragraph 9 for a replacement.
3.1.8 The contractor shall conduct an inspection upon receipt of an AN/BPS-15 radar mast prior to commencement of work. The inspection shall confirm receipt of the AN/BPS-15 radar mast with the supplied documentation package. The AN/BPS-15 radar mast documentation package is comprised of the following:
3.1.8.1 Material Identification (ID) / Control Tag, QA Form 2 – The contractor shall validate the inscribed markings on the AN/BPS-15 radar mast correlate to the recorded data in the “MIC NO/SERIAL NO” field of the QA Form 2 attached to the AN/BPS-15 radar mast. If a QA Form 2 is lost or illegible upon receipt of an AN/BPS-15 radar mast, notification, within twenty-four hours, by telephone and email message to the TRF-B COR and Planning points-of-contact listed in paragraph 9 is required.
3.1.8.1.1 The QA Form 2 shall remain legible and remain physically attached to the AN/BPS-15 radar mast at all times during repair and refurbishment processes and upon completion of refurbishment the QA Form 2 shall be returned to TRF-B physically attached to the AN/BPS-15 radar mast.
3.1.8.1.2 The contractor shall only remove the QA Form 2 temporarily when it is required to preclude damage during refurbishment processes. When the QA Form 2 requires removal prior to a potentially damaging operation, the QA Form 2 shall be stored in the vicinity of the AN/BPS-15 radar mast such that it cannot be misplaced or damaged, and without delay reattached to the AN/BPS-15 radar mast upon the immediate cessation of each potentially damaging process. The contractor shall not make any entry on the QA Form 2; its purpose is for traceability and material control requirements by TRF-B instructions.
3.1.8.2 Maintenance Certification Record/Re-Entry Control, QA Form 9/QA Form 10 (REC) - The contractor shall validate the “CWP/REC SERIAL NO” recorded in data field “4.” of the REC correlates to the recorded data in the “CWP SER. NO.” field of the QA Form 2 attached to the AN/BPS-15 radar mast.
3.1.8.2.1 The REC shall remain legible, and accompany the AN/BPS-15 radar mast at all times during repair and refurbishment processes. The REC shall be returned to TRF-B with the AN/BPS-15 radar mast upon completion of refurbishment. If a REC is lost or illegible upon receipt of AN/BPS-15 radar mast, notification, within twenty-four hours, by telephone and email message to the TRF-B COR and Planning points-of-contact listed in paragraph 9 is required. The contractor shall not make any entry on the REC; its purpose is for SUBSAFE work authorization and control requirements by TRF-B instructions.
3.1.8.3 Thermal Spray Job Control Record (TSJCR) – The contractor shall validate the inscribed markings on the AN/BPS-15 radar mast correlate to the recorded data in the “MIC NO.” field in Section I of the TSJCR that accompanies the AN/BPS-15 radar mast.
3.1.8.4 Objective Quality Evidence (OQE) Record – The contractor shall verify the OQE Record, Reference 2.1 applicable Enclosures (9) or (10), is enclosed with the AN/BPS-15 radar mast.
3.1.9 The contractor shall refurbish the outer surfaces of both “wear and non-wear areas” of the
AN/BPS-15 Radar Mast using thermal spray deposition processes and process controls IAW References 2.1 and Reference 2.2.
3.1.9.1 Pre-thermal spray machining of the AN/BPS-15 Radar Mast “wear and non-wear area” shall be performed IAW paragraph 4.4.2 of Reference 2.2.
3.1.9.1.1 The AN/BPS-15 Radar Mast “wear and non-wear area” sketch, Enclosure (3) of Reference 2.1, provide additional process limits and requirements in the “Repair Notes” and “Drawing Notes” blocks that shall be adhered to during pre-thermal spray machining processes.
3.1.9.1.2 The base material and yield strength properties of the AN/BPS-15 Radar Mast are provided in Reference 2.1 Enclosure (2) paragraph 7.
3.1.9.2 Nondestructive testing PT meeting the requirements of Reference 2.4 shall be conducted upon completion of pre-thermal spray machining operations.
3.1.9.3 Reference 2.1 Enclosure (2) paragraph 8.a requires solvent cleaning be performed IAW paragraph 4.4.1. of Reference 2.2.
3.1.9.4 Reference 2.1 Enclosure (2) paragraph 8.a requires abrasive blasting be performed IAW paragraph 4.4.2.5 of Reference 2.2.
3.1.9.5. Reference 2.1 Enclosure (2) paragraph 5 requires the type of thermal spray as plasma spray using a Monel (NiCu) bond coat and Alumina-Titania finish coat, or a Nickel-Aluminum- Molybdenum (NiAlMo) bond coat with Alumina-Titania finish coat.
3.1.9.5.1 Reference 2.1 Enclosure (2) paragraph 6 specifies the maximum thickness for the thermal spray Monel (NiCu) or Nickel-Aluminum-Molybdenum (NiAlMo) bond coat and Alumina-Titania finish coat.
3.1.9.6 Reference 2.1 Enclosure (2) paragraphs 8.b.(1)(i) and 8.b.(1)(ii) specifies the tolerance for outside diameter and surface finish of the thermal spray restoration of the AN/BPS-15 Radar Masts.
3.1.9.7 Reference 2.1 Enclosure (2) paragraph 9 requires inspection of thermal sprayed coatings IAW paragraph 3.5.2.1 of Reference 2.2.
3.1.10 The contractor shall ensure cleanliness of the AN/BPS-15 radar mast prior to its return to
TRFB. Masts shall be in a similar state of cleanliness as when received from TRFB, and shall be free of industrial residue and debris from the thermal spray processes.
3.1.11 During the TRF-B review of each AN/BPS-15 radar mast’s submitted TSJCR and/or OQE
Record, if TRF-B determines correction/changes are required to meet the requirements of Reference 2.1 for records retention, the contractor shall make corrections/changes within three workdays of notification by email message.
3.1.12 The contractor shall provide weekly progress reports, no later than close of business on every
Wednesday, to the TRF-B COR and Planning points-of-contact listed in paragraph 9 concerning all work in process at the contractor’s facility under this contract. The content of the report shall express completion percentages for each radar mast and completion projections for the following week along with proposed dates for performance of NDT PT.
3.1.12.1 The contractor shall identify any discrepancies discovered during receipt of, or work in process of, the AN/BPS-15 Radar Mast. Communication of the discrepancies shall be made to the TRF-B COR and Planning points-of-contact listed in paragraph 9 not later than twenty-four hours of discrepancy discovery.
3.2. Government (TRF-B) Work Requirements:
3.2.1 TRF-B nondestructive testing division, code 630. NDT Level III Examiner will evaluate the contractor’s, or sub-contractor’s if used, submitted records in accordance with paragraph
3.1.3 to ensure compliance with all NAVSEA requirements for NDT PT, to include Reference 2.4 and Reference 2.7.
3.2.1.1 TRF-B nondestructive testing division, code 630, NDT Level III Examiner may determine the need to assess the conduct of the NDT PT by the contractor, or subcontractor, to verify their compliance with the requirements of Reference 2.4 and Reference 2.7. This assessment may be performed by an initial and potential follow-on, site visit(s) by TRF-B nondestructive testing division, code 630, personnel.
3.2.1.1 Site visits of the contractor’s facility for the initial assessment, and potential follow-on review, will be coordinated by the TRF-B COR and NDT Level III Examiner points-of-contact listed in paragraph 9 with input from the contractor concerning the period of performance (dates and schedule) of the site visits.
3.2.1.2 The funding and the arrangement of travel of the TRF-B employees for the purpose of site visit(s) is the responsibility of TRF-B.
3.2.2 TRF-B engineering division, code 410, and SUBSAFE Program division, code 06, personnel will conduct the initial assessment, and any required forthwith every twenty-four months, to verify the contractor’s compliance with SUBSAFE requirements through an initial and follow-on periodic site visits IAW Reference 2.1 Enclosure (1) paragraphs 3 through 3.f.
3.2.2.1 Site visits of the contractor’s facility for the initial assessment, or twenty-four-month follow-on review, will be coordinated by the TRF-B COR, Engineering, and SUBSAFE Program points-of-contact listed in paragraph 9 with input from the contractor concerning the period of performance (dates and schedule) of the site visits.
3.2.2.2 The funding and the arrangement of travel of the TRF-B employees for the purpose of site visit(s) is the responsibility of TRF-B.
3.2.3 Upon award of contract TRF-B will enter into a Memorandum of Agreement (MOA) with the contractor to assign responsibilities and actions required by both parties for the conduct of SUBSAFE work under the oversight of TRF-B IAW Reference 2.1 Enclosure (1) paragraph 2.
3.2.4 For each AN/BPS-15 radar mast, TRF-B will provide the TSJCR, Reference 2.1 Enclosure
(5), within the shipping crate, which is pre-filled by TRF-B IAW Reference 2.1 Enclosure (5).
3.2.4.1 TRF-B will apply the unique thermal spray serial number to each AN/BPS-15 radar mast
IAW Reference 2.1 Enclosure (1) paragraph 5.c. in the specified area IAW Reference 2.1 Enclosure (3).
3.2.5 TRF-B will provide the OQE Record, Reference 2.1 applicable Enclosures (9) or (10), with each AN/BPS-15 radar mast, within the shipping crate, for use during refurbishment.
3.2.6 TRF-B will provide the REC, within the shipping crate, prior to shipping an AN/BPS-15 radar mast to the contractor.
3.2.7 TRF-B will physically attach the Material Identification (ID) / Control Tag, QA Form 2, to each AN/BPS-15 radar mast prior to shipping a radar mast to the contractor.
3.2.8 A review of each AN/BPS-15 radar mast submitted TSJCR and OQE Record documentation will be performed by TRF-B engineering division, code 413, and TRF-B material certification branch, code 612, prior to acceptance and retention.
3.2.8.1 During review, if TRF-B determines changes are required to meet the record requirements of
Reference 2.1 notification to the contractor will be made via the COR within 5 workdays of receipt of each AN/BPS-15 radar mast’s TSJCR and OQE Record.
3.2.9 TRF-B shall perform a technical receipt inspection of each restored AN/BPS-15 radar mast upon receipt from the contractor IAW Reference 2.1 Enclosure (1) paragraph 9 through 9.d.
3.2.9.1 The completion of inspections, review of documentation, and acceptability of the contractor’s services will be completed within 10 workdays from the date of receipt of each restored AN/BPS-15 radar mast.
4. CONTRACTOR FURNISHED ITEMS – PROPERTY, MATERIAL, EQUIPMENT,
SERVICES
11.2.3.1 The radar mast listed in paragraph 5.3.1 will be the first incremental delivery under this contract. Services shall be completed and asset shipped and received by TRF-B no later than (NLT) 49 calendar days from the date the radar mast was received by the contractor.
11.2.3.2 Following receipt and acceptance IAW paragraph 6.2 by TRF-B, of the radar mast from paragraph 11.2.3.1, the follow on radar mast listed in paragraph 5.3.2 is the second and last incremental delivery under this contract. Services shall be completed by the contractor and the asset shipped and received by TRF-B NLT 49 calendar days from the date the radar mast was received by the contractor.
Requirements Originator TRFB Code 440 DIV-HD Digital Signature & Date: _______________________________________