A04_CACH_Admin_Office_Asbestos_Tile_Removal_Project_Scope_v1.pdf
PDF 288 KB Posted
- Attached to
- CACH-ADMIN OFFICE ASBESTOS TILE REMOVAL Federal contract opportunity
- Solicitation number
- 140P1522Q0014
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| IMG_3521_0003.jpg | JPG image | |
| IMG_3517_0003.jpg | JPG image | |
| IMG_3513_0003.jpg | JPG image | |
| CACH_office_carpet_dust_bacteria_analysis_0003.pdf | ||
| IMG_3519_0003.jpg | JPG image | |
| IMG_3518_0003.jpg | JPG image | |
| IMG_3516_0003.jpg | JPG image | |
| ACMReport_0003.pdf | ||
| IMG_3520_0003.jpg | JPG image | |
| IMG_3515_0003.jpg | JPG image | |
| IMG_3512_0003.jpg | JPG image | |
| Sol_140P1522Q0014_Amd_0003.pdf | ||
| IMG_3514_0003.jpg | JPG image | |
| Sol_140P1522Q0014_Amd_0002.pdf | ||
| Sol_140P1522Q0014_Amd_0001.pdf | ||
| B03_SCA_WD__2015-5477.pdf | ||
| B08_Clause___Provisions.pdf | ||
| B08_BidSchedule.xlsx | XLSX spreadsheet | |
| Sol_140P1522Q0014.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Canyon de Chelly National Monument
SCOPE OF WORK
CACH Administration Office Asbestos Tile Floor Removal Project
NATIONAL PARK SERVICE
INTERIOR REGIONS 6 | 7 | 8
1. PROJECT OVERVIEW
2. LOCATION AND FACILITIES
a. Canyon De Chelly National Monument (CACH) Administration Office Asbestos Tile Floor
Removal Project is located within the boundaries of the Canyon De Chelly. Located in
Northeastern Arizona, about 3 miles East from the Highway 191 on Indian Route 7.
b. The Park North Boundary runs along Indian Route 64 and Southern Boundary along
Indian Route 7, Additional boundaries to the West is locate along the Eastern City
Boundary of Chinle to the East the Western Boundary City of Tsaile.
1 Short Project Description
Contractor will be responsible for removal of existing Carpet floor, asbestos tile floor, vinyl, and wood cove base.
1. There is one layer of Carpet covering the Asbestos tile floor. The top layer was installed in 1980 over the existing asbestos tile and mastic. Both layers are damaged and required removal for new carpet tiles. The original tile and mastic (Flintkote Classic XI) is damaged and presents an indoor air quality hazard. No reinstallation of tile is required.
Additionally, the work in this project will:
• Provide construction oversight and management.
• Level concrete floors at high spots
• Repair all visible concrete floor fractures, dips, chips, and any other deficiency
• Apply concrete sealer in area of work
• Complete all services in co-operation with National Park Service staff
Section 10 provides photos of the existing conditions, Section 2 and 9 provides additional detailed information on the project description, existing conditions, design criteria, and technical requirements.
2 NPS Points of Contact
Contractual - Contracting Officer (CO):
Deborah Cimmer Deborah_cimmer@nps.gov
Project Manager and COR/POC:
Ryan Young ryan_young@nps.gov SOFO Facilities Maintenance Manager
CACH, NAVA, & HUTR
3 Data and Materials to be provided by the NPS
The following data and materials are provided to the Contractor by the National Park Service (NPS) as attachments to this Scope of Work. Items available electronically are referenced throughout the document.
• Asbestos Report (See A06 document) mailto:ryan_young@nps.gov
4 Schedule of Values and Schedule
5 General Requirements
This Section defines components of the project and Contract Line Items, and outlines progress payments and required project meetings. Bids shall be submitted on a Bid Offer Sheet. See attachment E.
6 Pre-Project Requirements
7 Notifications/Permits:
• Notifying the State of Arizona and Department of Environmental Protection 10 days prior to start date as applicable.
• Contractor to obtain Local permits if required.
8 Notifications of Asbestos Abatement Activities:
• Post 10 Day “Notice of Asbestos Abatement” sign 10 days prior to start date or as soon as possible at all entranced to The Visitor Center.
9 Definition of Contract Line Items
The intent of this Section is to explain, in general, what is included in each contract line item and to clarify limits or cut-off points where one item ends, and another begins. If a portion of the work is not explicitly covered in any line item below but is a part of the project, include the costs for that work in a related line item. The Contractor is responsible for determining and obtaining all necessary permits.
All measurements and payments will be based on completed and accepted work performed in accordance with the drawings and specifications. Payment shall be full compensation to complete the work items in good faith, including incidental work. If no contract line item exists for a portion of the work, include the costs in a related item. Payment will be made only for completed work at the contract unit price based. Payment under each line item shall be full compensation for the following:
1. Labor
2. Materials (that are installed or delivered to site)
3. Equipment
4. Tools
5. Testing
6. Subcontracts and services
10 Contract Line Item No. 1 – Mobilization / Demobilization
This item includes:
• Mobilization
• Costs of preparatory work and operations, including but not limited to those necessary for the movement of personnel, equipment, supplies, materials and incidentals to the project
• Site facilities necessary for the work on the project, sanitary facilities, and traffic control
• Work or costs necessary for the completion of the project such as inspections, testing, system startup, project closeout, punch-list completion, final cleanup at site.
• Costs related to construction design documents, fees, permits, licenses, insurance, bonds, taxes and all other costs that the contractor is to obtain or pay to perform the work.
• Any management and inspection of base bid items.
11 Contract Line-Item No. 2 – Site Preparation for Asbestos-Containing Material (ACM)
This item consists of:
• Clearing work site (approximately 200 sq ft)
• Cordon off work site
• Mobilization, and
• All other activities necessary to complete this work.
o This item will also identify alternatives to correct any weaknesses or deficiencies that may be found.
o This item shall also address any environmental concerns that may impact the proposed design.
o Store existing furniture in authorized site approved by park service representative
12 Contract Line-Item No. 3 – Floor Tile and Vinyl Cove Base Removal
This item consists of:
• Removal of two layers of carpet and floor tile with bottom layer containing asbestos (approximately 200 sq ft)
• Remove approximately 6 linear feet of cove base
• All other activities necessary to complete this work.
• Mobilization
• All other activities necessary to complete this work.
o This item will also identify alternatives to correct any weaknesses or deficiencies that may be found.
o This item shall also address any environmental concerns that may impact the proposed design.
o This item will also identify alternatives to correct any weaknesses or deficiencies that may be found.
13 Project Meetings
14 Kick-off Meeting
After 100% complete Documents are approved and prior to the start of construction, the CO will arrange an on-site pre-construction meeting with the Contractor. Notes of the meeting shall be recorded by the Contractor and will be distributed after the meeting. The meeting agenda will include the following as a minimum:
• Park rules and regulations
• Correspondence procedures
• Lines of authority
• Roles and responsibilities
• Coordination of subcontractors
• Submittal process
• Distribution of or access to digital images of construction progress
• Final work schedule
• Weekly work schedule
• Acceptance/rejection of the work
• Labor standards and labor law application
• Modifications
• Accident Prevention Plan and accident reporting
• Contractor’s Quality Control Plan
• Waste Management and Recycling Plan
• Hazardous Material Management Plan
• Medical emergency processes, availability, emergency numbers, and contacts
• Park permits, burning construction waste, rules of the road, alcohol use, housekeeping, firearms, pets, natural and cultural resource concerns
• Traffic control
• Visitation and public relations
• Environmental and sustainability requirements for the project
• Archeological resources protection requirements (Park requires that for new ground disturbance that onsite archeological monitoring is on site. If a monitor is not available or present this work cannot take place.
Value engineering
Regulated Work Area Preparation
15 Establish and Isolation of Regulated Abatement Work Area(s):
The contractor shall establish work area within the Visitor Center as required by the particular ACM being removed and the abatement method chosen. These methods include limited containments for non-friable abatement. The material type being removed shall dictate the isolations of the regulated area. The immediate work area shall be considered all interior spaces of the Visitor Center from which the asbestos containing materials are actively being removed. The asbestos project regulated abatement work area shall extend to the perimeter of the building work area and shall have signage posted. All existing exterior doors shall be maintained as emergency means of egress.
16 Decontamination System Location:
Construction of remote three (3) stage worker/waste decontamination unit(s) is required within The
Visitor Center. Actual location to be field verified with the General Contractor National Park Service
The decontamination units shall remain until all work has been completed and successful inspection and air testing is achieved.
17 Work Area Preparation:
1. All work areas shall be posted to prevent unauthorized entry.
2. All windows, doors, diffusers, etc. leading into the work area shall be closed and critically sealed with two (2) layers of 6 mil. Polyethylene.
3. All walls and ceilings not included in the removal and/or clean-up shall be covered with 6 mil.
Polyethylene.
4. Negative pressure shall be established within the work areas to maintain -0.02 in w.c and/or minimum of four (4) air exchanges per hour Negative air shall be exhausted through exterior windows and/or doors.
5. All critical barriers and negative air machines shall remain until acceptable final Post Tests are obtained as per section 6.0 of this work plan.
6. Local exhaust systems shall be in accordance with ANSI Z9.2 and 29 CFR Part 1926.1101 that will provide at least four (4) air changes per hour inside of the negative pressure enclosure Local exhaust equipment shall be operated 24 hours per day until receipt of satisfactory final air clearance results.
7. Local exhaust systems shall be leak proof to the filter and equipped with HEPA filters minimum pressure differential in the work area of negative 0.02 inches of water column will be maintained relative to adjacent unsealed areas.
8. Filters on local exhaust equipment shall conform to ANSI Z9.2 and UL 586.
9. The local exhaust system shall terminate out of doors and remote from any public access or ventilation intakes.
18 Removal of Asbestos Containing Materials
19 Worker Protection:
During work area preparation removal of ACM from the work area and final cleaning all personnel must be equipped with half-face respirators at minimum.
All personnel shall don disposable coveralls suits proper foot-head wear and gloves during removal and cleaning activities.
20 Abatement Activities:
1. Contractor to install fully operational worker/waste decontamination unit as per EPA/OSHA
Regulations.
2. Contractor to establish work area boundaries and isolate as per section 3.1 above.
3. Contractor to HEPA vacuum, wet wipe and remove all movable non-porous objects from the work area prior to gross removal activities.
4. Contractor to wet (using amended water) and double bag all loose contaminated debris within the regulated work area under dust control methods (negative air machines and critical barriers) and must be supervised by the on-site Industrial Hygiene Technician and asbestos abatement contractor’s on-site supervisor.
5. Amended Water shall be available to control any dust that may be generated during clean-up activities.
6. Once all debris have been double bagged and removed from the work area all gross removal of materials may begin.
7. Removal of Asbestos-Containing Materials shall be performed in accordance with State, Federal
EPA (NESHAPS), and Federal OSHA Regulations.
21 Project Decontamination:
1. At completion of removal, each work area shall undergo thorough visual inspection to determine that no visible asbestos materials remain.
2. After work area is certified to be visually clean by the Owners Representative PM air samples will be collected and analyzed in accordance with Section 6.3 of this Work Plan
3. Upon successful completion of visual inspection by the Owners Representative (PM) and acceptable Final Air Clearance Testing the Contractor shall encapsulate all surfaces from which ACM was removed.
22 Air Monitoring Requirements
23 OSHA Air Monitoring:
1. Contractor to retain the services of Monitoring firm to perform OSHA Personal Air Monitoring.
2. Verbal OSHA Air Monitoring results to be available within 24 hours.
3. OSHA Air Monitoring results to be posted on-site within 72 hours.
24 Air Monitoring requirements:
1. Owner’s consultant to perform Area Air Monitoring.
2. Area air samples to be located within the affected work zone out-side but adjacent to the work zone and within the clean room of the remote decontamination units.
3. Additional samples shall be located along the waste removal path.
25 Work Area Inspections:
1. Owner’s consultant shall perform pre abatement during abatement and post abatement work area inspections.
2. Owner’s consultant to keep detailed log of all activity’s visitors work procedures and paperwork associated with the abatement project.
26 Post Abatement Air Monitoring:
Owner’s consultant shall perform post abatement air monitoring in accordance with State, Federal EPA (NESHAPS), and Federal OSHA Regulations.
27 Disposal of Asbestos-Containing Waste Materials:
28 Waste Disposal:
1. Disposal of asbestos-containing waste material shall be performed in strict compliance with applicable regulations and EPA NESHAPS Regulations.
2. All ACM disposal bags shall be six (6) mil polyethylene and must contain the following labels
a. OSHA ASBESTOS WARNING LABEL
b. NESHAPS M- WARNING LABEL
c. NATIONAL PARK SERVICE
Canyon De Chelly P.O. Box 588 Chinle, AZ 86503
3. Asbestos waste dumpsters shall be properly labeled enclosed and leak-tight and kept locked when unattended.
4. Waste shipment records (Manifests) shall be provided to
a. National Park Service
b. General Contactor
c. Owners Environmental Consultant for inclusion in the final report
29 Risk Analysis
Risk Analysis is a technique to identify and assess factors that may jeopardize the success of a project or achieving a goal. This technique also helps define preventive measures to reduce the probability of these factors from occurring and identify countermeasures to successfully deal with these constraints when they develop.
30 Codes and Authorities
All work performed shall comply with applicable laws, regulations, and NPS policies and guidelines. The following list provide information to some of these policies and guidelines: (when applicable)
All units, structures and components must be constructed based on the following codes and authorities, depending upon application:
• The Code of Federal Regulation, including:
• 10 CFR Part 435 – Energy Performance Standards for Federal buildings
• 10 CFR Part 436 – Federal Energy Management and Planning Programs
• 29 CFR Parts 1910 and 1926 – Occupational Safety and Health Administration (OSHA)
• 29 CFR Part 1926 - Safety and Health Regulations for Construction.
• 40 CFR Part 763, Subpart E, Appendix E, Section 1- Polarized Light Microscopy.
• 42 CFR Part 84, Subpart K - Non-Powered Air-Purifying Particulate Respirators.
• National Emission Standards for Hazardous Air Pollutants (NESHAPs).
• International Building Code (IBC) latest edition
• National Consensus Standards, as applicable
• American Society for Testing Materials (ASTM) specifications as applicable
• American National Standards Institute (ANSI)
• ANSI C2 National Electric Safety Code
• NFPA (National Fire Protection Association) 70 and 70e – National Electric Code (NEC), most recent edition
• Underwriters Laboratories
• American Institute of Steel Construction, Inc. (AISC) Steel Construction Manual, latest edition
• American Iron and Steel Institute (AISI) Light Gauge Cold-formed Steel Design Manual, latest edition
• American Water Works Association (AWWA)
• National Science Foundation (NSF), NSF 61
• Specifications for Aluminum Structures, Aluminum Construction Manual, latest edition
• American Welding Society (AWS) specifications as applicable
• Americans with Disabilities Act and Architectural Barriers Guidelines, 2004
• American Concrete Institute publications, latest editions
• American Society of Heating, Refrigerating, and Air Conditioning Engineers (ASHRAE)
• ASHRAE Standard 62.1 Ventilation for Acceptable Indoor Air Quality
• ASHRAE Standard 90.1 Energy Standards for Buildings Except Low-Rise Residential Buildings
• ASHRAE Handbooks: Fundamentals, HVAC System and Equipment, HVAC Applications
• Architectural Woodwork Institute’s (AWI’s) Architectural Woodwork Standards, 2009 edition
• Illuminating Engineering Society (IES) of North America – Lighting Design Standards, including standards and recommendations in Chapter 10 – Lighting Design Guide
31 NPS RM-22A: Recreation Fee Collection Manual Construction Requirements
32 Construction Support
33 Staging Areas
Construction sites will be limited to the smallest feasible area and marked by the NPS.
Construction equipment and material storage shall be located in the back patio of the Visitor Center, unless directed otherwise by the CO. All staging areas shall be returned to pre-construction conditions once construction is complete. Standards for this, and methods for determining when the standards are met, shall be developed in consultation with the CO. If used, all temporary water, sewer, sanitary facilities, electric and other utilities and utility connections shall be completely removed upon project completion.
The location of trailers, storage, field offices, sheds, portable toilets and staging areas will require CO approval.
34 Construction Camp
Establishment of a construction camp will not be permitted.
35 Construction Zones
Do not disturb portions of project site beyond areas in which the Work is indicated. Construction zones shall be fenced with CO approved construction barrier fencing, chain link, plastic or portable fencing before any construction activity. The fencing shall define the construction zone and confine activity to the minimum area required for construction. All protection measures shall be clearly stated in the construction documents, and workers will be instructed to avoid conducting activities beyond the construction zone as defined by the construction zone fencing. The Contractor shall protect tree trunks and root systems of trees in or adjacent to work areas.
36 Protection of Public
The Contractor shall fence, barricade, or otherwise block off the immediate work area to prevent unauthorized entry. Erect and maintain fencing, barricades, lights, signals, and warning signs in accordance with MUTCD-2009 (With Revisions May 2012).
37 Parking of Contractor Vehicles
Parking of vehicles shall be limited to existing roads, in legally designated areas, and within approved staging area(s).
38 Access
Coordinate construction efforts with the COR such that there is minimal impact to the work of NPS personnel, other contractors, and the visiting public.
The Contractor shall allow for Government occupancy of project site, and keep roadways clear and available to the Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.
Maintain existing building in a weather tight condition throughout construction period. Repair damage caused by construction operations. Protect building during construction period.
39 Visitor Experience
The following mitigation measures shall be incorporated into the project to minimize the impacts of construction activities on the visitor experience:
• Clearly marked off work areas.
• Co-ordinate construction activities with park staff during peak visitation hours
40 Working Hour Restrictions
All work and deliveries shall be limited to the weekday business hours unless otherwise approved by the
CO. No work shall occur on NPS holidays or weekends without prior approval.
41 Environmental and Sustainability Requirements for Construction
The following are general environmental and sustainability requirements during construction, designed to minimize construction impacts.
42 Air
Employ construction practices that minimize dust production and combustion by-products.
43 Water
Avoid materials that can leach toxic chemicals into the ground water. Do not allow toxic chemicals to enter sewers or storm drains. Apply Best Management Practices, including vehicle wash-down areas, protection of equipment storage and maintenance areas, and sweeping of roadways related to hauling activities.
44 Soil (Not Used)
45 Exotic Vegetation and Noxious Weeds
Prevent the introduction and minimize the spread of exotic vegetation and noxious weeds.
Contractor shall meet the following requirements:
1) Cleaning of Equipment
a) The Contractor shall ensure that prior to moving on to the Project Area, all equipment, is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds.
Contractor shall ensure that all equipment has been pressure washed and is free of exotic species prior to start-up of operations and moving of equipment to Project Area.
Equipment shall be considered free of soil, seeds and other such debris when a visual inspection does not disclose such material. Disassembly of equipment components or specialized inspection tools is not required.
b) Contractor shall notify the Contracting Officer at least 2 days prior to moving any equipment onto the Project Area. Notification will include identifying the location of the equipment’s most recent operations. The Contractor shall arrange for the COR to inspect each piece of equipment prior to it being placed in service.
46 Vegetation Salvage and Re-vegetation Plan (Not Used)
47 Habitats (Not Used)
48 Special Status Species (Not Used)
49 Noise
Minimize noise generation during construction. Operate power equipment in accordance with local noise restrictions.
50 Materials
Use resources efficiently. Select “green” materials where possible and use construction practices that achieve the most efficient use of resources and materials.
51 Waste Management Goals
Employ processes that ensure the generation of as little waste as possible. Minimize waste generation due to over-packaging, poor planning, breakage, mishandling, contamination, error or other factors. Of the waste generated, as much as is economically feasible shall be reused, salvaged or recycled. Waste disposal in landfills shall be minimized. All material unsuitable for recycling must be disposed of, in a legal manner, at public or private dumping areas outside the park.
Materials that may be recycled include but are not limited to the following:
• Cardboard, paper, packaging
• Clean dimensional wood, pallet wood
• Beverage containers
• Concrete
• Concrete Masonry Units
• Metals from banding, ductwork, piping, rebar, roofing, etc.
• Drywall
• Paint
• Glass
• Plastics
52 Air and Water Pollution Control
Air quality impacts are expected to be temporary and localized. All necessary and reasonable measures shall be taken to reduce air and water pollution by any material or equipment used during construction. To reduce tailpipe emissions, construction equipment shall not be left idling any longer than is necessary for safety and mechanical reasons. Volatile wastes shall be stored according to best industry practices and in covered containers.
53 Cultural Resources (Not Used)
54 Quality Control
55 General
The quality of all work shall be the responsibility of the Contractor. Inspect and test all work as needed to ensure that the quality of materials, workmanship, construction, finish, and functional performance is in compliance with applicable specifications and drawings. Quality Control Daily
Reports shall be completed by the Quality Control Supervisor. Test reports shall be completed by person performing the test. Testing the soil compaction of the lagoon floors shall be performed and the exact locations of the test shall be included with the results of the test.
56 Quality Control
The Contractor's Quality Control Supervisor may also perform the duties of Project Superintendent.
The Contractor's designated Quality Control (QC) Supervisor shall be on the project site whenever contract work is in progress. The Contractor's job supervisory staff may be used to assist the QA
Supervisor, supplemented, as necessary, by additional certified testing technicians.
57 Quality Control Phases
58. Preparatory Phase
Perform before beginning each element of work.
• Review quality control submittal requirements with personnel directly responsible for the quality control work.
• Review all applicable specifications sections related to the feature of work.
• Ensure that copies of all referenced standards related to sampling, testing and execution for the feature of work are available on site.
• Ensure that provisions have been made for field control testing.
• Examine the work area to ensure that all preliminary work has been completed.
• Verify all field dimensions and advise the CO of discrepancies with contract documents.
• Ensure that necessary equipment and materials are at the project site and that they comply with approved shop drawings and submittals.
• Document all preparatory phase activities and discussions on the Contractor's Quality Control
Daily Report.
• Final Constructability checklist included and completed.
• All compliance is complete.
• No funding issues. Class A estimate is within available funds.
• Staging areas are adequate for the intended purpose.
• Noise, dust, and special safety concerns have been addressed in the special conditions.
• Hazardous material scope of work is clearly shown, quantified, and accounted for in the estimate. State and local requirements have been considered.
• If the availability of material, labor, or equipment is an issue on remote sites has it been considered in the cost estimate and in the overall contract period.
• Training and certifications have been outlined in the individual spec sections
• Project schedule requirements are up to date and appropriate for the project size and complexity.
• Submittal requirements match internal NPS/DSC processes
• All reference standards have been incorporated.
• Quality control staff requirements are appropriate.
• All required forms have been attached to individual specification sections.
• Requirements for compliance with applicable laws, environmental regulations, and ordinances have been included.
58 Initial Phase
As soon as work begins, inspect, and test a representative portion of a particular element of work for quality of workmanship.
• Review control testing procedures to ensure compliance with contract requirements.
• Document all initial phase activities and discussions on the Contractor's Quality Control Daily
Report. Exact location of initial phase shall be indicated for future reference and comparison with follow-up phases.
59 Follow-Up Phase
Inspect and test as work progresses to ensure compliance with contract requirements until completion of work.
60 Additional Preparatory and Initial Phases
Additional preparatory and initial phases may be required on the same element of work for the following reasons:
• Quality of on-going work is unacceptable.
• Changes occur in the applicable quality control staff, on-site production supervision, or work crew.
• Work on a particular element of work is resumed after a substantial period of inactivity.
61 Execution
62 Off-Site-Control
Items that are fabricated or assembled off-site shall be inspected for quality control at the place of fabrication.
63 On-Site Control
Notify the CO at least 48 hours in advance of the preparatory phase meeting and notify the CO at least 24 hours in advance of the initial and follow-up phases.
64 Documentation
Maintain Quality Control Daily Reports, Daily Test Report Information Sheets, and Accessibility
Inspection Reports (attached) of quality control activities and tests.
Quality Control Daily Reports may not be substituted for other written reports required under clauses of the contract, such as Disputes, Differing Site Conditions, or Changes.
65 Enforcement
The Contractor shall stop work on any item or feature pending satisfactory correction of any deficiency noted by the Contractor’s quality control staff or the CO.
Temporary Materials, Equipment and Services
Temporary materials may be new or used but must be adequate in capacity for the required usage, must not create unsafe conditions, and must not violate requirements of applicable codes and standards.
66 Fire Protection Equipment
Observe and enforce standards of fire prevention. No open fires shall be allowed. A capable and qualified person shall be placed in charge of fire protection. The responsibilities shall include locating and maintaining fire protective equipment and establishing and maintaining safe torch cutting and welding procedures (see section 4.7.6).
67 Vehicles and Equipment
Provide one fire extinguisher on each vehicle or piece of equipment. Extinguishers shall have a minimum UL rating of 2-A: 10-B: C.
68 Hazard Control
Take all necessary precautions to prevent fire during construction. Do not store flammable or combustible liquids in existing structures. Provide adequate ventilation during use of volatile or noxious substances.
69 Spark Arresters
Equip all gasoline or diesel powered equipment used in potential forest or grass fire locations with spark arresters approved by the U. S. Forest Service. Written determinations of areas and periods of potential fire hazard will be issued by CO. Locate internal combustion equipment so that exhausts discharge well away from combustible materials. Locate service areas a minimum of 50 feet from buildings. Shut down equipment before refueling.
70 Smoking
Smoking within buildings or temporary storage sheds is prohibited. A designated smoking area will be identified by NPS.
71 Welding
Cutting by torch or welding shall be performed only when adequate fire protection is provided. A Hot
Work Permit, issued by the park, is required for any activity that has the potential to produce flames or sparks.
72 Electricity
Coordinate work with park POC. NPS will provide this utility.
73 Telephone
Limited cell phone service is available at the project site.
74 Water
NPS shall provide access to potable water and pay costs.
75 Heating and Cooling (Not Used)
76 Sanitary Facilities
The Contractor shall provide and maintain temporary toilet facilities in accordance with State Health
Department and NPS regulations for use of Contractor’s personnel. Completely remove sanitary facilities upon completion of work.
77 Preservation of Adjacent Features
Confine all operations to work limits of the project. Prevent damage to natural surroundings. Restore damaged areas outside the work limits, repairing or replacing damaged trees and plants, at no additional expense to the NPS.
Do not remove, injure or destroy trees or other plants without prior approval. Consult with the CO.
Remove agreed upon roots and branches that interfere with construction. Do not fasten ropes, cables, or guys to existing trees. Carefully supervise excavation, grading, backfilling, and other construction operations near trees and plants, to prevent damage.
78 Maintaining Existing Utilities
Location of existing utilities is the responsibility of the Contractor. Disruptions of services shall be kept to a minimum. The Contractor shall coordinate with the local utility companies. All disruptions shall be arranged at least 48 hours in advance with the NPS and must be approved by the CO.
Construction procedures will prevent accidental disruptions to facilities outside the project limits by investigation of existing utilities and protection during construction: accidental disruptions shall be remedied at no cost to the NPS.
79 Hauling Restrictions
Comply with all legal and local load restrictions in the hauling of materials.
80 Accident Prevention
81 Accident Prevention Program
Prior to the Preconstruction Meeting, submit a site-specific accident prevention program. The program must be accepted by the NPS before any on site work can begin.
82 Accident Reporting
Reportable accidents, defined as death, occupational disease, traumatic injury to Contractor’s personnel, NPS employees or the public, property damage of any accident and fires, must be reported immediately. Complete an Accident/Property Damage Report (attached Form CM-22) and forward to the CO within seven days.
83 Quality Assurance
Ensure that all employees are physically qualified to perform their assigned duties in a safe manner.
Do not allow employees to work if their abilities are impaired. Operators of all equipment shall be able to understand signs, signals and operating instructions, and be capable of operating such equipment.
84 Safety Measures
Provide the following:
• First aid supplies
• Personal protective equipment that meets the requirements of NIOSH and MSHA
• Emergency instructions, including telephone numbers and reporting instruction for ambulance, physician, hospital, fire department and park police. Place in conspicuous locations at the worksite
• Adequate egress always in accordance with the Life Safety Code (NFPA 241)
• Hard hats for all employees and for up to 6 visitors
• Designate and post signs in all hard hat areas
85 Housekeeping
Keep project neat, orderly, and in a safe condition at all times.
86 Cleaning
Before scheduling the final inspection, remove all tools, equipment, surplus materials, and rubbish.
Restore or refinish surfaces that are damaged due to work of this contract to original condition.
Remove grease, dirt, stains, foreign materials, and labels from finished surfaces. Thoroughly clean building interiors. Pick up and remove all construction debris from the site. At time of final inspection, project shall be thoroughly clean and ready for use.
87 System Demonstration and Training (As Applicable)
Train designated personnel in adjustment, operation, including seasonal and emergency operations, if applicable; maintenance; and safety requirements of equipment and systems. Instructors shall be thoroughly trained in operating theory as well as practical operation and maintenance work for each type of equipment or system. The sequence of the training shall follow the approved outline of the training guide; i.e. Operating and Maintenance Data. Individual sections specify the duration of training required. If no duration is listed, provide training of sufficient duration to adequately cover the subjects.
88 Substantial Completion and Final Inspection
Submit written certification that project, or designated portion of project, is substantially complete, and request, in writing, a final inspection. Upon receipt of written request that project is substantially complete, the CO will proceed with inspection within 10 calendar days of receipt of request or will advise the Contractor of items that prevent the project from being designated as substantially complete.
When work is determined to be substantially complete, a list of deficiencies ("Punch List") shall be drafted and be corrected before final acceptance. The COR/POC is the official accepting the project complete and verifies all items have been corrected.
Project Description and Technical Requirements
89 Existing Conditions
90 Background
The beautiful Canyon de Chelly lies in the heart of the Navajo Nation located near the Four Corners area in northeastern Arizona. The canyon is home to a variety of cliff dwellings and additional archeologically significant sites as well as an important cultural site for the Navajo Nation. Canyon de Chelly National
Monument was established as a National Park Service (NPS) unit in 1931 and features numerous structures important in the development of the NPS, including the subject of this scope of work – the
Visitor Center.
91 Existing Site Description
The existing visitor center at Canyon de Chelly was built in the mid 1960’s, under the NPS “Mission
66” program. This program was created after World War II to modernize, enlarge, and reinvent the
National Park System. The visitor center was designed by Cecil Doty, an architect with the NPS. Doty is well known for the quantity and quality of his design work for the NPS, beginning in the 1930’s, and contributing to the development of the “NPS Rustic Style.” In the 1950’s and 1960’s, Doty made the transition to a more modernist style, stripped of obvious associations with regional context. Doty's designs are also known for being modest and utilitarian.
The visitor center is constructed with a combination of reinforced concrete block masonry walls, wood frame walls, heavy timber construction using glue-laminated beams and rigid frames
(assembled with bolted steel connectors), and wood joists and rafters. The floors are slab on grade, and the foundations are reinforced concrete block on concrete spread footings. Finishes include resilient tile, carpeting, gypsum board, acoustic ceiling tile, wood paneling, tongue and groove ceiling boards and plywood decking. Originally, the building had large, roofed “portals” at the front and rear entrances, and a built-up roof.
The original mechanical and electrical systems were conventional for their time. The original mechanical system had a furnace and evaporative cooler in the mechanical room, connected to supply air ductwork under the floors and return air ductwork above the ceiling in the lobby and main hallway.
The building is served by a municipal sewer system. There is no fire suppression system.
The building has had many alterations over the years. Although some of the modifications are minor, major modifications include enclosure of the front and rear portals with wood framing and windows, the creation of an office under a portion of the rear portal, enlargement and remodeling of the restrooms and mechanical room, addition of a fireplace in the lobby, accessibility modifications, and roofing over of the trellis on the southeast. The entire building has been covered with standing seam metal roofing; but it is not obvious if the original built-up roof is still there.
The mechanical and electrical systems have been incrementally modified over the years, as well. The heating system now has two gas-fired furnaces, tied into the original heating and cooling ductwork. In addition, three evaporative coolers have been installed on the roof, connected to ductwork in the attic, which supplies different “zones.”
The building has been tested for asbestos floor tiles.
92 Detailed Project Description
There are two layers, one carpet and the other asbestos tiles in the Admin office. The top layer was installed in 1980 over the existing asbestos tile and mastic. Both layers are damaged and required removal for new carpet tiles. The original tile and mastic (Flintkote Classic XI) are damaged and presents an indoor air quality hazard.
Primary factors to consider will be that the existing asbestos floor tiles will be replaced with new carpet tile floors and vinyl cove base at later date. The new construction will fit sensitively into the existing building and materials will require little maintenance and be of durable construction techniques. Electrical utility is available at the Visitor Center and is to be provided.
93 General Site Notes
• The contractor shall obtain, at his own expense, applicable codes, licenses, standards, specifications, permits, bonds, etc. which are necessary to perform the work.
• The contractor shall be responsible for notifying the contracting officer at least 48 hours prior to start up or restart of any work.
• The contractor shall be responsible for the protection of all utilities and repair of utilities if damaged. Repair shall be done at no additional cost to the government. All work in utility easements shall be performed according to the requirements of the governing agency.
• The contractor shall provide temporary barricades, signage and other forms of protection as required to protect government personnel and the public from injury due to construction activities.
• Do not damage adjacent properties (including fences). The contractor shall promptly repair any damage to adjacent properties at no additional cost to the government.
• The contractor shall conduct construction operations in a manner to ensure minimum interference with roads, trails, walks, and other facilities. Do not close, block or obstruct roads, walks, or other facilities without the contracting officer's written permission. Provide alternate routes around closed or obstructed traffic ways (including sidewalks, etc., assume required safety and access measures necessary to protect the public during construction operations).
• The contractor shall ensure all new paved surfaces meet ABAAS guidelines.
• All affected areas must be restored to their original condition from before the work began. Any damages will be fixed and repaired at no cost to the government.
94 Demolition Notes
• All items indicated for removal and excess items shall be disposed of by the contractor, off-site, legally. Items to be removed may include trash, rubbish, concrete, and other miscellaneous items present.
• Utilities shown are for information only. It is the responsibility of the contractor to locate and protect all existing utilities. Any damage caused by the contractor shall be repaired to the satisfaction of the government at no additional cost.
• Contractor shall take all necessary precautions to protect existing roadways, walks, curb and gutter, signs, utilities, and vegetation. Damage to existing features caused by construction activities shall be replaced at the contractor's expense.
• Contractor shall not disturb areas outside of work scope.
• Protect interior walls and carpet in place.
95 Layout Notes
• All dimensions shall be field verified by contractor prior to construction. Any deviation from these plans must be approved by contracting officer prior to construction.
• Notify contracting officer immediately of any discrepancy between written coordinate points/elevations and digital information.
• Contractor shall use water sprinkling and other suitable methods to limit dust and dirt scattering when requested by the government. Do not use water when it may create hazardous conditions such as icing, flooding or runoff pollution.
• Contractor shall field verify site conditions and base bid on actual conditions and measurements.
• Contractor shall provide smooth finish grade free of ruts, depressions, and irregularities.
96 Project Schedule
Upon award, the Contractor shall determine and provide a schedule for completion of the project, including identification of probable critical paths. The schedule shall include milestones and elements, and any others identified by the Contractor:
Upon acceptance of the Schedule by the Contracting Officer, the Schedule will be used to evaluate the
Contractor's monthly applications for payment, if applicable. The schedule shall be updated and transmitted to the CO before the Kick-off meeting, and immediately if any adjustments impacting the schedule by a week or more are required.
97 Additional Information
98 General Information:
Electric is available at the site All connections to existing panels if available shall be the responsibility of the Contractor utilizing licensed Electrician All other existing electric within the work areas shall be shut-down or protected with ground fault circuit interrupters (GFCIs).
Fire extinguishers first aid kits and spill kits will be readily available at the site at all times at minimum fire extinguishers shall be ABC rated unless otherwise directed by the owner and/or the Owners representative.
The Contractor shall make sure that all dislodged asbestos containing materials are removed from the substrate and all debris/waste is removed at the end of each work shift Containment/engineering controls shall remain in operation all waste materials bagged and placed in secure location/locked on-site waste container all equipment/supplies and the site secured at the end of each work shift.
99 Environmental, Safety, and Health Compliance:
The Contractor shall comply with those applicable laws, ordinances, criteria, rules, and regulations of
Federal State regional and local authorities regarding handling, storing, transporting, and disposing of asbestos waste materials including the applicable requirements of the current issue of 29 CFR, Part
1926.1101, 40 CFR, Part 61, SUB-PART A and 40 CFR, Part 61, SUB-PART M. Where the requirements of this work plan applicable laws, Rules, criteria, ordinances, regulations and referenced documents vary, the most stringent requirements as defined by the Government shall apply.
100 Fire and Medical Emergencies:
Contractor shall maintain First-Aid Kits at all active work areas for treatment of minor cuts and scratches. Fire extinguishers shall be maintained in the building throughout the asbestos removal project and used in the event of small scale fire as first response.
IN THE CASE OF FIRE AND MEDICAL EMERGENCIES the Contractor shall
Contact:
DIAL 928-608-6301 FOR EMERGENCY SERVICES