A04_Attachment 3 - Drawings.pdf
PDF 26 MB Posted
- Attached to
- Beckwourth District Office Water System
- Solicitation number
- 1240LT26Q0114
- Issued by
-
Department of Agriculture Forest Service
About this file
This file contains architectural and engineering drawings for the Beckwourth District Office water system project located at 23 Mohawk Highway, Blairsden, California in Plumas County. The drawings package includes title sheets, general notes, water system plans, plan and profile sheets, civil details, plumas county-specific details, and electrical symbols and abbreviations prepared by JCA/AET JV as the architecture and engineering team lead, with Provost & Pritchard Consulting Group providing civil engineering, electrical engineering, and survey services. The project involves demolition and abandonment of the existing onsite water system, construction of a new water distribution system featuring approximately 10,890 linear feet of 6-inch HDPE main line with service laterals ranging from 1 to 2 inches in diameter, installation of backflow preventor with pressure reducing valves, fire hydrants, shutoff valves, and connections to existing building plumbing. Key infrastructure components include two fire hydrants, multiple isolation valves and pressure reducing valve assemblies in seven valve boxes serving different building groups, a 3-inch water meter connection, pavement and hardscape restoration where pipe trenching crosses county roads and private parking areas, and installation of a heated aluminum backflow preventor enclosure with electrical service requiring a new 20-ampere circuit. The drawings specify minimum 3-foot cover on the 6-inch main in paved areas and 2-foot minimum cover on service laterals in landscaped areas, require coordination with Plumas County for encroachment permits and standards compliance, and designate all work to maintain protection of existing sanitary sewer, electrical lines, and other site utilities during construction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 4 - Wage Determination.pdf | ||
| 1240LT26Q0114 Beckwourth Water System Upgrades.pdf | ||
| Attachment 1 - Schedule of Items.xlsx | XLSX spreadsheet | |
| A04_Attachment 2 - Statement of Work.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
© 2024 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS © 2023 TomTom
DRAWN
DESIGNER
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
6/4 /24
:3
3 A
ND
YS
G
:\J
CA
-A
ET
JV
-4
8\4
-P
LU
M
AS
N F
BE
CK
W
OU
RT
H
W
AT
ER
D
IS
T
SY
ST
EM
\30
0 C
AD
\34 0 S
HE
ET
S
ET
S\
_G
EN
ER
AL
\G -0
0 T
IT
LE
S
HE
ET
.D W
G;
R5
PACIFIC SOUTHWEST
WATER
DISTRIBUTION
SYSTEM
BECKWOURTH
D.O.
PLUMAS NATIONAL
FOREST
REGION 5
TITLE SHEET
5/09/24
AS
SM
AS
50% DESIGN SUBMITTAL
95% DESIGN SUBMITTAL
100% DESIGN SUBMITTAL 5/09/24
4/03/24
1/17/24
ARCHITECTURE AND ENGINEERING TEAM LEAD:
JCA/AET JV
7 FREELON STREET
SAN FRANCISCO, CA 94107
CONTACT: STEVE GRIST, RA, AIA
TEL: 415-762-8388 x 35
CIVIL ENGINEERING, ELECTRICAL ENGINEERING,
AND SURVEY:
PROVOST & PRITCHARD CONSULTING GROUP
3387 BODERO LANE
CHICO, CA 95973
CONTACT: ANDY SCHEER, PE
TEL: 866-766-6200
KEY NOTE
1. DEMOLITION/ABANDONEMENT OF EXISTING ONSITE WATER
SYSTEM.
2. CONSTRUCTION OF A NEW ONSITE WATER SYSTEM INCLUDING
BACKFLOW PREVENTOR, PRESSURE REDUCING VALVES, FIRE
HYDRANTS, AND CONNECTIONS TO EXISTING BUILDING PLUMBING.
3. RESTORATION OF PAVEMENT WHERE PIPE TRENCHING CROSSES
COUNTY ROADS AND PRIVATE PARKING LOTS AND HARDSCAPE.
4. PROTECTION OF EXISTING SANITARY SEWER, ELECTRICAL LINES
AND ALL OTHER SITE UTILITIES.
5. INSTALLATION OF NEW ELECTRICAL CIRCUIT FOR BACKFLOW
PREVENTOR ENCLOSURE HEATER.
THE DRAWINGS AND SPECIFICATIONS PREPARED BY JCA/AET., FOR THIS PROJECT DO
NOT INCLUDE THE HANDLING AND REMOVAL OF HAZARDOUS BEARING MATERIALS. THE
SITE MAY CONTAIN HAZARDOUS MATERIAL. THE CONTRACTING OFFICER AND THE
CONTRACTOR SHALL DETERMINE HOW BEST TO LEGALLY REMOVE, TRANSPORT AND
DISPOSE OF THE HAZARDOUS BEARING MATERIALS PER EPA AND ALL OTHER
APPLICABLE CODES AND REGULATIONS.
A-501
REFERENCE DRAWING NUMBER
SHEET WHERE REFERENCE
DRAWING IS LOCATED
A-501
ELEVATION OR SECTION
DRAWING NUMBER
SHEET WHERE DRAWING IS
LOCATED
1 REVISION CHANGE
INDICATOR (POST BID
SETS ONLY)
WATER DISTRIBUTION SYSTEM
BECKWOURTH DISTRICT OFFICE
PLUMAS NATIONAL FOREST
PACIFIC SOUTHWEST, REGION 5, CALIFORNIA
NOT TO SCALE
PROJECT AREA:
23 MOHAWK HWY RD
BLAIRSDEN, CALIFORNIA
PLUMAS NATIONAL FOREST
A.B. ANCHOR BOLT
ABA THE ARCHITECTURAL
BARRIERS ACT
ABV. ABOVE
ABBREV. ABBREVIATIONS
A.F.F. ABOVE FINISH FLOOR
ALT. ALTERNATE
ALUM. ALUMINUM
AP ACCESS PANEL
APPROX. APPROXIMATE
AWS AMERICAN WELDING
SOCIETY
BOD BASIS OF DESIGN
BD. BOARD
BLDG. BUILDING
CG CORNER GUARD
CL CENTER LINE
CLG. CEILING
CLR CLEAR
DEMO. DEMOLITION
DIA. DIAMETER
DIM. DIMENSION
DTL. DETAIL
DWG(S). DRAWING(S)
(E) EXISTING
EA. EACH
ELEV. ELEVATION
ELEC. ELECTRICAL
EQ. EQUAL
E.W. EACH WAY
FCO FLOOR CLEAN OUT
FE FIRE EXTINGUISHER
FIN. FINISH
FIX. FIXTURE
FL. FLOOR
F.O. FACE OF
FRAM'G. FRAMING
FR FIRE RETARDANT
FRT FLAME RETARDANT
TREATED OR FIRE
RETARDANT TREATED
FT. FOOT OR FEET
GA GAUGE
GALV. GALVANIZED
GLAZ. GLAZING
GYP. GYPSUM
H.M. HOLLOW METAL
HT. HEIGHT
HVAC HEATING,
VENTILATING, AND AIR
CONDITIONING
IBC INTERNATIONAL
BUILDING CODE
IEC INTERNATIONAL
ELECTRICAL CODE
IFC INTERNATIONAL FIRE
CODE
IMC INTERNATIONAL
MECHANICAL CODE
INSUL. INSULATION
INT. INTERIOR
IPC INTERNATIONAL
PLUMBING CODE
LAV. LAVATORY
MAT'L. MATERIAL
MAX. MAXIMUM
MECH. MECHANICAL
MEP. MECHANICAL,
ELECTRICAL &
PLUMBING
MISC. MISCELLANEOUS
MIN. MINIMUM
MMR MOLD & MOISTURE
RESISTANT
MTD. MOUNTED
MTL. METAL
(A) NEW
N/A NOT APPLICABLE
NFPA NATIONAL FIRE
PROTECTION
ASSOCIATION
N.I.C NOT IN CONTRACT
NO./# NUMBER
N.T.S. NOT TO SCALE
O.C. ON CENTER
OPN'G OPENING
P.A.F. POWDER ACTUATED
FASTENER
PL PLATE
PLYWD PLYWOOD
PR. PAIR
PREP. PREPARATION
PEMBS PRE-ENGINEERED
METAL BUILDING
SYSTEM
PREFAB. PREFABRICATED
RCP REFLECTED CEILING
PLAN
REINF. REINFORCING
REQ'D. REQUIRED
REV. REVISION
R.O. ROUGH OPENING
S.C.D. SEE CIVIL DRAWINGS
S.E.D. SEE ELECTRICAL
DRAWINGS
S.F. SQUARE FEET
S.F.P.D. SEE FIRE PROTECTION
DRAWINGS
SHELV. SHELVING
SHT. SHEET
SIM. SIMILAR
S.M. SHEET METAL
S.M.D. SEE MECH. DRAWINGS
S.P.D. SEE PLUMB.
DRAWINGS
SPEC. SPECIFICATIONS
S.S.D. SEE STRUCTURAL
DRAWINGS
SS STAINLESS STEEL
STC SOUND TRANSMISSION
CLASS
STL. STEEL
T&B TOP & BOTTOM
THK. THICK
T.O. TOP OF
TYP. TYPICAL
UL UNDERWRITERS'
LABORATORY
U.N.O. UNLESS OTHERWISE
NOTED
V.I.F. VERIFY IN FIELD
W/ WITH
WCO WALL CLEANOUT
WT. WEIGHT
Ø/DIA. DIAMETER
# POUND OR NUMBER
℄ CENTER LINE
INTERNATIONAL BUILDING CODE (IBC)
UPC
TITLE 24 ENERGY CODE
ABA ACCESSIBILITY STANDARDS
NFPA
GRAEAGLE LAND AND WATER COMPANY CUSTOMER CONNECTION STANDARDS
PLUMAS COUNTY ROAD CROSSING AND PAVEMENT RESTORATION STANDARDS
PROJECT SITE
SCOPE OF WORK LEGEND DIRECTORY
ABBREVIATIONSVICINITY MAP
HAZARDOUS MATERIALSCODE REFERENCES
PR
O
PE
R
TY
O
F U
N
IT
E D
S
TA
TE
S
G O
VE
R
N M
EN
T
- F O
R O
FF
IC
IA
L
U
SE
O N
LY
TRUE NORTH
G-01 - TITLE SHEET
G-02 - GENERAL NOTES
C-01 - EXISTING CONDITIONS AND DEMOLITION PLAN
C-02 - WATER SYSTEM PLAN
C-03 - PLAN AND PROFILE SOUTH
C-04 - PLAN AND PROFILE NORTH
C-05 - CIVIL DETAILS
C-06 - PLUMAS COUNTY DETAILS
E-01 - ELECTRICAL SYMBOLS AND ABBREVIATIONS
E-02 - GENERAL ELECTRICAL
SHEET LIST
PROPERTY OF THE UNITED STATES
GOVERNMENT. COPYING, DISSEMINATION, OR
DISTRIBUTION OF THESE DRAWINGS, PLANS OR
SPECIFICATIONS TO UNAUTHORIZED PERSONS
IS PROHIBITED.
6/05/24
DESIGNER
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
5/7 /24
:1
9 S
AW
YE
R
G:
\JC
A-
AE
T
JV
-4
8\4
-P
LU
MA
S
NF
B
EC
KW
OU
RT
H
W
AT
ER
D
IS
T
SY
ST
EM
\30
0 C
AD
\34 0 S
HE
ET
S
ET
S\
_G
EN
ER
AL
\G -0
1 G
EN
ER
AL
N
OT
ES
.D
W G;
PR
OP
ER
TY
O F
UN
IT
ED
S
TA
TE
S
GO
VE
RN
ME
NT
FO
R
OF
FI
CI
AL
U
SE
O
NL
Y
R5
PACIFIC SOUTHWEST
WATER
DISTRIBUTION
SYSTEM
BECKWOURTH
D.O.
PLUMAS NATIONAL
FOREST
REGION 5
GENERAL NOTES
5/09/24
AS
SM
AS
G-02 2 10
50% DESIGN SUBMITTAL
95% DESIGN SUBMITTAL
100% DESIGN SUBMITTAL 5/09/24
4/03/24
1/17/24
SPECIAL NOTE
WHERE UNDERGROUND AND SURFACE STRUCTURES ARE SHOWN ON THE PLANS, THE LOCATIONS, DEPTH AND DIMENSIONS OF STRUCTURES ARE BELIEVED TO BE REASONABLY CORRECT, BUT ARE NOT GUARANTEED. SUCH STRUCTURES ARE SHOWN FOR THE INFORMATION OF THE CONTRACTOR, BUT INFORMATION SO GIVEN IS NOT TO BE CONSTRUED AS A REPRESENTATION THAT SUCH STRUCTURES WILL, IN ALL CASES, BE FOUND WHERE SHOWN, OR THAT THEY REPRESENT ALL OF THE STRUCTURES WHICH MAY BE
ENCOUNTERED.
SITE SAFETY AND PROTECTION NOTES
THE DUTY OF THE GOVERNMENT OR ITS AGENTS TO CONDUCT CONSTRUCTION REVIEW OF THE CONTRACTOR'S PERFORMANCE AND THE UNDERTAKING OF INSPECTIONS OR THE GIVING OF INSTRUCTIONS AS AUTHORIZED HEREIN IS NOT INTENDED TO INCLUDE REVIEW OF THE ADEQUACY OF THE CONTRACTOR'S SAFETY MEASURES IN, ON, OR NEAR THE CONSTRUCTION SITE AND MUST NOT BE CONSTRUED AS SUPERVISION OF THE ACTUAL CONSTRUCTION NOR MAKE THE GOVERNMENT OR ITS AGENTS RESPONSIBLE FOR PROVIDING A SAFE PLACE FOR THE PERFORMANCE OF WORK BY THE CONTRACTOR, SUBCONTRACTORS, OR SUPPLIERS, OR FOR ACCESS, VISITS, USE, WORK, TRAVEL OR OCCUPANCY BY ANY PERSON.
THE CONTRACTOR MUST HAVE AT THE WORK SITE, COPIES OR SUITABLE EXTRACTS OF CONSTRUCTION SAFETY ORDERS, ISSUED BY CAL-OSHA. CONTRACTOR MUST COMPLY WITH PROVISIONS OF THESE AND ALL OTHER APPLICABLE LAWS, ORDINANCES AND REGULATIONS. THE CONTRACTOR MUST COMPLY WITH PROVISIONS OF THE SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION, PROMULGATED BY THE SECRETARY OF LABOR UNDER SECTION 107 OF THE CONTRACT WORK HOURS AND SAFETY STANDARDS ACT, AS
SET FORTH IN TITLE 29 C.F.R.
TO PROTECT THE LIVES AND HEALTH OF CONTRACTOR'S EMPLOYEES UNDER THE CONTRACT, THE CONTRACTOR MUST COMPLY WITH ALL PERTINENT PROVISIONS OF THE "MANUAL OF ACCIDENT PREVENTION IN CONSTRUCTION" ISSUED BY THE ASSOCIATED GENERAL CONTRACTORS OF AMERICA, INC., AND MUST MAINTAIN AN ACCURATE RECORD OF ALL CASES OF DEATH, OCCUPATIONAL DISEASE, AND INJURY REQUIRING MEDICAL ATTENTION OR CAUSING LOSS OF TIME FROM WORK, ARISING OUT OF AND IN THE COURSE OF EMPLOYMENT
OR WORK UNDER THE CONTRACT.
THE CONTRACTOR ALONE MUST BE RESPONSIBLE FOR THE SAFETY, EFFICIENCY, AND ADEQUACY OF CONTRACTOR'S FACILITIES, APPLIANCES, AND METHODS AND FOR ANY DAMAGE, WHICH MAY RESULT FROM THEIR FAILURE OR THEIR IMPROPER CONSTRUCTION, MAINTENANCE OR OPERATION.
THE CONTRACTOR AGREES THAT IT MUST ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT MUST APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR MUST DEFEND, INDEMNIFY AND HOLD THE GOVERNMENT, JCA-AET, PROVOST & PRITCHARD CONSULTING GROUP, AND THEIR RESPECTIVE AGENTS HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY
ARISING FROM THE SOLE NEGLIGENCE OF GOVERNMENT OR THEIR RESPECTIVE AGENTS.
THE GOVERNMENT AND ITS AGENTS' SITE RESPONSIBILITIES ARE LIMITED SOLELY TO THE ACTIVITIES OF THEIR EMPLOYEES ON SITE.
THESE RESPONSIBILITIES MUST NOT BE INFERRED BY ANY PARTY TO MEAN THAT THE GOVERNMENT OR ITS AGENTS HAVE RESPONSIBILITY FOR SITE SAFETY. SAFETY IN, ON, OR ABOUT THE SITE IS THE SOLE AND EXCLUSIVE RESPONSIBILITY OF THE CONTRACTOR ALONE. THE CONTRACTOR'S METHODS OF WORK PERFORMANCE, SUPERINTENDENCE AND THE CONTRACTOR'S EMPLOYEES, AND SEQUENCING OF CONSTRUCTION ARE ALSO THE SOLE AND EXCLUSIVE RESPONSIBILITIES OF THE CONTRACTOR
ALONE.
GENERAL NOTES
1. THE GOVERNMENT MUST BE CONTACTED AT LEAST 48 HOURS PRIOR TO COMMENCEMENT OF WORK ON OR
NEAR EXISTING GOVERNMENT FACILITIES.
2. USED MATERIAL, REJECTS, MISFITS, OR SECONDS, ETC. ARE NOT ACCEPTABLE FOR USE ON GOVERNMENT
FACILITIES.
3. ALL CONSTRUCTION MUST BE IN CONFORMANCE WITH THESE PLANS, PROJECT SPECIFICATIONS AND
GOVERNMENT SPECIFICATIONS.
4. CONTRACTOR MUST FIELD VERIFY THE HORIZONTAL AND VERTICAL LOCATIONS OF ALL EXISTING FACILITIES PRIOR TO COMMENCING WORK. CALL UNDERGROUND SERVICE ALERT (USA) AT 8-1-1. CONTRACTOR MUST
MAKE GOVERNMENT AWARE OF ANY DISCREPANCIES.
5. ALL CONSTRUCTION MUST BE PERFORMED IN ACCORDANCE WITH APPLICABLE HEALTH AND SAFETY LAWS OF
THE STATE OF CALIFORNIA AND CAL/OSHA STANDARDS.
6. TRENCH BACKFILL MUST BE COMPACTED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS .
7. ALL EXCESS MATERIAL AND/OR DEBRIS MUST BE REMOVED UPON COMPLETION OF INSTALLATION.
8. CONTRACTOR MUST BE RESPONSIBLE FOR PROVIDING ADEQUATE DUST CONTROL AT ALL TIMES.
9. WORK TO TAKE PLACE WITHIN PLUMAS COUNTY RIGHT-OF-WAY IS TO BE COORDINATED WITH THE COUNTY BY THE CONTRACTOR. CONTRACTOR TO OBTAIN ALL NECESSARY ENCROACHMENT PERMITS AND ENSURE THAT
WORK CONFORMS WITH COUNTY STANDARDS AND REQUIREMENTS.
PR
O
PE
R
TY
O
F U
N
IT
ED
S
TA
TE
S G
O
VE
R N
M
EN
T
- F
O R
O
FF
IC
IA
L U
SE
O
N
LY
BENCHMARKS
PROJECT BENCHMARK
NGS STATION "HPGN D CA 03 MN", AN ALUMINUM CALTRANS DISK
SET ON THE SOUTH SIDE OF HIGHWAY 70, 1 MILE EAST OF
HIGHWAY 89.
ELEVATION = 4889.50' NAVD88 DATUM
TOPOGRAPHY NOTE
TOPOGRAPHY SHOWN WAS COLLECTED BY PROVOST &
PRITCHARD CONSULTING GROUP DURING A FIELD SURVEY
CONDUCTED IN NOVEMBER OF 2023.
BOUNDARY NOTE
THE BOUNDARY/EASEMENT INFORMATION SHOWN ON THESE
PLANS IS BASED UPON RECORD INFORMATION TIED TO LIMITED
PHYSICAL MONUMENTS, AND WAS PREPARED UNDER THE
DIRECTION OF TIMOTHY M. ODOM, PLS 8468, AND SHOULD BE
CONSIDERED APPROXIMATE.
BASIS OF BEARINGS
THE CALIFORNIA COORDINATE SYSTEM OF 1983, ZONE 1,
ESTABLISHED LOCALLY BY STATIC AND RTK GPS OBSERVATIONS.
www.provostandpritchard.com
LINE & CURVE TABLE
NUMBER
C1
L1
L2
L3
L4
L5
L6
L7
L8
L9
L10
L11
L12
L13
L14
L15
L16
L17
L18
L19
L20
L21
L22
L23
LENGTH
8.18
5.80
12.63
4.16
41.65
45.35
14.60
140.32
70.71
35.16
48.11
25.74
33.02
28.32
13.83
80.29
37.43
186.84
50.56
20.94
7.52
73.28
15.46
89.91
RADIUS
50.00
LINE/CHORD DIRECTION
N32° 53' 27.44"E
N49° 21' 37.78"E
S39° 17' 54.51"E
S84° 17' 54.51"E
N73° 12' 05.49"E
N28° 12' 05.49"E
N37° 34' 49.39"E
N37° 34' 49.39"E
N52° 25' 10.61"W
N7° 25' 10.61"W
N52° 25' 10.61"W
N37° 34' 49.39"E
N82° 34' 49.39"E
N37° 34' 49.39"E
N7° 25' 10.61"W
N52° 25' 10.61"W
S82° 34' 49.39"W
S37° 34' 49.39"W
S7° 25' 10.61"E
S52° 53' 55.73"E
N83° 16' 50.16"E
S52° 57' 59.44"E
S11° 09' 26.92"E
S52° 53' 55.73"E
DELTA
9° 22' 44"
START STA
1+09.59 N:1807868.25 E:6946006.70
0+00.00 N:1807822.66 E:6945928.86
0+05.80 N:1807826.43 E:6945933.26
0+18.43 N:1807816.66 E:6945941.26
0+22.59 N:1807816.24 E:6945945.40
0+64.24 N:1807828.28 E:6945985.27
1+17.78 N:1807875.11 E:6946011.14
1+32.37 N:1807886.68 E:6946020.05
2+72.69 N:1807997.89 E:6946105.62
3+43.40 N:1808041.01 E:6946049.59
3+78.56 N:1808075.87 E:6946045.05
4+26.67 N:1808105.22 E:6946006.92
4+52.41 N:1808125.61 E:6946022.62
4+85.43 N:1808129.88 E:6946055.36
5+13.75 N:1808152.32 E:6946072.63
5+27.58 N:1808166.04 E:6946070.85
6+07.88 N:1808215.01 E:6946007.22
6+45.31 N:1808210.18 E:6945970.10
8+32.15 N:1808062.10 E:6945856.15
8+82.70 N:1808011.97 E:6945862.68
9+03.65 N:1807999.34 E:6945879.38
9+11.16 N:1808000.22 E:6945886.85
9+84.44 N:1807956.08 E:6945945.34
9+99.90 N:1807940.92 E:6945948.34
END STA
1+17.78 N:1807875.11 E:6946011.14
0+05.80 N:1807826.43 E:6945933.26
0+18.43 N:1807816.66 E:6945941.26
0+22.59 N:1807816.24 E:6945945.40
0+64.24 N:1807828.28 E:6945985.27
1+09.59 N:1807868.25 E:6946006.70
1+32.37 N:1807886.68 E:6946020.05
2+72.69 N:1807997.89 E:6946105.62
3+43.40 N:1808041.01 E:6946049.59
3+78.56 N:1808075.87 E:6946045.05
4+26.67 N:1808105.22 E:6946006.92
4+52.41 N:1808125.61 E:6946022.62
4+85.43 N:1808129.88 E:6946055.36
5+13.75 N:1808152.32 E:6946072.63
5+27.58 N:1808166.04 E:6946070.85
6+07.88 N:1808215.01 E:6946007.22
6+45.31 N:1808210.18 E:6945970.10
8+32.15 N:1808062.10 E:6945856.15
8+82.70 N:1808011.97 E:6945862.68
9+03.65 N:1807999.34 E:6945879.38
9+11.16 N:1808000.22 E:6945886.85
9+84.44 N:1807956.08 E:6945945.34
9+99.90 N:1807940.92 E:6945948.34
10+89.81 N:1807886.68 E:6946020.05
LINE & CURVE TABLE: 6" MAIN WATER LOOP ALIGNMENT
S
S S
S S
S S
SS
SS
SS
SS
S
S S
SCO SCO
SD
SD
SD SD
OE
O E
O E
O E
O E
O E
O E
O E
O E
O E
O E
OE
OE
OE
OE
OT
OT
O T
O T
O T
O T
O T
O T
OT
O T
O T
O T
O T
OE OE OE OE OE OE OE OE OE OE
UE
U E
U E
W
W
W
W
W
W
W
W W
U T
U T
UT
U T
U T
G
G
G
O E
O E
O E
OE
OE
OE
O E
OE
OE
O E
O E
O T
O T
OT
OT
O E
OE
OE
OE
OE
OE
OE
W W
W W W W W
W
W W W
W
WW
OE
OE
E
E
E E
E
E
E
W
W
W
W
W
E
T
E
E
T
E E
T
E
T
E
E
6" HDPE
6" HDPE
6" H
D
PE
6"
HDPE
6" H
D
PE
6" HDPE
6" H
D
PE
1" HDPE
1" HDPE
2" H
DP
E
6" HDPE
1" HDPE
1" H D
PE
W
W
W
W W
W
WWW
W W
W
W W W
W
W
W W
6" H
D
PE
10+90
0+00
1+00 2+00 3+
4+
5+00
6+
7+008+00
9+
+0
L1
L2L3
L7 L8
L9
L1
L11
L1
L1
L16
L1
L4
L5 L6
L12
L17
L20
L2
C1
L13
L2
L2
1" H
D
PE
L19
0 15 30 60
SCALE IN FEET
GENERAL NOTES
1. EXISTING WATER LINES TO BE ADANDONED IN-PLACE.
2. SHUTOFF VALVE TO BE PROVIDED FOR EACH
BUILDING.
3. FURNISH AND INSTALL: DR-11 200 PSI HDPE.
4. CONTRACTOR TO LOCATE CONNECTION POINTS TO
EACH BUILDING AND FURNISH AND INSTALL ALL
FITTINGS REQUIRED TO CONNECT EXISTING
BUILDING PLUMBING TO NEW HDPE SERVICE LINE.
5. SEE SHEET G-02 FOR MAIN LOOP ALIGNMENT TABLE.
6. MAINTAIN 3' MIN COVER ON 6" MAIN AND ALL PIPING
WITHIN PAVED AREAS. 2' MIN COVER ON SERVICE
LATERALS IN LANDSCAPED AREAS.
CONSTRUCTION CALLOUTS
PROTECT IN PLACE EXISTING GRAEAGLE WATER
COMPANY 3" SERVICE LINE AND WATER METER.
ALL PIPING AND APPURTENANCES DOWNSTREAM
OF METER TO BE REPLACED.
INSTALLATION WITHIN COUNTY RIGHT-OF-WAY,
CONTRACTOR TO COORDINATE ENCROACHMENT PERMIT
WITH COUNTY. FOLLOW COUNTY STANDARDS FOR
TRENCH, SHOULDER AND PAVEMENT RESTORATION. SEE
SHEET C-06.
6" PIPE STUB FOR FUTURE EXPANSION. CAP BELOW
GRADE AND PROVIDE 3'x3' TRAFFIC RATED BOX.
SERVICE TO WASH RACK AREA. PROVIDE 2" RISER
PIPE WITH STOP AND WASTE BALL VALVE.
CONNECT EXISTING IRRIGATION SERVICE LINE TO
NEW SERVICE LATERAL.
HATCHING LEGEND
AC ROADWAY, PLUMAS COUNTY.
AC PARKING LOT.
CONCRETE SIDEWALK.
HISTORIC RETAINING WALL CROSSING. BORE PIPE
UNDER EXISTING STONE RETAINING WALL AND
PROTECT WALL IN PLACE.
6" BACK FLOW PREVENTOR, CONCRETE PAD,
AND HEATED ALUMINUM ENCLOSURE. SEE
ELECTRICAL SHEETS FOR HEATER
ELECTRICAL SERVICE.
LEGEND
PROPOSED FIRE HYDRANT.
PROPOSED SHUTOFF VALVE.
C-05
WATER SERVICE CONNECTION. C-05
8 SANITARY SEWER CROSSING.
STORM DRAIN CROSSING.
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
5/7 /24
:3
5 S
AW
YE
R
G:
\JC
A-
AE
T
JV
-4
8\4
-P
LU
MA
S
NF
B
EC
KW
OU
RT
H
W
AT
ER
D
IS
T
SY
ST
EM
\30
0 C
AD
\34 0 S
HE
ET
S
ET
S\
_P
LA
NS
_M
AP
S\
C-
W
AT
ER
S
YS
TE
M
PL
AN
.D
W G;
R5
PACIFIC SOUTHWEST
WATER
DISTRIBUTION
SYSTEM
BECKWOURTH
D.O.
PLUMAS NATIONAL
FOREST
REGION 5
WATER SYSTEM PLAN
5/09/24
AS
SM
AS
C-02 4 10
50% DESIGN SUBMITTAL
95% DESIGN SUBMITTAL
100% DESIGN SUBMITTAL 5/09/24
4/03/24
1/17/24
Know what's below.
Call before you dig.
WARNING
POWER LINES
OVERHEAD
PR
O
PE
R
TY
O
F U
N
IT
ED
S
TA
TE
S G
O
VE
R N
M
EN
T
- F
O R
O
FF
IC
IA
L U
SE
O
N
LY
C-05
BOX TABLE
BOX # APPURTENANCES SIZE REMARKS
B1 2" PRV AND 2" SHUTOFF VALVE 17"x30" PRESSURE REDUCTION AND ISOLATION
FOR BARRACKS
B2 2" PRV AND 2-1" SHUTOFF VALVES 17"X30" PRESSURE REDUCTION AND ISOLATION
FOR BUILDINGS 1015 AND 2011
B3 2" PRV AND 2-1" SHUTOFF
VALVES 17"X30" PRESSURE REDUCTION AND ISOLATION
FOR BUILDINGS 1010 AND 2010
B4 1" PRV AND 1" SHUTOFF VALVE 14"X19" PRESSURE REDUCTION AND ISOLATION
FOR BUILDING 1011
B5 1" SHUTOFF VALVE 14"x19" ISOLATION FOR BUILDING 5101-1
B6 1" SHUTOFF VALVE 14"X19" ISOLATION FOR BUILDING 1302
B7 1" SHUTOFF VALVE 14"X19" ISOLATION FOR BUILDING 5101-2
B1
B2
B3
B4
C-05
C-05
BOX NOTES
1. BOXES TO BE RECTANGULAR PLASTIC
VALVE BOXES.
2" HDPE
1" HDPE
B5
B6
B7 www.provostandpritchard.com
PROPOSED FIRE HYDRANT. PLACE HYDRANTS A
MINIMUM OF 10' FROM COUNTY ROAD EDGE OF
PAVEMENT.
2" COMBINATION AIR VALVE.
C-05
C-05
PROTECT IN PLACE EXISTING FROST-FREE YARD
HYDRANT. YARD HYDRANT IS CONNECTED TO
BUILDING PLUMBING PIPING AND ARE TO REMAIN
OPERATIONAL AFTER WATER SYSTEM
REPLACEMENT.
O E
O E
O E
O E
O E
O E
O T
O T
O T
O T
O T
O T
O T
O T
OT
O T
O T
UE
UE
U E
U E
U E
U E
UE
UT
UT
U T
U T
UT
UT
SD
U T
U T
U T
U T
G
G
G
OE
OE
OE
OT
OT
OT
O E O E
O E
OE
OE
OE
OE
OEOE
OE
OT
E
E
E
E
E
E
EE
T
E
E
T
E
T
E
E
W
W
W
W W
W
W
W
W
W
W W
W W
W W
W
W
W W
W
W
W
W W
W
ISOLATION VALVE
STA=0+43.13
ISOLATION VALVE
STA=10+83.71
ISOLATION VALVE
STA=1+38.40
0+00
1+00
2+00
3+
4+
5+00
10+00
F&I ±119 LF 6'' HDPE
F&I ±5 LF 6'' HDPE
F&I ±13 LF 6'' HDPE
F&I ±4 LF 6'' HDPE
F&I ±5 LF 6'' HDPE
F&I ±35 LF 6'' HDPE
F&I ±33 LF 6'' HDPE F&I ±14 LF 6'' HDPE
F&I ±8 LF 6'' HDPE
F&I ±15 LF 6'' HDPE
F&I ±83 LF 6'' HDPE
F&I ±5 LF 6'' HDPE
F&I ±21 LF 6'' HDPE
F&I ±64 LF 6'' HDPE
FIRE HYDRANT
STA=2+79.65
OFFSET=24.71FIRE HYDRANT
STA=0+35.56
OFFSET=-9.89
F&I ±44 LF 6'' HDPE
F&I ±9 LF 6'' HDPE
F&I ±14 LF 6'' HDPE
6'' 22.5°
ELBOW
STA: 0+22.59
6'' 45°
ELBOW
STA: 0+64.24
6" TEE
STA: 1+32.36
6'' 90°
ELBOW
STA: 2+72.68
6'' 45°
ELBOW
STA: 3+43.39
6'' 45°
ELBOW
STA: 3+78.55
6'' 45°
ELBOW
STA: 5+13.74
6'' 45°
ELBOW
STA: 5+27.58
6'' 45°
ELBOW
STA: 9+84.49
6'' 45°
ELBOW
STA: 9+99.94
6'' 90°
ELBOW
STA: 0+05.79
6'' 45°
ELBOW
STA: 0+18.43
2" SERVICE CONNECTION
STA: 0+37.13
6" TEE
STA: 0+35.56
6" TEE
STA: 2+78.70
SERVICE CONNECTION
STA: 5+22.12
2" SERVICE CONNECTION
STA: 2+57.44
F &I
L F
6' ' H
D
PE
F&I ±5 LF 6'' HDPE
ISOLATION VALVE
STA=2+67.89
Pipe Run - ADS
0+00 1+00 2+00 3+00 4+00
F&I ±13 LF 6'' HDPE
F&I ±5 LF 6'' HDPE
F&I ±5 LF 6'' HDPE
F&I ±35 LF 6'' HDPE
6'' 45°
ELBOW
STA: 0+18.43
6'' 22.5°
ELBOW
STA: 0+22.59
6'' 45°
ELBOW
STA: 0+64.24
6'' 45°
ELBOW
STA: 3+43.39
6'' 45°
ELBOW
STA: 3+78.55
6'' 90°
ELBOW
STA: 0+05.79
6'' 90°
ELBOW
STA: 2+72.68
ISOLATION VALVE
STA=0+43.13
6" TEE
STA: 0+35.56
2" SERVICE CONNECTION
STA: 0+37.13
2" SERVICE CONNECTION
STA: 2+57.44
6" TEE
STA: 2+78.70
6" TEE
STA: 1+32.36
ISOLATION VALVE
STA=1+38.40
F&I ±119 LF 6'' HDPE
F&I ±10 LF 6'' HDPE
F&I ±64 LF 6'' HDPE
F&I ±21 LF 6'' HDPE
F&I ±44 LF 6'' HDPE
F&I ±9 LF 6'' HDPE
F&I ±14 LF 6'' HDPE
3' M
IN
C
O
VE
R
ISOLATION VALVE
STA=2+67.89
Pipe Run - ADS
9+30 10+00 10+90
F&I ±15 LF 6'' HDPE F&I ±83 LF 6'' HDPE
6'' 45°
ELBOW
STA: 9+84.49
6'' 45°
ELBOW
STA: 9+99.94
ISOLATION VALVE
STA=10+83.71
3' M
IN
C O
VER
F&I ±73 LF 6'' HDPE
CONSTRUCTION CALLOUTS
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
5/8 /24
:0
3 A
ND
YS
G
:\J
CA
-A
ET
JV
-4
8\4
-P
LU
MA
S
NF
B
EC
KW
OU
RT
H W
AT
ER
D
IS
T
SY
ST
EM
\30 0 C
AD
\34
0 S
HE
ET
S
ET
S\
_S
EC
TI
ON
S_
PR
OF
IL
ES
\P
LA
N
AN
D
PR
OF
IL
E- 1.D
W G;
R5
PACIFIC SOUTHWEST
WATER
DISTRIBUTION
SYSTEM
BECKWOURTH
D.O.
PLUMAS NATIONAL
FOREST
REGION 5
PLAN AND PROFILE
SOUTH
5/09/24
AS
SM
AS
C-03 5 10
50% DESIGN SUBMITTAL
95% DESIGN SUBMITTAL
100% DESIGN SUBMITTAL 5/09/24
4/03/24
1/17/24
0 10 20 40
SCALE IN FEET
0 10 20 40
SCALE IN FEET
0 10 20 40
SCALE IN FEET
FH PROVIDE FIRE HYDRANT.
MATCHLINE
STA=9+30
SEE SHEET C-04
MATCHLINE
STA=4+00
SEE SHEET C-04
COUNTY ROAD CROSSING. FOLLOW COUNTY
STANDARDS FOR TRENCH AND PAVEMENT
RESTORATION.
CR
EXISTING WATER METER
LOCATION BEGIN NEW
WATER DISTRIBUTION
SYSTEM.
MAIN LINE PROFILE STA 0+00 TO 4+00
MAIN LINE PROFILE STA 9+30 TO 10+86
WC PROVIDE WATER CONNECTION TO BUILDING.
C-05
PR
O
PE
R
TY
O
F U
N
IT
ED
S
TA
TE
S G
O
VE
R N
M
EN
T
- F
O R
O
FF
IC
IA
L U
SE
O
N
LY
F&I ±111 LF 2" HDPE
C-06
C-06
C-06
C-05
WC
WC
WC
WC
WC
WC
WC
FH
FH
ISOLATION VALVE.
C-05
F&I ±160 LF 2" HDPE
F&I ±8 LF 1" HDPE
F&I ±137 LF 1" HDPE
BP
BP BACKFLOW PREVENTOR.
C-05
BP
2" TO 1" HDPE
F&I ±49 LF 1" HDPE
1" HDPE
B1 B2
B7
B6
B5
IV
CC
B...
CONCRETE CROSSING. CONTRACTOR TO USE
TRENCHLESS INSTALLATION OR SAW CUT
CONCRETE AND REPLACE IN KIND.
PLASTIC VALVE BOX. SEE SHEET C-02 FOR
VALVE BOX TABLE.
IVIV
IV
IV
IV
IV
CR
CC
CC
CR
CC
CC
IV
IV
IV
IV
Know what's below.
Call before you dig.
WARNING
POWER LINES
OVERHEAD
www.provostandpritchard.com
COUNTY R/W
COUNTY R/W
COUNTY R/W
COUNTY R/W
SS SANITARY SEWER CROSSING. WATER PIPE TO
CROSS OVER SEWER PIPE WITH 1' MIN
CLEARANCE.
SS
CC
CC
IC
IC CONNECT EXISTING IRRIGATION SERVICE
LATERAL TO NEW BUILDING SERVICE LINE
EL
EL PIPE ELEVATIONS SHOWN ON PROFILE ARE
APPROXIMATE. CONTRACTOR TO MAINTAIN A
MINIMUM OF 3.0' OF COVER AND SET PIPE
ELEVATIONS/DEPTH SO AS TO AVOID LOCAL
HIGH POINTS AND LOW POINTS IN THE PIPE. A
SINGLE SYSTEM HIGH POINT TO OCCUR AT
APPROX 4+50 AND A SINGLE SYSTEM LOW
POINT TO OCCUR AT APPROX 9+00.
EL
RW
RW PROTECT IN PLACE ALL EXISTING HISTORIC
STONE RETAINING WALLS ONSITE.
OT
O T
O T
O T
O T
O T
O T
O T
U E
UE
UE
UT
UT
UT
SD
SD
SD
U T
O E
O E
O E
O E
OE
OE
OE
OE
OE
OE
OE
OE
OE
O T
O T
O T
O T
OT
OT
OT
O E O E
O E
OE
OE
OE
OE
OE
OE
E
E
T
E
E
6'' 90°
ELBOW
STA: 4+26.66
6'' 45°
ELBOW
STA: 4+52.40
6'' 45°
ELBOW
STA: 4+85.42
6'' 45°
ELBOW
STA: 5+13.74
6'' 45°
ELBOW
STA: 5+27.58
6'' 45°
ELBOW
STA: 6+07.87
6'' 45°
ELBOW
STA: 6+45.30
6'' 45°
ELBOW
STA: 8+32.14
6'' 45°
ELBOW
STA: 8+82.70
2" SERVICE CONNECTION
STA: 4+46.03
1" SERVICE CONNECTION
STA: 5+22.12
6" TEE
STA: 6+67.66
6" TEE
STA: 6+64.02
W
W
W
W W
W W
W W
W
W
W
W
W W
WWW
W
COMBO AIR VALVE
STA=4+48.68
ISOLATION VALVE
STA=4+99.58 F&I ±47 LF 6'' HDPE
F&I ±18 LF 6'' HDPE
F&I ±33 LF 6'' HDPE
F&I ±14 LF 6'' HDPE
F&I ±8 LF 6'' HDPE
F &I
L F
6' ' H
D
PE
F&I ±37 LF 6'' HDPE
F&I ±18 LF 6'' HDPE
F& I ±
LF
6' ' H
DPE
F&I ±21 LF 6'' HDPE
F&I ±164 LF 6'' HDPE
FIRE HYDRANT
STA=6+64.02
OFFSET=-31.02
6'' 45°
ELBOW
STA: 8+82.70
6'' 45°
ELBOW
STA: 8+82.70
6'' 45°
ELBOW
STA: 8+82.70
6'' 45°
ELBOW
STA: 9+03.72
6'' 45°
ELBOW
STA: 9+11.20
6" CAP
STA: 6+67.66
OFFSET: 40.19
Pipe Run - ADS
4+00 5+00 6+00 7+00 8+00 9+00 9+30
F&I ±47 LF 6'' HDPE
F&I ±18 LF 6'' HDPE
F&I ±33 LF 6'' HDPE
F&I ±14 LF 6'' HDPE
F&I ±8 LF 6'' HDPE
F&I ±80 LF 6' ' HDPE
F&I ±37 LF 6'' HDPE
F&I ±18 LF 6'' HDPE
F&I ±50 LF 6'' HDPE
6'' 90°
ELBOW
STA: 4+26.66
6'' 45°
ELBOW
STA: 4+52.40
6'' 45°
ELBOW
STA: 5+13.74
6'' 45°
ELBOW
STA: 5+27.58
6'' 45°
ELBOW
STA: 6+07.87
6'' 45°
ELBOW
STA: 6+45.30
6'' 45°
ELBOW
STA: 8+32.14
6'' 45°
ELBOW
STA: 8+82.70
ISOLATION VALVE
STA=4+99.58
2" SERVICE CONNECTION
STA: 4+46.03
1" SERVICE CONNECTION
STA: 5+22.12
6" TEE
STA: 6+64.02
6" TEE
STA: 6+67.66
COMBO AIR VALVE
STA=4+48.68
6'' 45°
ELBOW
STA: 4+85.42
F&I ±164 LF 6' ' HDPE
F&I ±5 LF 6'' HDPE
F&I ±21 LF 6'' HDPE
EXISTING SD
EXISTING SD
EXISTING SD
EXISTING SS
F&I ±7 LF 6'' HDPE
3' M
IN
C O
VER
1'-0" M
IN
C
LEAR
AN
C
E
1'-0" M
IN
C
LEAR
AN
C
E
1'-0" M
IN
C
LEAR
AN
C
E
6'' 45°
ELBOW
STA: 9+03.72
6'' 45°
ELBOW
STA: 9+11.20
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
5/8 /24
:0
3 A
ND
YS
G
:\J
CA
-A
ET
JV
-4
8\4
-P
LU
MA
S
NF
B
EC
KW
OU
RT
H W
AT
ER
D
IS
T
SY
ST
EM
\30 0 C
AD
\34
0 S
HE
ET
S
ET
S\
_S
EC
TI
ON
S_
PR
OF
IL
ES
\P
LA
N
AN
D
PR
OF
IL
E- 2.D
W G;
R5
PACIFIC SOUTHWEST
WATER
DISTRIBUTION
SYSTEM
BECKWOURTH
D.O.
PLUMAS NATIONAL
FOREST
REGION 5
PLAN AND PROFILE
NORTH
5/09/24
AS
SM
AS
C-04 6 10
50% DESIGN SUBMITTAL
95% DESIGN SUBMITTAL
100% DESIGN SUBMITTAL 5/09/24
4/03/24
1/07/24
0 10 20 40
SCALE IN FEET
0 10 20 40
SCALE IN FEET
CONSTRUCTION CALLOUTS
CAP
FH
MATCHLINE
STA=9+30
SEE SHEET C-03
MATCHLINE
STA=4+00
SEE SHEET C-03
MAIN LINE PROFILE STA 4+00 TO 9+30
WR
PR
O
PE
R
TY
O
F U
N
IT
ED
S
TA
TE
S G
O
VE
R N
M
EN
T
- F
O R
O
FF
IC
IA
L U
SE
O
N
LY
F&I ±82 LF 1" HDPE
F&I ±54 LF 1" HDPE
F&I ±136 LF 1" HDPE
F&I ±31 LF 6" HDPE
F&I ±41 LF 6" HDPE
F&I ±15 LF 2" HDPE
FH PROVIDE FIRE HYDRANT.
COUNTY ROAD CROSSING. FOLLOW COUNTY
STANDARDS FOR TRENCH AND PAVEMENT
RESTORATION.
CR
WC PROVIDE WATER CONNECTION TO BUILDING.
C-05
C-06
C-06
C-06
C-05
ISOLATION VALVE.
C-05
IV
CC
B...
CONCRETE CROSSING. CONTRACTOR TO USE
TRENCHLESS INSTALLATION OR SAW CUT
CONCRETE AND REPLACE IN KIND.
PLASTIC VALVE BOX. SEE SHEET C-02 FOR
VALVE BOX TABLE.
www.provostandpritchard.com
Know what's below.
Call before you dig.
WARNING
POWER LINES
OVERHEAD
WC
WC
B4 B3
CC
RW
RW RETAINING WALL CROSSING. BORE UNDER ±1'
HIGH STONE RETAINING WALL.
AV PROVIDE COMBINATION AIR VALVE.
C-05
AV
AV
IV
IV
IV
IV
CR
CAP PROVIDE 6" PIPE CAP AND 3'x3' TRAFFIC RATED
BOX.
SD EXISTING STORM DRAIN CROSSING. DEPTH
TO BE VERIFIED BY CONTRACTOR.
SS EXISTING SANITARY SEWER CROSSING.
WATER PIPE TO CROSS OVER SEWER WITH 1'
MIN CLEARANCE.
SD
SD
SD
SS
EL PIPE ELEVATIONS SHOWN ON PROFILE ARE
APPROXIMATE. CONTRACTOR TO MAINTAIN A
MINIMUM OF 3.0' OF COVER AND SET PIPE
ELEVATIONS/DEPTH SO AS TO AVOID LOCAL
HIGH POINTS AND LOW POINTS IN THE PIPE. A
SINGLE SYSTEM HIGH POINT TO OCCUR AT
APPROX 4+50 AND A SINGLE SYSTEM LOW
POINT TO OCCUR AT APPROX 9+00.
EL
EL
WR PROVIDE 2" STANDPIPE FOR SERVICE TO
WASH RACK C-05
SERVICE CONNECTION
RECTANGULAR PLASTIC
VALVE BOX. ADD EXTENSIONS
AS NECESSARY TO MATCH
DEPTH OF EXISTING BUILDING
CONNECTION
CONTRACTOR TO FURNISH AND INSTALL
FITTINGS TO CONNECT 1" HDPE TO
EXISTING PIPING. CONNECT AS CLOSE
TO EXISTING BUILDING AS POSSIBLE
1" HDPE
1" GATE VALVE
EXISTING BUILDING POINT OF
CONNECTION. CONTRACTOR TO
VERIFY LOCATION, SIZE AND
MATERIAL FOR EACH BUILDING
2'±
EXISTING BUILDING
6" DEEP GRAVEL
BRICK
1" PRESSURE REDUCING
VALVE
NOTE
DETAIL SHOWS SCENARIO WHERE PRV AND SHUTOFF VALVE ARE ADJACENT TO
BUILDING. SOME BUILDING PRV AND SHUTOFF VALVES ARE LOCATED IN SHARED
BOXES WHERE THE SERVICE LATERAL CONNECTS TO THE 6" MAIN. SEE WATER
SYSTEM PLAN FOR VALVE LOCATIONS AND BOX SIZES.
BACKFLOW PREVENTOR
7'-7"±
ZURN WILKINS MODEL
FSC CAST IRON "Y"
TYPE STRAINER
12" MIN
HEATED ALUMINUM ENCLOSURE MADE
BY HOTBOX OR ENGINEER APPROVED
EQUAL. ENCLOSURE TO HAVE R-10
INSULATION AND INCLUDE HEATER
PROVIDED BY ENCLOSURE
MANUFACTURER. SEE ELECTRICAL
SHEETS FOR HEATER SERVICE.
6" THICK CONCRETE PAD WITH #4 BARS, 12"
ON CENTER, EACH WAY.
SLAB TO EXTEND 9" BEYOND EDGES OF
ENCLOSURE. MOUNT ENCLOSURE TO PAD
PER MANUFACTURER INSTRUCTIONS.
ZURN WILKINS 375A
REDUCED PRESSURE
BACKFLOW
ASSEMBLY WITH
FLANGED OS&Y GATE
VALVES
CONTRACTOR TO FURNISH
AND INSTALL ALL FITTINGS TO
TRANSITION TO 6" HDPE
IMMEDIATELY DOWNSTREAM
OF WATER METER
3" WATER METER
TO REMAIN
6" DUCTILE IRON
TRANSITION FROM HDPE TO
DUCTILE IRON PIPE A MINIMUM
OF 36" HORIZONTALLY FROM
EDGE OF SLAB (TYP FOR INLET
AND OUTLET PIPING)
14" LENGTH CLASS 200
PVC COLLAR
CONCRETE THRUST
BLOCK
VEHICLE WASH AREA SERVICE
2' x 3' x 2' DEEP PRECAST
CONCRETE BOX WITH STEEL
CHECKER-PLATE LID
6" DEEP 34"
DRAIN ROCK
.5
2" BALL VALVE WITH BALL DRAIN (STOP AND WASTE)
INSTALL SUCH THAT WHEN VALVE IS CLOSED, 2"
STANDPIPE DRAINS AUTOMATICALLY.
WEBSTONE H-X061 OR APPROVED EQUAL.
MAINTAIN MIN 6" CLEARANCE BETWEEN DRAIN PORT
AND GROUND
2" GALVANIZED STEEL RISER
PIPE WITH THREADED END
2" PRESSURE
REDUCING VALVE
2" GALVANIZED
STEEL
2" HDPE
1.
5'
2.
5'
4" THICK CONCRETE
COLLAR
.5'
3'
REMOVE AND DISPOSE OF
VALVE BOX AND COVER
REMOVE AND DISPOSE OF
CONCRETE COLLAR
CUT, REMOVE, AND DISPOSE OF
TOP PORTION OF RISER AND STEM
EXTENSION, IF APPLICABLE.
MATCH EXISTING
SURFACE (TYP.)
EDGE OF EXCAVATION
(SEE NOTE 3) FILL EXISTING RISER WITH
CEMENT SLURRY BACKFILL
EXCAVATE FOR VALVE BOX REMOVAL
AND ABANDONMENT AND BACKFILL
AND 95% COMPACTION NATIVE SOIL
1.
5'
M
IN
EXISTING
PAVEMENT
NOTES:
1. CONCRETE PLUG SHALL BE PER SPECIFICATIONS.
2. PLUG THICKNESS SHALL BE MINIMUM 2X DIAMETER OF ABANDONED PIPE.
3. EDGE OF EXCAVATION SHOWN FOR ILLUSTRATION PURPOSES ONLY, TRENCH
WIDTH MAY VARY.
WATER VALVE BOX ABANDONMENT & REMOVAL
UTWR
REPLACE AC PAVEMENT,
MATCH EXISTING THICKNESS
SHUTOFF VALVE
FEET
.5 1
MUELLER RESILIENT WEDGE 2360
SERIES GATE VALVE , AWWA C509,
OR APPROVED EQUAL
8" I.D. PVC RISER.
CONTINUOUS TRACER WIRE,
#10 STRANDED COPPER,
WHITE INSULATION.
UNPAVED AREAS
EXISTING
GRADE
PAVED AREAS
TYLER UNION
TUG05 VALVE
BOX
ASSEMBLY
(G05 BOX &
LID #506011
OR # 605007)
OR
APPROVED
EQUAL. CAST
IRON COVER
SHALL BE
IMPRINTED
WITH "WATER"
CONCRETE COLLAR (CLASS 2)
TO BE POURED AGAINST
UNDISTURBED SOIL
6"
3" M
IN
2"
2" M
IN
INSTALLATIONS IN NON-PAVED AREAS
UNLESS OTHERWISE SPECIFIED, SET FRAME
2" ABOVE FINISH GRADE. COLLAR SHALL BE
FORMED (CIRCULAR FORM). EXPOSED
EDGES SHALL RECEIVE 12" RADIUS AND
SURFACE SHALL RECEIVE A SWEAT FINISH.
WATER
WATER PIPE
ALL VALVES
SHALL BE
FLANGED OR
MECHANICAL
JOINTS WITH
RESTRAINED
JOINT
ADAPTERS.
AA
2"
SECTION A-A
2' R
EQ
D
LIBRARY FOLDER NAME
2" M
IN
"M
IN
"M
AX
VA
R
IE
S
FIRE HYDRANT
MECHANICAL JOINT
MIN 5 CF CRUSHED
ROCK DRAINAGE
KEEP DRAIN HOLES OPEN
BRICK
THRUST BLOCK BRACED AGAINST SIDE OF TRENCH. 4 CUBIC FEET
MIN OF CONCRETE AND 6 SQUARE FEET OF BEARING AREA
FURNISH AND INSTALL DRY-BARREL FIRE HYDRANT WITH 6"
INLET, 4.5" MAIN VALVE OPENING AND TWO 2.5" HOSE
CONNECTIONS. MAIN VALVE OPENING TO FACE ADJACENT
STREET OR PARKING LOT.
HYDRANT TO BE PAINTED RED.
BREAKAWAY FLANGES
6" HDPE
6" DUCTILE IRON
NOTES
1. CONTRACTOR SHALL FURNISH AND INSTALL ADAPTOR FLANGE OR
COUPLING TO ACCOMMODATE TRANSITION FROM HDPE TO
DUCTILE IRON.
2. HYDRANT RUN BETWEEN GATE VALVE AND 90° BEND SHALL RISE
NOT MORE THAN 1/4" PER FT
3. ALL FITTINGS TO BE WRAPPED IN 4 MIL. VISQUEEN.
SEE SHUTOFF
VALVE DETAIL
TYPICAL UTILITY TRENCH
1' -6
VA
R
IE
S
VA
R
IE
S
1' -6
1' -6
TY
P
6" MIN
95% RELATIVE
COMPACTION
90% RELATIVE
COMPACTION
6" MIN
NOT TO SCALE
0.15' GRIND W/TOP
LIFT PAVING TYP
MARKER TAPE
MATCH EXISTING AC PAVEMENT
THICKNESS. 2" MIN.
NATIVE MATERIAL FREE OF LUMPS
LARGER THAN 1/2"
NOMINAL DIAMETER
TRACER WIRE
PIPE AS SPECIFIED
SELECT BACKFILL
AS SPECIFIED
FINISHED GRADE
WHERE HARD PAN IS ENCOUNTERED
THE TRENCH MUST BE OVER EXCAVATED
A MINIMUM OF 6" INCHES AND PIPE BEDDING
REPLACED WITH SELECT MATERIAL COMPACTED
TO 85% PRIOR TO PLACING PIPE
COMBINATION AIR VALVE ASSEMBLY
2' x 3' x 2' DEEP PRECAST
CONCRETE BOX WITH STEEL
CHECKER-PLATE LID
APCO 145C COMBINATION
VALVE OR APPROVED EQUAL
2" GATE VALVE
2" HDPE
2' x 3' x 2' DEEP PRECAST
CONCRETE BOX WITH STEEL
CHECKER-PLATE LID
APCO 145C COMBINATION
VALVE OR APPROVED EQUAL
2" HDPE
2" GATE VALVE
6" HDPE
2'
2.
5'
M
IN
2' MIN
2" SCHEDULE 40 GALVANIZED
STEEL PIPE
HDPE TO STEEL PIPE
TRANSITION
8" PVC RISER
2" SCHEDULE 40 GALVANIZED
STEEL PIPE
2' MIN
SLOPE
PVC RISER
1.
5'
2" GALVANIZED STEEL VENT
PIPE
#24 MESH BRONZE
SCREEN COVER
6" DEEP 34"
DRAIN ROCK
3" THICK
CONCRETE
COLLAR
.5'
CUT NOTCH IN STEEL LID TO ALLOW FOR VENT PIPE
PENETRATION. CUT SUCH THAT GAPS AROUND VENT PIPE ARE
MAXIMUM 12" WIDE AND LID CAN BE REMOVED WITHOUT
INTERFERING WITH VENT
C-05
C-05
C-05
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
5/7 /24
:4
2 A
ND
YS
G
:\J
CA
-A
ET
JV
-4
8\4
-P
LU
MA
S
NF
B
EC
KW
OU
RT
H W
AT
ER
D
IS
T
SY
ST
EM
\30 0 C
AD
\34
0 S
HE
ET
S
ET
S\
_C
IV
IL
_D
ET
AI
LS
\C
IV
IL
D
ET
AI
LS
.D
W G;
R5
PACIFIC SOUTHWEST
WATER
DISTRIBUTION
SYSTEM
BECKWOURTH
D.O.
PLUMAS NATIONAL
FOREST
REGION 5
CIVIL DETAILS
5/09/24
AS
SM
AS
C-05 7 10
50% DESIGN SUBMITTAL
95% DESIGN SUBMITTAL
100% DESIGN SUBMITTAL 5/09/24
4/03/24
1/17/24
PR
O
PE
R
TY
O
F U
N
IT
ED
S
TA
TE
S G
O
VE
R N
M
EN
T
- F
O R
O
FF
IC
IA
L U
SE
O
N
LY
C-05
C-05
C-05
C-05
C-05 www.provostandpritchard.com
6/05/24
MULTICOREVIEWLINK:SHEET,WATER VALVE BOX ABANDONMENT & REMOVAL
MULTICOREVIEWLINK:SHEET,WATER VALVE BOX ABANDONMENT & REMOVAL
MULTICOREVIEWLINK:SHEET,WATER SERVICE CONNECTION
MULTICOREVIEWLINK:SHEET,WATER SERVICE CONNECTION
MULTICOREVIEWLINK:SHEET,SHUTOFF VALVE
MULTICOREVIEWLINK:SHEET,SHUTOFF VALVE
MULTICOREVIEWLINK:SHEET,BACK FLOW PREVENTION-PRESSURE REDUCTION
MULTICOREVIEWLINK:SHEET,BACK FLOW PREVENTION-PRESSURE REDUCTION
MULTICOREVIEWLINK:SHEET,WASH AREA SERVICE
MULTICOREVIEWLINK:SHEET,WASH AREA SERVICE
MULTICOREVIEWLINK:SHEET,FIRE HYDRANT
MULTICOREVIEWLINK:SHEET,FIRE HYDRANT
MULTICOREVIEWLINK:SHEET,TYPICAL UTILITY TRENCH
MULTICOREVIEWLINK:SHEET,TYPICAL UTILITY TRENCH
MULTICOREVIEWLINK:SHEET,COMBINATION AIR VALVE
MULTICOREVIEWLINK:SHEET,COMBINATION AIR VALVE
UNPAVED TRENCH RESTORATION SHOULDER RESTORATIONPAVED TRENCH RESTORATION
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
5/2 /24
:1
9 A
ND
YS
G
:\J
CA
-A
ET
JV
-4
8\4
-P
LU
MA
S
NF
B
EC
KW
OU
RT
H W
AT
ER
D
IS
T
SY
ST
EM
\30 0 C
AD
\34
0 S
HE
ET
S
ET
S\
_C
IV
IL
_D
ET
AI
LS
\C
IV
IL
D
ET
AI
LS
-0
3.D W
G;
R5
PACIFIC SOUTHWEST
WATER
DISTRIBUTION
SYSTEM
BECKWOURTH
D.O.
PLUMAS NATIONAL
FOREST
REGION 5
PLUMAS COUNTY
DETAILS
5/09/24
AS
SM
AS
C-06 8 10
50% DESIGN SUBMITTAL
95% DESIGN SUBMITTAL
100% DESIGN SUBMITTAL 5/09/24
4/03/24
1/17/24
PR
O
PE
R
TY
O
F U
N
IT
ED
S
TA
TE
S G
O
VE
R N
M
EN
T
- F
O R
O
FF
IC
IA
L U
SE
O
N
LY
C-06
C-06
C-06 www.provostandpritchard.com
6/05/24
MULTICOREVIEWLINK:SHEET,UNPAVED TRENCH RESTORATION
MULTICOREVIEWLINK:SHEET,UNPAVED TRENCH RESTORATION
MULTICOREVIEWLINK:SHEET,SHOULDER RESTORATION
MULTICOREVIEWLINK:SHEET,SHOULDER RESTORATION
MULTICOREVIEWLINK:SHEET,PAVED TRENCH RESTORATION
MULTICOREVIEWLINK:SHEET,PAVED TRENCH RESTORATION
CIRCUIT BREAKER
M
UTILITY
METER
E
GROUND WELL
TRANSFER SWITCH
(ATS) AUTOMATIC TRANSFER SWITCH
(MTS) MANUAL TRANSFER SWITCH
MOTOR
CONDUIT TRANSITION
BELOW GRADE - ABOVE GRADE
ABOVE GRADE - BELOW GRADE
BELOW GRADE CONDUIT
TRANSFORMER
UTILITY METER
HP
1. INSTRUMENTS AND EQUIPMENT ARE SHOWN IN THE GENERAL VICINITY, VERIFY LOCATIONS WITH OWNER AND RUN
CONDUITS AND CONDUCTORS ACCORDINGLY.
2. CONDUIT SHALL BE CONCEALED, WHEREVER POSSIBLE.
3. PROVIDE SEPARATE GROUNDING CONDUCTOR IN EVERY CONDUIT, UNLESS NOTED OTHERWISE.
4. PROVIDE CONCRETE HOUSEKEEPING PAD FOR ALL FLOOR MOUNTED EQUIPMENT.
SYMBOLS
LEGEND
GENERAL NOTES:
CAT6 COPPER ETHERNET CABLE
DATA COMMUNICATIONS CABLE, ETHERNET
SINGLE MODE FIBER OPTIC CABLE
COAXIAL CABLE
SERIAL CABLE
COPPER
COMMUNICATION (PID)
CAT6
ENET
FO
s
XXX
NOTE
ABBREVIATIONS
A
AAP
ABAN
ABCB
ABS
ABSW
ABT
AC
ACB
ACK
ACP-X
ACTR
ADDL
ADDM
AF
AFC
AFF
AFG
AHC
AHM
AI
AIC
ALT
AM
AMB
ANN
ANT
AO
APU
ARM
AS
ASU
ASYM
AT
ATO
ATP
ATS
AUTO XFMR
AUX
AWG
B
BAT
BCT
BDCT
BFG
BFV
BHP
BKR
BPD
BRF
C C-A-M
CB
CC
CCS
CCT
CCTV
CCW
CFP
CKT
C-M
CO
COAX
COEF
COM
COMM
CPT
CP-X
CR-X
CS
CT
CTC
CTRL
CV
CW
DC
DCS
DCU-X
DD
DE
DEEN
DEMO
DI
DISC
DIST
DIV
DM
DO
DPDT
DPST
DS
DX
E/G
EC
E/C
ECC
EM
EMF
EMT
EN
ENAM
ENCL
ENG
ENMT
EP
ESD
ESR
ESTP
ETM
AMP
ALARM ANNUMCIATOR PANEL
ABANDON
AIR BLAST CIRCUIT BREAKER
ABSOLUTE
AIR BREAK SWITCH
AIR BLAST TRANSFORMER
ALTERNATING CURRENT
AIR CIRCUIT BREAKER
ACKNOWLEDGE
AREA/AUXILIARY CONTROL PANEL NO.X
ACTUATOR
ADDITIONAL
ADDENDUM
AMP FRAME
AUTOMATIC FREQUENCY CONTROL
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
AUTO-HOLD-CLOSED
AMPERE HOUR METER
ANALOG INPUT
AMP INTERRUPTING CAPACITY
ALTERNATE
AMMETER
AMBIENT
ANNUNCIATOR
ANTENNA
ANALOG OUTPUT
AUXILIARY POWER UNIT
ARMORED CABLE
AMMETER SWITCH
AIR SUPPLY UNIT
ASYMMETRICAL
AMP TRIP
AUTOMATIC THROW OVER
AMMETER TEST POINT
AUTOMATIC TRANSFER SWITCH
AUTOMATIC TRANSFORMER
AUXILIARY
AMERICAN WIRE CAGE
BELL
BATTERY
BUSHING CURRENT TRANSFORMER
BUS DIFFERENTIAL CURRENT TRANSFORMER
BELOW FINISHED GRADE
BUTTERFLY VALVE
BRAKE HORSEPOWER
BREAKER
BUSHING POTENTIAL DEVICE
BELOW RAISED FLOOR
CONDUIT
COMPUTER-AUTO MANUAL
CIRCUIT BREAKER
CONTROL CABLE
CENTRAL CONTROL SYSTEM
CONTROL CIRCUIT TRANSFORMER
CLOSED CIRCUIT TELEVISION
COUNTER CLOCKWISE
CHEMICAL FEED PUMP
CIRCUIT
COMPUTER MANUAL
CUT OFF SWITCH
COAXIAL CABLE
COEFFICIENT
COMMON
COMMUNICATION
CONTROL POWER TRANSFORMER
CONTROL PANEL DESIGNATION X
CONTROL RELAY DESIGNATION X
CONTROL SWITCH
CURRENT TRANSFORMER
CURRRENT TRANSFORMER CABINET
CONTROL
CONTROL VALVE
CLOCKWISE / COOL WHITE
DIRECT CURRENT
DISTRIBUTED CONTROL SYSTEM
DISTRIBUTED CONTROL UNIT NO.X
DELAY UPON DE-ENERGIZING
DELAY UPON ENERGIZING
DE-ENERGIZE
DEMOLITION
DIGITAL/DISCRETE INPUT
DISCONNECT SWITCH
DISTRIBUTION
DIVISION
DEMAND METER
DIGITAL/DISCRETE OUTPUT
DOUBLE POLE DOUBLE THROW
DOUBLE POLE SINGLE THROW
DOOR SWITCH
DIRECT EXPANSION
EMERGENCY GENERATOR
ELECTRICAL CONTRACTOR
ELECTRICAL AND CONTROLS
ECCENTRIC
EMERGENCY
ELECTROMOTIVE FORCE
ELECTRICAL METALLIC TUBING
ENERGIZED
ENAMEL
ENCLOSURE
ENGINE
ELECTRICAL NON-METALLIC TUBING
EXPLOSION PROOF
EMERGENCY STOP DEPRESSED
EMERGENCY STOP RELAY
EMERGENCY STOP
ELAPSED TIME METER
(F)
FA
FACP
FBO
FC
FCV
FDR
FLA
FLP
FLUOR
FLX
FM
FO
F-O-S F-O-S-A F-O-S-R
FP-X
FRC
FREQ
FS
FU
FUSW
FUT
FVNR
FVR
FWD
G
GEN
GFCI
GFR
GRC
GS
H
HF
Hg
HID
HMI
HO
H-O-A H-O-R
HORIZ
HP
HPF
HPS
HR
HS
HSTAT
HV
HVAC
HZ
I I/C
IC
IGN
IJB
IMC
INCAND
INST
INSTR
INT
INTERCOM
ISP
IBP
IW#
IWP
JB
K kA kAICD kV kVA kVAR kW kWD kWH
L L1,L2,L3
LA
LB
L-B
LBL
LC
LCP-X
LDR
LEL
L-G
LL
L-L
LLCO
L-N
LOR
LOS
LP
LP-X
LR
LRA
LS
LTG
LV
LVL
FUTURE
FIRE ALARM
FIRE ALARM CONTROL PANEL
FURNISHED BY OTHERS
FOOTCANDLE / FAIL CLOSED
FLOW CONTROL VALVE
FEEDER
FULL LOAD AMPS
FAIL TO LAST POSITION
FLUORESCENT
FLEXIBLE CONDUIT
FREQUENCY MODULATION / FLOOR MOUNTED
FAIL OPEN / FIBER OPTIC
FAST-OFF-SLOW
FAST-OFF-SLOW-AUTO
FAST-OFF-SLOW-REMOTE
FIELD PANEL NO.X
FIBERGLASS RIGID CONDUIT
FREQUENCY
FLOAT SWITCH
FUSE
FUSED SWITCH
FUTURE
FULL VOLTAGE NON-REVERSING
FULL VOLTAGE REVERSING
FORWARD
GROUND
GENERATOR
GROUND FAULT CIRCUIT INTERRUPTER (RECEPTACLE)
GROUND FAULT RELAY
GALVANIZED STEEL RIGID CONDUIT
GOVERNOR SWITCH
HOT-LEG
HIGH FREQUENCY
MERCURY
HIGH INTENSITY DISCHARGE
HUMAN MACHINE INTERFACE
HIGH OUTPUT
HAND-OFF-AUTO
HAND-OFF-REMOTE
HORIZONTAL
HORSEPOWER
HIGH POWER FACTOR
HIGH PRESSURE SODIUM
HOUR
HAND OPERATED SELECTOR SWITCH
HUMIDISTAT
HIGH VOLTAGE
HEATING/VENTILATION/AIR CONDITIONING
FREQUENCY (HERTZ)
INSTANTANEOUS LOAD
INSTANTANEOUS/CONTINUOUS LOAD
INTERRUPTING CAPACITY
IGNITION
INSTRUMENT JUNCTION BOX
INTERMEDIATE METAL CONDUIT
INCANDESCENT
INSTANTANEOUS
INSTRUMENT
INTERLOCK
INTERMCOMMUNICATION
INTERNET SERVICE PROVIDER
INSTRUMENT PULL BOX
IN WALL (#INCHES AFF OR AFG)
IN WALL WEATHERPROOF
JUNCTION BOX
KEY INTERLOCK
KILOAMP
KILOAMP INTERRUPTING CAPACITY
KILOVOLT
KILOVOLT AMPERE
KILOVAR (REACTANCE)
KILOWATT
KILOWATT DEMAND
KILOWATT HOUR
LONG-TIME
LIGHTING PANEL BRANCH CIRCUIT
LIGHTNING ARRESTOR
POUND
LINE-BUS
LABEL
LIGHTING CONTACTOR
LOCAL CONTROL PANEL NO.X
LOADING RELAY
LOWER EXPLOSIVE LIMIT
LINE-GROUND
LEAD-LAG LOAD REACTOR
LINE-LINE
LOW LEVEL CUT-OFF
LINE-NEUTRAL
LOCAL OFF REMOTE
LOCK-OUT STOP
LIGHT POLE
LIGHTING PANEL NO.X
LATCHING RELAY LINE REACTOR
LOCKED ROTOR AMPS
LIMIT SWITCH
LIGHTING
LOW VOLTAGE
LEVEL
M/G
MA
MAN
MATV
MAX
MC
MCA
MCB
MCCB
MCC
MCP
MERC
MG
MGO
MH
MLO
MM
MO
MOD
MOT
MOV
MPR
MSP
MS-X
MTO
MTR-X
MTS
MV
MVA
MVS
MW
MWH
M-X
N
NC
NCTO
NEC
NEG
NEUT
NFC
NIC
N-J
NL
NO
NOTC
NP
O O-C O-C-A
OCB
OCPD
OCR
OD
OH
OHGW
OL
O-O O-O-A O-O-R
OPT
O-R O-S-C
P
PA
PB
PCM
PCP-X
PCS
PE
PF
PFCC
PH
PLC
PNL
PPSC
PPX
PQM
PRI
PRV
PS
PSI
PT
PVC
PWR
RAC
RECPT
REV
RF
RGS
RH
RMS
RM-X
R-O-A
RS
RTD
RUNN
RVAT
RVNR
RVSS
R-X
MOTOR GENERATOR
MILLIAMPERE
MANUAL
MASTER ANTENNA TELEVISION SYSTEM
MAXIMUM
MODULATE-CLOSE
MOTOR CIRCUIT AMPS
MAIN CIRCUIT BREAKER
MOLDED CASE CIRCUIT BREAKER
MOTOR CONTROL CENTER
MOTOR CIRCUIT PROTECTOR
MERCURY VAPOR
MILLION GALLON
MAGNETICALLY OPERATED
MANHOLE / MOUNTING HEIGHT
MAIN LUGS ONLY
MAGNETIC-INDUCTIVE FLOW METER
MANUALLY OPERATED
MOTOR OPERATED DAMPER
MOTOR
METAL OXIDE VARNISTOR
MOTOR PROTECTION RELAY
MOTOR STARTING PANEL
MOTOR STARTER NO.X
MANUAL THROW OVER
MOTOR NO.X
MANUAL TRANSFER SWITCH
MEGAVOLT
MEGAVOLT-AMPERES
MEDIUM VOLTAGE SWITCH
MEGAWATT
MOTOR WINDING HEATER
MOTOR CONTROLLER NO.X
NORMAL, NEUTRAL
NORMALLY CLOSED
NORMALLY CLOSED TIME OPEN
NATIONAL ELECTRICAL CODE
NEGATIVE
NEUTRAL
NONMETALLIC FLEXIBLE CONDUIT
NOT IN CONTRACT
NORMAL-JOG
NIGHT LIGHT
NORMALLY OPEN
NORMALLY OPEN TIMED CLOSED
NAMEPLATE
OPEN OR CLOSED
OPEN-CLOSE
OPEN-CLOSE-AUTO
OIL CIRCUIT BREAKER
OVERCURRENT PROTECTION DEVICE
OIL CIRCUIT RECLOSURE
OUTER DIAMETER
OVERHEAD
OVERHEAD GUY WIRE
OVERLOAD RELAY
ON-OFF
ON-OFF-AUTO
ON-OFF-REMOTE
OPTIONAL
OFF-REMOTE
OPEN-STOP-CLOSE
POLE
PUBLIC ADDRESS
PUSHBUTTON/PULL BOX
PROCESS CONTROL MODULE
PUMP CONTROL PANEL NO.X
PVC COATED GALVANIZED STEEL CONDUIT
PHOTOCELL
POWER FACTOR
POWER FACTOR CORRECTION CAPACITOR
PHASE
PROGRAMMABLE LOGIC NUMBER
PANEL
PACKAGED POWER SUPPLY CENTER
POWER PANEL NO.X
POWER QUALITY METER
PRIMARY
PRESSURE REDUCING VALVE
PRESSURE SWITCH
POUNDS PER SQUARE INCH
POTENTIAL TRANSFORMER
POLYVINYL CHLORIDE RIGID PLASTIC CONDUIT
POWER
RIGID ALUMINUM CONDUIT
RECEPTACLE
REVERSE
RADIO FREQUENCY
RIGID GALVANIZED STEEL CONDUIT
RELATIVE HUMIDITY
ROOT MEAN SQUARED
REMOTE MODULE NO.X
REMOTE-ON-AUTO
RAPID START
RESISTIVE TEMPERATURE DETECTOR
RUNNING
REDUCED VOLTAGE AUTO TRANSFORMER
REDUCED VOLTAGE NON-REVERSING
REDUCED VOLTAGE SOLID STATE
RESISTOR OR POTENTIOMETER NO.X
SHIELD
SURGE ARRESTER
SHORT CIRCUIT
SUPERVISORY CONTROLS & DATA ACQUISITION
SOFT DRAWN BARE COPPER
SECOND
SLOWER-FASTER
SUB FEED LUGS
SIGNAL
SEALTITE LIQUIDTIGHT FLEXIBLE CONDUIT
SURFACE MOUNTED
SOLENOID-OPERATED VALVE
SINGLE POLE
SURGE PROTECTIVE DEVICE
SINGLE POLE DOUBLE THROW
SPEAKER
SINGLE POLE SINGLE THROW
SOLID STATE
START-STOP
SUPERVISORY SET POINT CONTROL
SHORTING TERMINAL BLOCK
SOLENOID VALVE
SWITCH
SWITCHBOARD
SWITCHGEAR
SYMMETRICAL
SYMBOL
SYSTEM
SOURCE 1
SOURCE 2
TACHOMETER
TERMINAL BLOCK - UNIT X
THERMOCOUPLE / TIME CLOCK / TRAY CABLE
TEMPERATURE DETECTOR RELAY
TIME DELAY RELAY
TOTALLY ENCLOSED
TOTALLY ENCLOSED FAN COOLED
TEMPORARY
TOTALLY ENCLOSED NON-VENTILATED
TERMINAL
TERMINAL JUNCTION BOX
THERMAL MAGNETIC
TOTAL
TWISTED PAIR
TEMPERATURE SWITCH
TWO SPEED CONSEQUENT POLE, TWO WINDING
TWO SPEED SEPARATE WINDING
TWO SPEED CONSEQUENT POLE, ONE WINDING
TWISTED SHIELDED PAIR
THERMOSTAT
TURBIDITY
ULTRA HIGH FREQUENCY
UNGROUNDED
UNINTERRUPTIBLE POWER SUPPLY
UNDER VOLTAGE RELAY
VOLT
VOLT AMPERE
VOLT ALTERNATING CURRENT
VARMETER
VACUUM BREAKER
VOLTAGE CONTROLLED OSCILLATOR
VENDOR CONTROL PANEL
VOLT DIRECT CURRENT
VELOCITY
VARIABLE FREQUENCY DRIVE
VERY HIGH FREQUENCY
VERY HIGH OUTPUT
VIBRATION
VOLTMETER
VAPORPROOF
VOLTAGE REGULATOR
VOLTAGE SWITCH
VOLTMETER SWITCH
VOLTAGE TRANSFORMER
VOLTAGE TEST POINT
WATT / WEST
WATTHOUR DEMAND METER
WATTHOUR METER
WATTMETER
WEATHER PROOF
WATER TIGHT
TRANSFORMER
POSITION SWITCH
S
SA
SC
SCADA
SDBC
SEC
S-F
SFL
SIG
SLT
SM
SOV
SP
SPD
SPDT
SPKR
SPST
SS
S-S
SSC
STB
SV
SW
SWBD
SWGR
SYMM
SYM
SYS
S1 S2
TACH
TB-X
TC
TD
TDR
TE
TEFC
TEMP
TENV
TERM
TJB
TM
TOT
TP
TS
TS2W
TS2W
TSIW
TSP
TSTAT
TU OR TURB
UHF
UNG
UPS
UVR
V
VA
VAC
VAR
VB
VCO
VCP
VDC
VEL
VFD
VHF
VHO
VIB
VM
VP
VR
VS
VS
VT
VTP
W
WHD
WHM
WM
WP
WT
XFMR
ZS
PSH
FIN
FIR
PB
YL-A
FIELD MOUNTED INSTRUMENT
PANEL MOUNTED INSTRUMENT
SCADA SIGNAL
INDICATING LIGHT
PLC SIGNAL
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
6/6 /24
:2
2 N
IC
G :\J
CA
-A
ET
JV
-4
8\4
-P
LU
MA
S
NF
B
EC
KW
OU
RT
H
W
AT
ER
D
IS
T
SY
ST
EM
\30
0 C
AD
\34 0 S
HE
ET
S
ET
S\
_E
LE
CT
RI
CA
L\
E0 0_
EL
EC
TR
IC
AL
S
YM
BO
LS
A
ND
A
BB
RE
VI
AT
IO
NS
.D W
G;
R5
PACIFIC SOUTHWEST
WATER
DISTRIBUTION
SYSTEM
BECKWOURTH
D.O.
PLUMAS NATIONAL
FOREST
REGION 5
ELECTRICAL SYMBOLS
AND ABBREVIATIONS
5/09/24
HC
SM
HC
E-01 9 10
50% DESIGN SUBMITTAL
95% DESIGN SUBMITTAL
100% DESIGN SUBMITTAL 5/09/24
4/03/24
1/17/24
PR
O
PE
R
TY
O
F U
N
IT
ED
S
TA
TE
S G
O
VE
R N
M
EN
T
- F
O R
O
FF
IC
IA
L U
SE
O
N
LY
www.provostandpritchard.com
06/05/2024
OE
UE
UE
W
W
W
W
W
W
W
G
G
G
OE
OE
OE
OE
O E
O E
O T
O T
EEE
W
W
W
W
W
W
W
W
SCALE: 1" = .5'
POST MOUNTED RECEPTACLE
8"
ISOMETRIC
VIEW
N.T.S.
NOTES:
INSTALL THE POST MOUNTED RECEPTACLE WITHIN THE BACKFLOW
PREVENTOR ENCLOSURE. COORDINATE LOCATION OF RECEPTACLE WITH
ENCLOSURE/HEATER MANUFACTURER.
WEATHER RESISTANT
GFCI RECEPTACLE
AND ENCLOSURE
CONCRETE SLAB
LIBRARY FOLDER NAME
CONDUIT TRENCH
DETECTABLE WARNING TAPE WITH "BURIED
ELECTRICAL LINE BELOW", OR APPROVED
EQUAL.
12"
1 1/2" CLEARANCE
BETWEEN
CONDUITS
(VERTICAL AND
HORIZONTAL)
6" (MIN.)
SEPARATION BETWEEN
POWER AND SIGNAL
CIRCUITS
SIGNAL/COMM
CONDUITS,
QUANTITY PER PLANS
POWER CONDUITS,
QUANTITY PER PLANS
NATIVE BACKFILL
90% COMPACTION (MIN.)
CONDUIT,
PER PLANS
4" CLEARANCE
BETWEEN CONDUIT
EDGE AND TRENCH
WALL (TYP.)
UNDISTURBED NATIVE
SOIL
24"
4" SAND AROUND
CONDUITS (TOP
AND BOTTOM)
SCALE: N.T.S.
CONDUIT STUB UP
RGS CONDUIT
MAX 24" ABOVE
GRADE
RGS COUPLING
GRC RISER
PVC TO GRC COUPLING
PVC SWEEP FACTORY
SWEEPS ONLY
PVC CONDUIT PER PLANS
ADAPTER COUPLING
SEALANT
PVC SLEEVE
CONCRETE SLAB
COUPLING
TO INSTRUMENT
LIQUIDTIGHT
FLEX CONDUIT
48" MAX
NOTES
1. ALL ABOVE GRADE CONDUIT SHALL BE GRC.
2. ALL BELOW GRADE CONDUIT SHALL BE PVC-40.
3. PROVIDE ABOVE-GRADE CONDIUT SUPPORTS AS REQUIRED BY NEC, OR REQUESTED BY OWNER.
4. PROVIDE CONDUIT EXPANSION/DEFLECTION AS REQUIRED, OR REQUESTED BY OWNER.
5. PROVIDE FITTINGS TO INTERCONNECT COUPLING WITH POST-MOUNTED WEATHER RESISTANT
RECEPTACLE.
0 5 10 20
SCALE IN FEET
NOTES
1. PROVIDE PULLBOXES, AS NEEDED, FOR CONDUIT ROUTING TO MAINTAIN NEC CONDUIT BEND LIMITS.
2. FIELD FIT CONDUIT RUN, ENSURE NO EXISTING OR NEW UTILITIES, OR ENVIRONMENTAL FEATURES ARE DISTURBED WHEN CONDUIT IS
ROUTED FROM THE EXISTING ELECTRICAL PANEL TO THE BACKFLOW PREVENTOR ENCLOSURE.
3. COORDINATE ELECTRICAL SERVICE DESIGN WITH BACKFLOW PREVENTOR ENCLOSURE AND HEATER MANUFACTURER.
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
6/6 /24
:2
1 N
IC
G :\J
CA
-A
ET
JV
-4
8\4
-P
LU
MA
S
NF
B
EC
KW
OU
RT
H
W
AT
ER
D
IS
T
SY
ST
EM
\30
0 C
AD
\34 0 S
HE
ET
S
ET
S\
_E
LE
CT
RI
CA
L\
E0 1_
GE
NE
RA
L
EL
EC
TR
IC
AL
.D
W G;
R5
PACIFIC SOUTHWEST
WATER
DISTRIBUTION
SYSTEM
BECKWOURTH
D.O.
PLUMAS NATIONAL
FOREST
REGION 5
GENERAL ELECTRICAL
5/09/24
HC
SM
HC
E-02 10 10
50% DESIGN SUBMITTAL
95% DESIGN SUBMITTAL
100% DESIGN SUBMITTAL 5/09/24
4/03/24
1/17/24
Know what's below.
Call before you dig.
WARNING
POWER LINES
OVERHEAD
POST MOUNTED WEATHER RESISTANT 20A RATED DUPLEX RECEPTACLE
BACKFLOW PREVENTOR
AND HEATED ENCLOSURE.
1" CONDUIT WITH 2#10
AND 1#10G XHHW-2
CONDUCTORS
EXISTING ELECTRICAL PANEL
E-02
E-02
E-02
E-02
E-02
E-02
CONDUIT STUB UP
E-02
CONDUIT TRENCH
E-02
REMOVE UNUSED 15A
BREAKER AND REPLACE
WITH 20A 1PHASE GFCI
BREAKER FOR HEATER,
MATCH MAKE/MODEL OF
EXISTING BREAKERS
www.provostandpritchard.com
06/05/2024
MULTICOREVIEWLINK:SHEET,POST MOUNTED WEATHER RESISTANT RECEPTACLE
MULTICOREVIEWLINK:SHEET,POST MOUNTED WEATHER RESISTANT RECEPTACLE
MULTICOREVIEWLINK:SHEET,CONDUIT TRENCH
MULTICOREVIEWLINK:SHEET,CONDUIT TRENCH
MULTICOREVIEWLINK:SHEET,CONDUIT STUB UP
MULTICOREVIEWLINK:SHEET,CONDUIT STUB UP
MULTICOREVIEWLINK:SHEET,POST MOUNTED WEATHER RESISTANT RECEPTACLE
MULTICOREVIEWLINK:SHEET,POST MOUNTED WEATHER RESISTANT RECEPTACLE
MULTICOREVIEWLINK:SHEET,CONDUIT STUB UP
MULTICOREVIEWLINK:SHEET,CONDUIT STUB UP
MULTICOREVIEWLINK:SHEET,CONDUIT TRENCH
MULTICOREVIEWLINK:SHEET,CONDUIT TRENCH
| G-01 TITLESHEET |
| G-02 GENERAL NOTES |
| C-01 EXISTING CONDITIONS AND DEMOLITION PLAN |
| C-02 WATER SYSTEM PLAN |
| C-03 PLAN AND PROFILE SOUTH |
| C-04 PLAN AND PROFILE NORTH |
| C-05 CIVIL DETAILS |
| C-06 PLUMAS COUNTY DETAILS |
| E-01 ELECTRICAL SYMBOLS AND ABBREVIATIONS |
| E-02 GENERAL ELECTRICAL |
File details come from the government source that posted it. Updated .