This is a Statement of Work (SOW) for an asbestos abatement project at the Montezuma National Wildlife Refuge Visitors Center in Seneca Falls, New York. The Department of the Interior Fish and Wildlife Service is soliciting services for the removal and disposal of approximately 1,550 square feet of non-friable asbestos-containing black floor mastic identified during a November 11, 2021 property assessment. The scope of work encompasses removal of asbestos materials in compliance with state and federal regulations, abatement materials installation, OSHA air sampling, and proper disposal of the asbestos materials separate from demolition waste. The work must be completed within the specified period of performance, beginning no earlier than December 1, 2026 and concluding no later than March 1, 2027, during regular business hours of 7:00 a.m. to 5:30 p.m., Monday through Friday, excluding recognized Federal holidays.

View the file

Other files

File Type Posted
A06_Asbestos_Survey_Report_0001.pdf PDF
Sol_140FC226Q0029_Amd_0001.pdf PDF
B03_WD.pdf PDF
Sol_140FC226Q0029.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 2 – Statement of Work (SOW)

Asbestos abatement project including removal and disposal of the asbestos materials and OSHA air sampling.

1.0 Background

Montezuma NWR will be building a new Visitors Center that will combine office space and public space at 3395 US Route 20 East in Seneca Falls, NY. The intention of the current center is to demolish the structure. The property was tested for asbestos on November 11, 2021, which came back positive for asbestos in the black floor mastic.

The material that would need to be removed is approximately 1550 sq ft of non-friable asbestos within the flooring. The original report indicates 2250 sq ft of black floor mastic which is based off the square footage of the entire building, however, two rooms in the building do not contain the asbestos containing black mastic. These two rooms are approximately 700 sq ft.

2.0 Scope

The asbestos will need to be removed per state and federal regulations before proper demolition and disposed of separately from the demolition waste. The scope of this abatement project will include removal of the asbestos materials, abatement materials, OSHA air sampling, and disposal of the asbestos materials as per the survey.

3.0 Period of Performance

Starting no earlier than December 1, 2026 and completing no later than March 1, 2027.

3.1 Hours of Operations

Delivery shall be during regular business hours which are 7:00 a.m. to 5:30 p.m. Monday through Friday except recognized Federal holidays.