A04 1167728 EWP_2025_McDowellCo_CoalHeritageRd_SpiceCk-Dwgs_20251114.pdf

PDF 8 MB Posted

Attached to
EWP Streambank Stabilization McDowell County, WV. Federal contract opportunity
Solicitation number
12FPC326B0014
Issued by
Department of Agriculture Under Secretary for Farm Production and Conservation

About this file

This is a technical design and construction document prepared by the Natural Resources Conservation Service (NRCS) under the Emergency Watershed Protection Act for streambank stabilization work in McDowell County, West Virginia. The project addresses erosion and streambank damage at two sites along Coal Heritage Road near Spice Creek: Site 1 at 12673 Coal Heritage Road (coordinates N37.445070, W81.702405) and Site 2 at 13008 Coal Heritage Road (coordinates N37.443020, W81.697523). The document was prepared by N. Knox in September 2025 with design approval dated 9/2025, drawn approval 10/2025, and checked approval 11/2025.

Site 1 involves rock riprap streambank stabilization spanning approximately 390 tons of riprap with grout, 598 square yards of geotextile, 103 tons of blanket drain aggregate, 70 linear feet of foundation preparation on shallow bedrock, 40 linear feet of 3-inch drain pipe, 10 linear feet of perforated drain pipe, 10 drain pipe caps, and 5 drain pipe tees. Site 2 involves a 9-foot high gabion wall measuring 105 feet in length with 198 cubic yards of gabions, 210 tons of rock riprap foundation preparation, 280 square yards of rock riprap geotextile, and 70 square yards of shallow bedrock foundation preparation. Construction notes specify utility location via Call 811, restoration of access roads and fences, erosion control measures per West Virginia Department of Highways standards, and material disposal at approved offsite locations. All excavation limits, channel configurations, and stabilization details are provided through comprehensive technical drawings with multiple sections and details sheets.

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Na tu ra l R es ou rc es

Co ns er va tio n

Se rv ice

U ni te d

St at es D ep ar tm en t of

Ag ric ul tu re

McDowell County

E W

P

ST

R

EA

M

BA

N K

ST

AB

IL

IZ

AT

IO

N M

C D

O W

EL

L

C O

U N

TY

, W

ES

T

VI

R

G

IN

IA

C

O

AL

H

ER

IT

AG

E R

O

AD

, S

PI

C E

C R

EE

K

SI

TE

S

C O

VE

R

S H

EE

T

N . K

N O

X 9/

UTILITY NOTIFICATION

"The Natural Resources Conservation Service makes no representation as to the existence or non-existence of any utilities at the construction site. Shown on these construction drawings are those utilities which have been identified. It is the responsibility of the contractor(s) to assure themselves that no hazard exists or damage will occur to utilities."

COVER SHEET

QUANTITIES AND CONSTRUCTION NOTES

LOCATION MAP

SHEET LIST TABLE

SITE 1 - SITE MAP - 12673 COAL HERITAGE ROAD

SHEET TITLE

SITE 1 - PLAN VIEW

TYPICAL GROUTED ROCK RIPRAP SECTION & DETAILS

SITE 2 - PLAN VIEW

TYPICAL CHANNEL BOTTOM CONFIGURATION

TYPICAL GROUTED ROCK RIPRAP DETAILS

SITE 2 - SITE MAP - 13008 COAL HERITAGE ROAD8

TYPICAL FOUNDATION PREPARATION ON ROCK RIPRAP DETAILS

TYPICAL GABION WALL SECTION & DETAILS

TYPICAL GABION WALL DETAILS

TYPICAL FOUNDATION PREPARATION ON SHALLOW BEDROCK DETAILS

A.

D

EI

C

H

ER

T

A.

D

EI

C

H

ER

T

PM

, D

S, T

S

9/

/2

/2

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Designed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Sheet of

AutoCAD SHX Text Drawing Name

AutoCAD SHX Text File Name

AutoCAD SHX Text Date

AutoCAD SHX Text

%%ULOCATION MAP

AutoCAD SHX Text K E N T U C K Y

AutoCAD SHX Text O H I O

AutoCAD SHX Text V I R G I N I A

AutoCAD SHX Text P E N N S Y L V A N I A

AutoCAD SHX Text M A R Y

AutoCAD SHX Text L A N D

AutoCAD SHX Text

JOB APPROVAL

AutoCAD SHX Text

CLASS V

AutoCAD SHX Text DRAWINGS PREPARED UNDER THE AUTHORITY OF THE EMERGENCY WATERSHED PROTECTION ACT by the NATURAL RESOURCES CONSERVATION SERVICE of the UNITED STATES DEPARTMENT OF AGRICULTURE STREAMBANK STABILIZATION COAL HERITAGE ROAD, SPICE CREEK SITES 1 & 2 DAMAGE SURVEY REPORT NO. 54-01-25-5087-002 MCDOWELL COUNTY, WEST VIRGINIA ra l R es ou rc es

Co ns er va tio n

Se rv ice

U ni te d

St at es D ep ar tm en t of

Ag ric ul tu re

E

W P

ST

R

EA

M

BA

N

K

ST

AB

IL

IZ

AT

IO

N

M C

D O

W

EL

L C

O U

N

TY

, W

ES

T

VI

R G

IN

IA

C O

AL

H

ER

IT

AG

E

R O

AD

, S

PI

C

E C

R

EE

K

SI

TE

S

Q

U

AN

TI

TI

ES

A

N D

C O

N

ST

R U

C

TI

O N

N O

TE

S

N . K

N O

X 9/

* THE AREA REQUIRED FOR OVERLAP IS NOT

INCLUDED IN THE QUANTITY FOR GEOTEXTILE.

CONSTRUCTION NOTES

1. Call 811 to locate utilities prior to mobilization and excavation.

2. Access roads shall be restored to pre-construction condition or better.

3. All fences removed and/or damaged as a result of the contractor's operations shall be restored to a condition equal to or better than they existed before the start of work.

4. Soil compacted as a result of construction operations shall be loosened for a depth of 6-inches below the compacted soil layer and re-graded to blend with existing ground.

5. Provide sub-channel as shown on Typical Channel Bottom Configuration drawing.

6. While working in the stream all efforts will be made to reduce downstream impacts including keeping the excavator tracks elevated above flowing water. A diversion berm shall be established at the top of each stream access point to minimize surface water from flowing toward the stream.

7. Required pollution control measures shall be installed as needed in accordance with Construction Specification 5, Pollution Control.

8. Site access shall be off the main road and shall be in accordance with all West Virginia Department of Highways rules and guidelines. The contractor shall provide signage and flagmen for traffic control as required. See Construction Specification 9, Traffic Control.

9. Excess material from the excavation & obstruction removal shall be wasted off-site in accordance with all local, state, & federal regulations and as approved by the NRCS representative in the field. Floodplains will not be allowed as waste areas under any circumstances. Waste areas shall be seeded according to Construction Specification 6, Seeding, Sprigging and Mulching.

10. The contractor shall provide approved fill as required to complete the work.

11. Trash, tires, & woody debris within the work limits shall be disposed of off-site in an approved landfill. The contractor shall be responsible for the landfill tipping fees.

12. All pipes encountered in the embankment shall be extended through the rock riprap and/or gabions with the same pipe material or better to the face of the slope or baskets.

13. Pipes 12" diameter and larger shall be encased in a minimum of 6" of concrete when passing through rock riprap and/or gabions. Concrete shall have a minimum compressive strength of 2500 psi.

14. The contractor shall maintain the cleanliness of public and private roads impacted by hauling operations during the duration of the work.

15. Starting location of the streambank stabilization measure will be marked in the field.

16. Reshape/transition the stream's bank at the upstream and downstream ends of stabilization measures as directed by NRCS representative.

17. After the foundation is excavated, NRCS representative shall determine if foundation preparation will be required and type. Foundation preparation quantities not included or covered by the variation in quantity clause.

SITE 2 - TABLE OF ESTIMATED QUANTITIES

GABION

GEOTEXTILE

SY*

RIPRAP

TONS

GABIONS

CY

EARTH FILL

CY

FOUNDATION PREPARATION

SHALLOW BEDROCK

SY**

FOUNDATION PREPARATION

ROCK RIPRAP

TONS***

FOUNDATION PREPARATION

ROCK RIPRAP GEOTEXTILE

SY***

196 0 198 70 210 280AS NEEDED

** QUANTITIES ASSUMING BEDROCK

ENCOUNTERED FOR ENTIRE LENGTH.

*** QUANTITIES ASSUMING ROCK RIPAP

FOUNDATION FOR ENTIRE AREA.

GEOTEXTILE

SY*

BLANKET

DRAIN

TONS

RIPRAP

TONS

GROUT

RIPRAP

CY

FOUNDATION PREPARATION

SHALLOW BEDROCK

LF**

598 103 390 78 70

SITE 1 - TABLE OF ESTIMATED QUANTITIES

DRAIN PIPE

LF

DRAIN PIPE

PERFORATED

LF

DRAIN PIPE

CAP

EA

DRAIN PIPE

TEE

EA

EARTH FILL

CY

AS NEEDED

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Designed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Sheet of

AutoCAD SHX Text Drawing Name

AutoCAD SHX Text File Name

Date ra l R es ou rc es

Co ns er va tio n

Se rv ice

U ni te d

St at es D ep ar tm en t of

Ag ric ul tu re

E

W P

ST

R

EA

M

BA

N

K

ST

AB

IL

IZ

AT

IO

N

M C

D O

W

EL

L C

O U

N

TY

, W

ES

T

VI

R G

IN

IA

C O

AL

H

ER

IT

AG

E

R O

AD

, S

PI

C

E C

R

EE

K

SI

TE

S

LO

C

AT

IO

N

M

AP

N . K

N O

X 9/

SITE 1 - 12673 COAL HERITAGE ROAD

LAT: N37.445070 LON: W81.702405

SITE 2 - 13008 COAL HERITAGE ROAD

LAT: N37.443020 LON: W81.697523

FEET

0 2000 4000

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Designed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Sheet of

AutoCAD SHX Text Drawing Name

AutoCAD SHX Text File Name

CONSTRUCTION LIMITS

ROCK RIPRAP STREAMBANK STABILIZATION.

SEE DETAILS, SHEETS 5 - 7.

COAL HERITAGE ROAD

12673

CL

CL

C L

CL

CL

CL TBM1

SPICE CREEK

TUG FORK

TBM2

0.

M

IL

ES

T

O R

O D

ER

FI

EL

D

, W V

Na tu ra l R es ou rc es

Co ns er va tio n

Se rv ice

U ni te d

St at es D ep ar tm en t of

Ag ric ul tu re

E

W P

ST

R

EA

M

BA

N

K

ST

AB

IL

IZ

AT

IO

N

M C

D O

W

EL

L C

O U

N

TY

, W

ES

T

VI

R G

IN

IA

C O

AL

H

ER

IT

AG

E

R O

AD

, S

PI

C

E C

R

EE

K

SI

TE

S

SI

TE

SI

TE

M

AP

C

O

AL

H

ER

IT

AG

E R

O

AD

N . K

N O

X 9/

NAD83 WV STATE PLANE, SOUTH ZONE, US FOOT GRID. NAVD88 VERTICAL DATUM

ELEVATIONEASTINGNORTHINGDESCRIPTION

PROJECT CONTROL

TBM2 - PK NAIL IN EDGE OF ROAD 1075.971764728.46162855.13

TBM1 - DUPLEX NAIL IN POWER POLE 1076.701764692.86162833.36

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Designed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Sheet of

AutoCAD SHX Text Drawing Name

AutoCAD SHX Text File Name

AutoCAD SHX Text Date

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

COAL HERITAGE ROAD

12673

CL

CL

CL

CL

C L

C L

C L

CL

CL CL

CL

CL CL

TBM2

TBM1

EXISTING SIGN, WITH BURIED

ELECTRIC. DO NOT DISTURB

OHOHOH

O H

O H

OVERHEAD UTILITY

GRAVEL BAR

EXISTING BRIDGE WINGWALL. DO NOT

DISTURB. KEY AND TRANSITION ROCK

RIPRAP SLOPE TO EXISTING

ACCESS

70'

KEY AND TRANSITION ROCK

RIPRAP SLOPE TO EXISTING

RESTORE ORIGINAL STREAM

BOTTOM WIDTH APPROX 20'

0.4 MILES TO RODERFIELD, W

V

Na tu ra l R es ou rc es

Co ns er va tio n

Se rv ice

U ni te d

St at es D ep ar tm en t of

Ag ric ul tu re

E

W P

ST

R

EA

M

BA

N

K

ST

AB

IL

IZ

AT

IO

N

M C

D O

W

EL

L C

O U

N

TY

, W

ES

T

VI

R G

IN

IA

C O

AL

H

ER

IT

AG

E

R O

AD

, S

PI

C

E C

R

EE

K

SI

TE

S

SI

TE

PL

AN

V

IE

W

N . K

N O

X 9/

LEGEND

TOP OF BANK

TOE OF SLOPE

EDGE OF PAVED ROAD

CONSTRUCTION LIMITSCL

CONTROL POINT

NOTES

1. CHANNEL CLEARING AND DEBRIS DISPOSAL SHALL BE DIRECTED BY

THE NRCS REPRESENTATIVE.

2. BORROW MATERIAL SHALL BE TAKEN FROM GRAVEL BAR WITHIN THE

CONSTRUCTION LIMITS AS DIRECTED BY THE NRCS REPRESENTATIVE.

3. DISPOSAL AREA FOR EXCAVATED MATERIAL SHALL BE AT AN

APPROVED LOCATION OFFSITE.

4. CONTRACTOR SHALL CONSERVE SUITABLE MATERIALS

FOR FINAL GRADING AND SEEDING OPERATIONS.

UTILITY POLE

WATER METER

TBM#

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Designed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Sheet of

AutoCAD SHX Text Drawing Name

AutoCAD SHX Text File Name

AutoCAD SHX Text Date

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING

GROUND

SECTION - GROUTED ROCK RIPRAP

3' MIN. OR TO BEDROCK. IF BEDROCK

ENCOUNTERED, SEE TOE ON BEDROCK

DETAIL, SHEET 7.

8'

EXCAVATION

LIMITS

1'- 6"

6"

3'

8'

3' OF D50 = 18" ROCK RIPRAP PLACED WITH

VOIDS FOR GROUT PLACEMENT. FOR DETAILS,

SEE CONSTRUCTION SPECIFICATION 62

BLANKET DRAIN

1' OF #57 AGGREGATE

1' MIN. OF TOPSOIL ON GEOTEXTILE

OVER TOP OF RIPRAP. PROVIDE

POSITIVE DRAINAGE.

GEOTEXTILE

2'

4'

7.5'

5.4'

FLOW

OR

POSITIVE DRAINAGE

DRAIN PIPE, 3" DIA. SCH. 40

ASTM D1785 SOLID PIPE, 10'

C.C. (MAX). SLOPE TO DRAIN.

SEE DETAILS, SHEET 7.

6"

DRAIN PIPE, 3" DIA. SCH. 40

ASTM D1785 PERFORATED PIPE.

SEE DETAILS, SHEET 7.

FINAL GRADE. SEE TYPICAL CHANNEL

BOTTOM CONFIGURATION ON

SHEET 14.

EXCAVATION LIMITS. BACKFILL AFTER

ROCK RIPRAP WITH GROUT PLACEMENT.

1'

BEGINNING/END OF ROCK

RIPRAP STABILIZATION

PLAN - RIPRAP KEY

GEOTEXTILEBLANKET DRAIN

ROCK RIPRAP WITH GROUT

TOP OF ROCK RIPRAP SLOPE

TOE OF ROCK RIPRAP SLOPE

INSTALL ALONG SLOPE FROM

THE TOE OF EXCAVATION TO

TOP OF ROCK RIPRAP.

TYP.

RIPRAP KEY

TOE OF

EXCAVATION

TOP OF ROCK RIPRAP

AND BLANKET DRAIN

Na tu ra l R es ou rc es

Co ns er va tio n

Se rv ice

U ni te d

St at es D ep ar tm en t of

Ag ric ul tu re

E

W P

ST

R

EA

M

BA

N

K

ST

AB

IL

IZ

AT

IO

N

M C

D O

W

EL

L C

O U

N

TY

, W

ES

T

VI

R G

IN

IA

C O

AL

H

ER

IT

AG

E

R O

AD

, S

PI

C

E C

R

EE

K

SI

TE

S

SI

TE

TY

PI

C

AL

G

R O

U

TE

D R

O C

K R

IP

R

AP

SE

C

TI

O N

D

ET

AI

LS

N . K

N O

X 9/

NOT TO SCALE

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Designed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Sheet of

AutoCAD SHX Text Drawing Name

AutoCAD SHX Text File Name

EXISTING

GROUND

0' TO 3' MAX.

EXCAVATION

LIMITS

1'- 6"

BLANKET DRAIN

1' OF #57 AGGREGATE

CHANNEL BOTTOM

GEOTEXTILE

2'

DRAIN PIPE, 3" SCH. 40 ASTM

D1785 SOLID PIPE, 10' C.C.

(MAX). SLOPE TO DRAIN.

6"

SECTION - TOE ON BEDROCK

BEDROCK

2'- 6" EQUAL EQUAL

#8x4' REBAR 5' C.C MAX.

DRILL 1-1/4" DIA HOLE INTO BEDROCK.

EPOXY OR GROUT NOT REQUIRED.

6"

8'

1' MIN. OF TOPSOIL ON GEOTEXTILE

OVER TOP OF RIPRAP. PROVIDE

POSITIVE DRAINAGE. 1'

(CONDITIONAL - SHALLOW BEDROCK)

3' OF D50 = 18" ROCK RIPRAP PLACED WITH

VOIDS FOR GROUT PLACEMENT. FOR DETAILS,

SEE CONSTRUCTION SPECIFICATION 62

TEE

120°

PERFORATED PIPE

1'

2.5"

1"

PERFORATED PIPE WITH

TWO ROWS OF 3 8" HOLES

ANIMAL GUARD, 12" STAINLESS

BOLT WITH WASHERS AND NUT

2" FROM END.

ANIMAL GUARD

END CAP

PLAN - DRAIN PIPE

2"ANIMAL GUARD

DRAIN PIPE, 3" DIA. SCH. 40

ASTM D1785 SOLID PIPE

8'

END CAP

3" DIA. TWO-WAY

CLEANOUT TEE

1'DRAIN PIPE, 3" DIA SCH. 40,

ASTM D1785 PERFORATED

PIPE. SEE DETAILS ABOVE.

BEGIN/END BLANKET

DRAIN, 5' MAX. FROM

END CAP

BLANKET DRAIN

#57 AGGREGATE

Na tu ra l R es ou rc es

Co ns er va tio n

Se rv ice

U ni te d

St at es D ep ar tm en t of

Ag ric ul tu re

E

W P

ST

R

EA

M

BA

N

K

ST

AB

IL

IZ

AT

IO

N

M C

D O

W

EL

L C

O U

N

TY

, W

ES

T

VI

R G

IN

IA

C O

AL

H

ER

IT

AG

E

R O

AD

, S

PI

C

E C

R

EE

K

SI

TE

S

SI

TE

TY

PI

C

AL

G

R O

U

TE

D R

O C

K R

IP

R

AP

D

ET

AI

LS

N . K

N O

X 9/

NOT TO SCALE

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Designed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Sheet of

AutoCAD SHX Text Drawing Name

AutoCAD SHX Text File Name

CONSTRUCTION LIMITS

CL

CL

CL

CLCL

C L

GABION WALL STREAMBANK STABILIZATION.

SEE DETAILS, SHEETS 9 - 13.

TBM2

TBM3

COAL HERITAGE ROAD

13008

0.7 MILES TO RODERFIELD, W

V

SPICE CREEK

Na tu ra l R es ou rc es

Co ns er va tio n

Se rv ice

U ni te d

St at es D ep ar tm en t of

Ag ric ul tu re

E

W P

ST

R

EA

M

BA

N

K

ST

AB

IL

IZ

AT

IO

N

M C

D O

W

EL

L C

O U

N

TY

, W

ES

T

VI

R G

IN

IA

C O

AL

H

ER

IT

AG

E

R O

AD

, S

PI

C

E C

R

EE

K

SI

TE

S

SI

TE

SI

TE

M

AP

C

O

AL

H

ER

IT

AG

E R

O

AD

N . K

N O

X 9/

NAD83 WV STATE PLANE, SOUTH ZONE, US FOOT GRID. NAVD88 VERTICAL DATUM

ELEVATIONEASTINGNORTHINGDESCRIPTION

PROJECT CONTROL

TBM3 - PK NAIL IN EDGE OF ROAD 1104.101766088.01162076.26

TBM2 - DUPLEX NAIL IN POWER POLE 1102.971765995.21162140.50

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Designed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Sheet of

AutoCAD SHX Text Drawing Name

AutoCAD SHX Text File Name

AutoCAD SHX Text Date

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

C L

CL

CL

CL

CL

CL

CL

CL

CLCL

CL

CL

TBM3

TBM2

END AT EXISTING CRIB WALL

EXISTING FENCE

DO NOT DISTURB

105' OF 9' HIGH GABION WALL

COAL HERITAGE ROAD

13008

RESTORE ORIGINAL STREAM

BOTTOM WIDTH APPROX 18'

OH

OH

OH

OH

OH

OH

OVERHEAD UTILITY

DEBRIS REMOVAL -

EXISTING CONCRETE

SLAB.

BEGIN AT EXISTING GABION WALL

DOWNSTREAM OF EXISTING BRIDGE.

SET GABION WALL AT ELEVATION 1094.1

OH

0.7 MILES TO RODERFIELD, W

V

INSTALL COUNTERFORT AT BEGINNING,

MIDDLE AND END OF GABION WALL.

SEE DETAILS, SHEETS 10 & 11.

Na tu ra l R es ou rc es

Co ns er va tio n

Se rv ice

U ni te d

St at es D ep ar tm en t of

Ag ric ul tu re

E

W P

ST

R

EA

M

BA

N

K

ST

AB

IL

IZ

AT

IO

N

M C

D O

W

EL

L C

O U

N

TY

, W

ES

T

VI

R G

IN

IA

C O

AL

H

ER

IT

AG

E

R O

AD

, S

PI

C

E C

R

EE

K

SI

TE

S

SI

TE

PL

AN

V

IE

W

N . K

N O

X 9/

LEGEND

TOP OF BANK

TOE OF SLOPE

EDGE OF ACCESS ROAD

CONSTRUCTION LIMITSCL

CONTROL POINT

NOTES

1. CHANNEL CLEARING AND DEBRIS DISPOSAL SHALL BE DIRECTED BY

THE NRCS REPRESENTATIVE.

2. BORROW MATERIAL SHALL BE TAKEN FROM WITHIN THE

CONSTRUCTION LIMITS AS DIRECTED BY THE NRCS REPRESENTATIVE.

3. DISPOSAL AREA FOR EXCAVATED MATERIAL AND DEBRIS SHALL BE AT

AN APPROVED LOCATION OFFSITE.

4. GABION WALL ALIGNMENT, LAYOUT, LENGTH AND HEIGHT MAY VARY

AS DETERMINED BY THE NRCS REPRESENTATIVE.

5. BACKFILL MATERIAL BEHIND GABIONS SHALL BE FROM CHANNEL

SHAPING AND/OR STOCKPILED MATERIAL AS DIRECTED BY THE NRCS

REPRESENTATIVE. .

UTILITY POLE

TBM#

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Designed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Sheet of

AutoCAD SHX Text Drawing Name

AutoCAD SHX Text File Name

AutoCAD SHX Text Date

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SECTION - 9' HIGH GABION WALL

2' MIN. EMBEDMENT OR TO BEDROCK

IF BEDROCK IS LESS THAN 2', SEE

FOUNDATION PREPARATION ON

SHALLOW BEDROCK, SHEET 12.

6'x 3'x 3'

2' MIN. 1' MIN.

LOWEST POINT

IN STREAM

EXCAVATION LIMITS

BACKFILL AFTER GABION

INSTALLATIONEXCAVATION LIMITS

GEOTEXTILE

6'x 4.5'x 3'

7'

EXISTING

GROUND

TYP.

1.5'

POSITIVE DRAINAGE

6' MIN.

NOTES

1. SEE TYPICAL CHANNEL BOTTOM CONFIGURATION SHEET 14.

2. REFER TO SHEET 2 FOR ESTIMATED QUANTITIES.

3. AFTER THE FOUNDATION IS EXCAVATED, NRCS

REPRESENTATIVE SHALL DETERMINE IF FOUNDATION

TREATMENT WILL BE REQUIRED AND TYPE. SEE CONDITIONAL

FOUNDATION TREATMENT DETAILS ON SHEETS 12 & 13.

4. THE CONTRACTOR SHALL ONLY EXCAVATE THE AMOUNT OF

FOUNDATION NEEDED TO INSTALL THE BOTTOM LAYER OF

GABION WALL INTENDED TO PLACE PER MANUFACTURER'S

RECOMMENDATIONS DURING THE SAME WORKDAY.

5. BACKFILL BEHIND EACH LAYER OF GABIONS AS THE LAYERS

PROGRESS VERTICALLY. BACKFILL MATERIAL SHALL BE

APPROVED AND BE FREE OF TRASH, CONCRETE, WOODY

DEBRIS, ETC. CONSERVE SUITABLE MATERIALS FOR FINAL

GRADING AND SEEDING OPERATIONS.

1' BACKFILL

OR FLATTER BASED

ON ACTUAL SITE

CONDITIONS

9.5

6°

FINAL GRADE. SEE TYPICAL

CHANNEL BOTTOM CONFIGURATION

ON SHEET 14.

EXISTING CHANNEL

BOTTOM

12' (MAX.) LEADING

EXCAVATION

SEE NOTE 4

BACKFILL AND NEXT LAYER

TRAILING COMPLETED

LOWER LAYER

WHEN MORE GABIONS ARE INTENDED,

LEAVE LAST GABION EMPTY TO

FACILITATE LACING THE NEXT AS

PLACEMENT PROGRESSES.

PROFILE - GABION

PLACEMENT/FILLING SEQUENCE

FOUNDATION GRADE

BOTTOM LAYER

9' (MIN.) COMPLETED LOWER LAYER IN

ADVANCE OF BACKFILL OF ADJACENT

GABIONS AND START OF NEXT LAYER

6'x 3'x 3'

Na tu ra l R es ou rc es

Co ns er va tio n

Se rv ice

U ni te d

St at es D ep ar tm en t of

Ag ric ul tu re

E

W P

ST

R

EA

M

BA

N

K

ST

AB

IL

IZ

AT

IO

N

M C

D O

W

EL

L C

O U

N

TY

, W

ES

T

VI

R G

IN

IA

C O

AL

H

ER

IT

AG

E

R O

AD

, S

PI

C

E C

R

EE

K, S

IT

ES

TY

PI

C

AL

G

AB

IO

N W

AL

L

SE

C

TI

O

N

D

ET

AI

LS

N . K

N O

X 9/

NOT TO SCALE

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Designed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Sheet of

AutoCAD SHX Text Drawing Name

AutoCAD SHX Text File Name

CONSTRUCTION NOTES

1. EACH VERTICAL SEAM SHALL BE LACED PRIOR TO SETTING BASKET

IN PLACE AND PRIOR TO LACING TO ADJOINING BASKETS.

2. EACH BASKET SHALL BE LACED TO THE ADJOINING BASKET AT ALL

VERTICAL EDGES AND HORIZONTAL EDGES.

3. EACH DIAPHRAGM SHALL BE LACED TO THE LID OF THE BASKET

AFTER CLOSING. DIAPHRAGM SHALL BE LACED ALONG ALL SIDES.

4. ALL LACING SHALL BE DONE WITH 13.5 GAUGE WIRE USING THE TWO,

ONE, TWO, LOOPING PROCEDURE AS SHOWN IN THE LACING DETAILS.

5. ALL WIRE SHALL BE TIGHTLY LACED AND THE ENDS OF THE LACING

WIRE SHALL BE DOUBLED BACK AND TWISTED NOT LESS THAN THREE

TURNS AROUND ITSELF IN A LENGTH NOT GREATER THAN ONE INCH.

6. INSTALL ACCORDING TO MANUFACTURER'S RECOMMENDATIONS.

7. GABION BASKET LENGTH MAY VARY FROM TYPICAL LAYER DIAGRAM

WHERE APPLICABLE TO STAGGER SEAM WITH LAYER BELOW AS

APPROVED BY THE NRCS REPRESENTATIVE.

6'x 4.5'x 3'

6'x 3'x 3'

9' HIGH GABION WALL

WITH COUNTERFORT

1/3 H

1/3 H

1/3 H

1/3 L 1/3 L

1/3 L

INTERIOR SUPPORT DETAIL

5"5"

LACING DETAIL

1/3 L 1/3 L

1/3 L

LA

YE

R

LA

YE

R

6'x 3'x 3'

6'x 3'x 3'

6'x 3'x 3'

9'

LAYER 3

6'x 3'x 3'

6'x 4.5'x 3'

6'x 3'x 3'

LAYER 2 LAYER 1

FR

O

N T

FA

C

E

FR

O

N T

FA

C

E

FR

O

N T

FA

C

E6'x 3'x 3'

6'x 3'x 3'

6' x

3' x

3'

6' 4.5' 3'

12'

COUNTERFORT

LAYER DIAGRAM

INSTALL COUNTERFORT AT

BEGINNING, MIDDLE AND

END OF GABION WALL.

3'

6'x 3'x 3'

9'x 3'x 3'

6'x 4.5'x 3'

6'x 3'x 3'

6'x 4.5'x 3'

3'

6'x 3'x 3'

WIRE DOUBLED BACK

AND TWISTED

LA

YE

R

6'x 3'x 3' 6'x 3'x 3'

6' x

3' x

3'

Na tu ra l R es ou rc es

Co ns er va tio n

Se rv ice

U ni te d

St at es D ep ar tm en t of

Ag ric ul tu re

E

W P

ST

R

EA

M

BA

N

K

ST

AB

IL

IZ

AT

IO

N

M C

D O

W

EL

L C

O U

N

TY

, W

ES

T

VI

R G

IN

IA

C O

AL

H

ER

IT

AG

E

R O

AD

, S

PI

C

E C

R

EE

K, SI

TE

S

TY

PI

C

AL

G

AB

IO

N W

AL

L

D

ET

AI

LS

N . K

N O

X 9/

NOT TO SCALE

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Designed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Sheet of

AutoCAD SHX Text Drawing Name

AutoCAD SHX Text File Name

1.25'

(TYP.)

VARIES

VA

R

IE

S

1' MIN. TO 1.5' MAX.

0' TO 2' MAX.

CHANNEL BOTTOM

1.5'

2.5'

PROFILE - GABIONS WITH REBAR SPACING

BEDROCK

1.25' MAX.

(TYP.)

2.

5'

M

AX

(T

YP

1.25' (TYP.)

NO. 10 REBAR

(TYP.)

NO. 10 REBAR

(TYP.)

G

AB

IO

N

W

ID

TH

VARIES

FOUNDATION PREPARATION PAYMENT LIMITS

1' MIN. TO 1.5' MAX.

FO

U

N D

AT

IO

N

PR

EP

AR

AT

IO

N

PA

YM

EN

T

LI

M

IT

S

PLAN - GABIONS WITH REBAR/DRILLHOLE PATTERN

0' TO 2' MAX.

VA

R

IE

S

1.5'

2.5'

2.5' MAX.

(TYP.)1' MIN. TO 1.5' MAX.

FINAL GRADE

SECTION - GABIONS WITH REBAR SPACING

MAXIMUM ANGLE OF

REBAR/DRILLHOLE PATTERN

~1.5'

~2.5'

15° MAX.

VERTICAL NO. 10 REBAR

(TYP.)

MAX. TILT OF

REBAR/DRILLHOLE

FRONT OF

GABION

BACK OF

GABION

CHANNEL BOTTOM

BEDROCK

1' MAX.

BEDROCK

NOTES:

1. Drill holes for Rebar shall be 1 3/8" diameter. The use of epoxy or non-shrink grout is not required. The rebar shall be driven by hammer to the required depth without bending.

2. Care shall be taken by the contractor to prevent damage to the rebar during gabion filling operations.

FOUNDATION PREPARATION SHALLOW BEDROCK

(CONDITIONAL)

3. Different gabion bottom layer configurations will require additional rebar by repeating the pattern shown. Quantities on sheet 2 based on bottom width x length.

4. Final pattern and spacing to be directed by NRCS representative in the field.

Na tu ra l R es ou rc es

Co ns er va tio n

Se rv ice

U ni te d

St at es D ep ar tm en t of

Ag ric ul tu re

E

W P

ST

R

EA

M

BA

N

K

ST

AB

IL

IZ

AT

IO

N

M C

D O

W

EL

L C

O U

N

TY

, W

ES

T

VI

R G

IN

IA

C O

AL

H

ER

IT

AG

E

R O

AD

, S

PI

C

E C

R

EE

K, S

IT

ES

TY

PI

C

AL

F

O U

N D

AT

IO

N P

R

EP

AR

AT

IO

N

O N

S H

AL

LO

W B

ED

R

O C

K D

ET

AI

L

N . K

N O

X 9/

NOT TO SCALE

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Designed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Sheet of

AutoCAD SHX Text Drawing Name

AutoCAD SHX Text File Name

9.5

6°

FINAL

GRADE

EXCAVATION LIMITS

BACKFILL AFTER GABION

INSTALLATION

EXCAVATION LIMITS

BACKFILL AFTER

GABION INSTALLATION

POSITIVE DRAINAGE

SECTION - GABION WALL

1.5'

1.5'

3' MIN.

VA

R

IE

S

FOUNDATION PREPARATION PAYMENT LIMITS

VARIES WITH GABION CONFIGURATION.

ASSUMED 12' FOR QUANTITIES ON SHEET 2.

NRCS REPRESENTATIVE WILL DETERMINE

DEPTH OF ROCK RIPRAP IN THE FIELD.

ASSUMED 3' FOR QUANTITIES ON SHEET 2.

GEOTEXTILE

0.6'

ROCK RIPRAP,

6"- 18" GRADATION.

OR FLATTER BASED ON

ACTUAL SITE CONDITIONS

2' MIN. BACKFILL

NRCS REPRESENTATIVE WILL DETERMINE

DISTANCE BASED ON ACTUAL SITE CONDITIONS

ASSUMED 3' FOR QUANTITIES ON SHEET 2.

FINAL GRADE. SEE TYPICAL CHANNEL

BOTTOM CONFIGURATION ON

SHEET 14.

FOUNDATION PREPARATION ROCK RIPRAP

(CONDITIONAL)

Na tu ra l R es ou rc es

Co ns er va tio n

Se rv ice

U ni te d

St at es D ep ar tm en t of

Ag ric ul tu re

E

W P

ST

R

EA

M

BA

N

K

ST

AB

IL

IZ

AT

IO

N

M C

D O

W

EL

L C

O U

N

TY

, W

ES

T

VI

R G

IN

IA

C O

AL

H

ER

IT

AG

E

R O

AD

, S

PI

C

E C

R

EE

K, S

IT

ES

TY

PI

C

AL

F

O U

N D

AT

IO

N P

R

EP

AR

AT

IO

N

O N

R O

C K

R

IP

R

AP

D

ET

AI

LS

N . K

N O

X 9/

NOT TO SCALE

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Designed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Sheet of

AutoCAD SHX Text Drawing Name

AutoCAD SHX Text File Name

Notes:

1. Final location of subchannel to be located in the field by the NRCS representative. The subchannel shall be transitioned as necessary to meet existing grades at the upstream and downstream site extents.

2. Subchannels are not required for bedrock streambeds.

3. Use material from the required excavations and/or approved fill from offsite to reconstruct streambanks as necessary. Seed and mulch per

Construction Specification 6, Seeding, Sprigging and Mulching.

EXISTING

GROUNDFINAL CHANNEL BOTTOM SHALL

BE ROUGH & IRREGULAR.

PROVIDE POSITIVE DRAINAGE

TOWARD SUBCHANNEL.

~1

~1

1'

1/3 BW

SUBCHANNEL

BOTTOM WIDTH

(BW)

~2

DEPOSITION VARIES

CHANNEL BOTTOM CONFIGURATION

SEE SITE PLAN

STREAMBANK STABILIZATION

MEASURE, GABION WALL OR

ROCK RIPRAP SLOPE.

Na tu ra l R es ou rc es

Co ns er va tio n

Se rv ice

U ni te d

St at es D ep ar tm en t of

Ag ric ul tu re

E

W P

ST

R

EA

M

BA

N

K

ST

AB

IL

IZ

AT

IO

N

M C

D O

W

EL

L C

O U

N

TY

, W

ES

T

VI

R G

IN

IA

C O

AL

H

ER

IT

AG

E

R O

AD

, S

PI

C

E C

R

EE

K, S

IT

ES

TY

PI

C

AL

C

H

AN

N

EL

B O

TT

O

M C

O N

FI

G

U R

AT

IO

N

N . K

N O

X 9/

NOT TO SCALE

AutoCAD SHX Text Checked

AutoCAD SHX Text Approved

AutoCAD SHX Text Designed

AutoCAD SHX Text Drawn

AutoCAD SHX Text Sheet of

AutoCAD SHX Text Drawing Name

AutoCAD SHX Text File Name

Sheets and Views
8.5x11 Cover
MC-CHR_2-QuantitiesNotes.pdf
Sheets and Views
2-QuantitiesNotes
MC-CHR_3-LocationMap.pdf
Sheets and Views
8.5x11 LOCATION
MC-CHR_4-Site1-SiteMap.pdf
Sheets and Views
Site2-SitePlan
MC-CHR_5-Site1-PlanView.pdf
Sheets and Views
Site1-PlanView
MC-CHR_6-TypGroutedRiprapSection&Details.pdf
Sheets and Views
6 RiprapSection
MC-CHR_7-TypGroutedRiprapDetails.pdf
Sheets and Views
7 RiprapDetails
MC-CHR_8-Site2-SiteMap.pdf
Sheets and Views
Site2-SitePlan
MC-CHR_9-Site2-PlanView.pdf
Sheets and Views
Site2-PlanView
MC-CHR_10-TypGabionSectionDetails.pdf
Sheets and Views
10_9FT-SEC
MC-CHR_11-TypGabionDetails.pdf
Sheets and Views
11_9FT-GABION DETAILS
MC-CHR_12-TypFoundPrepBedrockDetails.pdf
Sheets and Views
12-TYP BEDROCK
MC-CHR_13-TypSecRiprapFoundDetails.pdf
Sheets and Views
13-RIPRAP FOUNDATION
MC-CHR_14-TypChannelBottomDetails.pdf
Sheets and Views
14-TYP CHANNEL
MC-CHR_5-Site1-PlanView.pdf
Sheets and Views
Site1-PlanView
MC-CHR_2-QuantitiesNotes.pdf
Sheets and Views
2-QuantitiesNotes
MC-CHR_1-CoverSheet.pdf
Sheets and Views
8.5x11 Cover
MC-CHR_1-CoverSheet.pdf
Sheets and Views
8.5x11 Cover
MC-CHR_2-QuantitiesNotes.pdf
Sheets and Views
2-QuantitiesNotes
MC-CHR_6-TypGroutedRiprapSection&Details.pdf
Sheets and Views
6 RiprapSection
MC-CHR_7-TypGroutedRiprapDetails.pdf
Sheets and Views
7 RiprapDetails
MC-CHR_1-CoverSheet.pdf
Sheets and Views
8.5x11 Cover
MC-CHR_6-TypGroutedRiprapSection&Details.pdf
Sheets and Views
6 RiprapSection
MC-CHR_2-QuantitiesNotes.pdf
Sheets and Views
2-QuantitiesNotes
MC-CHR_7-TypGroutedRiprapDetails.pdf
Sheets and Views
7 RiprapDetails
MC-CHR_6-TypGroutedRiprapSection&Details.pdf
Sheets and Views
6 RiprapSection
MC-CHR_7-TypGroutedRiprapDetails.pdf
Sheets and Views
7 RiprapDetails
MC-CHR_1-CoverSheet.pdf
Sheets and Views
8.5x11 Cover
MC-CHR_6-TypGroutedRiprapSection&Details.pdf
Sheets and Views
6 RiprapSection
MC-CHR_1-CoverSheet.pdf
Sheets and Views
8.5x11 Cover

File details come from the government source that posted it. Updated .