A04_0040620744_Attach_0001_SOW_KEMO_Preserve_And_Stabilize_Earthwork_.pdf

PDF 233 KB Posted

Attached to
Provide Tree Thinning Services Federal contract opportunity
Solicitation number
140P5123Q0029
Issued by
Department of the Interior National Park Service Southeast Region

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Kennesaw Mountain National Battlefield Park

Kennesaw, GA

Statement of Work

Preserve and Stabilize Historic Civil War Earthworks

(Removal of hazardous Trees on and near Earthworks)

PMIS# 205232F

1. Background:

Kennesaw Mountain National Battlefield Park preserves a Civil War battlefield of the Atlanta Campaign. The battle was fought here from June 18, 1864 until July 2, 1864. There are 4 battlefield areas at the park: The Kolb farm area, Visitor Center including the top of Kennesaw Mountain, off Burnt Hickory Road and the main site is located at Cheatham Hill. The Visitor Center provides introductory information about the park and the battle. While walking some of the 18+ miles of interpretive walking trails you will see historic earthworks, cannon emplacements and various interpretive signs. There are 3 monuments representing states that fought here.

Kennesaw Mountain is 1808 feet above sea level. It is approximately a 700 foot incline from the Visitor Center to the mountain's summit. The hike up is approximately 1.4 miles on the road and 1.2 mile up the trail. Kennesaw Mountain National Battlefield Park was authorized for protection by the War Department in 1917 and was transferred to the Department of the Interior as a unit of the National Park System in 1933. The 2992+- acre park includes the site of some of the heaviest fighting of the Atlanta Campaign. The park was set aside as an important cultural property dedicated to public inspiration and interpretation of the significant historic events that occurred here.

2.0 General Statement of Work:

The purpose of this Statement of Work is to establish a contract for the removal of hazardous and potentially hazardous trees to the Civil War Earthworks at the Kennesaw Mountain National Battlefield Park. approximately 2.5-mile radius. The work will be completed in one continuous cycle. Trees will range from 10 inches to 37+ inches in diameter and up to 100+ feet high. The contractor will remove trees, dismantle and rig down, manual climb, use chainsaw, and flush cut to maximum 6” above grade. Debris and stumps will remain in place. Of concern in these cutting operations is the protection of the historic earthworks. These earthen fortifications date back to the battle here and are a major resource to be protected within the park boundaries. These earthworks are particularly vulnerable to damage by the operation of both the tracked and wheeled vehicles which are often used in timbering operations. It is essential and mandatory that the contractor meet with the COTR and representatives of the park’s staff before operations begin in any new area, so they can be shown what these earthworks look like and discuss how best to protect them. All of this contract will occur around the earthworks.

Park employees have marked over 140 hazardous trees to be felled. The trees felled have been deemed and marked imminent resource threats by the NPS prior to the execution of the scope of work.

Trees will be removed 20 to 30 trees per month until completion of project.

3.0 Work Descriptions:

Tree Removal: Removed trees and debris shall be fallen safely to prevent injury of workers and/or visitors using the adjacent areas. Trees will be felled away from all earthworks to prevent damage to the earthworks. When ordered by the NPS, tree debris and limbs will be chipped and hauled to a NPS approved area for disposal. When chipping is not ordered by the NPS, the contractor will spread tree debris and limbs evenly across the area of disposal. The contractor may harvest large trees and limbs that they actively remove. Salvaged wood, should the contractor choose to re-utilize the material, will be removed immediately after felling, chipping and bucking of individual trees. Removed/harvested trees are the property of the contractor.

Desired Results: With the completion of the tree and limb removal project at Kennesaw Mountain National Battlefield Park, trees and limbs order by the NPS shall be removed and/or chipped and spread in the area of disturbance and the worksites will show little indication of that removal. Stumps ultimately shall be cut at ground level and no grinding. Park boundaries, roads, parking lots and trails will be free of hazardous trees that may interfere with safe use of those areas.

3.1 Certified Arborist:

Contractor must be a Certified Arborist ISA (International Society of Arboriculture) or equivalent

Contractor must submit International Society of Arboriculture (ISA) certificate or equivalent certificate.

List two similar projects successfully completed be included with the quote by the contractor.

3.2 Certified Arborist Bidding:

Due to the complexity of the project, it is recommended for bidders to attend the scheduled site visit.

Site visit meeting date/time – see Site Visit Instruction.

3.3 Accident Prevention

The Contractor shall conduct operations to prevent accidents, injuries, and damages. Additionally, the Contractor shall comply with applicable state and local safety, health, and sanitation laws.

3.4 Accident Reporting

The Contractor shall immediately notify the Contracting Officer or his/her designated representative of any and all accidents to which the Contractor’s employees are a party or witness; and, of any and all accidents involving his/her employees or equipment working under this contract.

Bid List – Provide price per tree for each service described and size provided.

Type A Tree Removal

16 to 24 inch DBH = 25 to 30 inch DBH = 31 to 36 inch DBH = 37+ inch DBH =

Type B Tree Removal

Services Include: Felling trees, limbing dropped trees, moving all tree debris into the park 60 feet away from all park boundaries, roads, and trails to keep fire breaks open. Cut and spreading debris ensure direct soil contact.

10 to 15 inch DBH = 16 to 24 inch DBH = 25 to 30 inch DBH = 31 to 36 inch DBH = 37+ inch DBH =

Type C Tree Removal

Services Include: Felling and limbing trees, mechanically chipping limbs and spreading resulting chips evenly at the site. All tree logs removed from site. Stump shall be cut 6 inches or less from the ground.

Site will be restored to the general appearance of the surrounding woods or landscape. This is a major vehicle traffic area and contractor shall provide additional traffic flaggers and other traffic control measures and must be in place and functional at all times during the tree removal operations.

10 to 15 inch DBH = 16 to 24 inch DBH = 25 to 30 inch DBH = 31 to 36 inch DBH = 37+ inch DBH =

Type D Tree Removal

Services Include: Felling and limbing trees through climbing, mechanically chipping limbs and spreading resulting chips evenly at the site. All tree logs removed from site. Stump shall be cut 6 inches or less from the ground. Site will be restored to the general appearance of the surrounding woods or landscape. This is a major vehicle traffic area and contractor shall provide additional traffic flaggers and other traffic control measures and must be in place and functional at all times during the tree removal operations.

10 to 15 inch DBH =

16 to 24 inch DBH = 25 to 30 inch DBH = 31 to 36 inch DBH = 37+ inch DBH =

4.0: HAULING RESTRICTIONS:

When hauling on National Park Service roads, do not exceed the following load restrictions:

Single Units Gross Vehicle Weight –Lbs.

2 axles 40,000 3 axles 48,000 4 or more axles 52,000

Combination Units Gross Vehicle Weight –Lbs 3 axles 57,000 4 axles 62,000 5 or more axles 66,000

Where the ground is saturated with water or during periods of freezing and thawing, the Contracting Officer may impose further load restrictions or suspend hauling.

4.1 Haul vehicles shall turn around only at intersections and parking areas, not on the Park Road.

4.2 Operate loaded vehicles hauling material at speeds not exceeding the posted speed limit and spaced at 500-foot minimum intervals. On bridges, speeds shall not exceed 25 MPH and not more than one loaded hauling vehicle will be allowed on any bridge at one time. Hauling of materials, supplies, and equipment over the park road, other than within the limits of the project, will not be permitted without prior approval of the Contracting Officer. Load restrictions on park roads are identical to the state load restrictions with such additional regulations as may be imposed by the Contracting Officer.

5.0: EQUIPMENT

Equipment that is leaking any type fluids shall be repaired immediately or removed from the park.

Equipment deemed unsafe by the NPS will be repaired immediately or removed from the park.

6.0: INSPECTION – CONTROL OF WORK

Contractor working hours shall take place Monday through Friday, not before 7:00 AM and no after 6:00 PM. The contractor may work other hours only with submission of a written request and subsequent permission of the Contracting Officer. Work on weekends or on Federal Holidays and at night may be performed only with submission of a written request and subsequent permission of the Contracting Officer. All work shall be scheduled by the NPS, five (5) work days or more notice will be given by the NPS.

7.0: PROTECTION AND RESTORATION OF PROPERTY

The contractor shall be responsible for the preservation from injury or damage, resulting directly or indirectly from the execution of the work, of all public and private property along and adjacent to the park. Contractor shall use every precaution necessary to prevent damage to historic earthworks, pipes, conduits, and other underground structures; also, all overhead structures such as wires, cables, etc.; and poles, trees, shrubbery and crops, within or outside of the project area. Any damage by the contractor or his employee shall be repaired at once at the contractor expense. The contractor will stop work immediately as directed by the COR if there is a suspicion of potentially undocumented cultural and natural resources. In such cased the NPS would require review and documentation of such resources.

8.0: SAFETY

The contractor must keep the entrance roads and parking lots open for public use at all times during removal activities. Contractor shall provide all traffic flaggers and other traffic control measures and must be in place and functional at all times during the tree removal and trimming in public areas, roads, trails and parking lots. Special care must be taken to prevent impacting the surrounding areas and facilities. The contractor will post appropriate warning signs indicating periods of tree removal and trimming work. The successful contractor shall use best management practices for tree removal and trimming, following all NPS, State, County and OSHA regulations pertaining to tree removal and trimming. Employees utilizing chain saw equipment shall wear approved safety equipment to include chaps, hard hat, eyes and hearing protection. All equipment shall be in good and safe working condition. Contractor shall inspect all equipment at the start of the work day. Contractor shall start each day with a safety briefing/meeting with all contractor and NPS staff on the work site.

The FOB point will be Destination. “FOB Destination” means that all costs for transportation or freight from the shipping point shall be paid by the contractor and included as a separate line item. The total price should include all shipping cost.

4.0: Hauling Restrictions:
When hauling on National Park Service roads, do not exceed the following load restrictions:
4.1 Haul vehicles shall turn around only at intersections and parking areas, not on the Park Road.
4.2 Operate loaded vehicles hauling material at speeds not exceeding the posted speed limit and spaced at 500-foot minimum intervals. On bridges, speeds shall not exceed 25 MPH and not more than one loaded hauling vehicle will be allowed on any bridg...
5.0: EQUIPMENT
Equipment that is leaking any type fluids shall be repaired immediately or removed from the park.

6.0: INSPECTION – CONTROL OF WORK

File details come from the government source that posted it. Updated .