A03 Attachment 0004 Non Hazardous Construction and Demolition Debris Submittal Form.pdf
PDF 14 KB Posted
- Attached to
- Repair Quarters One Federal contract opportunity
- Solicitation number
- W52P1J-22-R-5010
About this file
This document contains a submittal form for non-hazardous construction and demolition debris resulting from a project, as well as information about a related federal contract opportunity. The submittal form requires contractors to estimate the weight, percentage to be landfilled, recycled, or diverted, and provide documentation of disposal for various construction materials generated from a project. The related federal contract opportunity is a solicitation from the Department of the Army to repair Quarters One on Rock Island Arsenal in Illinois. The solicitation includes attachments with further details about repair requirements.
View the file
Other files for this federal contract opportunity
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Estimated Weight Estimated Percent to be Landfilled
Estimated Percent to be Recycled
Estimated Percent to be Diverted TOTAL Weight Weight landfilled Landfill Weight recycled Recycler Weight
Diverted Diversion Weight tickets received
(pounds) (%) (%) (%) (pounds) (pounds) (vendor/ company name) (pounds) (vendor/ company name) (pounds) (vendor/ company name) Y or N
CIVIL
Asphalt Concrete Gravel Soil Structural Steel Structural Wood Other Wood Other Steel/Metal Top Soil Sub Soil Trees Crushed Stone/Base
ARCHITECTURAL
Aluminum Brick Carpet Ceiling Tile
CMU
Copper Doors Drywall Glass Insulation Materials Iron Metal Studs Misc Metal Paper Plastic Roofing Materials Sheet Metal Stone Vinyl Base Vinyl Flooring Windows Wood Studs
ELECTRICAL
Ballasts Light Fixtures Transformers Wire Conduit
MECHANICAL
Cast Iron Pipe Copper Pipe Steel Pipe HVAC Equipment White Goods Plumbing Fixtures
RPZ/DCD
Insulation
PHASE II:C&D Report Data
Material
Non-Hazardous Construction and Demolition Debris Submittal Project Title:
Project Number:
Contractor Name:
Contracting Officer's Representative:
PHASE I:C&D Plan Data
File details come from the government source that posted it. Updated .