A03 Attachment 0004 Non Hazardous Construction and Demolition Debris Submittal Form.pdf

PDF 14 KB Posted

Attached to
Repair Quarters One Federal contract opportunity
Solicitation number
W52P1J-22-R-5010
Issued by
Department of the Army Materiel Command Joint Munitions Command

About this file

This document contains a submittal form for non-hazardous construction and demolition debris resulting from a project, as well as information about a related federal contract opportunity. The submittal form requires contractors to estimate the weight, percentage to be landfilled, recycled, or diverted, and provide documentation of disposal for various construction materials generated from a project. The related federal contract opportunity is a solicitation from the Department of the Army to repair Quarters One on Rock Island Arsenal in Illinois. The solicitation includes attachments with further details about repair requirements.

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Estimated Weight Estimated Percent to be Landfilled

Estimated Percent to be Recycled

Estimated Percent to be Diverted TOTAL Weight Weight landfilled Landfill Weight recycled Recycler Weight

Diverted Diversion Weight tickets received

(pounds) (%) (%) (%) (pounds) (pounds) (vendor/ company name) (pounds) (vendor/ company name) (pounds) (vendor/ company name) Y or N

CIVIL

Asphalt Concrete Gravel Soil Structural Steel Structural Wood Other Wood Other Steel/Metal Top Soil Sub Soil Trees Crushed Stone/Base

ARCHITECTURAL

Aluminum Brick Carpet Ceiling Tile

CMU

Copper Doors Drywall Glass Insulation Materials Iron Metal Studs Misc Metal Paper Plastic Roofing Materials Sheet Metal Stone Vinyl Base Vinyl Flooring Windows Wood Studs

ELECTRICAL

Ballasts Light Fixtures Transformers Wire Conduit

MECHANICAL

Cast Iron Pipe Copper Pipe Steel Pipe HVAC Equipment White Goods Plumbing Fixtures

RPZ/DCD

Insulation

PHASE II:C&D Report Data

Material

Non-Hazardous Construction and Demolition Debris Submittal Project Title:

Project Number:

Contractor Name:

Contracting Officer's Representative:

PHASE I:C&D Plan Data

File details come from the government source that posted it. Updated .