This document provides specifications for repairing Quarters One on Rock Island Arsenal in Rock Island, Illinois. The solicitation requests proposals to repair the building's roof, masonry, doors, windows, carpentry, metalwork, concrete work, and restore the site. Proposals are due by June 2022 and the contract is for repair work including replacing the asphalt shingle roof, repointing masonry, repairing doors and windows, and cleaning and restoring other exterior elements. The specifications include requirements for hazardous materials abatement, engineering controls, work practices, medical surveillance, and disposal of asbestos-containing materials that may be encountered during the repair work.

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MISSISSIPPI RIVER BASIN

ROCK ISLAND ARSENAL

ROCK ISLAND, ILLINOIS

REPAIR BUILDING 301, QUARTERS 1

PR 2022-573

Construction Solicitation and Specifications

JUNE 2022

SCHEDULE OF PRICES

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

BASE BID

0001 Mobilization and Demobilization 1 JOB XXXXXXXX $ 0002 Demolition 1 JOB XXXXXXXX $ 0003 Hazardous Materials Abatement 1 JOB XXXXXXXX $ 0004 Roof Work 1 JOB XXXXXXXX $ 0005 Masonry Work 1 JOB XXXXXXXX $ 0006 Door Work 1 JOB XXXXXXXX $ 0007 Window Work 1 JOB XXXXXXXX $ 0008 Carpentry Work 1 JOB XXXXXXXX $ 0009 Metal Work 1 JOB XXXXXXXX $ 0010 Concrete Work 1 JOB XXXXXXXX $ 0011 Site Restoration 1 JOB XXXXXXXX $

OPTION 1

0101 Replace Limestone Pier 1 JOB XXXXXXXX $

JOB = LUMP SUM

ENSURE THAT ALL AMOUNT LINES HAVE BEEN COMPLETED.

TOTAL OF ESTIMATED AMOUNTS - OPTION 1

(ITEM NO. 0101)

TOTAL OF ESTIMATED AMOUNTS - BASE BID

(ITEM NOS. 0001 THROUGH 0011, INCL.)

THE GOVERNMENT RESERVES THE RIGHT TO AWARD ANY OR ALL

OPTIONS AFTER THE DATE THE CONTRACTOR RECEIVES NOTICE TO

PROCEED. IF BID OPTION 1 IS AWARDED, THE CONTRACT WILL BE

EXTENDED 60 CALENDER DAYS.

Quarters 1, Arsenal Island, Exterior Repairs

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 20 00 PRICE AND PAYMENT PROCEDURES

01 33 00 SUBMITTAL PROCEDURES

DIVISION 02 - EXISTING CONDITIONS

02 82 13 ASBESTOS ABATEMENT

02 83 13 LEAD IN CONSTRUCTION

DIVISION 03 - CONCRETE

03 20 01 CONCRETE REINFORCEMENT

03 31 00 CAST-IN-PLACE STRUCTURAL CONCRETE

DIVISION 04 - MASONRY

04 03 00 UNIT MASONRY CLEANING AND RESTORATION

DIVISION 05 - METALS

05 73 00 DECORATIVE METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 20 00 FINISH CARPENTRY

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 31 13 ASPHALT SHINGLES

07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING

07 62 13 COPPER SHEET METAL FLASHING AND TRIM

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 01 52 WOOD DOORS AND WINDOWS RESTORATION

08 11 69 METAL STORM DOORS

08 51 69 ALUMINUM STORM WINDOWS

DIVISION 09 - FINISHES

09 90 00 PAINTS AND COATINGS

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 20 00

PRICE AND PAYMENT PROCEDURES

PART 1 GENERAL

1.1 SUBMITTALS

1.2 JOB PAYMENT ITEMS

1.2.1 Mobilization and Demobilization

1.2.1.1 Payment

1.2.1.2 Unit of Measure

1.2.2 Demolition

1.2.2.1 Payment

1.2.2.2 Unit of Measure

1.2.3 Hazardous Materials Abatements

1.2.3.1 Payment

1.2.3.2 Unit of Measure

1.2.4 Roof Work

1.2.4.1 Payment

1.2.4.2 Unit of Measure

1.2.5 Masonry Work

1.2.5.1 Payment

1.2.5.2 Unit of Measure

1.2.6 Door Work

1.2.6.1 Payment

1.2.6.2 Unit of Measure

1.2.7 Window Work

1.2.7.1 Payment

1.2.7.2 Unit of Measure

1.2.8 Carpentry Work

1.2.8.1 Payment

1.2.8.2 Unit of Measure

1.2.9 Metal Work

1.2.9.1 Payment

1.2.9.2 Unit of Measure

1.2.10 Concrete Work

1.2.10.1 Payment

1.2.10.2 Unit of Measure

1.2.11 Site Restoration

1.2.11.1 Payment

1.2.11.2 Unit of Measure

1.2.12 Replace Limestone Pier

1.2.12.1 Payment

1.2.12.2 Unit of Measure

PART 2 PRODUCTS

PART 3 EXECUTION

SECTION 01 20 00 Page 1

-- End of Section Table of Contents --

SECTION 01 20 00 Page 2

SECTION 01 20 00

PRICE AND PAYMENT PROCEDURES

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Mobilization and Demobilization

1.2 JOB PAYMENT ITEMS

Payment items for the costs of this Contract for which Contract job payments will be made are listed in the SCHEDULE OF PRICES and as described. All costs for items of work, which are not specifically mentioned to be included in a particular job payment item, to be included in the listed job item most closely associated with the work involved. The job price and payment made for each item listed will constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

1.2.1 Mobilization and Demobilization

1.2.1.1 Payment

Submit a list of equipment and the value representing this mobilization and demobilization for approval.

Mobilization and demobilization for all plant and equipment, materials, tools, and supplies necessary to complete the work, will be made for Base Bid Item No. 0001, "Mobilization and Demobilization." Mobilization consists of all costs required, as applicable, to prepare plant and equipment for shipment, moving plant, equipment, supplies, and incidentals to the work site. Demobilization consists of all costs required to prepare plant and equipment for removal and for removing all plant, equipment, unused supplies, and incidentals from the work site, including restoration of staging areas used for construction operations. The Contractor will be paid 60 percent of the job price upon completion of mobilization to the work site. The remaining 40 percent will be paid to the Contractor upon completion of demobilization at the end of the Contract. Failure to justify such price to the satisfaction of the Contracting Officer may result in: payment of actual mobilization costs, as determined by the Contracting Officer at the completion of mobilization; actual demobilization costs, as determined by the Contracting Officer at the completion of demobilization; and payment of the remainder of this item in

SECTION 01 20 00 Page 3 the final payment under this Contract. Construction bonds, with proof of a paid invoice, may be paid under this payment item.

1.2.1.2 Unit of Measure

Unit of measure: job.

1.2.2 Demolition

1.2.2.1 Payment

Payment for all costs associated with demolition, include, but is not limited to, demolition activities, proper disposal, and recycling debris will be paid for Base Bid Item No. 0002 "Demolition."

1.2.2.2 Unit of Measure

Unit of measure: job.

1.2.3 Hazardous Materials Abatements

1.2.3.1 Payment

Payment for all costs associated with the control, removal, transportation, and proper disposal of asbestos materials will be included for Base Bid Item No. 0003, "Hazardous Materials Abatements." Such price includes, but is not limited to, controlling, removing, pretesting, post-testing, manifesting, reporting, all equipment and materials, permits and properly disposing waste generated as part of the asbestos material control, removal, and disposal activities for the hazardous materials abatements.

1.2.3.2 Unit of Measure

Unit of measure: job.

1.2.4 Roof Work

1.2.4.1 Payment

Payment for all costs associated with providing roof work includes, but is not limited to, replacement of the existing asphalt shingle with new shingles and the replacement of the EPDM roof membrane, repair roof hatch and install new roof hatch hardware, install metal security gate at roof access, chimney cap replacement, improving gutter drainage, repair deteriorated downspouts and installing of downspout leaders will be made for Base Bid Item No. 0004, "Roof Work."

1.2.4.2 Unit of Measure

Unit of measure: job.

1.2.5 Masonry Work

1.2.5.1 Payment

Payment for all costs associated with masonry work includes, but is not limited to, cleaning of the exterior masonry, cleaning of the stone cornices, repointing of the exterior masonry wall and repair of stone cornices, repair deteriorated limestone plinth at portico and apply stone

SECTION 01 20 00 Page 4 consolidant and salt protectant will be made for Base Bid Item No. 0005, "Masonry Work."

1.2.5.2 Unit of Measure

Unit of measure: job.

1.2.6 Door Work

1.2.6.1 Payment

Payment for all costs associated with repairing doors includes, but is not limited to, replacing of all existing storm doors, repair exterior doors (which includes sanding, priming, refinishing and reinstalling of door), replace all weatherstripping around doors and clean and refurbish existing door hardware will be made for Base Bid Item No. 0006, "Door Work."

1.2.6.2 Unit of Measure

Unit of measure: job.

1.2.7 Window Work

1.2.7.1 Payment

Payment for all costs associated with repairing the windows includes, but is not limited to, replacing of all storm windows, retain and repair all existing deteriorated windows (which includes sanding, priming, refinishing and reinstalling window), replacing all sealant and caulking around windows will be made for Base Bid Item No. 0007, "Window Work."

1.2.7.2 Unit of Measure

Unit of measure: job.

1.2.8 Carpentry Work

1.2.8.1 Payment

Payment for all costs associated with wood working includes, but is not limited to, repair and paint of column covers, column cover wood base, wood cornices, wood deck, wood screens, wood fascia, wood ceiling, wood stairs at portico, installing a wood stair step at the east elevation, and replace all deteriorated wood surfaces will be made for Base Bid Item No. 0008, "Carpentry Work."

1.2.8.2 Unit of Measure

Unit of measure: job.

1.2.9 Metal Work

1.2.9.1 Payment

Payment for all costs associated with metal fabrication includes, but is not limited to, cleaning and repairing metal railings and columns, and installing metal railing at the kitchen porch will be made for Base Bid Item No. 0009, "Metal Work."

SECTION 01 20 00 Page 5

1.2.9.2 Unit of Measure

Unit of measure: job.

1.2.10 Concrete Work

1.2.10.1 Payment

Payment for all costs associated with concrete work includes repairin the concrete stairs will be made for Base Bid Item No. 0010, "Concrete Work."

1.2.10.2 Unit of Measure

Unit of measure: job.

1.2.11 Site Restoration

1.2.11.1 Payment

Payment for all costs associated with restoring the site and staging areas to original or better condition includes, but is not limited to, seeding;

debris removal, and removal of temporary construction items will be made for Base Bid Item No. 0011, "Site Restoration."

1.2.11.2 Unit of Measure

Unit of measure: job.

1.2.12 Replace Limestone Pier

1.2.12.1 Payment

Payment for all costs associated with replacing the limestone pier will be made for Option 1 Item No. 0101, "Replace Limestone Pier."

1.2.12.2 Unit of Measure

Unit of measure: job.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

-- End of Section --

SECTION 01 20 00 Page 6

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 33 00

SUBMITTAL PROCEDURES

PART 1 GENERAL

1.1 SUMMARY

1.2 DEFINITIONS

1.2.1 Submittal Descriptions (SD)

1.2.2 Submittal Approving Authority

1.2.3 Work

1.3 SUBMITTAL CLASSIFICATION

1.3.1 Government Approved

1.3.2 Information Only

1.4 SUBMITTAL REGISTER AND DATABASE

1.4.1 Use of Submittal Register

1.4.2 Contractors Use of Submittal Register

1.4.3 Approving Authority Use of Submittal Register

1.4.4 Contractor Action Code and Action Code

1.5 CONTRACTOR'S TRANSMITTAL FORM PREPARATION

1.6 VARIATIONS

1.6.1 Considering Variations

1.6.2 Proposing Variations

1.6.3 Warranting that Variations are Compatible

1.6.4 Review Schedule is Modified

1.7 GOVERNMENT APPROVING AUTHORITY

1.7.1 Review Period

1.8 SCHEDULING

1.9 DISAPPROVED SUBMITTALS

1.10 APPROVED SUBMITTALS

1.11 APPROVED SAMPLES

PART 2 PRODUCTS

PART 3 EXECUTION

ATTACHMENTS:

ATTACHMENT A - Submittal Register

ATTACHMENT B - Transmittal Form (ENG Form 4025-R)

SECTION 01 33 00 Page 1

SECTION 01 33 00

SUBMITTAL PROCEDURES

PART 1 GENERAL

1.1 SUMMARY

The submittal process is intended to be a paperless, electronic process using the Resident Management System's (RMS) Transmittal module to the maximum extent possible, unless otherwise noted in this Contract or as directed by the Contracting Officer in writing.

Contract Clause 52.236-5 MATERIAL AND WORKMANSHIP and Contract Clause 252.236-7001, CONTRACT DRAWINGS AND SPECIFICATIONS applies to all "submittals."

Submittals may be requested in addition to those specified when deemed necessary to adequately describe the work covered.

Complete each submittal in sufficient detail to allow ready determination in accordance with Contract requirements.

The Contractor's Quality Control (CQC) System Manager to check and approve all items prior to submittal and code, sign, and date indicating action taken. Clearly identify proposed deviations from the Contract requirements. Include within submittals items such as: Contractor's, manufacturer's, or fabricator's drawings; descriptive literature including (but not limited to) catalog cuts, diagrams, operating charts or curves;

test reports; test cylinders; samples; O&M manuals (including parts list);

certifications; warranties; and other such required submittals.

Schedule and submit submittals requiring Government approval prior to the acquisition of the material or equipment covered. Pick up and dispose samples not incorporated into the work in accordance with manufacturer's Safety Data Sheets (SDS's) and existing laws and regulations.

1.2 DEFINITIONS

1.2.1 Submittal Descriptions (SD)

Submittal requirements are specified in the technical sections. Submittals are identified by the Submittal Description (SD) numbers and titles as follows:

SD-01 Preconstruction Submittals

Submittals which are required prior to commencing work on-site or a construction activity, these include, but are not limited to, insurance, schedules, background checks, APP, AHA, work plans, tabular list including location, features, or other pertinent information regarding products, materials, equipment, components, and any incidental to be used in and for the work.

SD-02 Shop Drawings

SECTION 01 33 00 Page 2

Drawings, diagrams, and schedules specifically prepared to illustrate some portion of the work. Diagrams and instructions from the manufacturer or fabricator for use in producing the product and as aids for integrating the product or system into the project. Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated.

SD-03 Product Data

Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials, systems or equipment for some portion of the work. Samples of warranty language when the Contract requires extended product warranty(s).

SD-04 Samples

Fabricated or unfabricated physical examples of materials, equipment, or workmanship that illustrates functional and aesthetic characteristics of a material or product and to establish standards by which the work can be judged. Color samples from the manufacturer's standard line (or custom color samples if specified) to be used in selecting or approving colors for the project. Field samples and mock-ups constructed on the project site that establish standards by which the ensuring work can be judged. Includes assemblies or portions of assemblies incorporated into the project and those to be removed at the conclusion of the work.

SD-07 Certificates

Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system, or material attesting that product, system, or material is in accordance as specified. Certificates, etc, to be dated after award of project Contract and clearly name the project. Document required of Contractor, or of a manufacturer, supplier, installer, or subcontractor through Contractor, the purpose of which is to further quality of orderly progression of a portion of the work by documenting procedures, acceptability of methods or personnel qualifications.

Confined space entry permits.

Text of posted operating instructions.

SD-11 Closeout Submittals

Documentation to record compliance with technical or administrative requirements or to establish an administrative mechanism. Special requirements necessary to properly close out a construction Contract.

For example, record drawings and as-built drawings. Also, submittal requirements necessary to properly close out a major phase of construction on a multi-phase Contract.

1.2.2 Submittal Approving Authority

Office or designated person authorized to approve submittal.

1.2.3 Work

As used in this section, on- and off-site construction required by Contract

SECTION 01 33 00 Page 3 documents, including labor necessary to produce submittals, construction, materials, products, equipment, and systems incorporated or to be incorporated in such construction.

1.3 SUBMITTAL CLASSIFICATION

1.3.1 Government Approved

Government approval is required for extensions of design, critical materials, deviations, equipment whose compatibility with the entire system to be checked, and other items as designated by the Contracting Officer.

Government approval is required for any deviations from the Solicitation or Accepted Proposal and other items as designated by the Contracting Officer. Within the terms of Contract Clause 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION, they will be considered "shop drawings."

1.3.2 Information Only

Submittals not requiring Government approval are for information only.

They are not considered to be "shop drawings" within the terms of the Contract Clause as referenced. Approval is not required on information only submittals. The Government reserves the right to require the Contractor to resubmit any item found not in compliance with the Contract.

This does not relieve the Contractor from the obligation to furnish material in accordance with the drawings and specifications; will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work; and does not relieve the Contractor of the requirement to furnish samples for testing by the Government laboratory or for check testing by the Government in those instances where the technical specifications so prescribe.

1.4 SUBMITTAL REGISTER AND DATABASE

The Government-provided ATTACHMENT A - Submittal Register, has columns (a), (g), (h), and (i) filled in with planning dates and submitted for approval within 30 calendar days after Notice to Proceed is received. Maintain the Submittal Register and keep it updated as the work progresses throughout Contract duration. Submit completed Submittal Register with all final approved submittal items after the final inspection and prior to close out of the Contract. Use the RESIDENT MANAGEMENT SYSTEM (RMS) program as the primary tracking system for the Submittal Register and associated transmittals.

Column (c): Lists specification section in which submittal is required.

Column (d): Lists each submittal description (SD No. and type, e.g. SD-02 Shop Drawings) required in each specification section.

Column (e): Lists one principal paragraph in specification section where a material or product is specified. This listing is only to facilitate locating submitted requirements. Do not consider entries in column (e) as limiting project requirements.

Track all submittals by maintaining a complete Submittal Register, including completion of all data columns, including dates on which submittals are received and returned by the Government.

SECTION 01 33 00 Page 4

1.4.1 Use of Submittal Register

Verify that all submittals required for the project are listed if any submittal is missing, an amendment or modification will be issued.

Coordinate and complete the following fields on the register:

Column (a) Activity Number: Activity number from the project schedule.

Column (g) Contractor Submit Date: Scheduled date for approving authority to receive submittals.

Column (h) Contractor Approval Needed By: Scheduled date that submittal item requires approval.

Column (i) Contractor Material: Date that Contractor needs material delivered to Contractor control.

1.4.2 Contractors Use of Submittal Register

Update the following fields with each submittal throughout Contract.

Column (b) Transmittal Number: Contractor assigned list of consecutive numbers.

Column (j): Action Code date used to record Contractor's review before transmitting to the Government.

Column (k): Date of action used to record Contractor's review when forwarding submittals to QC.

Column (l): List date of submittal transmission.

Column (q): List date approval received.

1.4.3 Approving Authority Use of Submittal Register

Update the following fields:

Column (b) Transmittal Number: Contractor assigned list of consecutive numbers.

Column (l): List date of submittal receipt.

Column (m) through (p): List date related to review actions.

Column (q): List date returned to Contractor.

1.4.4 Contractor Action Code and Action Code

Entries for columns (j) and (o), as prescribed by ATTACHMENT B - Transmittal Form (ENG Form 4025-R)).

1.5 CONTRACTOR'S TRANSMITTAL FORM PREPARATION

Use the RMS Transmittal Log for submitting both Government Approved and Information Only submittals in accordance with the instructions on the reverse side of the form and as specified. Generate the Transmittal Form (ENG Form 4025-R) and electronically signed by the Contractor Quality Control System Manager using the Resident Management System (RMS)

SECTION 01 33 00 Page 5

Transmittal Log. Properly complete this form by filling out all the heading blank spaces and identifying each item submitted.

Include all required submittal information, for each submittal item, and in the order listed on the ENG Form 4025-R. Multiple submittal items from the same specification section may be transmitted with one ENG Form 4025-R.

Save submittal information as a .pdf file, separate from the ENG Form 4025-R, named with the Contract Number and the transmittal number (for example: W912EK21C0001 00 73 05-1.pdf).

Large File Transmittal Submissions:

For transmittal document files too large for the RMS Transmittal Document Package (usually 250 MB or larger), post the transmittal to the following website:

https://safe.apps.mil/

The Contractor must request that the Contracting Officer provide a file drop-off request through the safe website, which will provide instructions for uploading the file. The E-mail subject and file name are to follow the same format as specified.

Sample Transmittal Submission:

For samples, mail or deliver the .pdf hard copy of the ENG Form 4025-R with the samples attached. Submit the ENG Form 4025-R electronically to serve as the official approval/disapproval document for the submission and to meet the requirements of this Contract. The sample will be kept by the Government unless otherwise coordinated.

1.6 VARIATIONS

Variations from Contract requirements require a Government approval in accordance with Contract Clause FAR 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION and will be considered where advantageous to the Government.

1.6.1 Considering Variations

Discussion with Contracting Officer prior to submission, will help ensure functional and quality requirements are met and minimize rejections and re-submittals. When contemplating a variation which results in lower cost, consider submission of the variation as a Value Engineering Change Proposal

(VECP).

Specifically point out variations from Contract requirements in transmittal letters. Failure to point out deviations may result in the Government requiring rejection and removal of such work at no additional cost to the Government.

1.6.2 Proposing Variations

Check the column "variation" of ENG Form 4025-R for submittals which include proposed deviations requested by the Contractor. If lower cost is a benefit, also include an estimate of the cost savings. Set forth in writing the reason for any deviations and annotate such deviations on the submittal. The Government reserves the right to rescind inadvertent

SECTION 01 33 00 Page 6 approval of submittals containing unnoted deviations.

1.6.3 Warranting that Variations are Compatible

When delivering a variation for approval, Contractor warrants that this Contract has been reviewed to establish that the variation, if incorporated, will be compatible with other elements of work.

1.6.4 Review Schedule is Modified

In addition to normal submittal review period, 10 working days will be allowed for consideration by the Government of submittals with variations.

1.7 GOVERNMENT APPROVING AUTHORITY

When approving authority is Contracting Officer, the Government will:

a. Note the date on which the submittal was received.

b. Review submittals for approval within scheduling period specified and only for conformance with project design concepts and compliance with Contract documents.

c. Identify returned submittals with one of the actions as specified and with markings appropriate for action indicated.

Upon completion of review of submittals requiring Government approval, code and date approved submittals. An electronic copy of the approved submittal will be retained by the Contracting Officer and an electronic copy of the submittal will be returned to the Contractor.

1.7.1 Review Period

Contracting Officer review will be completed within 30 calendar days after date of submission. Submittals will be returned to the Contractor with submittal action codes described in the instructions as provided on the ENG

FORM 4025-R.

1.8 SCHEDULING

Schedule and submit concurrently submittals covering component items forming a system or items that are interrelated. Include certifications to be submitted with the pertinent drawings at the same time. No delay damages or time extensions will be allowed for time lost in late submittals. Adequate time (a minimum of 30 calendar days exclusive of mailing time) must be allowed and shown on the register for review and approval.

a. Coordinate scheduling, sequencing, preparing, and processing of submittals with performance of work to avoid delays. Allow for potential resubmittal of requirements.

b. Submittals called for by the Contract documents to be listed on the register. If a submittal is called for but does not pertain to the Contract, include the submittal in the register and annotate it "N/A" with a brief explanation. Approval by the Contracting Officer does not relieve the Contractor of supplying submittals required by the Contract documents but which have been omitted from the register or marked "N/A."

SECTION 01 33 00 Page 7

c. Re-submit register and annotate monthly by the Contractor with actual submission and approval dates. When all items on the register have been fully approved, no further re-submittal is required.

d. Carefully control procurement operations to ensure that each individual submittal is made on or before the Contractor scheduled submittal date shown on the approved "Submittal Register."

1.9 DISAPPROVED SUBMITTALS

Make corrections required by the Contracting Officer. If the Contractor considers any correction or notation on the returned submittals to constitute a change to the Contract drawings or specifications, notify the Contracting Officer, as required under the Contract Clause 52.243-4 CHANGES. The Contractor is responsible for the dimensions and design of connection details and construction of work. Failure to point out deviations may result in rejection and removal of such work at the Contractor's expense.

If changes are necessary to the submittals, make revisions and re-submit in accordance with the procedures above. Accomplish no item of work requiring a submittal change until the changed submittals are approved.

1.10 APPROVED SUBMITTALS

The Contracting Officer's approval or acceptance of submittals is not to be construed as a complete check, and indicates only that the general method of construction, materials, detailing, and other information are satisfactory. Approval or acceptance will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the Contractor Quality Control (CQC) requirements of this Contract is responsible for dimensions, the design of adequate connections and details, and the satisfactory construction of all work. After submittals have been approved or accepted by the Contracting Officer, no resubmittal for the purpose of substituting materials or equipment will be considered unless accompanied by an explanation of why a substitution is necessary.

The Government will electronically code and sign the transmittal form, and return the completed transmittal package back to the Contractor through RMS.

1.11 APPROVED SAMPLES

Approval of a sample is only for the characteristics or use named in such approval and is not be construed to change or modify any Contract requirements. Before submitting samples, ensure that the materials or equipment will be available in quantities required for the project. No change or substitution will be permitted after a sample has been approved.

Match the approved samples for materials and equipment incorporated in the work. If requested, any sample(s) provided for approval, including those which may be damaged in testing, will be returned to the Contractor, at its expense, upon completion of the Contract.

Failure of any materials to pass the specified tests is sufficient cause for refusal to consider, under this Contract, any further samples of the same brand or make of that material. The Government reserves the right to disapprove any material or equipment which previously has proved unsatisfactory in service.

SECTION 01 33 00 Page 8

Samples of various materials or equipment delivered on the site or in place may be taken by the Contracting Officer for testing. Samples failing to meet Contract requirements will automatically void previous approvals.

Replace such materials or equipment to meet Contract requirements.

Approval of the Contractor's samples by the Contracting Officer does not relieve the Contractor of its responsibilities under this Contract.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

-- End of Section --

SECTION 01 33 00 Page 9

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 6 PAGES

01 20 00 SD-01 Preconstruction Submittals 1.2.1Mobilization and Demobilization

02 82 13 SD-02 Shop Drawings GDetailed Drawings

SD-03 Product Data

3.10.3.1 GAsbestos Waste Shipment

Records

3.10.3.2 GAsbestos Management Plan

1.10.1 GRespiratory Protection Program

1.9.1 GLicenses, Permits, and

Notifications

3.10 GCleanup and Disposal

SD-06 Test Reports

3.8 GExposure Assessment and Air

Monitoring 02 83 13 SD-01 Preconstruction Submittals

1.4.2.3 GECDNOccupational and Environmental

Assessment Data Report

1.4.2.2 GECDNLead Compliance Plan

1.4.1.1 GECDNCompetent Person

1.4.1.2 GECDNTraining Certification

1.4.2.2.1 GECDNLead Waste Management Plan

3.5.2.1 GWritten Evidence

SD-06 Test Reports

1.4.2.3 GECDNSampling Results

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 6 PAGES

02 83 13 3.5.1 GECDNClearance Certification SD-11 Closeout Submittals

3.5.2.1 GECDNHazardous Waste Manifest

03 20 01 SD-02 Shop Drawings

3.1 GECDSReinforcement

SD-06 Test Reports

2.1.1 GECDSReinforcing Steel

03 31 00 SD-02 Shop Drawings

G ECGSimulated Stone Detailed Drawings

SD-03 Product Data

3.1.2 G ECGMix Plant

3.6 G ECGCuring and Protection

3.4.4 G ECGCold-Weather Placing

3.4.5 G ECGHot-Weather Placing

G ECGColored Admixture G ECGCuring Compound for Colored

Concrete

2.1.7.1 G ECGNonstaining Curing Material

G ECGJoint Sealant SD-04 Samples

G ECGMock-up of Stairs G ECGColor Charts

SD-05 Design Data

1.5 G ECGConcrete Mixture Proportions

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 6 PAGES

03 31 00 3.7Tests and Inspections SD-07 Certificates

G ECGTesting Technicians and Concrete Inspectors

04 03 00 SD-01 Preconstruction Submittals

1.5.1 GQuality Control Plan

1.5.1 GProject Training Program

1.5.2 GQualifications

SD-02 Shop Drawings 1.5.5Photographic Documentation

3.5.1 GStructural Upgrades

SD-03 Product Data 1.5.2Qualifications

1.5.6 GCleaning and Restoration

Methods

2.1 GCleaning Materials

2.1.4Biocides

2.2.2.1 GReplacement Mortar And Stucco

2.4 GMortar Mix

3.4.8.3 GWater Repellents Infiltration

3.4.8.4 GStone Consolidants

SD-04 Samples

1.5.7.1 GMock-ups

SD-05 Design Data

3.5.1 GStructural Upgrades

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 6 PAGES

04 03 00 Testing and Matching 3.5.2Existing Sealants for Asbestos and PCBs SD-07 Certificates

2.2Repair Materials 05 73 00 SD-01 Preconstruction Submittals

GInstallation Plan SD-02 Shop Drawings

GDetailed Drawings SD-03 Product Data

GRailing 06 20 00 SD-02 Shop Drawings

1.3 GDetail Drawings

SD-04 Samples

GMoldings GTrim

SD-07 Certificates

1.4 GCertificates of Grade

1.4 GCertificates of Compliance

1.4 GCertificates of Qualifications

07 31 13 SD-03 Product Data

2.1.1 GShingles

Underlayment SD-04 Samples

2.1.1 GShingles

GColor Charts

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 6 PAGES

07 31 13 SD-11 Closeout Submittals 1.5.1Manufacturer's Warranty 1.5.2Contractor's Warranty

07 53 23 SD-02 Shop Drawings

1.3.4 GRoof Plan Drawings

1.3.3 GWind Uplift Calculations

SD-03 Product Data

2.1.1 GEPDM Sheet

Seam Tape 3.2.3.1Bonding Adhesive 3.3Flashings

Fasteners and Plates

1.7 GWarranty

1.3.1Qualification of Manufacturer 1.3.2Qualification of Applicator

3.2 GApplication

3.2.3 GApplication Method

1.5 GCold Weather

SD-11 Closeout Submittals 1.7Warranty

Information Card 07 62 13 SD-02 Shop Drawings

2.1.6Sheet Metal SD-04 Samples

2.1Materials SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 6 PAGES

07 62 13 3.7Contractor Quality Control 07 92 00 SD-03 Product Data

GSealants Primers Bond Breakers Backstops

08 01 52 SD-02 Shop Drawings

1.3 GShop Drawings

SD-03 Product Data 3.2.10Weatherstripping

SD-04 Samples 3.2.10Weatherstripping

08 11 69 SD-03 Product Data

2.1.2 GStorm Doors

2.1.2.1Hardware

SD-04 Samples 2.1.2Storm Doors

2.3 GFinishes

08 51 69 SD-03 Product Data

2.1.2 GStorm Windows

09 90 00 SD-03 Product Data GCoatings

SD-04 Samples

1.8 GColors

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

CONTROLLED UNCLASSIFIED INFORMATION

TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES, OR

MANUFACTURER'S CERTIFICATES OF COMPLIANCE

For use of this form, see ER 415-1-10; the proponent agency is CECW-CE

DATE TRANSMITTAL NO.

SECTION I - REQUEST FOR APPROVAL OF THE FOLLOWING ITEMS (This section will be initiated by the contractor)

TO: FROM: CONTRACT NO. THIS IS A:

SPECIFICATION SEC. NO. (Covers only one section with each transmittal) PROJECT TITLE AND LOCATION THIS TRANSMITTAL IS FOR: (Check one)

FIO GA DA CR DA/CR DA/GA S

ITEM NO.

(See Note

3) a.

DESCRIPTION OF SUBMITTAL ITEM

(Type size, model number/etc) b.

SUBMITTAL TYPE CODE

(See Note 8) c.

NO. OF

COPIES

d.

CONTRACT REFERENCE

DOCUMENT

FOR

CONTRACTOR

USE

g.

VARIATION

(See

Instruction No.

6) h.

FOR CE

USE CODE

(Note 9) i.

SPEC.

PARA NO.

e.

DRAWING

SHEET NO.

f.

Remarks from Contractor

I certify that the above submitted items have been reviewed in detail and are correct and in the strict conformance with the contract drawings and specifications except as otherwise stated.

NAME AND SIGNATURE OF CONTRACTOR

ENCLOSURES RETURNED (List by Item No.) DATE

SECTION II - APPROVAL ACTION

NAME, TITLE AND SIGNATURE OF APPROVING AUTHORITY

ENG FORM 4025-R, JUL 2015 REPLACED EDITION OF MAR 2012, WHICH IS OBSOLETE

CONTROLLED UNCLASSIFIED INFORMATION

ATTACHMENT B TO SECTION 01 33 00

ATTACHMENT B TO SECTION 01 33 00

DIVISION 02 - EXISTING CONDITIONS

SECTION 02 82 13

ASBESTOS ABATEMENT

PART 1 GENERAL

1.1 REFERENCES

1.2 SUBMITTALS

1.3 PAYMENT

1.4 DEFINITIONS

1.4.1 Amended Water

1.4.2 Asbestos-Containing Material (ACM)

1.4.3 Authorized Person

1.4.4 Building Inspector

1.4.5 Class I Asbestos Work

1.4.6 Class II Asbestos Work

1.4.7 Class III Asbestos Work

1.4.8 Clean Room

1.4.9 Competent Person

1.4.10 Contractor/Supervisor

1.4.11 Critical Barrier

1.4.12 Decontamination Area

1.4.13 Demolition

1.4.14 Disposal Bag

1.4.15 Disturbance

1.4.16 Equipment Room or Area

1.4.17 Fiber

1.4.18 Friable ACM

1.4.19 Glovebag

1.4.20 High-Efficiency Particulate Air (HEPA) Filter

1.4.21 Intact

1.4.22 Negative Initial Exposure Assessment

1.4.23 NESHAP

1.4.24 Nonfriable ACM

1.4.25 Nonfriable ACM (Category I)

1.4.26 Nonfriable ACM (Category II)

1.4.27 Permissible Exposure Limits (PELs)

1.4.27.1 PEL-Time Weighted Average(TWA)

1.4.27.2 PEL-Excursion Limit

1.4.28 Regulated Area

1.4.29 Removal

1.4.30 Repair

1.4.31 Surfacing ACM

1.4.32 Thermal System Insulation (TSI) ACM

1.4.33 Transite

1.4.34 Worker

1.5 DESCRIPTION OF WORK

1.6 ENVIRONMENTAL REPORT

1.7 QUALITY ASSURANCE

1.7.1 Qualifications and Organization Report

1.7.2 Specific Requirements

1.7.3 Federal, State, or Local Citations on Previous Projects

SECTION 02 82 13 Page 1

1.7.4 Preconstruction Conference

1.8 SAFETY

1.8.1 Asbestos Hazard Abatement Plan Appendix

1.8.2 Activity Hazard Analyses Appendix

1.8.3 Local Exhaust System

1.9 SECURITY

1.9.1 Licenses, Permits and Notifications

1.9.2 Regulated Areas

1.9.3 Warning Signs and Tape

1.9.4 Warning Labels

1.10 MEDICAL SURVEILLANCE REQUIREMENTS

1.10.1 Respiratory Protection Program

1.10.2 Respiratory Fit Testing

1.10.3 Respirator Selection and Use Requirements

1.10.4 Personal Protective Equipment

1.10.5 Whole Body Protection

1.11 HYGIENE

1.12 TRAINING PROGRAM

PART 2 PRODUCTS

2.1 ENCAPSULANTS

2.2 ENCASEMENT

2.3 EXPENDABLE SUPPLIES

2.3.1 Glovebag

2.3.2 Duct Tape

2.3.3 Disposal Containers

2.3.4 Sheet Plastic

2.3.4.1 Flame Resistant

2.3.4.2 Reinforced

2.3.5 Mastic Removing Solvent

2.3.6 Leak-tight Wrapping

2.3.7 Viewing Inspection Window

2.3.8 Wetting Agents

2.3.9 Strippable Coating

2.4 EQUIPMENT

2.4.1 Tools

2.4.2 Rental Equipment

2.4.3 Air Monitoring Equipment

PART 3 EXECUTION

3.1 GENERAL REQUIREMENTS

3.2 PROTECTION OF ADJACENT WORK OR AREAS TO REMAIN

3.3 BUILDING VENTILATION SYSTEM AND CRITICAL BARRIERS

3.4 PRECLEANING

3.5 METHODS OF COMPLIANCE

3.5.1 Mandated Practices

3.5.2 Control Methods

3.5.3 Unacceptable Practices

3.5.4 Class I Work Procedures

3.5.5 Specific Control Methods for Class I Work

3.5.5.1 Negative Pressure Enclosure (NPE) System

3.5.5.2 Glovebag Systems

3.5.5.3 Mini-Enclosures

3.5.5.4 Wrap and Cut Operation

3.5.6 Class II Work

3.5.7 Specific Control Methods for Class II Work

3.5.7.1 Roofing Material

SECTION 02 82 13 Page 2

3.5.8 Specific Control Methods for Class III Work

3.6 FINAL CLEANING AND VISUAL INSPECTION

3.7 LOCKDOWN

3.8 EXPOSURE ASSESSMENT AND AIR MONITORING

3.8.1 General Requirements

3.8.2 Initial Exposure Assessment

3.8.3 Negative Exposure Assessment

3.8.4 Environmental Air Monitoring During Abatement

3.8.5 Final Clearance Air Monitoring

3.8.5.1 Final Clearance Requirements, NIOSH PCM Method

3.8.5.2 Final Clearance Requirements, EPA TEM Method

3.8.5.3 Air Clearance Failure

3.8.6 Air-Monitoring Results and Documentation

3.9 CLEARANCE CERTIFICATION

3.10 CLEANUP AND DISPOSAL

3.10.1 Title to ACM Materials

3.10.2 Collection and Disposal of Asbestos

3.10.3 Records and Management Plan

3.10.3.1 Asbestos Waste Shipment Records

3.10.3.2 Asbestos Management Plan

ATTACHMENTS:

ATTACHMENT A - Lead Sampling and Testing Log

SECTION 02 82 13 Page 3

SECTION 02 82 13

ASBESTOS ABATEMENT

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN SOCIETY OF SAFETY PROFESSIONALS (ASSP)

ASSP Z9.2 (2018) Design and Operation of Local Exhaust Ventilation Systems

ASTM INTERNATIONAL (ASTM)

ASTM D4397 (2016) Standard Specification for Polyethylene Sheeting for Construction, Industrial, and Agricultural Applications

ASTM E1368 (2014) Visual Inspection of Asbestos Abatement Projects

COMPRESSED GAS ASSOCIATION (CGA)

CGA G-7 (2019) Compressed Air for Human Respiration; 8th Edition

INTERNATIONAL SAFETY EQUIPMENT ASSOCIATION (ISEA)

ANSI/ISEA Z87.1 (2020) Occupational and Educational Personal Eye and Face Protection Devices

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 701 (2019) Standard Methods of Fire Tests for Flame Propagation of Textiles and Films

NATIONAL INSTITUTE FOR OCCUPATIONAL SAFETY AND HEALTH (NIOSH)

NIOSH 2003-154 (2003; 4th Ed; Supple 3) NIOSH Manual of Analytical Methods

U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)

EPA 340/1-90/018 Asbestos/NESHAP Regulated Asbestos Containing Materials Guidance

STATE OF ILLINOIS ADMINISTRATIVE CODE (IAC)

105 ILCS 105 Asbestos Abatement Act

225 ILCS 207 Commercial and Public Building Asbestos

SECTION 02 82 13 Page 4

Abatement Act

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1910.134 Respiratory Protection

29 CFR 1910.147 The Control of Hazardous Energy (Lock Out/Tag Out)

29 CFR 1926.1101 Asbestos

29 CFR 1926.32 Safety and Health Regulations for Construction - Definition

40 CFR 61 National Emission Standards for Hazardous Air Pollutants

40 CFR 763 Asbestos

42 CFR 84 Approval of Respiratory Protective Devices

49 CFR 107 Hazardous Materials Program Procedures

49 CFR 171 General Information, Regulations, and Definitions

49 CFR 172 Hazardous Materials Table, Special Provisions, Hazardous Materials Communications, Emergency Response Information, and Training Requirements

49 CFR 173 Shippers - General Requirements for Shipments and Packagings

UNDERWRITERS LABORATORIES (UL)

UL 586 (2009; Reprint Dec 2017) UL Standard for Safety High-Efficiency Particulate, Air Filter Units

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Detailed Drawings; G

SD-03 Product Data

Asbestos Waste Shipment Records; G Asbestos Management Plan; G Respiratory Protection Program; G Licenses, Permits, and Notifications; G Cleanup and Disposal; G

SECTION 02 82 13 Page 5

SD-06 Test Reports

Exposure Assessment and Air Monitoring; G

1.3 PAYMENT

Submit weight and delivery tickets for payment to the Contracting Officer during the progress of the work. Furnish scale tickets for each load of Asbestos-Containing Material (ACM) weighed and certified. These tickets to include: tare weight, identification mark for each vehicle weighed, and date, time, and location of loading and unloading. Furnish tickets at the point and time individual trucks arrive at the worksite. Furnish a master log of all vehicle loading for each day of loading operations. Before the final statement is allowed, file with the Contracting Officer certified weight and certified tickets, and manifests of all ACM actually disposed by the Contractor.

1.4 DEFINITIONS

1.4.1 Amended Water

Water containing a wetting agent or surfactant with a surface tension of at least 29 dynes per square centimeter.

1.4.2 Asbestos-Containing Material (ACM)

Any materials containing more than one percent asbestos.

1.4.3 Authorized Person

Person(s) authorized by the Contractor and required by work duties to be present in the regulated areas.

1.4.4 Building Inspector

Person who inspects buildings for asbestos and has EPA Model Accreditation Plan (MAP) "Building Inspector" training; accreditation in accordance with 40 CFR 763, Subpart E, Appendix C, has EPA/State certification/license as a "Building Inspector."

1.4.5 Class I Asbestos Work

Activities defined by OSHA involving the removal of thermal system insulation (TSI) and surfacing ACM.

1.4.6 Class II Asbestos Work

Activities defined by OSHA involving the removal of ACM which is not thermal system insulation or surfacing material. This includes, but not limited to, the removal of asbestos - containing wallboard, floor tile and sheeting, roofing and siding shingles, and construction mastic. Certain "incidental" roofing materials such as mastic, flashing, and cements when still intact are excluded from Class II asbestos work. Removal of small amounts of these materials which would fit into a glovebag may be classified as a Class III job.

SECTION 02 82 13 Page 6

1.4.7 Class III Asbestos Work

Activities defined by OSHA that involve repair and maintenance operations, where ACM, including TSI and surfacing ACM, will likely be disturbed.

Operations may include drilling, abrading, cutting a hole, cable pulling, crawling through tunnels or attics and spaces above the ceiling, where asbestos is actively disturbed or asbestos-containing debris is actively disturbed.

1.4.8 Clean Room

An uncontaminated room having facilities for the storage of employees' street clothing and uncontaminated materials and equipment.

1.4.9 Competent Person

In addition to the definition in 29 CFR 1926.32(f), a person who is capable of identifying existing asbestos hazards as defined in 29 CFR 1926.1101, selecting the appropriate control strategy, has the authority to take prompt corrective measures to eliminate them and has EPA Model Accreditation Plan (MAP) "Contractor/Supervisor" training; has EPA/State certification/license as a "Contractor/Supervisor."

1.4.10 Contractor/Supervisor

Individual who supervises asbestos abatement work and has EPA Model Accreditation Plan "Contractor/Supervisor" training; has EPA/State certification as a "Contractor/Supervisor."

1.4.11 Critical Barrier

One or more layers of plastic sealed over all openings into a regulated area or any other similarly placed physical barrier sufficient to prevent airborne asbestos in a regulated area from migrating to an adjacent area.

1.4.12 Decontamination Area

An enclosed area adjacent and connected to the regulated area and consisting of an equipment room, shower area, and clean room, which is used for the decontamination of workers, materials, and equipment that are contaminated with asbestos.

1.4.13 Demolition

The wrecking or taking out of any load-supporting structural member and any related razing, removing, or stripping of asbestos products.

1.4.14 Disposal Bag

A 6 mil thick, leak-tight plastic bag, pre-labeled in accordance with 29 CFR 1926.1101, used for transporting asbestos waste from containment to disposal site.

1.4.15 Disturbance

Activities that disrupt the matrix of ACM, crumble or pulverize ACM, or generate visible debris from ACM. Disturbance includes cutting away small amounts of ACM, no greater than the amount which can be contained in 1 standard sized glovebag or waste bag, not larger than 60 inches in length

SECTION 02 82 13 Page 7 and width in order to access a building component.

1.4.16 Equipment Room or Area

An area adjacent to the regulated area used for the decontamination of employees and their equipment.

1.4.17 Fiber

A fibrous particulate, 5 micrometers or longer, with a length to width ratio of at least 3 to 1.

1.4.18 Friable ACM

A term defined in 40 CFR 61, Subpart M and EPA 340/1-90/018 meaning any material which contains more than 1 percent asbestos, as determined using the method in accordance with 40 CFR 763, Polarized Light Microscopy (PLM), that when dry, can be crumbled, pulverized, or reduced to powder by hand pressure.

1.4.19 Glovebag

Not more than a 60 by 60 inch impervious plastic bag-like enclosure affixed around an asbestos-containing material, with glove-like appendages through which material and tools may be handled.

1.4.20 High-Efficiency Particulate Air (HEPA) Filter

A filter capable of trapping and retaining at least 99.97 percent of all mono-dispersed particles of 0.3 micrometers in diameter.

1.4.21 Intact

ACM which has not crumbled, been pulverized, or otherwise deteriorated so that the asbestos is no longer likely to be bound with its matrix. Removal of "intact" asphaltic, resinous, cementitious products does not render the ACM non-intact simply by being separated into smaller pieces.

1.4.22 Negative Initial Exposure Assessment

A demonstration by the Contractor to show that employee exposure during an operation is expected to be consistently below the OSHA Permissible Exposure Limits (PELs).

1.4.23 NESHAP

National…