A03_Attachment_0002_26-3-20_CDRL_CNC_Routers.pdf
PDF 466 KB Posted
- Attached to
- CNC Routers Federal contract opportunity
- Solicitation number
- W519TC26QA082
About this file
This is a Contract Data Requirements List (DD Form 1423-1) for CNC Router(s) equipment (Contract Line Item 26-3-20) to be delivered to Rock Island Arsenal. The document specifies detailed documentation and manual requirements that the contractor must provide in conjunction with equipment delivery.
The contractor must submit Installation and Preparation Documentation including: Equipment Characteristics (electronic format in Microsoft Excel, within 30 calendar days of award); Installation Documentation List (electronic format minimum 60 days before delivery, second copy at delivery); Tool List (itemized fixtures and tools required for installation and maintenance, 60 days before delivery); Footprint Drawing (fully dimensioned layout showing contours and access doors, 60 days before delivery); Machine Foundation Drawing (three copies—two paper, one electronic—60 days after award for concrete preparation guidance); Installation Drawing (anchor bolt locations, power source connection points, component weights, and utility capacity requirements, 60 days before delivery); Electrical Schematic (complete system schematic with capacity requirements, 60 days before delivery); and Pneumatic Schematic (complete system schematic with capacity requirements, 60 days before delivery). Additionally, the contractor must provide Equipment Identification documentation (make, model, standard features, optional features installed, and available field-installable options, 60 days before delivery); Maintenance Manual including Safety Lockout Procedure (three copies—two paper, one electronic—at delivery); Preventive Maintenance Procedure (three copies—two paper, one electronic—at delivery with daily operator checklist, visual inspections, and lubrication schedule); and Operator Manual (three copies—two paper, one electronic—at delivery with safe operation procedures). All electronic submissions must use acceptable formats including PDF, DXF, or Microsoft Word. All deliverables must be provided to Rock Island Arsenal, ATTN: TARA-LGC, Drew Canada, 2744 Rodman Ave (B220-B-D28), Rock Island, IL 61299-6400.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W519TC26QA082.pdf | ||
| A03_Attachment_0001_RIPD_E4000-26-3-20_CNC_Routers.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 1 of 12 Pages
C O N T R A C T D A T A R E Q U I R E M E N T S L I S T (1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
D. SYSTEM/ITEM
26-3-20 CNC Router(s)
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
Installation and Preparation Documentation
3. SUBTITLE
Equipment Characteristics
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
7. DD250 REQ
9. DIST
STATEMENT
REQUIRED
10. FREQUENCY
SEE BLOCK 16
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
b. COPIES
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide a copy of this information in either electronic or paper format, no later than 30-calendar-days after award of the contract. The contractor shall provide this information in electronic format using Microsoft Excel format.
The specific data required is:
Identify required info from LMP
PROVIDE COPIES, AS REQUESTED TO THE FOLLOWING:
Rock Island Arsenal
ATTN: TARA-LGC
Drew Canada 2744 Rodman Ave (B220-B-D28) Rock Island, IL 61299-6400
15. TOTAL
G. PREPARED BY
Chandler J. Work
H. DATE
16-Dec-2025
I. APPROVED BY
J. DATE
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 2 of 12 Pages
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the
2. TITLE OF DATA ITEM
Installation and Preparation Documentation
3. SUBTITLE
Installation Documentation List
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide a copy of this information in electronic format, a minimum of 60-calendar-days prior to delivery of equipment.
The contractor shall provide a second copy of this information in electronic or paper format at the time of delivery of the equipment.
Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).
A plainly visible cover sheet shall be provided with the Installation and Preparation Documentation package listing drawings and schematics required for installation.
ATTN: TARA-LGC
Drew Canada
Chandler J. Work
H. DATE
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 3 of 12 Pages
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the
2. TITLE OF DATA ITEM
Installation and Preparation Documentation
3. SUBTITLE
Tool List
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide a copy of this information in electronic format a minimum of 60-calendar-days prior to delivery of equipment.
The contractor shall provide a second copy of this information in electronic or paper format at the time of delivery of the equipment.
Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).
An itemized list of all fixtures, tools, and equipment, whether special or not, required to install, align, and maintain the equipment in this purchase description. NOTE: The contractor is responsible for providing special/custom tools and equipment necessary for installation, moving, and/or set-up as part of the equipment.
ATTN: TARA-LGC
Drew Canada
Chandler J. Work
H. DATE
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 4 of 12 Pages
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the
2. TITLE OF DATA ITEM
Installation and Preparation Documentation
3. SUBTITLE
Footprint Drawing
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide a copy of this information in electronic format a minimum of 60-calendar-days prior to delivery of equipment.
The contractor shall provide a second copy of this information in electronic or paper format at the time of delivery of the equipment.
Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).
A dimensioned drawing shall be provided to accurately depict the layout of system, showing contours. It shall be fully dimensioned and include net operating clearance for moving components which travel beyond the gross contour. The drawing shall distinguish between the base of the equipment at floor level and the gross contour where it may overhang the base. Location of access doors for servicing of the equipment shall also be designated.
ATTN: TARA-LGC
Drew Canada
Chandler J. Work
H. DATE
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 5 of 12 Pages
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the
2. TITLE OF DATA ITEM
Installation and Preparation Documentation
3. SUBTITLE
Machine Foundation Drawing
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide (3) copies of this information no later than 60-calendar-days after award of contract. Of these, (2) will be paper, and
(1) shall be electronic. Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).
The equipment requires a separate foundation, a drawing must be provided for approval. This will show all information necessary for a contractor to perform the required concrete preparation work prior to final installation of the system.
ATTN: TARA-LGC
Drew Canada
Chandler J. Work
H. DATE
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 6 of 12 Pages
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the
2. TITLE OF DATA ITEM
Installation and Preparation Documentation
3. SUBTITLE
Installation Drawing
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide a copy of this information in electronic format a minimum of 60-calendar-days prior to delivery of equipment.
The contractor shall provide a second copy of this information in electronic or paper format at the time of delivery of the equipment.
Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).
This drawing may be combined with either the Foundation Drawing or the Footprint Drawing, providing clarity is maintained. This drawing will provide location dimensions for anchor bolts including both the anchor bolt size and height of anchor bolt concrete surfaces clearly shown.
Dimensions will be from a common baseline, not chain dimensions. This is to prevent tolerance stack-up errors. Locations of the first connection points for all required power sources shall be shown and dimensioned.
Approximate gross weight of each separate component shall be indicated.
This drawing shall show capacity requirements at each utility point of first connection.
PROVIDE COPIES, AS REQUESTED TO THE FOLLOWING:
Rock Island Arsenal
ATTN: TARA-LGC
Drew Canada
Chandler J. Work
H. DATE
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 7 of 12 Pages
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the
2. TITLE OF DATA ITEM
Installation and Preparation Documentation
3. SUBTITLE
Electrical Schematic
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide a copy of this information in electronic format a minimum of 60-calendar-days prior to delivery of equipment.
The contractor shall provide a second copy of this information in electronic or paper format at the time of delivery of the equipment.
Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).
The equipment includes this type of utility and a complete system schematic is required. The capacity required at the point of first connection must be clearly stated.
ATTN: TARA-LGC
Drew Canada
Chandler J. Work
H. DATE
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 8 of 12 Pages
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the
2. TITLE OF DATA ITEM
Installation and Preparation Documentation
3. SUBTITLE
Pneumatic Schematic
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide a copy of this information in electronic format a minimum of 60-calendar-days prior to delivery of equipment.
The contractor shall provide a second copy of this information in electronic or paper format at the time of delivery of the equipment.
Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).
The equipment includes this type of utility and a complete system schematic is required. The capacity required at the point of first connection must be clearly stated.
ATTN: TARA-LGC
Drew Canada
Chandler J. Work
H. DATE
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 9 of 12 Pages
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the
26-3-20 CNC Routers
2. TITLE OF DATA ITEM
Installation and Preparation Documentation
3. SUBTITLE
Equipment Identification
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide a copy of this information in electronic format a minimum of 60-calendar-days prior to delivery of equipment.
Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).
This document shall consist of the make & model of the equipment with a complete list of standard features, optional features being installed in order to meet the specification, and a list of optional features available for field installation but not included. Each section shall be clearly identified.
Also included will be any technical data or brochures applicable to the equipment being provided.
ATTN: TARA-LGC
Drew Canada
Chandler J Work
H. DATE
16-Dec-25
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 10 of 12 Pages
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the
2. TITLE OF DATA ITEM
Maintenance Manual
3. SUBTITLE
Safety Lockout Procedure
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide (3) copies of this manual/information with delivery of the equipment. Of these, (2) will be paper, and (1) shall be electronic. Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).
This shall be a written procedure describing safe machine shutdown and the sequence by which lockout devices, and if necessary, line blocks and other restraints are affixed and removed prior to maintenance and service.
This may include drawings or photographs for clarity.
ATTN: TARA-LGC
Drew Canada
Chandler J Work
H. DATE
16-Dec-25
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 11 of 12 Pages
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the
2. TITLE OF DATA ITEM
Maintenance Manual
3. SUBTITLE
Preventive Maintenance Procedure
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide (3) copies of this manual/information with delivery of the equipment. Of these, (2) will be paper, and (1) shall be electronic. Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).
This section of the documentation shall include: Daily Operator Checklist, Visual Inspections, and a Lubrication Schedule. Procedures and schedules for inspections, adjustments, cleaning, and component replacements.
ATTN: TARA-LGC
Drew Canada
Chandler J. Work
H. DATE
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 12 of 12 Pages
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the
2. TITLE OF DATA ITEM
Operator Manual
3. SUBTITLE
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide (3) copies of this manual/information with delivery of the equipment. Of these, (2) will be paper, and (1) shall be electronic. Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).
This section of the documentation shall include: Procedures for safe operation of the equipment in all modes. It shall include information necessary for performing all the operations and utilizing all the functions listed in the purchase description.
ATTN: TARA-LGC
Drew Canada
Chandler J. Work
H. DATE
| CONTRACT DATA REQUIREMENTS LIST |
| Form Approved |
| B. EXHIBIT |
| C. CATEGORY |
| E. CONTRACT/PR NO. |
| 001 |
| SEE BLOCK 16 |
| SEE BLOCK 16 |
| Draft |
| G. PREPARED BY |
| CONTRACT DATA REQUIREMENTS LIST |
| Form Approved |
| B. EXHIBIT |
| C. CATEGORY |
| E. CONTRACT/PR NO. |
| 001 |
| SEE BLOCK 16 |
| SEE BLOCK 16 |
| Draft |
| G. PREPARED BY |
| CONTRACT DATA REQUIREMENTS LIST |
| Form Approved |
| B. EXHIBIT |
| C. CATEGORY |
| E. CONTRACT/PR NO. |
| 001 |
| SEE BLOCK 16 |
| SEE BLOCK 16 |
| Draft |
| G. PREPARED BY |
| CONTRACT DATA REQUIREMENTS LIST |
| Form Approved |
| B. EXHIBIT |
| C. CATEGORY |
| E. CONTRACT/PR NO. |
| 001 |
| SEE BLOCK 16 |
| SEE BLOCK 16 |
| Draft |
| G. PREPARED BY |
| CONTRACT DATA REQUIREMENTS LIST |
| Form Approved |
| B. EXHIBIT |
| C. CATEGORY |
| E. CONTRACT/PR NO. |
| 001 |
| SEE BLOCK 16 |
| SEE BLOCK 16 |
| Draft |
| G. PREPARED BY |
| CONTRACT DATA REQUIREMENTS LIST |
| Form Approved |
| B. EXHIBIT |
| C. CATEGORY |
| E. CONTRACT/PR NO. |
| 001 |
| SEE BLOCK 16 |
| SEE BLOCK 16 |
| Draft |
| G. PREPARED BY |
| CONTRACT DATA REQUIREMENTS LIST |
| Form Approved |
| B. EXHIBIT |
| C. CATEGORY |
| E. CONTRACT/PR NO. |
| 001 |
| SEE BLOCK 16 |
| SEE BLOCK 16 |
| Draft |
| G. PREPARED BY |
| CONTRACT DATA REQUIREMENTS LIST |
| Form Approved |
| B. EXHIBIT |
| C. CATEGORY |
| E. CONTRACT/PR NO. |
| 001 |
| SEE BLOCK 16 |
| SEE BLOCK 16 |
| Draft |
| G. PREPARED BY |
| CONTRACT DATA REQUIREMENTS LIST |
| Form Approved |
| B. EXHIBIT |
| C. CATEGORY |
| E. CONTRACT/PR NO. |
| 001 |
| SEE BLOCK 16 |
| SEE BLOCK 16 |
| Draft |
| G. PREPARED BY |
| CONTRACT DATA REQUIREMENTS LIST |
| Form Approved |
| B. EXHIBIT |
| C. CATEGORY |
| E. CONTRACT/PR NO. |
| 002 |
| SEE BLOCK 16 |
| SEE BLOCK 16 |
| Draft |
| G. PREPARED BY |
| CONTRACT DATA REQUIREMENTS LIST |
| Form Approved |
| B. EXHIBIT |
| C. CATEGORY |
| E. CONTRACT/PR NO. |
| 002 |
| SEE BLOCK 16 |
| SEE BLOCK 16 |
| Draft |
| G. PREPARED BY |
| CONTRACT DATA REQUIREMENTS LIST |
| Form Approved |
| B. EXHIBIT |
| C. CATEGORY |
| E. CONTRACT/PR NO. |
| 003 |
| SEE BLOCK 16 |
| SEE BLOCK 16 |
| Draft |
| G. PREPARED BY |
File details come from the government source that posted it. Updated .