A03_Attachment_0001_RIPD_E4000-26-3-20_CNC_Routers.pdf

PDF 270 KB Posted

Attached to
CNC Routers Federal contract opportunity
Solicitation number
W519TC26QA082
Issued by
Department of the Army Materiel Command Contracting Command Rock Island Arsenal

About this file

This is a Purchase Description for CNC Router Machine(s) from Rock Island Arsenal, dated December 15, 2025 (RIPD: E4000-26-3-20). The requirement encompasses the procurement of computer numerical control (CNC) routing equipment designed to provide new capability for routing composite materials at Rock Island Arsenal Joint Manufacturing Technology Center (RIA-JMTC).

The primary deliverables include: CLIN 001 for two single-spindle CNC routers; CLIN 002 for two twin-spindle (dual-head) CNC routers; optional CLINs 003 and 004 allowing purchase of up to two additional single-spindle or dual-spindle units respectively; CLIN 005 for tooling certificates valued at $10,000 each (up to five); and CLIN 006 for 200 hours of engineering support. The single-spindle machines must feature at minimum 24 horsepower, 20,000 rpm spindle speed, FANUC controls with Windows-based operating system, HSK-63 tool holders with 12-tool capacity, liquid-cooled spindles with chiller, aluminum vacuum grid tables (4ft x 5ft sections convertible to 5ft x 8ft), 3,500 ipm rapid traverse rate, ±0.001 inch accuracy and repeatability, and full dust containment enclosures compatible with composite, foam, and aluminum machining. Twin-spindle variants require two independent machining heads capable of simultaneous or separate operations. All equipment must comply with OSHA and local safety standards, include emergency stop controls, feature single-point utility disconnects, integrate with SigmaNest version 24.4.0.156 processing software, and undergo comprehensive performance testing including operational cycles, horsepower tests per ISO-10791-7, and accuracy verification. The contractor bears full responsibility for site preparation, installation, labor, materials, tooling, test materials, and comprehensive training covering operator instruction (5 personnel), programming (2 personnel), maintenance (2 personnel), and methods overview (4 personnel). Shipping must occur between 6:00 a.m. and 12:00 p.m. on Mondays through Thursdays, with all equipment delivered simultaneously unless pre-authorized otherwise. Final acceptance requires contractor set-up completion, successful performance testing, government inspection approval, completed training, and delivery of full documentation. The contractor must maintain verifiable service/repair capability with qualified English-speaking staff, telephone support during RIA normal working hours (8:00 a.m. to 3:00 p.m. CST Monday-Friday), 48-hour on-site response capability, and stocked maintenance parts availability.

View the file

Other files for this federal contract opportunity

Other files attached to CNC Routers, newest first.
File Type Posted
W519TC26QA082.pdf PDF
A03_Attachment_0002_26-3-20_CDRL_CNC_Routers.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ROCK ISLAND ARSENAL RIPD: E4000-26-3-20

PURCHASE DESCRIPTION DATE: 15-Dec-25

CNC ROUTER MACHINE(S)

GENERAL SYSTEM DESCRIPTION

1. STANDARDS AND PUBLICATIONS

1.1 Clarification

1.2 National Standards and Specifications

2. DESIGN

2.1 Ownership

2.2 General Design Standards

2.3 Safety, Security and Environmental

2.4 Responsibilities

3. CLIN 001 - Single Spindle CNC Router (2)

3.1 Dimensions:

3.2 Machine Frame and Gantry

3.3 Axis Definition

3.4 Table

3.5 Spindle

3.6 Tool Changer

3.7 Workpiece Holding

3.8 Control

3.9 Dust Containment and Extraction

3.10 Ranges and Capacities

3.11 Additional Components

4. CLIN 002 - TWIN SPINDLE CNC ROUTER (2)

5. CLIN 003 – SINGLE SPINDLE CNC ROUTER (UP TO 2 ADDITIONAL)

OPTION

6. CLIN 004 – DUAL SPINDLE CNC ROUTER (UP TO 2 ADDITIONAL)

OPTION

7. CLIN 005 – TOOLING CERTIFICATES (UP TO 5) OPTION

8. CLIN 006 – Engineering Support Hours (200) OPTION

9. Performance Tests

9.1 Responsibility for Inspections

9.2 Operational Test

9.3 Horsepower Test

9.4 Accuracy of a Finished Piece Test

9.5 Machine Models

10. INFORMATION TECHNOLOGY SYSTEMS AND SUPPORT

10.1 Installation IT Support:

10.2 INSPECTION/FINAL ACCEPTANCE:

10.3 Media/ Devices

10.3 INFORMATION ASSURANCE AND ACCREDITATION:

11. APPROVAL/SHIPPING

11.1 Shipping

11.2 Installation

11.3 Completion

12. TRAINING

12.1 Schedule

12.2 Location

12.3 Type

13. SERVICE

13.1 Service/Support Requirements

GENERAL SYSTEM DESCRIPTION

• This system is to provide new capability for routing composite materials at Rock Island

Arsenal Joint Manufacturing Technology Center. The system shall include all auxiliary equipment necessary to create a functioning working system. All labor and materials to facilitate this effort shall be the responsibility of the contractor.

1. STANDARDS AND PUBLICATIONS

1.1 Clarification

Any ambiguities, questions, requests for clarification or discrepancies between sections of this purchase description, drawings, national or industry standards discovered by the contractor in reviewing this purchase description shall be reported by the bidder in writing to the contracting officer BEFORE THE DATE SCHEDULED FOR CLOSE OF BIDDING/receipt of proposal.

Submission of a proposal or bid shall be construed as evidence that such examination has been made. Therefore, later claims for labor, material, or equipment required, or for difficulties encountered, which could have been foreseen had such reasonable examination been made, may be denied.

1.2 National Standards and Specifications

The contractor shall conform and provide equipment conforming to all local and federal codes and standards applicable to the equipment they are providing based on location and purpose of equipment in effect on the date of the opening of solicitation. It is not the responsibility of the government to make modifications to ensure compliance.

2. DESIGN

2.1 Ownership

2.1.1 This equipment is a standard product of the manufacturer and shall require either no change or minor design changes to meet requirements of these specifications. Therefore, ownership of the design will remain with the manufacturer.

2.2 General Design Standards

2.2.1 DEVIATION FROM PRODUCT: Modifications to the manufacturer’s standard design to achieve requirements as specified in this document are only permissible as dictated by good design practice. For example, mounting a 20-hp motor in a power train designed and normally using a 10-hp motor would not be acceptable.

2.2.2 UNITS OF MEASURE: Dimensions and capacities in this purchase description are given in the English-US (in-lb) system. All dials, gauges, and drawings shall be in the English- US system or both the English-US and the metric systems, unless otherwise specified in this document.

2.2.3 ID DATA PLATE: The equipment shall include a main data plate which will include the following data as a minimum requirement (additional information is acceptable):

Manufacturer Name, Manufacturer’s Dunns and Bradstreet Number, Manufacturer’s Model Number, Manufacturer’s Serial Number, Year of Manufacture, Contract Number, Machine

Weight. This information is necessary for compliance with the governments Unique Identification Program (UID).

2.2.4 DATA PLATES: All instruction, data, and identification plates and labels attached to this equipment and its controls shall be manufactured of corrosion and oil resistant metal or plastic material. All wording shall be in the English language using plain, bold face lettering.

Lettering shall be permanent and have a contrasting background.

2.2.5 ITEM UNIQUE IDENTIFICATION (IUID) REGISTRATION: The contractor shall register the equipment in the IUID Registry (as one single system). IUID registration requires the contractor to input Cage Code, Model Number, and Serial Number into a Government Database to allow for asset and inventory tracking. IUID Registry of the equipment shall be performed at http://dodprocurementtoolbox.com/site/uidregistry/. Training for IUID is available in https://wawftraining.eb.mil. IUID registration of this equipment is required prior to final payment in the Wide Area Work Flow (WAWF). The contractor shall also affix a machine readable 2-dimensional (2-D) matrix representing the IUID registry to the machine. The IUID 2-D matrix may be included on the ID Data Plate outlined in paragraph 3.2.4.

2.2.6 UTILITY CONNECTION: Equipment supplied to the Rock Island Arsenal will have single point shut-off for each utility supplied to a system. This means that equipment constituting a single system shall be wired to a single main electrical disconnect point, plumbed to a single pneumatic shut-off valve, etc… This will be referred to as the “point of first connection”. Each type of power source may have only one point of first connection. E.g. (1) pneumatic shut-off valve, (1) water supply shut-off valve, (1) electrical disconnect, etc… Each point of first connection shall be clearly labeled on the system and shown in the safety lockout portion of the documentation package. These points must be located on a stationary component and positioned such that they will not create a hazard to personnel during normal operation of the system. The first connection points shall be accessible from the shop floor without the use of ladders, steps, or stools. Access cannot be hampered by operation of the system.

2.2.7 UTILITY CONNECTION LABOR: Rock Island Arsenal shall provide only such labor and materials as will be needed to connect facility utilities to each point of first connection of the system. The supplier will be responsible for all connections beyond the point of first connection for each utility.

2.2.8 UTILITIES AVAILABLE: Rock Island Arsenal shall be responsible for providing the following:

2.2.8.1 Connection of 460-V, 60-Hz, 3-Ph AC electrical power to the fused or breaker type disconnect switch required in the ELECTRICAL DISCONNECT paragraph of this purchase description. Connection does not include filters, surge protection, or any peripheral equipment necessary to make the equipment functional.

2.2.8.2 Connection of approximately 80-psi compressed air to a single point for each system, if needed. Connection does not include filters, dryers, or any peripheral equipment necessary to make the equipment functional.

2.2.8.3 Connection of approximately 65-psi water to a single point for each system, if needed. Connection does not include filters or any peripheral equipment necessary to make the equipment functional. If water is required, the contractor shall be responsible for http://dodprocurementtoolbox.com/site/uidregistry/ https://wawftraining.eb.mil/ installing a back-flow limiting device sufficient to prevent possible contamination of the water system. This is necessary to maintain IEPA compliance.

2.2.8.4 Connection of 1.5-in diameter natural gas pipe with a 5 psi pressure within the plant to a single point for each system, if needed. Connection does not include filters or any peripheral equipment necessary to make the equipment functional.

2.2.8.5 If, due to contractor caused problems, the equipment or components of the equipment must be moved or removed and replaced, by RIA after initial placement, the contractor shall be billed for such work at current RIA labor and overhead rates.

2.2.9 ELECTRICAL DISCONNECT: The equipment shall be equipped with a manual, fused or breaker type disconnect switch, readily accessible to the operator, which will deactivate the entire equipment. It shall be located no more than 6-ft 7-in from the floor to the highest point the control device. It shall be capable of being locked in the de-energized state (OFF) only.

2.2.10 CONDUIT: Flexible conduit is not permitted in exposed areas. All wires, cables, and hoses will be enclosed by rigid, oil-proof protection, except where flexibility is necessary for operation of the equipment. Flexible wires, cables and hoses shall be arranged to prevent draping or tripping hazards.

2.2.11 SERVICE ACCESS: Components subject to periodic adjustment, replacement, or servicing shall be readily accessible. Meaning that experienced personnel can access the part after no more than 30-min of labor. If any special tools or equipment are necessary to access these components, said equipment will be supplied as part of the system and provided with a proper storage location within the system.

2.2.12 DEFLECTION: The system shall recover from distortion and deflection at no load. The machine and its components shall be sufficiently rigid that work piece finish and tolerances are not impaired by machine vibration.

2.2.13 NEW EQUIPMENT: The equipment furnished under this purchase description shall be new and unused.

2.2.14 COMPONENT ENVIRONMENT: Under no circumstances shall a component be used in an application not recommended by the component manufacturer. Components shall not be subjected to conditions of operation beyond the recommendations of the manufacturer, such as excessive heat, lack of lubrication, over-loading.

2.2.15 REPLACEMENT COMPONENTS: All replaceable components shall be manufactured to definite standards for tolerance, clearance, and finish, enabling components to be field installed without further machining.

2.2.16 CASTINGS AND FORGINGS: All castings and forgings shall be free of defects, scale, and mismatching. No process such as welding, peening, plugging, or filling shall be used for reclaiming any defective part for use in this equipment without the prior written consent of the contracting officer.

2.2.17 SURFACE BUILDING AND COATINGS: Welding, brazing, soldering, coating or plating shall be employed only where specified in the original design. These operations may not be employed as a means of reclaiming a defective part.

2.2.18 FASTENING DEVICES: All screws, pins, bolts, and similar parts shall be installed in such a manner as to prevent change in tightness. Those devices subject to removal or adjustment shall not be swaged, peened, staked, or otherwise permanently deformed. They shall not be installed using permanent bonding adhesives.

2.2.19 CLEANING AND DEBURRING: All surfaces of castings, forgings, molded parts, stampings, and welded components shall be cleaned and free from sand, dirt, fins, flash, scale, flux, and other harmful or extraneous materials. All edges shall be either rounded or beveled unless sharpness is required to perform a necessary function. Except as specified herein, the condition and finish of all surfaces shall be commensurate with the manufacturer’s commercial practice.

2.2.20 PAINTING: All unfinished surfaces of the equipment shall be painted with a lead free and chromium free commercial grade of metal primer and a minimum of one finish coat. The color shall be in accordance with the manufacturer’s standard commercial practice, or as necessary to maintain compliance with OSHA regulations, as applicable.

2.2.21 FILTRATION/REGULATION: Equipment requiring filtered or regulated energy sources shall be supplied with the components necessary to perform this function. E.g. the equipment shall be supplied with a Filter, Regulator, Lubricator (FRL) device, if filtered, lubricated, regulated pressurized air is required for the efficient, proper operation of the equipment. These devices shall be located on the equipment side of the lockout devices at the points of first connections.

2.2.21.1 Equipment which requires compressed air shall have a regenerative type desiccant or refrigerated compressed air dryer capable of drying air down to 35°F pressure dew point, minimum, from air entering the equipment at 110°F, and capable of supplying air to the rated standard cubic feet per minute (SCFM) of the equipment. The unit shall purge condensate automatically. In the case of the latter, the refrigerant used shall not be a Class I or Class II, ozone depleting substance. The air dryer shall be connected and/or piped to the equipment by the contractor.

2.2.21.2 Equipment which requires a high quality constant power source shall have proper isolation and/or power conditioning equipment for the power service designated in this description. All electrical equipment shall have a power factor (ratio of real power to apparent power) of no less than 80%, as read at the equipment main disconnect. Equipment with a power factor of less than 80% shall be fitted with suitable power factor correction capacitance, sized on the basis of the equipment inductive AC load.

2.2.22 MOTORS:

2.2.22.1 All motors shall be rated for continuous duty.

2.2.22.2 Motors shall not operate in an overload condition during normal operation of the equipment and shall be equipped with overload protection.

2.2.22.3 Each motor shall bear an identification plate containing the identity of the manufacturer, model number, serial number, input voltage, amperage, horsepower, phase, frequency, duty cycle, and frame size or mounting identification.

2.2.22.4 Motor starters and controls shall operate at no greater than 120-VAC. It is preferred that they operate at 24-VDC.

2.2.22.5 Motor starters shall provide drop-out protection. This means that, in the event of a loss of power, the equipment shall be re-energized only by the deliberate action of the operator. Manual or mechanical motor starters shall not be deemed acceptable.

2.2.23 DIALS AND GAUGES: All scales, dials, and gauges shall be manufactured of corrosion and oil resistant material. All wording shall be in the English language using plain, bold face lettering. Lettering shall be permanent and have a contrasting background.

2.3 Safety, Security and Environmental

2.3.1 SECURITY: The RIA-JMTC is an Army installation subject to Department of Defense safeguards, various precautions, and plant protection measures. All of the below requirements will be necessary of contractors visiting RIA to satisfy requirements of this purchase description; Additional requirements will be placed on contractors requiring access to the Army Network, or Common Access Card (CAC), as specifically detailed below. At all times during the execution of this work, contractor personnel will maintain adequate plant protection devices to minimize espionage, sabotage, and other malicious destruction and damage. The contractor shall comply with all security requirements of the Rock Island Arsenal. Rock Island Arsenal island-wide Force Protection levels may be adjusted/changed at any time, which may cause possible delays and will directly affect procedures for accessing the island.

2.3.1.1 Access and General Protection/Security Policy and Procedures: The contractor and any associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by the installation Director of Emergency Services. All contractor employees must comply with all personal identity verification requirements (IAW FAR clause 52.204-9) as directed by Department of Defense (DoD), Headquarters Department of the Army (HQDA), and any local policy. If the Force Protection Condition (FPCON) changes, the Government may require changes in contractor installation access, security matters, or security processes.

2.3.1.1.1 Access to RIA: Contractor and all subcontractor employees performing work at RIA shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) and any applicable installation, facility access screening and local security policies and procedures. The JMTC Representative shall provide guidance to complete the Access Control Records Check request Form though the Rock Island Arsenal Directorate of Emergency Services.

2.3.1.1.2 Random Antiterrorist Measures Program (RAMP) participation: Contractor personnel are subject to RAMP security program (i.e. vehicle searches, wearing of ID badges, etc.). Contractor shall comply with any, and all instructions issued by the Rock Island Arsenal Police Department. The RAMP is discussed in the RIA-JMTC Anti- Terrorism Training.

2.3.1.1.3 During FPCONs levels of Charlie or Delta, services may be discontinued/postponed due to a higher National or local security threat. Services will resume when FPCON Level is reduced to Bravo, or lower. FPCON levels are described in Anti-Terrorism Level I Training.

2.3.1.1.4 Contractor personnel shall return all Installation Badges and access passes as soon as possible prior to contract completion. RIA-JMTC electronic keys and access passes are accountable items, shad shall be returned within 24-hours of no longer being needed. Items will be returned to the COR, or paced in a drop box at a RIA-JMTC access point.

2.3.1.2 Security Training: The contractor shall complete the following training:

2.3.1.2.1 Anti-Terrorism, Level I: All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, or controlled access areas shall complete Anti-Terrorism (AT) Level I Awareness training. The COR will be provided a copy of the Rock Island Arsenal –Joint Manufacturing and Technology Center (RIA-JMTC) AT Level I Awareness Training and assure that the training is complete.

The contractor shall sign a memorandum of record for each contractor employees and subcontractor employee to the RIA-JMTC Operations Center prior issuing any electronic keys, or access pass being authorized.

2.3.1.2.2 iWatch (See Something, Say Something) Training: The Contractor and all associated subcontractors shall complete iWatch Training. iWatch Training shall be provided during the Anti-Terrorism Training.

2.3.1.3 For Contractors requiring Common Access Card (CAC): Before CAC issuance, the contractor employee requires a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05.

The contractor employee will be issued a CAC only if duties involve one of the following:

(1) Both physical access to a DoD facility and access, via logon, to DoD networks onsite, or remotely or (2) Remote access via logon, to a DoD network using DoD-approved remote access procedures, or (3) Physical access to multiple DoD facilities or multiple Non-DoD Federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6-months, or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management. Contractors needing a NACI or equivalent investigation or higher investigation will coordinate this investigation through their COR.

Contractor personnel shall turn in CAC cards upon completion of their contractual obligations, or at the request by the COR, or at the request of the Contracting Officer.

2.3.2 FEDERAL MARIJUANA LAWS REMAIN UNCHANGED: Note: Rock Island Arsenal is under the exclusive federal jurisdiction of the United States. Under federal law, marijuana is still defined as a Schedule I drug, and possession and use of marijuana is still illegal. Any person using or in possession of marijuana on Rock Island Arsenal may be criminally prosecuted in federal district court. In addition, such individuals may be permanently barred from entering Rock Island Arsenal.

2.3.3 REAL ID: Starting 03-May-2025 all personnel entering Rock Island Arsenal will be required to show a Real ID form of identification.

2.3.4 FIRE PREVENTION AND PROTECTION: The contractor shall comply with all fire prevention measures prescribed in the installation Fire Regulations, a copy of which is on file in the office of the Contracting Officer. A written fire permit shall be obtained from the installation Fire Marshall for use of open flame devices, such as torches, portable furnaces, tar kettles, or gas and electric welding and cutting equipment, in, on, or within 15-ft of the building. The contractor shall be liable for any fire loss to the Government properly attributable to negligence on the part of the contractor, including failure to comp1y with fire prevention measure described by the terms of this purchase description.

2.3.5 INDUSTRY AND REGULATIONS: The equipment shall comply with the most current of all local, state, and federal laws and regulations listed in Standards and Publications.

2.3.6 MATERIAL EXCLUSIONS: The equipment shall not contain polychlorinated biphenyl (PCB), ozone depleting substances (Class I or Class II), or asbestos materials.

2.3.7 SAFETY REGULATION COMPLIANCE: The contractor shall comply with standard OSHA and RIA safety standards, including but not limited to conforming to confined space work requirements when applicable and wearing of Personal Protective Equipment (PPE) where designated.

2.3.8 SAFETY LOCKOUTS: Each point of first connection shall be designed and constructed to allow the utility to be completely isolated from the equipment. This isolation shall be insured by application of a standard key locking padlock. The device(s) shall only be lockable in the de-energized (OFF) condition.

2.3.9 LOSS OF PRESSURE: Hydraulic and pneumatic circuits shall be designed such that loss of pressure, or pressure surges, shall not cause a hazard. Means shall be provided to prevent operation of the equipment with insufficient pressure, if such operation could cause a hazard.

2.3.10 TRAPPED ENERGY: Means shall be provided for the controlled release of stored energy. This energy may be in the form of, but not limited to, air and hydraulic pressure accumulators, capacitors, springs, counter balances and flywheels. When appropriate, a label shall be affixed to the stored energy source to identify the hazard.

2.3.11 WORKING RANGE: Hydraulic and pneumatic components shall be selected, which cannot be adjusted outside the safe working range of the circuit and/or equipment.

2.3.12 ACCUMULATORS: Gas charged accumulators operating above 200-psi charging pressure shall be charged with inert gas.

2.3.13 BRAKES: Braking systems shall be designed to “fail-on”. This means, energy supplied to the brake shall be used to disengage the brake. Loss of energy shall therefore cause the brake to activate.

2.3.14 EMERGENCY STOP: The system will incorporate a clearly identified, red, mushroomed, control button with a yellow backing plate at every operator work station. Upon momentary operation, any emergency stop button shall de-energize all machine motions and override all other controls without creating additional hazards. All motion stopped shall be restarted by the deliberate action of the operator (requiring manual reset). No other red mushroomed buttons shall be allowed on the equipment. It is preferred that there is no other red buttons of any type.

2.3.15 CONTROL GUARDS: Controls shall be guarded against accidental operation.

2.3.16 OPERATOR REACH: Controls shall be within reach and located such that the operator, when in the normal operating position, is not required to reach past moving parts, which may cause injury.

2.3.17 AUDIBLE NOISE: The equipment noise level during normal operation shall not exceed 85-dbs, “A” scale. Tests shall be conducted around the entire equipment 60-in to 65-in above the floor within 3-ft of any major sound source. Metal removal equipment shall comply with the standard noise requirement while making a midrange horsepower cut on rigidly clamped mild steel. The contractor shall furnish shields, baffles, enclosures, or other devices necessary to bring the equipment into conformance. Any such device shall not interfere with the proper operation of the equipment and shall be designed to preserve the visibility necessary for safe operation of the system.

2.4 Responsibilities

2.4.1 SITE INSPECTION: Any site inspections and/or measurements, which must be taken in order to determine the suitability of the proposed location or to perform the design of the system, are the sole responsibility of the contractor. This may begin prior to completing the bidding process. Rock Island Arsenal will support this function through the POC (point of contact) by guiding personnel, facilitating security registration, and providing general assistance. The contractor will be responsible for providing any and all equipment necessary for this process.

3. CLIN 001 - SINGLE SPINDLE CNC ROUTER (2)

Equipment: The supplier shall furnish all equipment normally considered by him to be standard for his machine unless identified in this requirement to be of specific manufacture. The following equipment shall be provided in addition to the equipment specified in other sections of this purchase description, which may not be standard. The inclusion of standard equipment in this paragraph is inadvertent and should not be construed to allow duplication.

3.1 Dimensions:

3.1.1 DOOR ACCESS: The equipment shall be shipped either assembled or disassembled to pass through a door 12-ft wide by 12-ft high, and shall not exceed 25-ft in length.

3.2 Machine Frame and Gantry

3.2.1 BRIDGE: The system shall include a fixed bridge design to allow for extreme rigidity during high speed machining operations.

3.2.2 BASE: The system shall include a webbed steel substructure allowing for vibration dampening attributes during the machining process.

3.2.3 DRIVE SYSTEM: The drive system shall be constructed of precision ballscrews.

3.3 Axis Definition

3.3.1 X-AXIS: The X-Axis shall be defined as the movement of the table underneath the fixed bridge.

3.3.2 Y-AXIS: The Y-Axis shall be defined as the movement of the machining head along the fixed bridge.

3.3.3 Z-AXIS: The Z-Axis shall be defined as the movement of the machining head up and down perpendicular to the Y Axis.

3.4 Table

3.4.1 CONSTRUCTION: The table shall be comprised of (2) 4ft x 5ft sections of Aluminum vacuum grid table. The table shall include removable spoil-board that fastens to the grid table to allow for use during nested part machining. The two sections of table shall be able to be slaved together to create one large 5ft by 8ft Table for larger part profiles.

3.4.2 MACHINING: The system shall have the ability to alternate machining from Table 1 and Table 2.

3.5 Spindle

3.5.1 SPINDLE POWER: The spindle shall be at least 24hp or equivalent power to be able to reach the following specifications.

3.5.2 SPINDLE SPEED: The spindle shall have a maximum speed of at least 20,000 rpm. The spindle shall be programmable and reversible, variable speed and capable of routing and drilling processes.

3.5.3 COOLING: The spindle shall be liquid cooled and the system shall include a chiller provided with the equipment.

3.5.4 SPINDLE TAPER: The spindle shall be set up to handle HSK-63 Tool Holders.

3.5.5 MIST LUBRICATOR: The system shall include a continuous oil mist lubricator. The output flow that be manually adjustable.

3.5.6 SPINDLE ENCODER: The spindle shall include encoder feedback to allow for the spindle to receive orientation commands.

3.5.7 AIR BLAST: The system shall also include the ability to produce an air blast to assist with chip/ particulate evacuation.

3.6 Tool Changer

3.6.1 TYPE: The system shall include an automatic rotary tool changer with the ability to store aggregates. The system shall be fully servo controlled.

3.6.2 TOOL CAPACITY: The tool capacity for the single spindle machines shall be a minimum of 12.

3.7 Workpiece Holding

3.7.1 PLACEMENT PEGS: The system shall include pneumatically controlled pop up perimeter positioning pins for sheet placement. This should include all solenoids and components necessary.

3.7.2 VACUUM TABLE ASSIST: The system shall include an appropriate vacuum table for part holding. The system shall be a programmable zone manifold that can handle porous or slightly warped material.

3.8 Control

3.8.1 TYPE: The controller shall be a FANUC control

3.8.2 OPERATING SYSTEM: The operating system shall be Windows-based operating system.

3.8.3 LASER COMPENSATION: 3-axis Bi-directional compensation with straightness compensation shall be available.

3.8.4 4th AXIS ROTARY PRE-WIRE: The system shall come pre-wired with all necessary components/capabilities to allow for a bolt on style rotary attachment allowing for 4th Axis capability.

3.8.5 VACUUM ZONE CONTROL:

3.8.6 CABINET: Electrical/ Control cabinets shall be designed to be used in industrial environment that is not tempered other than IR Heat. The space is not air conditioned.

3.8.7 CONNECTION: There shall be a RJ45 connection available on the control. There should be sufficient connection ports for any auxiliary peripherals such as monitors, keyboard, mouse etc.

3.8.8 SOFTWARE: RIA-JMTC uses SigmaNest as a processing software in order to nest and communicate programs with the machine tool. We currently operate using SigmaNest Version 24.4.0.156

3.9 Dust Containment and Extraction

3.9.1 ENCLOSURE: The units shall include full enclosures allowing for best dust containment and extraction capabilities. The enclosure shall still allow for adequate material loading and part removal.

3.9.2 DUST COLLECTION: The unit shall include an appropriate dust collection manifold that includes at the spindle exhausting to allow for removal for dust/ particulate from the machining environment. The machine exhaust manifold shall include a port to connect to an offline dust collection system to be provided by the Government. The design of this dust collection manifold shall be appropriate for the applicable materials being routed as well as the speeds in which the spindle shall be ran.

3.9.2.1 Materials include Carbon Fiber, Foam, Prepreg Composites (Aramid Fibers), and in some cases Aluminum.

3.10 Ranges and Capacities

3.10.1 X-AXIS TRAVEL: The machine shall have full access to the work envelope of the table.

3.10.2 Y-AXIS TRAVEL: The machine shall have full access to the work envelope of the table.

3.10.3 Z-AXIS TRAVEL: The system shall have at minimum 11in of z-axis capability.

3.10.4 TRAVERSE RATE: The system shall have a minimum of 3500ipm programmable rapid traverse rate.

3.10.5 CUTTING SPEED: The system shall have a minimum cutting speed of at least 300 ipm.

3.10.6 ACCURACY: The system shall have an accuracy of at least +/- 0.001”

3.10.7 REPEATABILITY: The system shall have a repeatability of at least +/- 0.001”

3.10.8 TABLE SIZE: The table shall be 5ft x 8ft but shall be capable of splitting into two 5ft x 4ft sections.

3.10.9 TABLE LOAD:

3.11 Additional Components

3.11.1 LINEAR SCALES: All axis shall include linear feedback scales to allow for superior precision.

3.11.2 STACK LIGHT: The system shall include a stack light showing equipment status.

4. CLIN 002 - TWIN SPINDLE CNC ROUTER (2)

This CLIN represents (2) dual head CNC routers with specifications that match that of the equipment in section 4 except for the following modifications:

4.1.1 SPINDLE: The machine shall have two machining heads with two of each associated system (dust collection manifold, spindle, lubricator etc.)

4.1.2 INDEPENDENT MACHINING: The machine shall be capable of machining with one head, both heads cutting identical parts, or each head cutting separate parts on the separate tables without sharing any axis.

4.1.3 TOOL CHANGER: 12 Tool tool changer for each head (24 total).

5. CLIN 003 – SINGLE SPINDLE CNC ROUTER (UP TO 2 ADDITIONAL) OPTION

This CLIN represents an option to purchase up to an additional (2) units in increments of (1) unit. This is an option and is subject to availability of funds. The equipment would match that of the offered equipment in Section 4 of this document.

6. CLIN 004 – DUAL SPINDLE CNC ROUTER (UP TO 2 ADDITIONAL) OPTION

This CLIN represents an option to purchase up to an additional (2) units in increments of (1) unit. This is an option and is subject to availability of funds. The equipment would match that of the offered equipment in Section 5 of this document.

7. CLIN 005 – TOOLING CERTIFICATES (UP TO 5) OPTION

This CLIN represents the purchase of up to (5) Tooling Certificates to be valued at $10,000 each in increments of (1) Certificate.

8. CLIN 006 – ENGINEERING SUPPORT HOURS (200) OPTION

This CLIN represents the purchase of (200) hours of engineering support for the equipment. This could be used for additional training, assistance with design optimization or applications support for system parameters and optimization.

9. PERFORMANCE TESTS

9.1 Responsibility for Inspections

Unless otherwise specified in the contract, the contractor is responsible for the performance of all inspection requirements. Except as otherwise specified in the contract, the contractor may use his own or other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any inspections when such action is deemed necessary to assure supplies and services conform to prescribed requirements.

9.2 Operational Test

Functions of the machine and the control unit shall be checked.

9.2.1 LABOR: After completion of start-up, the vendor shall perform the operational testing using the equipment installed by the vendor.

9.2.2 RUNOFF CHECKS: The runoff checks shall include operating the machine in each of its modes of operation to determine proper response of the machine to control commands. The cycle checks shall include spindle speed and feed rate changes, independent and simultaneous operation of machine axis motions, and control functions. If a failure occurs, the cycle shall be restarted after the correction and runoff for a full 8-hr period.

9.2.3 CYCLE TEST: Upon completion of the warm-up and runoff checks, the machine shall be cycled continuously for a period of 8-hrs without a malfunction.

9.2.4 Adjustments during the test may require restarting the test from the beginning.

9.3 Horsepower Test

9.3.1 LABOR: After completion of operational testing, the vendor shall perform the machining portion of the testing using the equipment installed by the vendor. RIA-JMTC shall perform required measurements/inspections of test samples.

9.3.2 MATERIALS: The vendor shall provide all tooling necessary to perform all testing. The vendor shall also be responsible for providing raw materials necessary to complete successful testing.

9.3.3 TEST: The machine shall be subjected to a cutting test which applies not less than the full-rated input power to the spindle motor to demonstrate removal capability. There shall be no evidence of chatter, stalling, or permanent distortion during or after the test.

9.4 Accuracy of a Finished Piece Test

The vendor shall perform the following tests in accordance with ISO-10791-7.

9.4.1 LABOR: After completion of the horsepower test, the vendor shall perform the machining portion of the testing using the equipment installed by the vendor. RIA-JMTC shall perform required measurements/inspections of test samples.

9.4.2 MATERIALS: The vendor shall provide all tooling necessary to perform all testing. The vendor shall also be responsible for providing raw materials necessary to complete successful testing.

9.4.3 TYPE OF TESTS: The vendor shall perform the test in accordance with ISO-10791-7 standard, Type-A Large Size (320-mm). The tests shall be performed using the base spindle (no alternative head attachments).

9.4.4 RESULTS: In order to pass the test, the results must meet the requirements listed in ISO- 10791-7 Table 3. Results must be recorded and provided to the RIA-JMTC representative.

9.5 Machine Models

The contractor shall provide models of the machine to be used for cad drawing and programming purposes.

10. INFORMATION TECHNOLOGY SYSTEMS AND SUPPORT

10.1 Installation IT Support:

10.1.1 PERSONNEL: RIA-JMTC will not provide the technician credentials to access the workstation. Access to the workstation will be provided by the RIA-JMTC IT Support Staff escort. Removable Media e.g., CD/DVD/USB/SD/External hard drive will be scanned prior to use. Programs and software must be ran from RIA-JMTC approved/provided media or CD/DVD(s). Contractor Devices will not be allowed to connect to the RIA-JMTC network nor will they be allowed to connect to RIA-JMTC equipment other than to scan and transfer media.

10.2 INSPECTION/FINAL ACCEPTANCE:

10.2.1 LICENSING: The software/ hardware license shall not have an internet connection. A license dongle or license file must be provided for offline use.

10.3 Media/ Devices

10.3.1 REMOVABLE MEDIA: Removable media consists of the following: CD, DVD, USB, SD, and External Hard Drives. Removable media shall be scanned prior to use. Programs and software must be ran from RIA-JMTC approved/ provided media or CD/ DVD(s).

10.3.2 CONTRACTOR DEVICES: Contractor Devices will not be allowed to connect to the RIA-JMTC network and they will not be allowed to connect to RIA-JMTC equipment other than to scan and transfer media.

10.3.3 NON-GOVERNMENT OWNED SYSTEMS OR DEVICES: The contractor shall comply with AR 25-1 and AR 25-2. The contractor shall not install or connect non- Government-owned computing systems or devices to Government networks without the COR’s coordination and obtaining the proper authorization from the appropriate Information System Security Manager (ISSM), ensuring that all software has a Government Assess Only Authorization. The non-Government-owned computing systems or devices include, but are not limited to, personal or Contractor-owned thumb drives e.g., memory sticks, flash drives, Universal Serial Bus (USB) drives, jump drives, pen drives, removable or external hard drives, Personal Digital Assistants (PDA), PC Cards/Express Cards, MP3 players, cell phones, digital media, floppy disks, compact disc (CD)/digital video disk (DVD) burners, optical recordings, photo flash cards, laptops, or any devices that can store data.

10.3 INFORMATION ASSURANCE AND ACCREDITATION:

10.3.1 Non-Government-Owned computing systems or devices: The Contractor shall comply with AR 25-1 and AR 25-2. The Contractor shall not install or connect non-Government-owned computing systems or devices to Government networks without a government representative coordinating and obtaining proper authorization from the appropriate Information System Security Manager (ISSM), ensuring that all software has a Government Assess Only Authorization. The non-Government-owned computing systems or devices include, but are not limited to, personal or Contractor-owned thumb drives e.g., memory sticks, flash drives, Universal Serial Bus (USB) drives, jump drives, pen drives, removable or external hard drives, Personal Digital Assistants (PDA), PC Cards/Express Cards, MP3 players, cell phones, digital media, floppy disks, compact disc (CD)/digital video disk (DVD) burners, optical recordings, photo flash cards, laptops, or any devices that can store data.

10.3.2 System Accreditation and Re-Accreditation: The Contractor shall assist in providing system accreditation documentation such as required artifacts and shall answer technical questions required for registration for accreditation. All documents shall be IAW Chapter 5, and Appendices D and E, AR 25-2, Information Systems Security (dated 3 August 2007) and DOD Instruction 8510.01, Risk Management Framework (RMF) Program or future DOD regulation that supersedes these regulations. The Contractor shall assist in performing yearly reviews of the accreditation, or whenever changes/additions are made to the system. The Contractor will assist in preparing risk assessments, as required.

11. APPROVAL/SHIPPING

11.1 Shipping

11.1.1 RESPONSIBILITY: The contractor is responsible for delivery of the equipment to the Rock Island Arsenal. Adequate preserving of equipment surfaces, packing, marking, and skidding of materials for shipment shall be the responsibility of the contractor. If special lifting devices, such as hooks or eyes, are required for ease of handling, they shall be supplied with the equipment. Any special devices shall be returned to the contractor upon request only if they will not be required for future movement of the equipment, and at the contractor’s expense.

11.1.2 SHIPPING SCHEDULE: Be aware, the Rock Island Arsenal will only off-load equipment arriving between 6:00 am and 12:00 pm (noon), local time on Mondays through Thursdays except holidays. For information concerning holidays, the contractor should consult the contracting officer. There is no place to stage transporting vehicles awaiting the arrival of contractors. All equipment shall be delivered at the same time, meaning the same day (multiple trucks are acceptable) unless pre-authorized to deliver on multiple days by the RIA-JMTC contracting officer.

11.1.3 RECEIVER: All shipments to Rock Island Arsenal including installation tools and/or replacement parts, as well as the original shipment of the equipment, shall be marked “ATTN:

Mr. Robert Mcclure TARA-LGC”. Items not correctly marked are subject to being returned at the vendor’s expense.

11.1.4 ARRIVAL INSPECTION: Upon receipt of equipment at Rock Island Arsenal, a preliminary inspection shall be performed to determine condition and/or count. This inspection shall be performed by Rock Island Arsenal personnel.

11.2 Installation

11.2.1 SITE PREPARATION REQUIREMENTS: The contractor shall be solely responsible for any necessary site inspections required for determining the specifications of work that must be completed prior to final system installation. The contractor will then provide detailed information of any preparation work that the vendor must perform prior to system installation to Rock Island Arsenal.

11.2.2 PREPARATION EXECUTION SUPPORT: Rock Island Arsenal will support the preparation portion of the installation by providing utilities to the points of first connection.

11.2.3 LABOR AND MATERIAL: The supplier is solely responsible for providing all labor, materials, hardware, tools, and equipment necessary for complete installation/start-up of this system except as specifically listed in this document as being provided by the Rock Island Arsenal.

11.2.3.1 Any lubricants, coolants, oils etc. required for initial start-up and operation shall be the responsibility of the contractor to provide.

11.2.3.2 Any anchoring mechanisms/materials shall be the responsibility of the contractor to provide. If RIA-JMTC is installation the foundation, JMTC will be responsible for the installation of the contractor provided anchoring mechanisms in preparation for machine placement.

11.2.3.3 Any decking, stairs, rail systems, or other specialized operator/machine interfaces shall be provided by the contractor for use at the install location

11.2.4 SUPERVISION: Supervision of the installation process will be the responsibility of the contractor. Rock Island Arsenal shall retain the right to periodic inspection and evaluation of the process, as it deems necessary.

11.2.5 OFF-LOADING/PLACEMENT: Off-loading of the equipment from the delivery vehicle, and placement of the equipment in position for the installation is the responsibility of the contractor. The contractor shall not be allowed to use government equipment to accomplish this work.

11.2.6 OFF-LOADING/PLACEMENT OPTION: At the request of the contractor, Rock Island Arsenal will perform the off-loading and placement of the equipment.

11.2.6.1 Any special requirements or precautions to be observed shall be the responsibility of the contractor to provide.

11.2.6.2 The contractor or his representative may be present during this process; however, such person will be responsible for being present upon arrival of the equipment at Rock Island Arsenal. Off-loading and placement shall not be delayed to allow arrival of the contractor or his representative.

11.2.6.3 If, due to contractor caused difficulties, the equipment or components of the equipment must be moved, removed or replaced by Rock Island Arsenal after initial placement, the contractor shall be billed for such work at current Rock Island Arsenal labor and overhead rates.

11.2.7 LIABILITY: In any case, the equipment remains the property of the contractor, and the contractor shall assume all responsibility and liability for the equipment and the work performed upon it. The government shall be held harmless for any damage done to the equipment at any time up until final acceptance of the equipment by Rock Island Arsenal, except in the case of intentional damage and/or gross negligence on the part of Rock Island Arsenal personnel.

11.2.8 SET-UP: The contractor shall be responsible for set-up and connection of the equipment beyond connections of the utilities to the points of first connection.

11.2.9 SECURITY: The RIA-JMTC is an Army installation subject to Department of Defense safe guards, various precautions, and plant protection measures. At all times during the execution of this SOW, the contractor will maintain adequate plant protection devises to minimize espionage, sabotage, and other malicious destruction and damage. The contractor shall comply with all security requirements of the Rock Island Arsenal. Rock Island Arsenal Island-wide Force Protection levels may be adjusted/changed at any time, which may cause possible delays and will directly affect procedures for accessing the Island.

11.2.10Delivery Hours or Service Hours: Service calls, equipment installation, training, and equipment delivery (where the contractor offloads) will only be allowed from 0600 – 1530, Monday through Thursday, except for Government Holidays. Deliveries of items where the contractor has opted for Government “off-loading option”, must be received before 1200 hours.

These hours are subject to change, however, the Government will notify the contractor of such changes. The vendor will contact the designated Performance Certifier/ COR to obtain an electronic key for their representative (i.e. delivery driver) in order to have access to the facility.

Deliveries and service calls outside the normal hours stated above will be coordinated with the Performance Certifier/ COR to address any emergency situations."

11.3 Completion

11.3.1 Final acceptance of the equipment shall occur after the following:

11.3.1.1 Set-up completion by the contractor.

11.3.1.2 Successful completion of performance testing at Rock Island Arsenal.

11.3.1.3 Final inspection approval by the government representative or inspector. This is to verify full compliance with this description to include amendments and modifications to the final contract. The government representative shall perform any and all tests he deems necessary to insure compliance with this description and industry standards to include, but not limited to ease of control, convenience of operation, safe operation, and adequacy of lubrication devices.

11.3.1.4 All required training is complete.

11.3.1.5 Complete documentation packages are delivered.

12. TRAINING

The contractor shall provide instruction in proper operation and maintenance of the equipment without additional cost to the government. Training shall be of sufficient duration that the recipients are able to demonstrate a reasonable level of competence as determined by the equipment installer and/or the inspector. Acceptance may be delayed as a result of inadequate training.

12.1 Schedule

Training shall training shall be coordinated with the Rock Island Arsenal. Daily training shall begin no later than 6:30 a.m. CST and shall continue until at least 2:15 p.m. CST. This is required to get full coverage of the 1st shift of operation at RIA-JMTC. If training does not begin until after the stated time, RIA-JMTC may at its option require additional training at a different time to compensate for the loss of training caused by the late start. This may include more time than what is represented by the delay (e.g. a 1-hr delay may require 2-hrs later to impart the knowledge lost).

12.2 Location

All training shall be performed at the Rock Island Arsenal. It shall be performed using the equipment purchased in this description.

12.3 Type

Each type of training shall be given independently. Rock Island Arsenal shall coordinate with the contractor to provide the proper personnel for each type of training. The following types of training shall be provided by the contractor.

12.3.1 OPERATOR: Training shall be provided by the contractor for (5) operators. This shall include instruction on the safe, efficient operation of the equipment delivered. The trainees supplied by RIA-JMTC shall be familiar with machine operation, but not necessarily with the style or type of controls provided with the equipment. (E.g. for a new CNC lathe, the operator will be familiar with CNC lathe operation, but may have no experience with a Fanuc control system.)

12.3.2 PROGRAMMING: If the equipment includes a programmable controller, programmer training shall be provided, separate from the operator training for (2) personnel. If programming is normally performed by the operator only, then this training may be combined with the operator training.

12.3.3 MAINTENANCE: Mechanical and electrical control and diagnostic maintenance training shall be provided by the contractor. This shall include information on troubleshooting and preventive maintenance procedures. This shall be provided for (2) personnel.

12.3.4 METHODS: Methods Training shall be provided by the contractor.