Statement of Work B3071

Cubicles 23 March 2020

The cubicles are located on the 2nd floor of B3071. The current configuration has cubicles with no physical separation. This configuration does not present the ideal situation for occupants of those cubicles. In order to remedy, the cubicles must be reconfigured as described below.

Statement of Work: The contractor to provide all labor, material, equipment, procurement and delivery cost to reconfigure cubicles C258 – C261, C263 – C267 and T617

General

• Disassemble all cubicles and any appurtenances in order to reconfigure as discussed below

• Disconnect power and IT from the cubicles

• Reconnect power and IT to cubicles and verify both are operational

• The contractor is responsible for field verifying all dimensions and finishes provided in the scope of work and shall base all pricing and materials on the verified information

• Cubicle manufacturer is Teknion

• Cubicle model name is Leverage

• Installation shall be completed within eight (8) weeks from award of contract

• Installation shall occur over the course of a single weekend o The government will ensure the cubicles are empty of all government equipment and personal items

• Notification of installation shall be given no less than seven (7) calendar days prior to planned start

• Shop drawings are required prior to installation

Cubicles C258 – C261 (Attachments 1 and 2)

• C258 – C259: Install 2 ea 3’ wide panels at end of cubicles.

• C260 – C261: Install 2 ea 3’ wide panels at end of cubicles.

Panels

• The panel height shall match the height of the existing cubicle panels.

o Existing cubicle height is 66”

• The panel shall be comprised of metal on the bottom on both sides o Existing finish of the panel bottom is Dark Bronze Metallic TR-DM

• The remaining panel shall consist of plastic laminate on both sides o Existing finish on the upper laminate is Amber Cherry

• The panels shall be supported on the free standing end such that lateral movement is minimized

• The panels shall have a metal top, bottom and side trim with finish matching the metal portion of the panel

Cubicles C263 – C267 (Attachments 3 and 4)

• C263: Move cubicle C263 down to accommodate the addition of the new panels

• C264 – C265: Insert panels between cubicle C264 and C265

• C266 – C267: Insert panels between cubicle C266 and C267

• The panels shall begin at the exterior wall and extend to the end of the cubicle o Existing cubicle depth is 9’ – 6”

• The panel height shall match the height of the existing cubicle panels.

o Existing cubicle height is 66”

• The panel shall be comprised of metal on the bottom on both sides o Existing finish of the panel bottom is Dark Bronze Metallic TR-DM

• The remaining panel shall consist of plastic laminate on both sides o Existing finish on the upper laminate is Amber Cherry

• The panels shall be supported on the free standing end such that lateral movement is minimized

• The panels shall have a metal top, bottom and side trim with finish matching the metal portion of the panel

Desktop

• Finish shall match amber cherry

Cubicle T617 Outside Room 219 (Attachment 5)

• T617 - Reconfigure cubicle as shown on Attachment 5.

• Supply and install one (1) 24” three (3) drawer filing cabinet

• Cubicle T-617 Reconfiguration. It is expected the contractor will reuse as many components from the existing configuration as possible. Any new materials shall match existing finishes

• Panel Heights vary from 36” to 66”

• Bottom of panels are composed of metal at bottom (both sides) o Finish is Dark Bronze Metallic TR-DM

• Remainder of panel OUTSIDE is plastic laminate o Finish is Amber Cherry

• Remainder of panel INSIDE is fabric o Finish is LUUM Meme Grounded

Government Furnished Material

• The Government has the following material to provide to the contractor o 1 EA - 36” Hutch

Attachments

1. Existing Configuration of Cubicles C258 – C261

2. Revised Configuration of Cubicles C258 – C261

3. Existing Configuration of Cubicles C263 – C267

4. Revised Configuration of Cubicles C263 – C267

5. Existing and Revised Configuration of cubicle T617

6. Cubicle Locations

ATTACHMENT 1

ATTACHMENT 2

ATTACHMENT 3

ATTACHMENT 4

ATTACHMENT 5

ATTACHMENT 6

End of Document

Statement of Work B3071 Cubicles
General
Cubicles C258 – C261 (Attachments 1 and 2)
Panels
Cubicles C263 – C267 (Attachments 3 and 4)
Panels
Desktop
Cubicle T617 Outside Room 219 (Attachment 5)