A02 Statement of Objectives_Raised Floor Panel Replacement.pdf

PDF 141 KB Posted

Attached to
Raised Floor Panel Replacement Federal contract opportunity
Solicitation number
W50S8123Q0009
Issued by
Department of the Army Massachusetts Army National Guard

About this file

This statement of objectives describes a requirement for a contractor to replace raised floor panels at a communications squadron building on Barnes Air National Guard Base in Westfield, Massachusetts. The contractor will be responsible for removing and disposing of approximately 2,000 square feet of existing raised floor tiles and replacing them with new tiles, including both full panels and those requiring cuts. The performance work statement must include estimated quantities of tiles needed, timelines for the work, identification of any subcontractors, and completion of the work within 60 calendar days of award. The contractor will have escorted access to the secure work site and must follow all security and traffic procedures required by the base. The solicitation was issued by the Department of the Army Massachusetts Army National Guard for requirement number W50S8123Q0009.

View the file

Other files for this federal contract opportunity

Other files attached to Raised Floor Panel Replacement, newest first.
File Type Posted
Room 45_3.jpg JPG image
LiskeyT Access Floors.pdf PDF
Room 45_2.jpg JPG image
Room 45_1.jpg JPG image
Room 45_4.jpg JPG image
A02. Statement of Objectives_Raised Floor Panel Replacement.pdf PDF
104 FW Service Contract Procedures.pdf PDF
B04 SCA Wage Determination.pdf PDF
A02 SOO Attachment 2 - 104 FW Service Contract Procedures.pdf PDF
B08 RFQ W50S8123Q0009 Repair Raised Floor.docx DOCX document
A02 SOO Attachment 1 - Panel Design.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF OBJECTIVE (SOO)

FOR

Raised Floor Panel Replacement

1. Purpose

1.1. This Statement of Objective (SOO) is prepared in accordance with (IAW) Federal Acquisition Regulation (FAR) 37.602(c). The interested contractor shall prepare and propose a Performance Work Statement (PWS) using the information contained in this SOO.

1.2. Interested contractors shall propose performance standards in their PWS. The Government shall evaluate the proposed standards to determine if they meet agency needs.

2. Scope

2.1. This is a non-personal services requirement. The Government shall not exercise any supervision or control over the contractor performing services for this requirement.

2.2. The contractor shall provide all personnel, equipment, tools, materials, supervision, transportation, and quality control necessary to replace raised floor panels in Building 29 on Barnes Air National Guard Base (ANGB), Westfield, Massachusetts (MA). The Government shall not be responsible for providing any of the above-mentioned categories to the contractor, unless there is a mutual agreement for any Government Furnished Property (GFP). GFP is not anticipated for this requirement.

3. Period and Place of Performance

3.1. The Period of Performance (PoP) for this requirement shall be completed within 60 calendar days from the effective date of the award or in the contractor’s quote. This period shall allow for the contractor’s mobilization to the site and completion of services.

3.2. The work will be performed in a high security area. The contractor shall strictly follow prescribed access to the work site and minimize disruption to the base work force. Contractor shall be escorted by a Government employee at all times. Clean-up of work area will be accomplished daily. Contractor shall follow all security and parking requirements while on base accomplishing the specified work.

4. Background

4.1. The access floor in the Communications Squadron building has panels that are worn and need to be replaced. The existing system, Liskey Access Floors - The Mark 40 System, is in good condition and does not need any repairs.

5. Performance Objectives

5.1. The interested offeror shall prepare and propose a Performance Work Statement (PWS), which clearly explains their plan remove and dispose existing Raised Floor Tiles (about 2,000 SFT), replace removed tiles with new tiles (full and with cuts).

5.1.1. Estimate Quantities

5.1.2. 47 - BNCC; Full Panels = 280 +/-; Panels that need to be cut = 36 +/-

5.1.3. 47A – COMSEC Vault; Full Panels = 42; Panels that need to be cut = 13

5.1.4. 47B – Storage; Full Panels = 36

5.2. The contractor shall include timelines in their plan, so the Government can properly coordinate access to facilities and update senior leaders. The project timeline shall identify, at minimum, the date the work will start or be completed, how long the project will take, and how many hours, roughly the site will need to be accessed over that time.

5.3. The Contractor shall identify any/all subcontractor(s) to the Government, so proper vetting can be accomplished.

5.4. The Government shall inspect the contractor’s performance of this requirement throughout the entire PoP. This will ensure performance objectives are being completed according to the established standards.

5.5. The Government shall grant the contractor approval of completion during the final inspection of services. Once the services are approved during the final inspection, the contractor shall submit their final invoice for Government acceptance and approval.

6. Operating Constraints

6.1. Base Access: The contractor shall comply with all base access procedures detailed in Attachment 2—104 FW Service Contract Procedures. Please ensure procedures are followed to avoid unnecessary delays at the gate. The Government shall not be liable for any contractual delays resulting from base access requests, if the Contractor does not comply with the appropriate procedures.

6.2. Traffic: It is highly encouraged to the Contractor to become familiar with the transportation route and traffic patterns from Barnes ANGB.

6.3. Weather: This requirement is indoors, so adverse weather should not present challenges resulting in performance delay unless the weather impacts accessing the base. The Contractor shall keep the Government aware of any/all updates to performance timelines, should the weather cause potential performance delay.