A02 - SCHEDULE A-E.pdf
PDF 626 KB Posted
- Attached to
- ClockTower Complex HVAC Total Maintenance Federal contract opportunity
- Solicitation number
- W912EK20T0001
About this file
This document outlines the requirements for a total maintenance contract for HVAC equipment at the Clock Tower Complex. It includes schedules listing all HVAC equipment to be maintained by location, as well as requirements for safety plans, filter changes, boiler/chiller water treatment, control calibration, and spare parts. The solicitation is for the Department of the Army Corps of Engineers Engineering District Rock Island to provide HVAC total maintenance services at various buildings within the Clock Tower Complex including the Clock Tower, Annex, East Annex, and associated mechanical and electrical rooms. The contractor must have a minimum of ten years experience working with the control system types listed.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A22 - Solicitation W912EK21T0001- CLOCKTOWER HVAC.pdf | ||
| A03 - Quality Assurance Survelliance Plan.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE A
The following HVAC equipment was identified during our survey and will be covered as a part of the Programmed Maintenance. This list may not include all HVAC equipment. The contractor is required to perform programmed maintenance on all installed equipment within the Clock Tower, Annex, and East Annex.
CLOCK TOWER, ANNEX, and East Annex
Basement
1 Quincy Air Compressor
Model #QC05012D00039
Serial # 5112864
2 Electric Motors
1 Refrigerated air dryer
1 Bell & Gossett Pump 7.5 HP
1 Bell & Gossett Pump 5 HP
1 Exhaust Fan EF-205-B-1
Sprinkler Room
1 Small Quincy Air Compressor
1 Electric Motor 1HP
1st Floor Mechanical Room
12 Fan Power Boxes(Reheat) ATU-20S-1-1 thru 12 Serves Basement
22 VAV Boxes (No fan)
26 Baseboard radiators w/ 20 pneumatic valves
1 McQuay Air Handling Unit
Model # CAH040FDAC-Vision
1 Supply Fan Motor 20 HP
1 Unit Heater UH-205-1-1
1 Loren-Cook Return Air Fan
Model # 402SQIB
1 Return Fan Motor 15 HP
1st Floor - Kitchenette
1 Exhaust Fan EF-205-1-1
1st Floor North Entryway
1 Cabinet Unit Heater CUH-205-1-1
2nd Floor Mechanical Room
12 VAV Boxes (No fan)
19 Baseboard radiator w/ pneumatic valves
2 VAV Boxes w/ Reheat
1 Trane Air Handling Unit 1995
1 Supply Fan Motor 15 HP
1 Return Air Fan Motor 1.5 HP
3rd Floor Mechanical Room
17 VAV Boxes (No fan)
Zero Baseboard radiator w/ pneumatic valves
1 McQuay Air Handling Unit
Model #E717905010
1Supply Fan Motor 15 HP
1 Return Air Fan Motor 1.5 HP
3rd Floor Higher Area
3 Fan Coil Units
4th Floor
2 Fan Coil Units
1 Exhaust fan 1 HP (Serves Clock Tower Bathrooms)
The Crossover
1 Magicaire Hanging Unit air handler (Hot/cold Water)
1 Supply Fan Motor
ANNEX –IM (NORTH)
Above Women’s Room
1 Air Handling Unit (2-Zones)
1 Supply Fan Motor 7.5 HP
Construction and Conference Room
1 Air Handling Unit Construction Zone 4-2019
1 Supply Fan Motor 5 HP
1 Return Fan Motor 5 HP
2 Circulating Pumps
11 Fan Powered VAV Boxes
Large Computer Room
2 Liebert Computer Room Units
Model # DE116GUCAE1
Serial # 519440-002
2ea. Compressors 19.6 RLA
1ea. Supply Fan Motor
1ea. Reheat
1ea. Humidifier
1 Carrier (Residential Style) Air Handling Unit (A/C only)
Boiler Room -
1 A.O. Smith Commercial Water Heater
Model # OVE 80 100
Serial # 0922M000882
1 Bell & Gossett Pump Fractional HP
5 Lochinvar Hot Water Boilers
Model # KBN-801 NEW 2014
2 Bell & Gossett Pumps NEW 2014
Series# 1510 2BC
5 Bell & Gossett Boiler Pumps NEW 2014
Series E90 1.25 AAB
2 Bell & Gossett Hydraulic Loop Pump NEW 2014
Series# 1510 2.5 BB
2 Bell & Gossett Pumps (South Annex) NEW 2014
Series # 90 2A
1 Bell & Gossett Pump (Heating coil Mez.) NEW 2014
Series# E90 1.5AAB
1 Bell & Gossett Pump (North Annex Mez.) NEW 2014
Series# E90 1.5AAB
1 Quincy Air Compressor
1 Electric Motor 1 HP
1 Hankison Air Dryer
1 Cambridge Built-Up Air Handling Unit
1 Return Fan Motor 3 HP FAN-217-1-2
1 Chilled Water Return Pump CWP-217-1-2
1 Chilled Water Return Pump CWP-217-1-3
1 Auto Roll Filter system Change Annually
1 Condensate Pump (Basement)
1 Glycol Make-up Tank Pump 1/4 HP
Battery Room -
1 Exhaust Fan
1 Electric Motor 2HP
Outside – On ground (West)
2 Liebert Air Cooled Condensing Units
Model # DS0174Y 208/230
Serial # 0149C53627
2ea. Condenser Fan Motors ¾ HP ea
1 York package unit (West Side on the Ground)
4 Compressor
1 Condenser Fan Motor
1 Trane Air Cooled Chiller 460v.
Model # RAUCC604BX03A0D000020S
4 Compressors 26.3 RLAea.
6 Condenser Fan Motors
2 Small Liebert Air Cooled Condensing Units (serves units in ceiling)
Model#PFH037A-YL0
1ea. Compressor
1ea Condenser Fan Motor
1 Goodman Air Cooled Condensing Unit – Serves Carrier in main computer room
Model # GSC130603BB
Serial # 1105561048
1 Compressor 19.9 RLA
1 Condenser Fan Motor 1/4 HP
Attic-
1 Attic Exhaust Fan
2 Fan Motors
Entryway-
1 Small entryway heating unit
Chiller House –
1 McQuay Chiller 210 Ton
Model # AGS210DMSNN-ER10
Serial # STNU100300015
2 Compressors 163 RLA ea.
12 Condenser Fan Motors 2.5 HP ea.
2 large Pumps 20 HP ea. CPW-234-1-1, CPW-234-1-2
1 Dayton Hanging Unit Heater
Model # 3E349B
1 Electric Heat – 15.0 KW
1 Glycol Make-up Tank Pump 1/4 HP
Outside the Chiller House - (Covered by the Total Coverage Agreement)
1 York Packaged Unit 460v. Cooling/Vent Only -Serves South Annex
Model # ZJ300N30G4C1AAD1A1
Serial #
4 Compressors
4 Condenser Fan Motors
1 Supply Fan Motor
1 ATU-217-2-1
1 Nortec Humidifier Note: Under the maintenance agreement, Contractor will provide replacement Cylinders as required.
HDMF-217-2-1
Model # RES_DELUX
Serial # 2004821202E06
Smoker’s Shack
1 Exhaust Fan
1 Electric Fan Motor
1 air conditioner
Geological Shop
1 Trane Packaged Unit NEW 2017
Model # THC092F3R0A0G0EB00006000E0000D0000000000
Seral # 172910215L 208/230v.
1 Compressor 15.9 RLA
1 Compressor 10.0 RLA
1 Condenser Fan Motor 3/4 HP
1 Supply Fan Motor 2-3/4 HP
1 Chandler Refrigeration / Heatcraft Walk-in Cooler 460v. 3PH
Model # HBT0751L6DS R-507
Serial # A18M00008
1 Compressor 10.8 RLA
1 Condenser Fan motor 1/3 HP
1 Supply Unit
1 Evaporator Fan Motor
1 Mitsubishi Mini Split System 2017
Model # PUZ-A42NKA74 R-410A
Serial # 78U00668D
1 Compressor 8.0 RLA
2 Condenser Fan Motor 0.5 FLA ea.
1 Mitsubishi Indoor Ceiling Cassette SMAC-217-1-1
1 Supply Fan Motor Fractional HP
1 Air to air heat exchanger – located above the ceiling
1 Fan Motor
1 Exhaust Fan – Serves Fume Hood
1 Fan Motor – Belt Drive
Small Computer Room (EDH)
2 Liebert Units
Model # MME036E-PH1
Serial # 99002
Annex South
1 Fan Power VAV Box for
24 VAV Boxes
20 Blower Coil Units
1 New Fan powered VAV Supply for Jeff M’s office
ALL AUTOMATIC TEMPERATURE CONTROLS ASSOCIATED WITH THE
ABOVE LISTED EQUIPMENT IN THE PRESENT BUILDING COMPLEX.
EAST ANNEX (Bldg. 340)
Outside - South side of building
1 York Air Cooled Condensing Unit
Model # HB480C00A4DAA2B R22
Serial # B0B5651023 480v.
2 Compressors 19.2 RLA ea.
2 Condenser Fan Motors 1.5 HP ea.
2 Liebert Air Cooled Condensers
Model # PFH027A PL3 208/230v. 1PH
Serial # 0543N116317
1 Compressor 11.4 RLA
1 Condenser Fan Motor 1/5 HP
4 Liebert Air Cooled Condensers (Large)
Model # PFH096A-AL3 460v.
Serial # 0727N150618 R22
1ea. Compressor 10.0 RLA
1ea. Compressor 5.7 RLA
1ea. Condenser Fan Motor 3/4 HP
1 Mitsubishi Mini Split system R22 340-8-4
Model #MXZ30TN2 208/230v. 1PH
Serial # 52906970 D
1 Air Cooled Condenser
1 Compressor 15.0 RLA
1 Condenser Fan motor 1.0 FLA
1 York Air Cooled Scroll Condenser Unit 9/2007
Model
YCUL0066EB46XCBSDTXLXXRLXXXX45SX1XXXXXXXXXXXX3XXXLXNJ1
XXXX
Serial # RKSM019969 460v.3PH 407C
4 Compressors 23.7 RLA
4 Liebert Air Cooled Condensers
Model # PFH020A PL3 208/230v. 1PH
Serial # 0733N152784
1 Compressor 9.3 RLA
4 Liebert Air Cooled Condensers
Model # PFH020A PL3 208/230v. 1PH
Serial # 0733N152890
1 Compressor 9.3 RLA
Indoor –
1 Large York Air Handling Unit
Model # XTI-069X096-FAMA046 460v.
Serial # AMPMXT0114 340-1-1
3 Belts B40
Hot water coil
4 Liebert Air Handling Units
Model # MMD96E-AH0L0S96
1ea Supply Fan Motor 8 Ton
1ea. Humidifier
10 Liebert Air Handling Units 208/230v
Model # 156024G1
1ea Supply Fan Motor 1.5 HP
1ea Belt A40
5 Tube Heaters 1 per garage bay
1ea. Natural Gas Burner
1ea Fan Motor
15(all) VAV Boxes
West Mechanical Room
2 Thermal Solutions Boilers 460v. 3PH 6/2007
Model # EVA0750BN1
Serials 64990582, 64990581
750,000 BTU Each
2 Bell & Gossett Pumps 5 HP ea.
1 Rheem Power Direct Vent Water Heater 40 Gal.
Model # PDV40 WHE-340-1-1
Serial # RHLN0210901722
1 Natural Gas Burner 40,000 BTU
1 Large York Air Handling Unit 340-1-5-11
Model # XTI-075X099-AAAA0*A 460v.
Serial # AHSMXT0117
1 Supply Fan Motor 20 HP
2 Belts A44
Hot water coil
East Mechanical Room
2 Thermal Solutions Boilers 120v. 1PH 8/2005
Model # EVA0500BN1
Serials 64816099, 64816098
750,000 BTU Each
2 Baldor Pump Motors 1.5 HP
1 Cyclone A.O. Smith Commercial Water Heater
Model # BTH 120 970
Serial # M06M000098
1 Natural Gas Burner 125,000 BTU 2006
Garage
1 Cyclone A.O. Smith Commercial Water Heater
Model # BTH 120976
Serial # M06M000357
1 Natural Gas Burner 125,000 BTU 2006
South Side Electrical Room (outside door for access)
2 Mitsubishi Mini-split indoor supply heads
Model #
Serial #
1ea. Supply Fan Motor
Rooftop
1 Cook Exhaust Fan 2005
EF1 Model # 60 ACE 60C2B
Serial # 068S857282-00/0000701
1 Fan Motor 1/6 HP 80 CFM
EF2 Model # 70 ACE 70C2B
Serial # 068S857282-00/00002001
1 Fan Motor 1/6 HP 150 CFM
EF3 Model # 100 ACE 100C3B
Serial # 068S857282-00/0003301
1 Fan Motor 1/4 HP 600 CFM
EF4 Model # 120 ACE 1203B
Serial # 068S857282-00/0004601
1 Fan Motor 1/4 HP 985 CFM
1 Cook Exhaust Fan 2007
EF340 Model # 80 ACE 8003B
Serial # 068S951729-00/0000701
1 Fan Motor 1/4 HP 525 CFM
SCHEDULE B
SAFETY PLAN
The Contractor shall submit a Safety Plan for in accordance with the PWS.
SCHEDULE C
FILTER SCHEDULE
Furnish and install replacement media for the following air filters.
All Air Handling Units and Packaged units - Make FOUR (4) media changes per annum.
All VAV boxes (where applicable) and fan coil units - Make TWO (2) media changes per annum.
IT IS FURTHER AGREED that should experience show that additional or more frequent changes are required such charges will be made after mutual consent at the established selling prices per additional filter changes.
SCHEDULE D
BOILER/CHILLER WATER TREATMENT:
Provide water treatment service on the following heating water and chilled water systems including the services listed below:
MAKE MODEL TYPE
1 TRANE RAUCC60 Listed on Schedule A
1 MCQUAY STNU1003 Listed on Schedule A
5 Lochinvar KBN801 Listed on Schedule A
a. To make an analysis of the heating water and chilled water systems to determine the proper kind and amount of additives needed.
b. To furnish needed additives in the amounts required.
c. To provide the necessary labor to inspect the heating water and chilled water systems as required.
d. To furnish the necessary labor to add the correct compounds (chilled water shall be 30% propylene glycol solution).
e. To make periodic water analysis and submit a report of our findings to the Government.
SIDE STREAM FILTERS:
The contractor shall monthly, during the heating season, check the condition of the hot water system side stream filters, and clean or replace the filter bags as required. Replacement filter bags shall be
Neptune 20-micron nylon mesh. The filters to be maintained are: SSF-205-B-1, SSF-217-1-1, SSF-217-1-2, and, SSF-217-1-3.
The contractor shall monthly, during the cooling season, check the condition of the chilled water system side stream filters, and clean or replace the filter bags as required. Replacement filter bags shall be
Neptune 20-micron nylon mesh. The filters to be maintained are: SSF-217-1-4 and SSF-234-1-1.
SCHEDULE E
CONTROL CALIBRATION: The contractor shall have a minimum of ten years of experience with the types of building automation system (BAS) controller types (i.e. – Robert Shaw, BACnet, and LON) and standalone controls (i.e. – Johnson Controls parallel fan box controllers) listed in ATTACHMENT A. The contractor shall have access to the desktop PC in the Annex computer room which has the BAS programming software and access to the BAS graphic screens. Remote access will not be provided. The contractor shall calibrate and verify the operation of the following types of control systems:
1. Mechanical Operated Components: Calibrate mechanical devices annually. Components used for cooling equipment shall be calibrated at the beginning of the cooling season and components used for heating shall be calibrated at the beginning of the heating season.
A. Check the calibration of all system pressure gauges with a pressure gauge that is calibrated correctly. If the system pressure gauge is out of calibration, adjust if possible. Otherwise, replace the system pressure gauge.
B. Check the calibration of all system temperature gauges with a temperature gauge that is calibrated correctly. If the system temperature gauge is out of calibration, adjust if possible. Otherwise, replace the system temperature gauge.
C. Check the calibration of all system thermometers with a thermometer that is calibrated correctly. If the system thermometer is out of calibration, adjust if possible. Otherwise, replace the system thermometer.
D. Flow meters shall be calibrated using the differential pressure across a balancing valve. Use the appropriate manufacturer’s literature to calibrate the flow meters.
2. Pneumatic Operated Controls: Calibrate pneumatic control devices annually. Components used for cooling equipment shall be calibrated at the beginning of the cooling season and components used for heating shall be calibrated at the beginning of the heating season.
A. Check main control air pressure at all control panels and adjust as required. If main control air pressure cannot be adjusted properly, check all pneumatic tubing and other devices upstream to determine the problem and repair.
B. Operate all pneumatic controlled devices to their full range of operation. If a device will not move its full range of operation either repair or replace as required.
C. Check all temperature control air filters. Clean or replace filers if required. Drain water from temperature control air filters.
D. Inspect all pneumatic actuators for condition. If an actuator appears to be poor condition, disassemble it and verify its condition. Repair or replace as required to maintain operation.
E. Calibrate all pneumatic room thermostats and adjust set points. Operate the thermostat to be sure it will control the pneumatic components controlled by it to their full range.
3. Electric Operated Controls: Calibrate electric control devices annually. Components used for cooling equipment shall be calibrated at the beginning of the cooling season and components used for heating shall be calibrated at the beginning of the heating season.
A. Operate all electric controlled devices to their full range of operation. If a device will not move its full range of operation either repair or replace as required.
B. Calibrate all electric room thermostats and adjust set points. Operate the thermostat to be sure it will control the components controlled by it to their full range.
C. Inspect all electric actuators for condition. If an actuator appears to be poor condition, disassemble it and verify its condition. Repair or replace as required to maintain operation.
4. DDC Systems: Calibrate DDC system components annually. Components used for cooling equipment shall be calibrated at the beginning of the cooling season and components used for heating shall be calibrated at the beginning of the heating season.
A. Verify the calendar schedule is correct and the clock within the computer is correct. If these items are not correct, adjust or contact personnel capable of changing the DDC schedule.
B. Check all control sequences by operating them to their full range of operation. Adjust sequences or contact personnel who can change sequences.
C. Calibrate all temperature and pressure sensors. Adjust sensors or replace as required.
D. Create back-up files for all control sequences
File details come from the government source that posted it. Updated .