A02. SMYU20-1009 Project Drawing.pdf
PDF 2 MB Posted
- Solicitation number
- W91QVN20R0140
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A21. W91QVN-20-R-0140.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHT. NO. REF. NO.
1 OF 3 T-1
20F3 C-1
3 OF3 C-2
X
REPAIR STORM DRAINAGE SYSTEMS, C DIAMOND (SECONDARY CHANNEL)
SMYU20-1009
DRAWING SCHEDULE
DESCRIPTION
COVER SHEET
SITE PLAN - NORTH AREA
SITE PLAN - SOUTH AREA
CHIEF OF DESIGN
CHIEF OF CONTRACT
ENVIRONMENTAL COORDINATION
CONSTRUCTION MANAGEMENT
THIS FACILITY CONTAINS NO ASBESTOS
CHIEF, OPERATIONS FLIGHT ENVIRONMENTAL FLIGHT
THIS FACILITY CONTAINS ASBESTOS, AREAS WILL NOT BE DISTURBED BY THIS PROJECT
THIS FACILITY CONTAINS ASBESTOS, GOVERNMENT WILL ABATE PRIOR TO CONTRACT AWARD CHIEF, PROGRAMS FLIGHT FIRE DEPARTMENT
THIS FACILITY CONTAINS ASBESTOS, CONTRACTOR IS RESPONSIBLE FOR ABATEMENT
BASE CIVIL ENGINEER
�-THIS PROJECT
PROJECT SITE
NOT TO SCALE
COMMUNICATIONS
BIOENVIRONMENT AL ENGINEERING
SAFETY
SECURITY POLICE
USER
DEPARTMENT OF THE AIR FORCE
51st CIVIL ENGINEER SQUADRON (PACAF)
APO AP96266
OSAN AB, REPUBLIC OF KOREA
REPAIR STORM DRAINAGE SYSTEMS, C DIAMOND
(SECONDARY CHANNEL)
AS SHOWN
COVER SHEET
PROJECTNO,
SMYU20-1009
T-1
File details come from the government source that posted it. Updated .