A02.14_DOR_CMB_StabilityChamber 25APR25.pdf

PDF 82 KB Posted

Attached to
Stability Chamber
Solicitation number
W912HZ25Q8243
Issued by

About this file

This document is a Description of Requirement (DOR) for a Stability Chamber for the U.S. Army Engineer Research and Development Center's Cement and Pozzolan Laboratory. The solicitation (W912HZ25Q8243) seeks a specialized environmental chamber with specific technical requirements, including maintaining 95% relative humidity at 23.0 ± 2.0 °C, 208v & 60 Hz electrical supply, minimum 45 cubic feet of internal storage, stainless steel wire shelves, and no glass door. The chamber must have maximum dimensions of 60 in wide x 40 in deep x 82 in tall and be delivered within 15 business days of contract award to the Vicksburg, MS facility.

The procurement is a 100% small business set-aside using NAICS code 333415 with a size standard of 1,250 employees. The solicitation will be awarded based on lowest price and technical capability, with offerors required to submit detailed technical descriptions, unit pricing, and compliance documentation. Offers must be submitted via email to Janalyn.H.Dement@usace.army.mil, with vendors needing to be registered in the System for Award Management (SAM) to be considered. The government intends to award the contract without discussions, expecting initial offers to represent the best technical and pricing terms.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Description of Requirement

Stability Chamber

Specifications:

The Cement and Pozzolan Laboratory within the Concrete and Materials Branch (CMB) of the Geotechnical and Structures Laboratory (GSL) of the US Army Engineer Research and Development Center (ERDC) requires a stability chamber for curing and storage of testing specimens. Stability chambers are specialized equipment that will maintain specific environmental conditions by controlling temperature and humidity at precise levels as to follow ASTM and other standards

The chamber selected must meet or exceed the following requirements:

1. Maintain a minimum of 95% relative humidity at 23.0 ± 2.0 °C

2. 208v & 60 Hz electrical supply

3. Minimum of 45 cubic feet of internal storage

4. Must come with stainless steel wire shelves

5. No glass door

6. Maximum overall dimensions of 60 in wide x 40 in deep x 82 in tall

7. Must be delivered within 15 business days of contract award date

8. Shipping and all fees must be included in quote

Delivery Location:

U.S. Army Engineer Research and Development Center 3909 Halls Ferry Road Bldg 6000 Vicksburg, MS 39180

Delivery Date:

The chamber must be delivered within 15 business days of contract award date.

File details come from the government source that posted it. Updated .