A01.12 Draft PWS 09Dec2020 Task Order Seed MEGA MATOC - Ft Douglas.pdf

PDF 2 MB Posted

Attached to
$50M MEGA MATOC ERS for FUDS Ft. Douglas
Solicitation number
W91238-21-R-0021
Issued by

About this file

This sources sought synopsis seeks information from industry to support preliminary planning for a $50 million Multiple Award Task Order Contract (MATOC) for environmental remediation services at sites in California, Nevada, and Utah. The base MATOC will award indefinite delivery indefinite quantity contracts for a wide range of services, and a seed task order is included for a remedial investigation, feasibility study, proposed plan, and decision document at Fort Douglas in Utah. Responses to the synopsis are due by December 16, 2020 and must include company information, two relevant project examples, business size, and joint venture details if applicable. Responses should be limited to five pages and sent to the specified Army Corps of Engineers points of contact.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement 1

Remedial Investigation / Feasibility Study / Proposed Plan / Decision Document 2 Impact Area Munitions Response Site, Fort Douglas 3

Salt Lake County, Utah 4

FUDS Project No. J08UT110801 5

9 December 2020 7

OBJECTIVE: 9

The overall objective of this task order (TO) is to perform a Remedial Investigation (RI), and if required due to 10 existing or potential risk to human health and the environment by the site prepare a Feasibility Study (FS), a 11

Proposed Plan, and a Decision Document in compliance with the Comprehensive Environmental Response, 12

Compensation, and Liability Act (CERCLA), as amended, and in accordance with Department of Defense (DoD), 13 Department of the Army (DA), and United States (US) Army Corps of Engineers (USACE) Regulations and Guidance. 14

The RI shall characterize site conditions of the Munitions Response Site (MRS) to define the nature and extent of 16

Munitions and Explosives of Concern (MEC) and Munitions Constituents (MC) contamination and assess the MEC 17 and MC risk to human health and the environment. The FS, if required, shall develop Remedial Action Objectives 18

(RAOs) specific to the conditions that exist, or can reasonably exist in the future throughout the site, and evaluate 19 remedial alternatives against the nine criteria stated in the National Contingency Plan (40CFR300.430(e)(9)). The 20 proposed remedy shall be presented in the Proposed Plan and selected in a Decision Document. 21

Work under this Performance Work Statement (PWS) falls within the Military Munitions Response Program 23

(MMRP) for the Impact Area Munitions Response Site, Fort Douglas, a Formerly Used Defense Site (FUDS), Project 24 Number J08UT110801. The Contractor shall perform all work in accordance with the references listed in 25

Attachment 1. 26

BACKGROUND: 27

Camp Douglas was established as an Army post on October 26, 1862, and the name was changed on December 30, 28 1878, to Fort Douglas. Jurisdiction over 9,190 acres of land was ceded to the U.S. by the Governor of Utah in 1904. 29

The net area of the installation subject to the Findings and Determination is the 7,898.12 acres of Fort Douglas as 30 of 24 December 1941, which included 3,343.31 acres acquired in fee and 4,554.81 acres acquired by transfer. Fort 31 Douglas was established as an Army post and was declared a military installation by an Executive Order on 32

September 3, 1867. Government construction and improvements included 137 buildings, including training, 33 storage and administrative structures, family housing, and miscellaneous support facilities and utilities. In the later 34

1960s, the mission of the facilities was to support active Army and Armed Forces Reserve component training in 35 Utah, Idaho and Montana. Portions of the property were transferred to other entities beginning in 1874. The 36 majority of the area was disposed in the late 1940s and mid-1960s. Portions of Fort Douglas were conveyed to Salt 37

Lake City, the U.S. Department of the Interior, the State of Utah, the University of Utah, the Veterans 38

Administration, the U.S. Navy, the Shriners Hospital for Crippled Children, and the U.S. Department of Agriculture. 39 Currently, the property is owned by various entities, including those aforementioned, and many private 40 individuals. Two areas are still in active use by the Department of Defense and therefore not eligible for the 41

Formerly Used Defense Site program. These areas are a Naval and Marine Corps Reserve Center (approximately 15 42 acres) and an area of the former Fort Douglas occupied by the U.S. Army Reserve 96th Regional Support Command 43

(approximately 51 acres). According to the Preliminary Assessment of Eligibility for the Fort Douglas Toxic Exercise 44

Area (J08UT1103), 3651.22 acres of the original Fort Douglas acreage were found to be eligible as separate FUDS 45

Property. Therefore, the net eligible area under this property is 4,246.9 acres. 46

The 1,459-acre Impact Area MRS is in Salt Lake County, Utah and encompasses the land rising from eastern Salt 48

Lake City onto the front slopes of the Uinta-Wasatch-Cache National Forest. The MRS was used by the Army to 49 train infantry, cavalry, and artillery units between 1862 and the late 1960s. The MRS consists of the artillery 1 impact areas in the mountains. Munitions known or suspected to have been used on the MRS including small arms 2 munitions, grenades, rockets, riot control agents, bombs, illumination signals, and small and large caliber artillery 3 and mortar rounds. No MEC was observed during the Site Inspection (SI) field activities. However, MD including 4 the (inert) fuze assembly for a 3.5- inch diameter rocket, fragments of 37mm projectiles, expended .30 caliber ball 5 munitions, expended .50 caliber ball munitions, and two copper jackets from small arms were observed. MEC/MD 6 have historically been reported at the MRS. Based on the SI qualitative MEC risk evaluation, there is the potential 7 for an explosive safety risk at the MRS. 8

Several explosive ordnance disposal incident reports linked to Fort Douglas have been reported. These include 10 findings which involve 60mm practice mortars, a 12-in HE Stokes mortar, an 81mm mortar, a practice grenade, and 11 a cache of roughly 500 pre-World War II small arms rounds. Most of the area associated with the Impact Area MRS 12 is an uninhabited, national forest and mountainous land controlled primarily by the USDA Forest Service. A small 13 portion of the MRS runs along the eastern side of the University. Access to the MRS is unrestricted. 14

2.1 Additional site-specific information provided on Fort Douglas FUDS includes: 15

Inventory Project Report (INPR) 16

Archives Search Report (ASR) 17 Site Inspection (SI) Report 18

Geographic Information System (GIS) files 19

Results of Systematic Project Planning sessions 1 and 2 (see Attachment 2). 20

2.2 Draft Uniform Federal Policy Quality Assurance Project Plan (UFP-QAPP) Worksheet #10, Conceptual Site 21 Model (CSM), and Worksheet #11, Data Quality Objectives steps 1 through 4 is provided in Attachment 2. 22

The worksheet identifies: 23

RI and FS problem statements as they are currently understood; 24 The goals of the data collection for the RI and FS as they are currently understood; 25

The information inputs that have tentatively been identified to fill data gaps in the preliminary CSM and 26 answer the RI and FS study questions; and 27

The boundaries of the project as they are currently understood. 28

GENERAL REQUIREMENTS: 29

3.1 Contractor Methods: This is a performance-based task order. The performance objectives and standards 30 included herein are the basis of the task order requirements. The technical approach and level of effort 31 expended to achieve task order objectives and standards are the responsibility of the Contractor. The 32

Government recognizes the contractor’s right to change the technical approach and level of effort from that 33 originally proposed. Any such changes shall be made in accordance with the approved UFP-QAPP; and shall 34 meet all project objectives and gain Government Quality Assurance acceptance in order to receive 35 payment. 36

3.2 Quality monitoring: The contractor will be evaluated periodically during performance of this task order to 37 ensure compliance with the proposed and accepted performance goals, regulations, guidance, and to 38 document that acceptance criteria, performance metrics, delivery schedule, and the overall schedule for 39 completion is being met. This evaluation will be performed according to the Quality Assurance Surveillance 40

Plan (QASP) provided in Attachment 3. Failure to adequately complete any service or product to at least a 41 satisfactory level of quality or timeliness may result in a repeat of the work, and/or a less than satisfactory 42 performance evaluation, or both. 43

3.3 Performance Standards: Performance standards are addressed in each task. 44

3.4 Task Incentives/Disincentives: Satisfactory or greater Contractor Performance Assessment Reporting 45

System (CPARS) rating/ less than satisfactory CPARS rating and re-performance of work at contractor’s 46 expense. 47

3.5 Acceptance Criteria: Task will be considered complete and acceptable once all objectives are achieved, all 1 minimum quality requirements are met, and all task-specific deliverables receive Army approval, through 2 the Contracting Officer’s Representative (COR). 3

3.6 Document review and approval: The USACE COR is the approval authority on all deliverables. The schedule 4 for document reviews shall be in accordance with the deliverable schedule included as Attachment 4. 5

3.7 Task pricing: A pricing schedule is provided in a separate file. 6

3.8 Contracting Officer Requirements: Only a warranted Contracting Officer (either a Procuring Contracting 7

Officer (PCO) or an Administrative Contracting Officer (ACO)), acting within their delegated limits, has the 8 authority to issue modifications or otherwise change the terms and conditions of this contract. The 9 contractor shall accept directions only from the USACE Contracting Officer (KO) or the duly authorized COR. 10 Requests made directly to the contractor by anyone other than the KO or COR will be immediately brought 11 to the attention of the KO and COR. The KO must authorize any changes to the project scope or other 12 provisions of this PWS in writing. In the event the contractor makes any changes at the direction of any 13 person other than the KO, the change will be considered to have been made without authority and no 14 adjustment will be made in the contract price to cover any increase in costs. 15

3.9 Security Requirements: 16

Pre-screen candidates using E-verify Program. The contractor must pre-screen candidates using the E-17 verify Program http://www.dhs.gov/E-verify website to meet the established employment eligibility 18 requirements. The vendor must ensure the correct information is entered into the E-verify system. An 19 initial list of verified/eligible candidates must be provided to the COR no later than 3 business days after 20 the initial contract award. Update list as candidates are added to the team. 21

3.10 For each project the contractor shall prepare one UFP-QAPP and one remedial investigation report. If a 22 project contains multiple munitions response sites, the contractor shall prepare separate feasibility 23 studies, proposed plans, and decision documents for each one. 24

Specific Tasks 25

4.1 Task 1, Project Management and Systematic Project Planning (CLIN 0100): This is a Firm Fixed Price task. 26

4.1.1 Objectives: Prepare and execute a Project Management Plan (PMP) and implement Systematic Planning 27

Process (SPP) in order to design a RI and, if required due to existing or potential risk to human health and 28 the environment by the site, prepare a FS. 29

4.1.2 Performance Standards: 30

Prepare the PMP in accordance with Engineer Regulation (ER) 5-1-11 and Engineer Manual (EM) 200-1-31

15. 32

Throughout the lifecycle of the project, manage in accordance with the approved PMP. 33

Contractor plans meetings to effectively meet schedule and to keep Government updated on 34 performance of tasks. 35

Meetings address all requirements per PWS, are conducted professionally, and are productive and 36 necessary. 37

Meeting materials are received by the Government at least 36 hours prior to meeting. (Meetings may be 38 cancelled or rescheduled if meeting materials are delivered late.) 39

Submit meeting minutes within 7 days of meeting and resubmit revisions as requested within 7 days of 40 receiving corrections. 41 All changes in plans are communicated to Government and include safety considerations and risk 42 mitigation. 43

QASP remains up to date and accurate through coordination between the Contractor and the 44

Government. 45 Updates to the QASP recommended to the Government within 30 days of changes to scope, approach or 46 work plan 47

Achieve the objectives of each SPP phase referring to the “Munitions Response-QAPP Toolkit Module 1: 1

Remedial Investigation (RI)/Feasibility Study (FS),” also known as “MR-QAPP”, UFP-QAPP Manual and 2 Worksheets, EPA QA/G-4, EM 200-1-15 and applicable Interim Guidance Documents. 3

Provide monthly progress reports that include the following for each project: updated schedule, 4 explanation of schedule changes and anticipated impact on performance of requirements, status of 5 action items from previous month, summary of any meetings held during previous month, task status 6 (planned, in progress, completed), changes in personnel, safety report, and percent (dollars) complete for 7 contract. Monthly reports shall be provided to the USACE PM (and any additional team members 8 identified by the USACE PM) by the 6th day of the following month. 9

Deliverables are accurate, contain the most current information, meet all requirements of the task per 10 the PWS and are submitted on time as per the deliverables schedule. 11

Assessments, evaluations, analyses, and recommendations are thorough, reliable, clearly presented. 12

4.1.3 Specific Task Requirements: 13

4.1.3.1 Project Management General (CLIN 0101) 14

Prepare for and attend a project kick-off meeting, to be conducted virtually. Meeting shall include, at a 15 minimum, the Contractor’s project manager, project geophysicist, and program geophysicist. 16 Prepare, submit, and gain USACE approval of a PMP that is detailed and comprehensive covering all 17 aspects of the Task Order, including payment milestones. This document is a living document and shall be 18 updated as necessary. 19 Coordinate with the Government on maintaining the Quality Assurance Surveillance Plan since Quality 20

Assurance Surveillance is dependent upon technical approach. Upon Government acceptance of PMP and 21

UFP-QAPP and after scope changes to the TO (such as an option is exercised), propose surveillance 22 methods and procedures (who, what, where, when) for updated tasks. 23 Prepare for and attend in-progress review (IPR) meetings. IPR meetings shall include but are not limited 24 to, regular feedback to the Government, as determined in the PMP, on the progress of its work through 25 email and regularly scheduled telephone conversations. 26

Provide monthly progress reports that include the following for each project: updated schedule, 27 explanation of schedule changes and anticipated impact on performance of requirements, status of 28 action items from previous month, summary of any meetings held during previous month, task status 29

(planned, in progress, completed), changes in personnel, safety report, and percent (dollars) complete for 30 contract. Monthly reports shall be provided to the USACE PM (and any additional team members 31 identified by the USACE PM) by the 6th day of the following month. 32

4.1.3.2 Systematic Project Planning (CLIN 0102) 33

Utilize the SPP process to finalize project-specific DQOs; the MEC and MC CSMs; and all UFP-QAPP 34 worksheets. 35

Plan for meetings to occur in accordance with Figure 9-1 of the MR-QAPP. Planning sessions #1 and #2 36 have been conducted and the draft Worksheet #10 and Worksheet #11 are provided in Attachment 2. 37

Planning sessions #3, #4, #5, and #6 are required to be facilitated by the Contractor. Assume that two 38 meetings will be one-day, in-person meetings, and two will be conducted virtually. The Contractor may 39 propose to deviate from the structure of the MR-QAPP if the basis for deviation is justified and accepted 40 by the Government. 41 Prepare and submit for acceptance an Abbreviated Accident Prevention Plan (AAPP) if a site visit is 42 planned prior to acceptance of UFP-QAPP. 43

Submit meeting materials at least two weeks in advance (three weeks recommended to allow sufficient 44 time to respond to comments, gain approval, and provide to stakeholders at least one workday before 45 the meeting). Meetings held are organized; accomplish requirements of the SPP process; and are 46 conducted in a professional manner. 47

Organize and coordinate all meetings; involve all stakeholders, upon approval by the Government; and be 48 responsible for the logistics of these meetings to include, but not limited to, providing a facilitator, 49 obtaining meeting location, and sending invitation letters (pending Government review and acceptance). 50

Use the UFP-QAPP Worksheet #9 to document SPP meetings and outcomes. 51

Utilize statistical methods (such as Visual Sample Plan (VSP) software) to support the decision-making 1 processes used to characterize both MEC as well as munitions MC. 2 Include process of considering, incorporating, documenting, and evaluating the benefits of green and 3 sustainable remediation (GSR) practices Pursuant to the DoD Memorandum “Consideration of Green and 4

Sustainable Remediation Practices in the Defense Environmental Restoration Program” (DoD, 2009) and 5

EP 200-1-10, Green Building Technology in Hazardous Waste Cleanup Applications, GSR employs 6 strategies throughout the remedial process that: 7

- Use natural resources and energy efficiently; 8

- Reduce negative impacts on the environment; 9

- Minimize or eliminate pollution at its source; 10

- Protect and benefit the community at large; and 11

- Reduce waste to the greatest extent possible 12

4.1.3.3 Additional In-Person Planning Meeting (CLIN 0103) (OPTIONAL TASK): This is a Firm Fixed Price task. 13

Submit meeting materials at least two weeks in advance and gain approval of meeting materials at 14 least five (5) federal working days prior to the meeting. Meetings held are organized; accomplish 15 requirements and goals set by USACE PM; and are conducted in a professional manner. 16

Organize and coordinate meeting; involve all stakeholders in coordination with and upon approval by 17 the Government; and be responsible for the logistics of these meetings to include, but not limited to, 18 providing a facilitator, obtaining meeting location, sending invitation letters (pending Government 19 review and acceptance), taking meeting minutes and coordinating acceptance of those minutes by all 20 attendees, and providing digital or paper presentations. 21

4.2 Task 2, Project Documents (CLIN 0200): This is a Firm Fixed Price task. 22

4.2.1 Objective: Prepare, submit and gain USACE acceptance of a UFP-QAPP, Accident Prevention Plan 23

(APP)/Site Specific Health Plan (SSHP), and Explosive Site Plan (ESP). 24

4.2.2 Performance Standards: 25

Prepare the UFP-QAPP in accordance with Intergovernmental Data Quality Task Force UFP-QAPP Manual 26 and Worksheets (March 2012) and the MR-QAPP; EM 200-1-15; EM 385-1-1; EM 385-1-97 including 27

Errata Sheets and Changes; General Data Validation Guidelines and the State of Utah regulatory guidance, 28 as appropriate. Contractor shall also enter data into FUDSChem. 29

See Attachment 5 for crosswalk for Optimized UFP-QAPP and MR-QAPP worksheets. 30

UFP-QAPP content related to MC shall meet the requirements of DoD Quality Systems Manual (QSM) for 31 Environmental Laboratories (current version). 32

The APP/SSHP must be approved by the government before field work can commence. 33

Prepare required submission in accordance with DESR 6055.09, Edition 1, EM 385-1-97, and Errata Sheet 34

#3 as a standalone document. 35 Deliverables are accurate, contain the most current information, meet all requirements of the task per 36 the PWS and are submitted on time as per the deliverables schedule. 37

Drafts contain 5 or fewer grammar plus spelling errors. 38

4.2.3 Specific Task Requirements: 39

4.2.3.1 UFP-QAPP (CLIN 0201) 40

Include a phased approach for the MC elements of the UFP-QAPP, address contaminants of interest, 41 sample media (soil/groundwater/sediment/surface water/air), background, and methods that will be 42 utilized to ensure that data generated are of an acceptable quality for its intended use. The contractor 43 shall discuss quantity, quality and the methods used to verify adherence to the precision, accuracy, 44 representativeness, comparability, completeness, and sensitivity (PARCCS) parameters for sample 45 collection, handling, laboratory analysis, verification and validation. 46

For MC, prepare a risk assessment work plan as part of the overall project work plan incorporating 47 implementation of the risk assessment and methodologies per USEPA Risk Assessment Guidance for 48 Superfund (RAGS), State regulatory guidance, and USACE EM 200-1-4, Volumes I and II, as appropriate; 49 and for MEC in accordance with the 7 February 2019 HQUSACE memorandum, “Subject: Trial Period 50

Extension for Risk Management Methodology (RMM) at Formerly Used Defense Sites (FUDS) Military 1

Munitions Response Program (MMRP) Projects.” 2 Provide a firewall plan that assures all seeding information cannot be viewed or otherwise obtained by, or 3 made available to any personnel except those inside the firewall. Appropriate personnel shall be 4 identified as part of the SPP process and include communication drivers with stakeholders. 5

Supplement the UFP-QAPP with standard operating procedures (SOPs) associated with the remedial 6 action. Examples: Additional Project Tasks (e.g., Biological and Cultural) & SOP’s not listed in MR-QAPP 7

Module 1, e.g., utility permits (if required), evacuation and establishing controlling exclusion zones, 8 vegetation removal, surface removal of MEC, MD, MPPEH, RRD, reacquisition of anomalies, intrusive 9 investigation of near surface anomalies, blow in place MEC items, and MEC consolidation. SOP’s that 10 would be expected to be included: anomaly avoidance, brush clearing, civil surveying, surface clearance & 11 intrusive operations for near surface anomalies, demolition operations, explosives management. These 12 can be individual SOP’s or combined into single MMRP Field operations SOP. 13 Include a section after the title page that illustrates the changes made to the “black” text from the MR-14

QAPP, module 1, template. The rationale for these changes must be specifically identified, documented, 15 and concurred upon by the project team. 16

Incorporate all requirements from the Cultural and Biological Resources Work Plan into the UFP-QAPP 17 prior to regulatory review of the Draft Final UFP-QAPP. 18

Attach all approved Cultural and Biological Technical Memorandums to the approved UFP-QAPP. Note: 19

The Contractor must adhere to the Freedom of Information Act and Section 304 of the NHPA so some or 20 all of the Cultural Technical Memorandums may be excluded from this requirement as determined by the 21 USACE Archaeologist. 22

The Contractor shall submit the draft UFP-QAPP and subsequent revisions to Army for review and 23 approval, through the USACE PM, until the final UFP-QAPP is accepted. 24

4.2.3.2 APP/SSHP (CLIN 0202) 25

The contractor will prove with all pertinent provisions of the latest version of the U.S. Army Corps of 26

Engineers Safety and Health Requirements Manual, EM 385-1-1. 27

The level of detail provided in the APP/SSHP shall be tailored to the type of work, complexity of 28 operations to be accomplished, and the hazards anticipated. 29

The contractor shall ensure that its subcontractors, suppliers, and support personnel comply with the 30 approved APP/SSHP at no additional cost to the Government. 31 Ensure that its subcontractors, suppliers, and support personnel comply with the approved APPs/SSHPs at 32 no additional cost to the Government. 33

4.2.3.3 ESP (CLIN 0203) 34

Obtain approval of the document from the Environmental and Munitions Center of Expertise (EM CX), 35 U.S. Army Technical Center for Explosives Safety (USATCES), and the Depart of Defense Explosives Safety 36

Board (DDESB). 37

Designate a single individual who shall work directly with the designated Project Lead OESS in order to 38 quickly and smoothly route the document through each of the reviews. This document will be in 39 electronic format only and not staffed through the Project Delivery Team (PDT), except for the designated 40

OESS. It will be reviewed by the Project Lead OESS, EMCX, U. S. Army Technical Center for Explosives 41

Safety (USATCES), and DDESB, with possible comments and changes required numerous times from each 42 reviewer. The designated OESS will orchestrate all the reviews. The document will not be labeled Draft, 43

Draft-Final or Final. 44

Once final approval is obtained, copies of the ESP along with all approvals will be combined into one 45 document and provided to the USACE PM and the ESP shall be added to the QAPP as an appendix. No 46 fieldwork shall begin without an approved ESP. 47

4.3 Task 3, Community Relations Support (CLIN 0300): This task is a Firm Fixed Price task. 48

4.3.1 Objectives: Prepare, submit and gain USACE acceptance of a CRP, also known as a Public Involvement 49

Plan (PIP). Successfully complete public meetings and support the USACE Sacramento District with 50 community relations. 51

4.3.2 Performance Standards: 1

Prepare the CRP in accordance with EP 200-3-1, ER 200-3-1, EP 1110-1-18, guidance provided in the FUDS 2 Public Involvement Toolkit and the DENIX UXO Safety Website, http://denix.osd.mil/uxo/. 3

Conduct community relations in accordance with the accepted CRP. 4

Deliverables are accurate, contain the most current information, meet all requirements of the task per 5 the PWS and are submitted on time as per the deliverables schedule. 6 Drafts contain 5 or fewer grammar plus spelling errors. 7

4.3.3 Specific Task Requirements: 8

Assist in planning and facilitating three (3) public meetings. These meetings are different from and in 9 addition to SPP meetings but should be scheduled at the same time as SPP meetings whenever possible 10 for efficiency. Meetings shall be held near the project site; specific location to be determined as part of 11 the CRP development. Support shall include providing a meeting facilitator, preparation and delivery of 12 briefings, graphics, maps, posters, provide sound equipment as needed, public notification, preparing 13 correspondence, professionally recording the meetings and routing meeting minutes through reviews, 14 and support of question and answer sessions during public meetings. 15

Prepare and deliver stakeholder surveys; review and present survey findings; complete of stakeholder 16 interviews. 17

Gain Government approval for all materials prior to them being presented/distributed to the public. 18

4.4 Task 4, Geospatial Data (CLIN 0400): This is a Firm Fixed Price task. 19

4.4.1 Objective: Utilize a GIS in the development of the CSM and maintain and manage all project and 20 geospatial data. 21

4.4.2 Performance Standards: 22

Manage and maintain project data in GIS in accordance with ER 1110-1-8156, EM 1110-1-2909, EM 1110-23

1-1200, and EM 200-1-15. 24

4.4.3 Specific Task Requirements: 25

Develop CSM in GIS. The Geospatial Data Package shall include all forms of data to include raster, vector, 26 tabular and any other form of applicable data to produce a comprehensive CSM. 27

Perform a pre- and post-project RI geospatial data analysis using a GIS. 28 Consolidate all available existing data applicable to the project into the project’s GIS database. Analyze 29 and relay pertinent information to the Project Delivery Team (PDT). 30

Document the information attained through the pre-RI analysis in the QAPP. 31 Document the information attained in the post-RI and FS analysis in the RI and FS reports. 32

Incorporate social, environmental, and economic entities that will be or may be impacted by, or affect 33 response-action activities into the pre-RI analysis and represent that data within the GIS. Data examples 34 include census, tax maps, maps of historical sites, soil type maps, hydrologic maps, maps of vegetation 35 cover and vegetation types, transportation maps, etc. 36

Incorporate details of entities impacted by RI/FS activities and impacts of future response action activities 37

(if applicable) in the post-RI and FS analysis and represent the data within the GIS. Data examples include 38 city/county jurisdictions, land parcels, fauna, flora, structures, landowners, homeowners, rental tenants, 39 schools, utilities, roads, businesses, recreational areas, air traffic, water bodies, and industries, etc. 40

Detail the fieldwork strategies, areas of concern, survey requirements, environmental concerns, 41 milestones and/or other factors that affect product delivery and future action planning in the pre and 42 post-RI and FS analyses. 43

Provide the Government and Stakeholders internet access to the GIS database. The database shall be 44 accessible by USACE at all times and be a living repository that is refined throughout the life of the 45 project. 46 Include data layers that identify site discoveries. Data types include: locations of subsurface anomalies, 47 identified by sensor type; MEC; munitions debris (MD); other debris; advanced geophysical classification 48

(AGC) source parameters; sampling locations; areas of unique or specific MEC risk determination; areas of 49 unique or specific MC risk determination; cultural resources; environmental, biological, and socio-50 economic information. 51

Include all archeological data in the GIS Database, but ensure it is not released to the public without 1 written permission from USACE. 2 Include all GIS metadata, geodatabases, layers etc. created, developed or modified under this task order 3 in original format in Final GIS deliverable. This deliverable shall meet QA acceptance prior to payment of 4 final invoice. 5

Maintain a geo-referenced permanent record of the investigation during the fieldwork and deliver as part 6 of the RI report. MEC and MD items shall be individual data points, including information regarding depth 7 to geometric center, type, and orientation. 8

4.5 Task 5, Right-of-Entry (CLIN 0500): This is a Firm Fixed Price task. 9

4.6.1 Objective: Assist the District in obtaining property Right of Entry (ROE). 10

4.6.2 Performance Standards: 11

Maintain and update property GIS data for all landowners within the project boundaries. 12

4.6.3 Specific Task Requirements: 13

Preserve property owner privacy. Property owner names shall not be disseminated in any 14 documents. 15

Contact property owners, as needed by mail, phone, or in person, in order to assist USACE in 16 obtaining and maintaining ROEs. The Contractor must clearly identify themselves as a Contractor 17 employee. 18

Assist with creating, printing and mailing 2nd and 3rd letters to landowners, calling landowners, and 19 maintaining database of landowner information and status of ROEs. Assume for proposal purposes: 20

50 landowners per mailing. 21

4.6 Task 6, RI/FS Field Activities (CLIN 0600): This is a Firm Fixed Price task. 22

4.6.1 Objective: Conduct a RI in accordance with CERCLA, as amended, and Department of Defense (DoD), 23

Department of Army (DA) and the United States (US) Army Corps of Engineers (USACE) Regulations and 24 Guidance characterizing the nature and extent of MEC and MC and identify and estimate costs and/or 25 negative impacts associated with biological and cultural resource management for each remediation 26 alternative at Impact Area Munitions Response Site (MRS) at former Fort Douglas. 27

4.6.2 Performance Standards: 28

Demonstrate that the work was performed in accordance with the accepted Biological and Cultural Work 29

Plans, UFP-QAPP and approved Field Change Requests stemming from planning sessions that occur during 30 the project lifecycle, and in accordance with all applicable laws, regulations, and guidance documents and 31 that all DQOs were achieved. 32

Demonstrate that biological and cultural data from the RI is sufficient to develop detailed cost estimates 33 to perform resources management for each remedial alternative. 34 Demonstrate that biological and cultural data from the RI is sufficient to analyze impacts to biological and 35 cultural resources for each remedial alternative. 36

TO requirements met with little rework/re-performance required and with few minor and no significant 37 problems encountered 38 Performance meets all technical and functional requirements, and the Contractor is highly responsive to 39 changes in technical direction and/or the technical support environment. 40

Deliverables are accurate, contain the most current information, meet all requirements of the task per 41 the PWS and are submitted on time as per the deliverables schedule. 42

Drafts contain 5 or fewer grammar plus spelling errors. 43

4.6.3 Specific Task Requirements: 44

4.6.3.1 MEC and MC Characterization (CLIN 0601) 45

4.6.3.1.1 General 46

Provide all assumed quantities in the proposal, based on the draft Worksheet #11, DQOs, provided by the 47

Government. 48

Update the CSM to describe the predicted horizontal and vertical distributions of MEC necessary to assess 49

MEC risk and estimate alternative costs in the FS. 50

Distinguish between Low Use Areas (LUAs) and No Evidence of Use (NEU) areas in accordance with the 1 criteria outlined in the UFP-QAPP. 2 Demonstrate that data inputs from the RI will be sufficient to develop detailed cost estimates for 3 remedial alternatives. The work and reporting shall estimate the anomaly densities across identified MEC 4 contaminated areas as well as other remediation cost drivers such as vegetation type and density, terrain 5 conditions, soil type, exclusion zone evacuation costs, etc. 6 Provide a data delivery system (SharePoint, external hard drives, etc.) to deliver all interim and final 7 electronic data. All detection data collection shall be at risk to the contractor without concurrence on the 8

Instrument Verification Strip (IVS) Memorandum results by USACE. 9

Restore all areas to their original condition; all access/excavation/detonation holes shall be backfilled. 10

4.6.3.1.2 Geophysical 11

To the maximum extent practicable, conduct the field investigation by gathering AGC data in addition to 12 data that is digitally recorded and geo-referenced (geo-referencing need be no more accurate than is 13 needed for the use of the data). If AGC is not proposed for any areas within the MRS, the contractor’s 14 proposal must include rationale as to why other technologies are selected and how they will achieve all 15 project DQOs. 16 Ensure the Contractor, or Subcontractor in charge of performing the ACG work, is accredited in 17 accordance with the DoD Advanced Geophysical Classification Accreditation Program (DAGCAP). DAGCAP 18 accreditation and AGC requirements shall be in compliance with the Office of the Secretary of Defense 19 (OSD) Policy Memo dated 11 April 2016 and the FUDS AGC Policy Memo dated 6 January 2017. The 20

DAGCAP accreditation must be current at the time of signing the final QAPP and throughout all fieldwork, 21 analysis, data usability assessment, and reporting. In accordance with DAGCAP, all data to include 22 detection surveys and intrusive investigation will fall under the DAGCAP accredited organization. 23 Collect geophysical data along transects spaced no more than 100 meters apart in order to demonstrate 24 that all areas with elevated anomaly density that have the potential to be High Use Area (HUA) are 25 traversed at the completion of fieldwork and that there is a 100% chance of detecting these areas 26 according to the VSP analysis. 27

Demonstrate that the boundaries of all identified HUAs have been defined to within +/- 250 feet, or as 28 otherwise specified in the UFP-QAPP. 29

4.6.3.1.3 Material Potentially Presenting an Explosive Hazard (MPPEH) Handling/Waste Disposal 30 Process and dispose of MEC and MD encountered in accordance with approved plan(s). 31

Inspect all MPPEH in accordance with DODI 4140.62, DESR 6055.09, EM 385-1-97 and applicable Errata 32 Sheets. 33

Maintain a detailed accounting of all MEC and MD and range-related debris (RRD) encountered. This 34 accounting shall include: amounts of MEC and MD; nomenclature; location and depth of MEC; location of 35

MD and RRD; and final disposition. The accounting system shall also account for all demolition materials 36 utilized on site. Digital photographs of MEC and examples of MD found during the investigation are to be 37 taken. 38

Dispose of any waste or hazardous waste created during the investigation in accordance with all 39 applicable DoD, DA, USACE regulations and guidance and Federal and State laws, regulation and guidance 40 rules and regulations. This includes properly containerized, staged, secured, labeled, sampled and 41 analyzed (if required) in accordance with the accepted UFP-QAPP. The Contractor shall perform disposal 42 actions for all waste items meeting all applicable regulations and dispose of all waste items in a timely 43 manner. Disposal facilities shall be identified by the contractor and submitted for acceptance by the 44 government. 45

4.6.3.1.4 MC Sampling and Analysis 46

Perform MC analyses as required, in accordance with the requirements of the DoD QSM (current version) 47 and the approved project specific UFP-QAPP. Data shall be entered into FUDSChem, as appropriate (see 48

Attachment 6). Validation shall be performed in accordance with Environmental Data Quality Workgroup 49 General Data Validation Guidelines, dated 9 February 2018. 50

Utilize laboratories that are DoD Environmental Laboratory Accreditation Program (DoD ELAP) 51 accredited, that conform to the most recent version QSM, and utilizes the most recent version of the SW-52

846 EPA Analytical Methods. Use of an analytical laboratory that is National Environmental Laboratory 1

Accreditation Program (NELAP) certified under the required fields of testing it is encouraged. NELAP relies 2 on consensus standards representing the best professional practices in the industry to establish the 3 requirements for this program, which is then implemented by state agencies recognized by The NELAC 4

Institute (TNI) as Accreditation Bodies. Errors such as inadequate methodologies in the laboratory 5 processing may reflect on the contractor’s rating. All inadequacies shall be addressed prior to the 6 acceptance of the UFP-QAPP. If they cannot be addressed to the satisfaction of the KO, the contractor 7 shall find a laboratory that can successfully perform the requirements of the project at no additional cost 8 to the government. The Contractor shall notify the USACE Project Manager for laboratory failure to meet 9 certification criteria in accordance with the requirements of their accreditation for analyses that are 10 conducted as part of this task order. If, for any reason, the laboratory responsible has their accreditation 11 suspended or revoked, the contractor shall identify an alternate laboratory to complete the task order at 12 no extra cost to the Government. Work shall be in accordance with DoD QSM (current version). 13 Propose and perform the stated quantity, quality and the methods used to verify adherence to the 14

PARCCS parameters for sample collection, handling, laboratory analysis, verification and validation. 15

Ensure that data generated are of an acceptable quality for its intended use, address contaminants of 16 interest and sample media. 17 Submit field and laboratory data in a format compatible with USACE FUDSChem requirements. 18

Use a DOD ELAP-certified laboratory for all the laboratory methods to be performed: 19 http://www.denix.osd.mil/edqw/Accreditation/index.cfm. 20

Submit field sampling Standard Operating Procedures (SOPs) and laboratory preparation methods for any 21 analyses without published ISM Preparation Methods to government chemist review. 22

4.6.3.2 Cultural and Biological Resource Management (CLIN 0602) 24

4.6.3.2.1 General and Work Plan 25

Demonstrate that data from the RI will be sufficient to develop detailed cost estimates for remedial 26 alternatives. The work and reporting shall estimate all biological and cultural cost drivers such as 27 vegetation type and density, terrain conditions, soil type, biological resources, archaeological 28 resources, etc. 29

Prepare and gain approval for a Biological and Cultural Resources Work Plan (Work Plan). A pre-draft, 30 draft, final Work Plan shall be submitted to USACE; the Work Plan must be accepted by USACE prior to 31 mobilization of RI field work. The Work Plan will become an attachment to the MR-QAPP. The Work 32

Plan shall include records research, survey protocols, general survey schedule, monitoring protocols, 33 detailed schedule for transects, qualifications for those performing the monitoring, and safety and 34 compliance services including training and awareness programs. 35 Amend the Work Plan to include an attachment detailing the change(s) made to the Final Work Plan. 36

All changes shall be coordinated and approved by USACE. These changes should also be discussed in 37 the survey reports. 38

As an appendix to the Work Plan the Contractor shall prepare draft correspondence for the USACE to 39 modify for coordination with interested Tribes and the Utah State Historic Preservation Officer 40 regarding identification of historic properties. The USACE district archaeologist will provide examples 41 of sample correspondence, if requested. 42 Conduct Biological and Cultural records and research searches and summarize available literature and 43 reports in the Work Plan. 44

Coordinate with stakeholder archaeologists and biologists (through USACE) to understand the 45 resources present within the RI Area of Potential Effects (APE), defined as the FUDS RI geophysical 46 investigation footprint, access, and any staging required for the geophysical investigations and include 47 these in the Work Plan. 48

Perform background research for previous archaeological and historic inventories and evaluations 49 work performed within a ¼-mile radius of the RI APE and include in the Work Plan. 50 Provide the completed records search to the USACE archaeologist for review prior to incorporating 51 into the Work Plan (assume review time of 10 workdays). 52

For biological resources work, obtain a current list of endangered species and critical habitat that may 1 occur within the project area from the National Marine Fisheries Service (NMFS), and/or the USFWS. 2 The Contractor shall identify any listed, proposed species (and candidate or species of concern, if 3 appropriate), and designated or proposed critical habitat, that are known or have the potential to 4 occur on site or in the vicinity of the project area. All data from this requirement shall be summarized 5 sufficiently in the Work Plan. 6 Perform appropriate level pre-project environmental surveys to determine whether special status 7 species or their suitable habitat is present in the work area. 8

Include surveys for rare plants in accordance with the procedures of the applicable Utah 9 protocols; 10

For the purposes of these surveys, no specimens of potentially special status plants shall be 11 collected. 12

Include surveys for Migratory Bird Treaty Act protected species, their habitats, and nests; 13

Include surveys to determine the location and extent of wetlands and any features regulated 14 under the Clean Water Act, if any are present. 15

Include surveys to determine if project may be inhabited by the following Federally protected 16 species: Yellow-billed cuckoo (Coccyzus americanus), Canada Lynx (Lynx canadensis), and Ute 17

Ladies’ tresses (Spiranthes diluvialis). 18

Include protocols for Surveying and Evaluating Impacts to Special Status Native Plant Population and 19 Sensitive Natural Communities (CDFW 2018) in the Work Plan. 20

Conduct Environmental Awareness Training prior to commencement of field work. The Contractor’s 21 biological monitor will deliver worker environmental awareness training to all personnel who will work 22 on site. Additional training shall be conducted for new personnel and any time site conditions change. 23

The training must be detailed enough to prevent violations of any protective measures. 24

Instruct all personnel to recognize signs of prehistoric use, and to report any such finds (or suspected 25 finds) immediately, so damage to such resources may be prevented. 26 Develop and execute an Invasive Plant Control Program. All equipment and vehicles will be cleaned of 27 all attached mud, dirt, and plant materials prior to arriving on-site to prevent the introduction and 28 spread of invasive plant species in accordance with Executive Order 13751, Safeguarding the Nation 29 from the Impacts of Invasive Species. 30 Obtain any required permits. (Known stakeholders include City of Salt Lake, County of Salt Lake, 31

University of Utah, State of Utah, U.S. Forest Service.) 32

4.6.3.2.2 Cultural Resource Monitoring 33

Assume that if monitors are present for all non-intrusive work (such as transects) no survey is needed 34 prior to non-intrusive fieldwork. Monitors shall be provided for non-intrusive transect geophysical 35 work, for MC sampling, and as determined by the Cultural Survey within the high density area per the 36

Cultural Technical Memorandum. (Note: Additional Cultural Monitoring, CLIN 0606, is reserved for 37 monitoring intrusive work outside of the high density area with the exception of MC investigations 38 which shall be included in CLIN 0602.) 39

Provide qualifications of the Secretary of Interior Qualified (SOI) archaeologists performing the 40 monitoring to USACE Archaeologist for approval. 41

Have an approved Archaeological Monitor present to monitor all non-intrusive fieldwork (transects) 42 completed on foot. (NOTE: If surveys are completed for transects then monitors may only be needed 43 for identified areas for transect work.) The monitor shall work with the geophysical investigators and 44

UXO safety team to help navigate and avoid all archaeological finds identified during RI geophysical 45 transects. Any finds will be reported to the USACE archaeologist in the daily monitoring logs. 46

Have an approved Archaeological Monitor provide pre-work orientation for the Contractor’s 47 employees. All personnel involved in RI geophysical investigation activities will undergo an orientation 48 from the Contractor’s Archaeological Monitor regarding recognition of historical and archaeological 49 objects that could be discovered during project activities, and steps to be taken if objects are found. 50

The orientation will take place prior to the initiation of RI geophysical investigation work. Should any 51 new personnel be brought in after the initial training, it is the responsibility of the Contractor’s 1

Archaeological Monitor to provide the training within a week of that person(s) starting work. 2 Complete intrusive fieldwork in accordance with Cultural Technical Memorandum (which states when 3

Archaeological Monitors must be present). 4

Ensure proper implementation of protective measures. The purpose of the Contractor’s Archaeological 5

Monitor is to inspect soil and other material as work proceeds to make a determination if potentially 6 NRHP-eligible cultural resources or human remains are present. If potentially significant resources are 7 discovered, the subsequent work shall be moved in order to avoid damage. 8

Have an approved Archaeological Monitor complete and maintain daily monitoring logs. These logs 9 shall include, at minimum, written descriptions of the areas monitored, project activities in those 10 areas, Contractor’s compliance/noncompliance with avoidance measures and report incidents of non-11 compliance, and photographs, as appropriate. Include descriptions of any find(s) and the response to 12 the find(s). Submit the daily monitoring logs electronically on a weekly basis to the Contracting Officer 13 and USACE Archaeologist, no later than the Friday following each work week. 14

Record all new archaeological sites and isolated items encountered during monitoring and update site 15 forms for previously recorded sites using the Utah State DPR forms. Each site shall be evaluated for the 16

National Register of Historic Places and eligibility recommendations shall be provided with the 17 monitoring report. 18

Document any archaeological sites and/or artifacts with digital photographs. Photo logs shall be kept 19 indicating GPS points, the site number, the subject of the photograph, and the cardinal direction of the 20 photograph. 21 Submit all GPS data as exportable GPS files in GIS format. Coordinates must be Utah UTM Zone 12, 22

NAD-83 datum, and in meters. Horizontal accuracy must be +/-3 meters. In the event uncorrected GPS 23 positions do not meet this requirement, the Contractor must differentially correct positions to within 24 +/- 3 meters accuracy. The Contractor’s Archaeologist shall capture all previously and newly recorded 25 sites, features and concentrations (locus) utilizing GPS/GIS. The Contractor shall deliver GIS data to 26 include all electronic survey data either in ESRI Shapefile format or in an ESRI Personal or File 27 geodatabase. Each site and concentration (locus) shall require a brief description. Existing feature and 28 concentration labels shall be retained. In instances where site was recorded and cannot be relocated, 29 the site shall be included as part of the mapping effort. However, data fields need to be included for 30 the site 1) clearly indicate the site no longer exists, and 2) when the site was originally recorded. 31 Ensure that no artifacts/fossils are collected during field monitoring as part of this PWS. Diagnostic 32 artifacts/fossils shall be photographed, GPS coordinates will be recorded, and a sketch of the artifact 33 will be made. 34

Report all archaeological finds identified during monitoring to the Contracting Officer and stop work 35 within 100 feet of the find. The Contracting Officer will, in turn, contact USACE tech lead archaeologists 36 to determine the significance of the resource and direct the Contractor's Archaeological Monitor 37 accordingly. 38

Complete new site records, as necessary, and shall update site forms for previously recorded sites. The 39 site record shall reflect any changes to the site boundary and include any newly identified historic built 40 environment resources, artifacts, features or concentrations/loci.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .