A00807-608634.pdf
PDF 1 MB Posted
- Attached to
- 608634 DEERFIELD FAP No. BFL(BR-OFF)-0032(052)X Bridge Replacement, D-06-001, Upper Road over Deer
- Solicitation number
- BD-26-1030-0H100-0H002-130064
- Issued by
- Franklin County, Massachusetts
About this file
This is a Special Provisions document issued by the Massachusetts Department of Transportation (MassDOT) Highway Division for Proposal No. 608634-134590 (Project A00807) related to an Eversource Energy bridge replacement project. The document establishes construction standards and technical specifications for underground electrical infrastructure work associated with the bridge replacement of Upper Road over Deerfield River in Deerfield, Massachusetts (Federal Aid Project No. BFL(BR-OFF)-0032(052)X, D-06-001). The project has an estimated value of $23,663,000, with sealed electronic proposals required by June 30, 2026 at 2:00 p.m. through www.bidx.com. Bidders must be pre-qualified by MassDOT in the BRIDGE-CONSTRUCTION category prior to submission. A proposal guaranty of 5 percent of bid value is required at submission, and all bidders must hold valid vendor codes and Digital IDs at least 14 days before the bid opening date.
The Special Provisions document contains detailed technical specifications for Eversource Energy construction standards, including cable riser guide installations, manhole covers, precast reinforced concrete components, conduit bank construction, and grounding systems for underground electrical utilities. Specifications address materials such as Schedule 40 and Schedule 80 PVC conduit, ductile iron manhole covers, precast concrete vaults, and copper grounding systems, with precise installation requirements and dimension tolerances. The contract is subject to prevailing wage rates as determined by the Massachusetts Department of Labor and Workforce Development and includes price adjustments for hot mix asphalt, Portland cement, diesel fuel, gasoline, and structural steel. The project is federally funded and subject to Title VI of the Civil Rights Act of 1964, Equal Employment Opportunity Contract Specifications under Executive Order 11246, and Architectural Access Board regulations. Proposal documents are available on www.bidx.com for official bidders, with informational documents available upon request from MassDOTBidDocuments@dot.state.ma.us.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 608634 - Plan Holders List 6-16-2026.pdf | ||
| A00820-608634.pdf | ||
| A00808-608634.pdf | ||
| A00875-608634.pdf | ||
| A00844-608634.pdf | ||
| A00832-608634.pdf | ||
| A00806-608634.pdf | ||
| A00811-608634.pdf | ||
| 608634 Bid Items List.txt | TXT text file | |
| A00834-608634.pdf | ||
| A00830-608634.pdf | ||
| A00801-608634.pdf | ||
| A00831-608634.pdf | ||
| 608634 - Notice to Contractors.pdf | ||
| A00810-608634.pdf | ||
| A00802-608634.pdf | ||
| A00842-608634.pdf | ||
| A00833-608634.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Massachusetts Department Of Transportation Highway Division Proposal No. 608634-134590
A00807 - 1
DOCUMENT A00807
EVERSOURCE SPECIAL PROVISIONS
Massachusetts Department Of Transportation Highway Division
A00807 - 2
*** THIS PAGE IS INTENTIONALLY LEFT BLANK ***
13EVERSOURCE ENERGY CONSTRUCTION STANDARD
APPROVED
ORIGINAL
CABLE RISER GUIDE
9/5/12
8/6/91
DTR 12.010
MINIMUM 12″
SCHEDULE
40 PVC
Notes
1. The first 10 feet of the riser conduit is to be sunlight resistant Schedule 80 PVC installed, bell end down. When
Schedule 80 PVC is used for UG, the bell end is installed over the steel bend at the base of the pole and is sealed with putty SC 508683. When connecting two pieces of steel conduit, fittings shall be sealed with pipe compound SC 506550.
2. a. If the UG portion of the conduit is steel, the bend is to be connected by a steel coupling.
b. If EB or DB type conduits are used, connect conduit to the steel bend with a PVC coupling (socket female).
3. From the top of the Schedule 80 conduit, extend upward with Schedule 40 PVC conduit, bell end down.
4. The top of the conduit shall extend at least 2 inches above the secondary or neutral attachment height (see DTR 04.047).
In an all conduit installation, the top of the conduit shall be sealed with putty SC 508683 and jute SC 553408, to prevent water from entering.
5. To select proper conduit size, see DTR 12.011, check overall cable(s) diameter (see DTR’s 32.019 thru 020).
Conduit Cable Diameter Size in Inches Range in Inches
2 0.5 1.4 3 1.4 2.4 4 2.4 2.9 5 2.9 4.0 6 4.0 5.0
6. Attach 2 1/2″ x 2 1/2″ adhesive backed label, “WARNING, UNDERGROUND ELECTRIC CABLE” SC 565484 approximately 6 feet above ground on the riser conduit (see SPC L 019 in Material Book).
7. Preferred location for riser placement is on field side of the pole opposite the direction of traffic. (Road side of pole opposite the direction of traffic is reserved for road crossings.)
8. Contact the toll free telephone number to locate buried cables before driving ground rods.
9. Steel conduit shall be grounded. If the steel elbow is installed with nonmetallic conduit, it shall also be grounded. Use 5/8″ x 8′ galvanized steel ground rod.
CABLE GRIP
ATTACHMENT
SCHEDULE 80
PVC NOTE 1
18″ MIN
BELOW 8′
36″ MAX
ABOVE 8′
60″ MAX
6′
NOTE 6
FINISHED GRADE
DIRECT BURIED CABLE
NOTE 4
2″
SECONDARY
OR NEUTRAL
See DSEM Section 07.82 for trench specifications
90° STEEL BEND
(ELBOW) #6 OR #4
COPPER WIRE
GROUND
CLAMP
GROUND ROD
NOTE 9
4″ MIN
UG CONDUIT INSTALLATION
A00807 - 3
ORIGINAL COVERS − MANHOLE − ENERGY RELEASE − DUCTILE IRON
32” DIAMETERAPPROVED
10/17/22 EVERSOURCE ENERGY CONSTRUCTION STANDARD SPC CVR-007 0
Notes
1. The ductile iron shall conform to ASTM A536−2019.
2. Design loading shall be in accordance with the latest edition of AASHTO HS25-1983.
3. Bearing surfaces of cover shall be machine finished with tolerance of 1/16 inch +0 inches.
4. Five 1−1/4−inch diameter holes 72 degrees apart.
5. “EVERSOURCE ELECTRIC” letters 2−1/2 inches high.
6. Eversource item number #620171 shall be cast in cover at the edge to the right of EVERSOURCE ELECTRIC logo.
7. Foundry name or insignia and date (year when manufactured) shall be cast in the underside of cover.
8. The 32 inch cover fits into the 30 inch frame. Weight 32 inch cover approximately 191 pounds.
½” – 13 SS pent head bolt covered by plastic (4) pick holes
21” Bolt Circle
NOTE 4
NOTE 5
Section A-A
Ductile Iron Locking Arm
¼” NEOPRENE GASKET
DETAIL B
NOTE 7 (1) ½” – 13 SS Hex Bolt, (2) SS Spacers,
(1) SS lock nut
A00807 - 4
SPC M 023
MANHOLE PRECAST REINFORCED CONCRETE
5� 0� x 10� 0� x 7� 0� INSIDE
10EVERSOURCE ENERGY
APPROVED
ORIGINAL
MATERIAL SPECIFICATION
11/1/01
8/23/73
S ee
D et ai ls a nd
N o te s on re ve rs e si de
S E
C T
IO
N
B B
N O
T E
S E
C T
IO
N
A A
8″ 6″
8′ 2″
7′ 0″
4″
N O
T E
N O
T E
5P L
A N
V
IE
W
0″
0″
6″ 6″
6″
A
A
6″
6′ 0″
5′ 0″
N O
T E
B B
N O
T E
N O
T E
A00807 - 5
SPC M 024
MANHOLE PRECAST REINFORCED CONCRETE
5� 0� x 10� 0� x 7� 0� INSIDE
10EVERSOURCE ENERGY
APPROVED
ORIGINAL
MATERIAL SPECIFICATION
11/1/01
8/23/73
ÉÉÉÉ
ÉÉÉÉ
ÉÉÉÉ
ÉÉÉÉ
ÉÉÉÉ
ÉÉÉÉ
ÉÉÉÉ
ÉÉÉÉ
ÉÉÉ
ÉÉÉ
ÉÉÉ
ÉÉÉ
ÉÉÉ
ÉÉÉ
ÉÉÉ
ÉÉÉ
ÉÉÉÉ
ÉÉÉÉ
ÉÉÉÉ
ÉÉÉÉ
ÉÉÉÉ
ÉÉÉÉ
ÉÉÉÉ
ÉÉÉÉ
1″ 6″
Notes
1. Manhole shall be designed for the following loads:
a. The roof shall be designed for AASHTO HS20 1996 direct wheel load.
b. The walls shall be designed for the summation of the following:
1) Soil pressure of not less than an equivalent fluid pressure of 33 pcf.
2) Hydrostatic pressure of 5 feet measured from the base of the manhole.
3) A surcharge of 2.5 feet of soil weighing 120 pcf.
c. The floor shall be designed to resist the hydrostatic pressure resulting from the 5 foot head called for in 1.b.2 above.
2. Concrete and concrete design shall be in accordance with ACI 318 1999.
3. Concrete shall have a minimum and maximum 28 day strength of 4000 and 5000 psi respectively.
4. Steel reinforcing bars shall conform to ASTM A615 1992 Grade 40 or 60. Welded wire mesh shall conform to
ASTM A185 1997 or A497 1999.
5. Pulling eyebolts, with a minimum 8000 pound pulling strength, shall be installed adjacent to window knockouts at eight places.
6. Zinc alloy inserts 1/2 inch 13 x 1 1/2 inch shall be installed at 40 places.
7. Openings and knockouts shall be clear of reinforcement.
8. Construction joint shall be sealed with asphalt cement or equivalent.
9. Manufacturer’s identification and month/year when manufactured shall be legibly marked in/on concrete in the side of the 38 inch opening.
6″
2″
2 1/2″
NOTE 8
INSIDE OUTSIDE
INTERFACE
SEALED WITH
ASPHALT
CEMENT
1″ x 8″ SHOULDER
EYE BOLT PER
NEMA/ANSI
C135.4 1987
4″ x 4″ x 1/4″
SQUARE WASHER
1 1/8″ HOLE PER
NEMA STANDARD
PH 10 1977
JOINT DETAIL WINDOW KNOCKOUT DETAIL PULLING EYEBOLT DETAIL
45°
3″
3/4″30°
6″
3″
A00807 - 6
ORIGINAL
CONDUIT BANK CONSTRUCTION 05/29/75
APPROVED
08/17/23 EVERSOURCE ENERGY CONSTRUCTION STANDARD DTR 73.209 6
Figure Dimensions (inches)
4” Duct 5” Duct 6” Duct W H S W H S W H S
1 19 2 2 19 21 2
2A 36 2 3 19 2
3A 21 2 4 19 38 2
4A 36 21 2 5 38 2
5A 36 2 Notes
1. At manholes, conduit banks shall be according to Figures 1, 2, 3, 4, or 5.
2. Minimum cover from top of a conduit bank to the pavement or earth surface shall be:
a. State highways 36 inches
b. Railroad tracks – 60 inches
c. 24 inches
3. In the conduit run between manholes if obstructions are encountered or to reduce trench depth, Figures 2A, 3A, 4A, or 5A are permissible.
4. Concrete shall be 2500 psi, ½-inch maximum stone, 6” to 9” slump of such consistency that spading will ensure the flow of concrete between and under the individual ducts, but not so wet as to float the ducts. For tier buildup, construction of a stiffer consistency should be used.
PREFERRED:
2” S
3”
3”
H
W
FIGURE 1
2 DUCTS
W W
W
W
W W W
W
H
H H
H
H H H
H
S S S S
S S S
S
S S S S
S S
S
2” 2” 2” 2”
2” 2” 2” 2”
3”
3”
3”
3”
3”
3”
3”
3”
3”
3”
3”
3”
3”
3”
3”
3”
FIGURE 2
4 DUCTS
FIGURE 3
6 DUCTS
FIGURE 4
8 DUCTS
FIGURE 5
12 DUCTS ALTERNATE: (see Note 3)
FIGURE 2A
4 DUCTS
FIGURE 3A
6 DUCTS
FIGURE 4A
8 DUCTS FIGURE 5A
12 DUCTS
A00807 - 7
DTR 76.011 1
10/11/12
07/20/06
EVERSOURCE ENERGY CONSTRUCTION STANDARD
APPROVED
ORIGINAL CONVENTIONAL UNDERGROUND, PRECAST CONCRETE
VAULT AND MANHOLE INSTALLATION GENERAL
SCOPE This section provides general notes for the installation of precast concrete manholes and network vaults.
GENERAL The following guidelines provides general requirements for the installation of precast concrete manholes and network vaults and is not intended for poured in place structures. The design drawings for the poured in place structures will provide the installation details for the structure. Due to site conditions, additional requirements or guidance may be required. Engineering should be contacted to address site specific conditions.
GENERAL REQUIREMENTS
The excavation shall be prepared such that the vault covers and gratings or manhole frames and covers will be at final grade.
The bottom of the excavation shall be level and adequately tamped to prevent settlement.
Fill and backfill material shall be free from lumps of clay, debris, organic matter, frozen material or other deleterious substances. Fill shall contain no rocks or lumps over four inches in the greatest dimension and not more than 15 percent of the particles shall be larger than two inches in greatest dimension. All fill shall comply with all environmental regulations.
Backfill shall be placed at optimal soil moisture content in lifts no greater than six inch maximum in depth and be thoroughly compacted with a mechanical vibrating compactor so as to prevent settlement of pavement after completion.
Vault and manhole grounding shall be installed prior to compaction of backfill and setting of the vault and shall be installed in accordance with DTR 76.451.
The bottom of the excavation shall be level and free of standing water and large debris.
Precast network vaults, vault grates, frames and covers shall be installed in accordance with
DTR 76.419.
Precast manholes shall be installed in accordance with DTR 76.311 and DTR 76.331.
Manhole construction joints shall be sealed with asphalt cement or approved equal.
Ducts shall enter vault at the windows with bell ends placed flush with the inside of the knock out.
Conduit duct bank shall be grouted/pointed up to ensure a smooth, clean face recessed three inches from the interior walls of the vault.
Radial separation of conduit systems from gas and other lines that transport flammable material shall be not less that twelve inches and should have sufficient separation from gas and other lines that transport flammable material to permit the use of pipe maintenance equipment.
A00807 - 8
EVERSOURCE ENERGY CONSTRUCTION STANDARD
APPROVED
ORIGINAL CONVENTIONAL UNDERGROUND
PRECAST, CONCRETE MANHOLE
07/20/06
07/20/06
DTR 76.311
FRAME, MANHOLE
Electric
NOTE 6
NOTE 5
CAST IRON MANHOLE COVER
MANHOLE FRAME
EXTENSION
NOTE 4
PRECAST CONCRETE MANHOLE
EXTENSION
(FOUR SEGMENTS) OR STANDARD
MASONRY BLOCKS
Notes
Manhole grounding shall be installed prior to setting the manhole. Manhole grounding shall be installed in accordance with DTR 76.451.
Customer service underground conduit shall be installation in accordance to DTR 84.811.
Duct banks shall be constructed in accordance with DTR 73.209.
Cast iron extension frames shall be used to adjust grade due to repaving.
Construction joint shall be sealed with asphalt cement or approved equal. Approval shall be provided by Distribution Engineering and Design Distribution Standards.
Standard manhole frame shall be 10 inches in height. A manhole frame of six inch height may be used for lower grades.
See DTR 76.333 for manhole window details.
A00807 - 9
EVERSOURCE ENERGY CONSTRUCTION STANDARD
APPROVED
ORIGINAL CONVENTIONAL UNDERGROUND
PRECAST, CONCRETE MANHOLE/VAULT WINDOW DETAIL
07/20/06
07/20/06
DTR 76.333
ÂÂÂÂ
ÂÂÂÂ
ÂÂÂÂ
ÂÂÂÂ
ÂÂÂÂ
ÂÂÂÂ
ÂÂÂÂ
ÂÂÂÂ
ÂÂÂÂ
ÂÂÂÂ
ÂÂÂÂ
ÂÂÂÂ
ÂÂÂÂ
ÂÂÂÂ
ÂÂÂÂ
ÂÂÂÂ
ÂÂÂÂ
ÂÂÂÂ
ÄÄÄÄÄÄÄÄÄÄÄ
ÄÄÄÄÄÄÄÄÄÄÄ
ÄÄÄÄÄÄÄÄÄÄÄ
ÄÄÄÄÄÄÄÄÄÄÄ
MANHOLE/
VAULT
WALL
CONDUIT
MANHOLE/VAULT WINDOW
END BELL CONDUIT
FITTING
NOTES 1, 2 AND 3
CONCRETE ENCASED
DUCT BANK
SEE DTR 73.209
GROUT
NOTE 3
4/0 BARE COPPER
GROUND WIRE
NOTE 5
ÄÄÄ
ÄÄÄ
Ä Ä
ÄÄ
ÄÄ
WATER STOP CONNECTOR
NOTE 5
CONDUIT
CONDUIT
Notes End Bells shall be installed on all conduit to prevent cable damage due to abrasion due to movement from thermal expansion.
End Bells shall be installed with Manufacturer’s recommended PVC cement.
End Bells shall be installed flush with the inside face of the knockout. The conduit window shall be finished with a grouted or concrete surface flush with the end bell conduit fittings.
Conduits shall be installed level and perpendicular to the manhole/vault wall.
5 4/0 AWG Bare Copper Ground. In high water table areas, the 4/0AWG ground wire shall be sealed using an oil stop compression connector placed within the grouted window opening (See DTR 76.451).
A00807 - 10
5/7/12
11/28/84
EVERSOURCE ENERGY CONSTRUCTION STANDARD
APPROVED
ORIGINAL CONDUIT SYSTEM GROUNDING
BELOW GRADE MANHOLES AND VAULTS
Notes Install all loop wires or grounds to 25 ohms or less.
Connect grounds to 4/0 copper bus in manhole or vault.
Install manhole grounding bus with 4 4/0, 4 way compression branch connectors, 516739.
For poured in place manholes, or overcast, grounding tail can be brought into the manhole through the floor.
For all other manholes, bring two (2) tails through duct opening.
DTR 76.451
FIGURE 1 Use when bottom of manhole or vault will be below permanent water level.
Install 4/0 bare copper wire, 30 to 35 feet long, a minimum of six inches below floor.
In areas with a high water table, the 4/0 ground wire should be sealed. This is done by adding a compression sleeve with an oil stop 504601 and placing the sleeve in the concrete or joint grout.
FIGURE 2 Use when bottom of manhole or vault is above permanent water level or in rocky soil.
a. Install two 5/8″ x 8′ copper clad steel ground rods below floor (preferred) or adjacent to walls (alternate).
b. Drive ground rods sideways, if necessary, in rocky soil.
MANHOLE GROUNDING BUS
4/0 BARE COPPER
4/0 BARE COPPER
LOOP, 30 35′
PREFERRED LOCATION
ALTERNATE LOCATION
MANHOLE GROUNDING BUS
4/0 BARE COPPER
NOTE 3
4/0 BARE COPPER
5/8″ COPPER CLADSTEEL-
GROUND ROD
WITH GROUND CONNECTER
FIGURE 1 FIGURE 2
NOTE 4
6″ MIN
NOTE 3
4/0 BARE COPPER
NOTE 4
A00807 - 11
A00807 - 12
| A00807 - Eversource SPs |