About this file
This is an Estimate of Quantities detail sheet prepared by the Massachusetts Department of Transportation Highway Division for Proposal No. 614242-135968, involving pavement mill and overlay work, drainage structure modifications, and ancillary improvements across Route 3A, Route 107, and Route 3 in Billerica, Salem, and Woburn, Massachusetts, with a project date of July 2026. The project encompasses substantial earthwork and pavement operations, including 370 cubic yards of unclassified excavation, 173 cubic yards of cement concrete for sidewalks, medians, ramps, and driveways, and 26 cubic yards of hot mix asphalt for similar applications. The primary pavement work involves 859 square yards of mill and overlay with 2-inch Superpave surface course over 2-inch pavement milling on Route 3A, along with additional pavement construction on Route 107 totaling 57 square yards and median/sidewalk improvements of 74 square yards. The scope also includes 778 square yards of cement concrete sidewalk, pedestrian curb ramps, driveway, and median island construction, as well as 43 square yards of hot mix asphalt driveway work. The project details numerous drainage structure modifications including catch basin installations, frame and grate adjustments, reinforced concrete pipe installation, and hydrant work, supplemented by granite curbing installations totaling 745 linear feet of straight curb and 255 linear feet of curved curb across the three locations.
The estimate provides specific locations and stations for utility and drainage work, including pull boxes, electric handholes, and silt sacks distributed across the project sites. Temporary and permanent asphalt patching is specified for utility trenches and pavement transitions, with sawcutting operations required on Route 107. The project includes guardrail end treatment work on Route 107 and comprehensive site-specific improvements at three major intersections: Route 3A at Wyman Road in Billerica, Route 107 at Swampscott Road in Salem, and Route 3 at Revere Road in Woburn. No pricing information, bid amounts, contract duration, response deadlines, or award dates are provided in this detail sheet. The document explicitly notes that bidding should not be conducted through COMMBUYS.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 614242 - Notice to Contractors.pdf | ||
| 614242 - Plan Holders List 8-25-2026.pdf | ||
| A00869-614242.pdf | ||
| DISTRICT_4-614242-135968-A-1.pdf | ||
| A00875-614242.pdf | ||
| A00820-614242.pdf | ||
| A00801-614242.pdf | ||
| 614242 Bid Items List.txt | TXT text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Massachusetts Department Of Transportation Highway Division Proposal No. 614242-135968
A00802 - 1
DOCUMENT A00802
DETAIL SHEETS
A00802 - 2
THIS PAGE INTENTIONALLY LEFT BLANK
A00802 - 3
THE Massachusetts Department of Transportation
Highway Division
TEN PARK PLAZA, BOSTON, MA
-ESTIMATE OF QUANTITIES - DETAIL SHEET-
CITY-TOWN Billerica, Salem, & Woburn ROAD Route 3A, Route 107, Route 3 DATE July 2026
Excavation Gravel Unclassified Excavation 370 Cu Yards Sub-base 13 Cu Yards Cem Conc Sidewalks/
Medians/ Ramps/ Driveways 173 Cu Yards
HMA Sidewalks/ Medians/ Driveways 26 Cu Yards
Ordinary Borrow 7 Cu Yards
PAVEMENT MILL AND OVERLAY (ROUTE 3A, ROUTE 107, ROUTE 3) AREA= 859 SY
SURFACE COURSE: 2" SUPERPAVE SURFACE COURSE - 12.5 POLYMER (SSC - 12.5 - P) OVER
ASPHALT EMULSION FOR TACK COAT OVER
PAVEMENT MILLING: 2" PAVEMENT FINE MILLING
FULL DEPTH CONSTRUCTION LESS THAN 4’ (ROUTE 107) AREA = 57 SY
SURFACE COURSE: 2" SUPERPAVE SURFACE COURSE - 12.5 POLYMER (SSC-12.5-P) OVER
ASPHALT EMULSION FOR TACK COAT OVER
INTERMEDIATE COURSE: 2.5" SUPERPAVE INTERMEDIATE COURSE 19.0 (SIC-19.0) OVER ASPHALT
EMULSION FOR TACK COAT OVER
BASE COURSE: 6" HIGH EARLY STRENGTH CEMENT CONCRETE BASE COURSE OVER
SUB-BASE: 8" GRAVEL BORROW TYPE B
HOT MIX ASPHALT MEDIAN/SIDEWALK (ROUTE 107/ROUTE3) AREA = 74 SY
SURFACE COURSE: 1.25" SUPERPAVE SURFACE COURSE – 9.5 (SSC-9.5) OVER
ASPHALT EMULSION FOR TACK COAT OVER
INTERMEDIATE COURSE: 1.75" SUPERPAVE SURFACE COURSE 12.5 (SSC-12.5) OVER
A00802 - 4
CEMENT CONCRETE SIDEWALK, PEDESTRIAN CURB RAMP,
DRIVEWAY, AND MEDIAN ISLANDS (ROUTE 3A, ROUTE 107, ROUTE 3) AREA = 778 SY
SURFACE COURSE: 6" CEMENT CONCRETE SURFACE COURSE (4000 PSI, 3/4", 610 AIR
ENTRAINED) OVER
HOT MIX ASPHALT DRIVEWAY (ROUTE 3A/ROUTE 3) AREA = 43 SY
SURFACE COURSE: 1.5" SUPERPAVE SURFACE COURSE – 9.5 (SSC-9.5) OVER
ASPHALT EMULSION FOR TACK COAT OVER
INTERMEDIATE COURSE: 2.5" SUPERPAVE SURFACE COURSE 12.5 (SSC-12.5) OVER
A00802 - 5
ITEM 146. DRAINAGE STRUCTURE REMOVED
Street Structure Station Offset Billerica – Route 3A CB 4+76 30.61’LT
ITEM 201. CATCH BASIN
Billerica – Route 3A CB 4+80 27.24’LT
ITEM 220. DRAINAGE STRUCTURE ADJUSTED
Billerica – Route 3A
CB 111+68 49.44’LT
CB 111+02 44.35’ LT
CB 4+19 23.06’ LT
DMH 111+29 42.60’ LT
DMH 4+16 16.41’ LT
DMH 4+72 23.97’ LT
ITEM 220.7 SANITARY STRUCTURE ADJUSTED
SMH 4+33 18.36’ RT
SMH 108+90 10.02’ RT
Woburn – Route 3 SMH 63+36 32.16’ LT
ITEM 222.1 FRAME AND GRATE – MASSDOT CASCADE TYPE
Billerica – Route 3A CBCI 4+80 27.24’ LT
ITEM 223.2 FRAME AND GRATE (OR COVER) REMOVED AND DISCARDED
Billerica – Route 3A CB 4+76 30.61’ LT
ITEM 241.12 12 INCH REINFORCED CONCRETE PIPE CLASS III
Street Station Start Station End Length (FT) Billerica – Route 3A 4+72 4+80 4
A00802 - 6
ITEM 303.06 6 INCH DUCTILE IRON WATER PIPE (MECHANICAL JOINT)
Billerica – Route 3A 110+94 110+94 27
ITEM 350.06 6 INCH GATE AND GATE BOX
Street Station Offset Billerica – Route 3A 110+93 26.0’ LT Billerica – Route 3A 110+93 45.3’ LT
ITEM 358. GATE BOX ADJUSTED
WG 108+86 25.71’ LT
WG 108+85 23.83’ LT
Woburn – Route 3 WG 63+46 21.49’ LT
ITEM 376. HYDRANT
Billerica – Route 3A 110+94 50.5’ LT
ITEM 376.3 HYDRANT – REMOVED AND STACKED
Billerica – Route 3A 109+91 46.3’ LT
ITEM 451. HMA FOR PATCHING
Permanent asphalt patching for utility trenches and as required by the Engineer.
ITEM 472. TEMOPORARY ASPHALT PATCHING
Temporary asphalt patching shall be used for temporary HMA at the following locations during construction:
• Temporary driveway ramps at proposed driveways. Assume 2ft long transition.
• Temporary drop-offs at limits of paving. Assume 5ft long transition.
ITEM 482.5 SAWCUTTING ASPHALT PAVEMENT FOR BOX WIDENING
Salem – Route 107 1+50 2+70 120
A00802 - 7
ITEM 504. GRANITE CURB TYPE VA4 – STRAIGHT
STREET LENGTH (FT)
Billerica – Route 3A 245.0 Salem – Route 107 325.0
Woburn – Revere Rd 20.0
ITEM 504.1 GRANITE CURB TYPE VA4 – CURVED
STREET LENGTH (FT)
Billerica – Route 3A 140.0 Salem – Route 107 115.0
ITEM 515. GRANITE CURB INLET - CURVED
Billerica – Route 3A 4+79 28.04’ LT
ITEM 516. GRANITE CURB CORNER TYPE A
Billerica – Route 3A 4+33 31.33’ RT Salem – Route 107 11+18 19.85’ RT
Woburn – Route 3
63+53 58.05’ LT
63+59 37.44’ LT
ITEM 581. CURB INLET REMOVED AND RESET
111+01 45.38’ LT
111+68 49.44’ LT
4+18 24.08’ LT
ITEM 582. CURB CORNER REMOVED AND RESET
108+65 8.61’ RT
108+85 7.93’ RT
113+01 25.49’ LT
113+24 23.56’ LT
113+61 21.11’ LT
113+87 19.09’ LT
A00802 - 8
ITEM 627.73 GUARDRAIL END TREATMENT, TL-3 (DOUBLE FACED)
Salem – Route 107 11+02 16.79’ LT
ITEM 630.2 HIGHWAY GUARD REMOVED AND DISCARDED
Street Station
Salem – Route 107 10+68 to 11+33
ITEM 697.1 SILT SACK
Location Existing & proposed CBs within project limits (EA)
Billerica – Route 3A at Wyman Rd 6 Salem – Route 107 at Swampscott Rd 4 Woburn – Route 3 at Revere Rd 2
ITEM 811.22 ELECTRIC HANDHOLE – SD2.022
Location STA OFFSET Salem – Route 107 at Swampscott Rd 11+07 21’R
Salem – Route 107 at Swampscott Rd 11+16 33’R
ITEM 811.31 PULL BOX 12x12 INCHES – SD2.031
Location STA OFFSET Billerica – Route 3A at Wyman Rd 109+89 44’L Billerica – Route 3A at Wyman Rd 109+69 45’L Billerica – Route 3A at Wyman Rd 109+54 51’L Billerica – Route 3A at Wyman Rd 4+78 28’L Billerica – Route 3A at Wyman Rd 4+43 27’L Salem – Route 107 at Swampscott
Rd 2+37 26’L
Salem – Route 107 at Swampscott Rd 11+04 22’R
Salem – Route 107 at Swampscott Rd 11+06 22’L
Salem – Route 107 at Swampscott Rd 11+55 28’R
Woburn – Route 3 at Revere Rd 12+33 75’L Woburn – Route 3 at Revere Rd 12+80 70’L