A.07.23 W912DW21R0022 (03-15-2021) FINAL.pdf
PDF 2 MB Posted
- Solicitation number
- W912DW21R0022
About this file
This solicitation requests proposals for multiple task order contracts to provide environmental remediation services. Work will include site characterization, assessment, and full remediation services for the U.S. Army Corps of Engineers Seattle District and other customers in the Northwestern Division. Services will involve hazardous waste cleanup, demolition, and remediation of per- and polyfluoroalkyl substances. Projects are mandated by programs such as Defense Environmental Restoration, Superfund, and Base Realignment and Closure. Contracts will have a three-year base period and two-year option, not exceeding $115 million total. Task orders may be firm-fixed price or cost-reimbursement. Proposals are due by 10:00 AM local time on April 15, 2021. Awards will be made to qualified 8(a) small businesses. The solicitation specifies requirements for site investigations, engineering support, response actions, analytical testing, health and safety plans, and other submittals.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A.07.23 W912DW21R0022 R0002 (04-19-2021).pdf | ||
| A.07.23 W912DW21R0022 R0001.pdf | ||
| A.07.23 Section J - Attachment 12 ERS Tables_9MAR2021.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 10:00 AM local time 15 Apr 2021
X
A X B X C
D
EX
X G F 124 - 132
133 - 149 X H 150 - 156 curt.stepp@usace.army.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 156
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
W912DW 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
CURT STEPP 206-764-6805
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 11
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
12 - 36 J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 39 - 42 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 43 - 44 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
45 - 69
PART II - CONTRACT CLAUSES
USA ENGINEER DISTRICT, SEATTLE
ATTN: CENWS-CT
4735 EAST MARGINAL WAY SOUTH, BLDG. 1202
SEATTLE WA 98134-2388
206-764-6817FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
70 - 123
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
15 Mar 2021
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
W912DW21R0022
Section B - Supplies or Services and Prices
SECTION B
SECTION B – SUPPLIES OR SERVICES & PRICES / COSTS
1. Contract Definition
The Northwestern Division Regional $115 million Section 8(a) Small Business Set-Aside Environmental Remediation Services (ERS) is an Indefinite Delivery / Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) issued as part of the U.S. Army Corps of Engineers (USACE), Northwestern Division (NWD) Multiple Environmental Government Acquisition (MEGA) Strategy.
This IDIQ MATOC ERS has been issued under NAICS Code 562910. The Seattle District has a requirement to support the Multiple Environmental Government Acquisition (MEGA) Acquisition Strategy Team to execute environmental remediation services at a number of sites. In response to this and other environmental remediation requirements across the Northwestern Division, Seattle District will award a $115M ERS Contract.
All Task Orders to be awarded under this MATOC will be competed in accordance with (IAW) FAR 16.505(b)(1), Fair Opportunity, and DFARS 216.505-70, Ordering Under Multiple Award Contracts, unless one of the exceptions to fair opportunity at FAR 16.505(b)(2)(i) applies. Task Orders awarded under this MATOC may be Fixed-Price contracts in accordance with FAR Subpart 16.2 or Cost-Reimbursement contracts in accordance with FAR Subpart
16.3. IAW FAR 16.505(b)(1) and DFARS 216.505-70 Task Order selection will be tailored to specific project requirements and awarded IAW pre-established factors and evaluation criteria. Factors may consist of, but not be limited to, the following:
1. Company Experience
2. Performance Confidence
3. Cost/Price
The business goal is to target award of up to five contracts; however, if the Source Selection Authority (SSA) determines during the source selection process that fewer than that number of contracts should be awarded, the SSA has the discretion of adjusting that number (higher or lower), or awarding none at all.
Please ensure that NAICS code 562910 is incorporated in your current Contract Registration at the System for Award Management (SAM), https://www.sam.gov/portal/public/SAM/
Failure to have this NAICS code current in SAM may result in not being considered for the award.
***NOTE***
When contacting the SAM Help Desk with issues relating to registering for a CAGE Code, please DO NOT ask for CAGE Code help, instead ask for help with SAM Registration which will end in a better result and assistance with the SAM Help desk.
For SAM Customer Service, contact:
Federal Service Desk URL: www.fsd.gov Hours: 8am - 8pm (Eastern Time) US Calls: 866-606-8220 International Calls: 334-206-7828
DSN: 866-606-8220
2. Eligibility
The contract will be awarded only to qualified Section 8(a) small business offerors who are eligible under the requirements of this solicitation.
3. Total Amount of Contract
The total amount of the MATOC with shared capacity among all Contractors awarded contracts under this solicitation shall not exceed $115 million. There is no limit of the number of Task Orders that may be executed against this contract. The cumulative total of all Task Orders issued under the MATOC shall not exceed the total contract capacity amount of $115 million.
4. Guaranteed Contract Amount
The minimum guarantee for the IDIQ is $2,500.
5. Performance Period
Contracts will have a basic ordering period (three (3) years) plus one option period (two (2) years), or until the $115 million contract limit is reached, whichever comes first. This Solicitation also includes FAR 52.217-8, which if necessary, allows the Government to extend the term of the Contract an additional six (6) months. The total length of the contract ordering period, including the exercise of all option periods, will not exceed five years and six months from date of contract award.
6. Pricing
6.1 Firm-Fixed Price (FFP) Task Orders.
FFP Task Orders will be for services performed at prices expressly provided for therein and based on the rates proposed by the offeror in the tables below. Profit will be reflected in individual Task Orders issued. The price for each firm-fixed price Task Order shall be based on the hourly rates for labor disciplines proposed by the offeror in the “Binding Capped Labor Rate Schedule” table shown below, and the offeror’s proposed markups for the other direct costs in the tables below. All hourly rates must include Overhead, General/Administrative, Labor Burden Fringes, and any other markups that are included in the offeror’s binding capped burdened rate. All hourly rates must be exclusive of profit. If a discipline is not listed in the Binding Capped Labor Rate Schedule and is required for a specific Task Order, that labor rate will be determined before award of that Task Order. Price/Cost analysis will be performed on firm-fixed priced task orders in accordance with FAR 15.404-1(c) to determine whether the proposed costs are fair and reasonable.
The offeror must submit its proposed rates for all disciplines and years listed in Table 1 below. The capped hourly, fully burdened labor rates proposed will be legally binding and will be the maximum rates that the offeror will use for all firm-fixed price Task Orders. Lower rates may be offered at the Task Order level, if deemed appropriate by the offeror. Offerors must provide one rate per labor discipline, including those provided by subcontractors. The offeror may not have all personnel on staff. Therefore, if those personnel are subcontracted, their rates must be provided in the tables as well. The rates provided per labor discipline must be fully burdened rates, exclusive of profit.
The offeror must only provide the Overhead and G&A rates for the prime, even if the labor disciplines will be performed by the prime or a subcontractor, depending on the Task Order. The subcontractor would be subject to honoring the labor rates stated for the subject labor discipline.
If during the Contract Period of Performance, the Contractor’s original subcontracted personnel are no longer available to the Prime, the Prime must find a subcontractor that has at a minimum, the same qualifications as the previous subcontracted personnel. The Prime must be responsible for negotiating the labor rates for those personnel that have been provided in this Solicitation. Those rates provided in Section B, Table 1 are the maximum that will be paid by the Government for any replacement personnel.
In Table 2 (Rates/Markups) below, offerors must show the breakout of all rates and markups that are incorporated into the binding capped burdened labor rates proposed by the offeror in Table 1.
The applicable capped labor rates shall be governed by the effective date of the Task Order. Task Orders will use the prices for the 12-month period effective on the date the Task Order is issued. Modifications to Task Orders will reflect the rates of the "current 12-month" bid schedule. For example, if the rate schedule changes over on 1 November of each year, and a Task Order is issued on 1 Sep 2018 for 12 months work, the maximum rates will be the rates that were effective on 1 Nov 2017. Under the same assumptions, if a modification to this Task Order is required in December 2018, labor rates effective on 1 Nov 2018 will apply.
Table 1
BINDING CAPPED LABOR RATE SCHEDULE, Firm Fixed Price Task Orders
DISCIPLINE
P R
IM
E
O R
S U
B
N
B U
R D
E N
E D
L A
B O
R
A
T E
S B as e
P er io d
Y ea r
B U
R D
E N
E D
L A
B
T E as e
P er io d
Y ea r
B U
R D
E N
E D
L A
B e
P er io d
Y ea r
B U
R D
E N
E D
L A
B e
P er io d
Y ea r
B U
R D
E N
E D
L A
B p ti on P er io d
Y ea r
B U
R D
E N
E D
L A
B ti on P er io d
Y ea r
R D
E N
E D
L A
B
S ix -m on th e xt en si on
0001 - Program Manager
0002 - Project Manager
0003 - On-Site Contractor Quality Control Supv
(CQCS)
0004 - On-Site Superintendent/ Site Manager
0005 - Safety & Health Manager (SHM)/Certified Industrial Hygienist (CIH)
0006 - Site Safety and Health Officer (SSHO)
0007 - Senior Contracts Manager
0008 - Procurement Specialist
0009 - Cost Estimator
0010 – Engineer
DISCIPLINE
P R
IM
E
O R
S
N
B U
R D
E N
E D
L A
B
T E
S B as e
P er io d
Y ea r
B U
R D
E N
E D
L A
B e
P er io d
Y ea r
B U
R D
E N
E D
L A
B e
P er io d
Y ea r
B U
R D
E N
E D
L A
B e
P er io d
Y ea r
B U
R D
E N
E D
L A
B ti on P er io d
Y ea r
B U
R D
E N
E D
L A
B ti on P er io d
Y ea r
R D
E N
E D
L A
B
S ix -m on th e xt en si on
0011 - Mechanical/ Electrical Engineer
0012 - Process Engineer
0013 – Geophysicist
0014 - Risk Assessor/ Toxicologist
0015 – Geologist
0016 - Scientist/ Biologist
0017 – Chemist
0018 - Hazardous Waste
0019 - Regulatory
0020 - CADD Operator
0021 - GIS Specialist
0022 - Engineering Technician
0023 - Field Technician
0024 – Clerical
NOTES:
1. Offerors are to submit their labor rates for each of the ordering periods.
2. Assume base year 1 labor rates cover period 1 September 2021 through 31 August 2022.
3. For each labor discipline, please annotate whether the discipline provided is Prime or Subcontractor. If both
Prime and Subcontractor will perform the work, indicate “Both” in column 2 and enter a single rate.
4. Offerors must provide an example of how mark-ups are applied to the labor rates. The indicated method will be used for all Task Orders issued under the contract.
5. Offerors are to provide only one table with one rate per discipline. Table 1 must be completely filled out.
Joint Ventures submit a single maximum rate in Table 1 for the JV.
6. If the cost for a discipline indicated above is included in an Offeror’s overhead rates as part of the Offeror’s standard accounting system, the Offeror must enter an hourly rate of $1 and include an explanation below the table regarding how that discipline’s costs are accounted for under the Offeror’s standard accounting practices.
7. Per Section L paragraph 4.0, all tables required for Proposal Volume II, Factor 3 must be submitted in PDF and native file format (e.g., Microsoft Excel) with viewable equations. Offerors should use the attached spreadsheet file (Section J, Attachment 12) to create the tables.
Table 2 Rates / Markups
Base
Contract Year 1
Year 2
Year 3
Option
Period 1 (Year 4)
Option
Period 1 (Year 5)
Option Period 2 (Six-month extension)
Overhead Rate*
G&A Rate*
If Applicable: Other Indirect Applied
Rates (Specifically identify rate and reason for rate below)
Binding Capped Burdened Labor
Rate Annual Escalation
*Must be substantiated by DCAA at a later time
NOTES:
1. Overhead and G&A rates should be shown separately.
2. The rates/markups provided in Table 2 are a breakout of the rates/markups incorporated into the binding capped burdened rates proposed by the offeror in Table 1. Escalation rates should be consistent with binding capped burdened rates in Table 1.
3. For any mark-up that is not considered as Overhead or G&A, please provide the markups along with documentation that the mark-up is part of your company’s standard accounting practices (examples:
computer usage fees, Facilities Capital Cost of Money).
6.2 Cost Reimbursable Type Task Orders
Cost reimbursable type Task Orders will be issued for project services based on allowable incurred costs for best effort on the part of the Contractor. For cost reimbursement type Task Orders, the Contractor must use DCAA/DCMA approved forward pricing, actual rates for individuals performing work if the offeror does not have DCAA/DCMA approved forward pricing rates, or third party audited rates. Cost realism analyses will be performed on cost-reimbursement task orders in accordance with FAR 15.404-1(d) to determine whether the estimated proposed cost elements are realistic for the work to be performed; reflect a clear understanding of the requirements;
and are consistent with the unique methods of performance and materials described in the offeror’s technical proposal. The Government reserves the right to request additional data other than certified cost or pricing data in order to determine the prices are fair and reasonable.
The Contractor must have an accounting system that is in compliance with Generally Accepted Accounting Principles (GAAP) and the Cost Accounting Standards (CAS), if applicable. In accordance with FAR 16.301-3, the Contractor’s accounting system must be determined adequate for tracking costs for cost reimbursable work.
Therefore, in order to be awarded a cost reimbursable Task Order under this contract the offeror must have an accounting system that is adequate for tracking costs under cost reimbursable contracts. See Section L, paragraph
4.2.3 for further details.
6.3 Profit/Fee on Firm Fixed Price and Cost Reimbursable Task Orders
Profit will be negotiated for each task order. Offerors must propose a maximum profit rate (for firm fixed price work) and a maximum fixed fee rate (for the project-specific cost reimbursable work) in Table 3. The proposed maximum profit rate will be legally binding and will be the maximum profit rate the offeror will be allowed to propose for all firm fixed price work performed under this contract. The proposed maximum fixed fee rate will be legally binding and will be the maximum fixed fee rate the offeror will be allowed to propose for all cost reimbursable work performed under the Task Order. Lower rates may be proposed on subsequent Task Orders/Modifications. Profit and fee will be negotiated on an individual Task Order and modification basis.
Table 3. Maximum Profit and Fee Rates
Maximum Fixed Fee Rate (Cost Reimbursable Work) Maximum Profit Rate (Firm Fixed Price Work)
Note: Offerors must propose a single rate in Table 3. Do not propose separate maximum rates for subcontractors or Joint Venture partners. Do not submit different maximum rates for self-performed work and subcontracted work.
7. Department of Labor Wage Rates
For individual Task Orders written against the contract, the appropriate Department of Labor Wage Determination will be provided.
8. Travel
The Contractor must perform all travel and attend all meetings necessary for completion of the work required by the Task Orders. Any travel necessary to complete work activities must be included in the agreed work for each task order. Cost of travel expenses must be consistent with FAR 31.205-46 Travel Costs. No fee or profit will be paid on travel.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 115,000,000 Job
FFP Base Period
FFP
NWD Regional $115M Section 8(a) Small Business Environmental Remediation Services (ERS). This CLIN is designated for Firm Fixed Price work.
The Contractor shall perform Environmental Remediation Services (ERS) work in support of existing and future customers within the Northwestern Division (NWD) of the US Army Corps of Engineers (USACE). The ERS is regional contract tool for NWD and may be used by its 5 districts: Seattle, Portland, Walla Walla, Kansas City, and Omaha. This base period is for a duration of three (3) years from the date of contract award. This MATOC consists of a shared capacity in the amount of $115,000,000.00.
FOB: Destination
PSC CD: F108
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 Job
CR Base Period
CPFF
NWD Regional $115M Section 8(a) Small Business Environmental Remediation Services (ERS). This CLIN is designated for Cost Reimbursement work.
The Contractor shall perform Environmental Remediation Services (ERS) work in support of existing and future customers within the Northwestern Division (NWD) of the US Army Corps of Engineers (USACE). The ERS is regional contract tool for NWD and may be used by its 5 districts: Seattle, Portland, Walla Walla, Kansas City, and Omaha. This base period is for a duration of three (3) years from the date of contract award. This MATOC consists of a shared capacity in the amount of $115,000,000.00.
FOB: Destination
PSC CD: F108
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
DO NOT ENTER
0003 Job OPTION FFP Option Period 1 (2 Year Duration)
FFP
NWD Regional $115M Section 8(a) Small Business Environmental Remediation Services (ERS). This CLIN is designated for Firm Fixed Price work.
The Contractor shall perform Environmental Remediation Services (ERS) work in support of existing and future customers within the Northwestern Division (NWD) of the US Army Corps of Engineers (USACE). The ERS is regional contract tool for NWD and may be used by its 5 districts: Seattle, Portland, Walla Walla, Kansas City, and Omaha. This option period is for a duration of two (2) years. .
This MATOC consists of a shared capacity in the amount of $115,000,000.00.
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0004 Job OPTION CR Option Period 1 (2 Year Duration)
CPFF
NWD Regional $115M Section 8(a) Small Business Environmental Remediation Services (ERS). This CLIN is designated for Cost Reimbursement work.
The Contractor shall perform Environmental Remediation Services (ERS) work in support of existing and future customers within the Northwestern Division (NWD) of the US Army Corps of Engineers (USACE). The ERS is regional contract tool for NWD and may be used by its 5 districts: Seattle, Portland, Walla Walla, Kansas City, and Omaha. This option period is for a duration of two (2) years. . This MATOC consists of a shared capacity in the amount of $115,000,000.00.
FOB: Destination
PSC CD: F108
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
0005 Job OPTION FFP Option Period 2 (6 Month Duration)
FFP
NWD Regional $115M Section 8(a) Small Business Environmental Remediation Services (ERS). This CLIN is designated for Firm Fixed Price work.
The Contractor shall perform Environmental Remediation Services (ERS) work in support of existing and future customers within the Northwestern Division (NWD) of the US Army Corps of Engineers (USACE). The ERS is regional contract tool for NWD and may be used by its 5 districts: Seattle, Portland, Walla Walla, Kansas City, and Omaha. This option period is for a duration of six (6) months.
This MATOC consists of a shared capacity in the amount of $115,000,000.00.
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0006 Job OPTION CR Option Period 2 (6 Month Duration)
CPFF
NWD Regional $115M Section 8(a) Small Business Environmental Remediation Services (ERS). This CLIN is designated for Cost Reimbursement work.
The Contractor shall perform Environmental Remediation Services (ERS) work in support of existing and future customers within the Northwestern Division (NWD) of the US Army Corps of Engineers (USACE). The ERS is regional contract tool for NWD and may be used by its 5 districts: Seattle, Portland, Walla Walla, Kansas City, and Omaha. This option period is for a duration of six (6) months. . This MATOC consists of a shared capacity in the amount of $115,000,000.00.
FOB: Destination
PSC CD: F108
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE
The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
2,500.00 $2,500.00 115,000,000.00 $115,000,000.00
DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND ORDER VALUE
The minimum quantity and order value for each Delivery/Task Order issued shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for each Delivery/Task Order issued shall not exceed the maximum quantity and order value stated in the following table.
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
0.00 $0.00 25,000,000.00 $25,000,000.00
CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE
The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.
CLIN
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
0001 $ 25,000,000.00 $25,000,000.00
0002 $ 25,000,000.00 $25,000,000.00
0003 $ 25,000,000.00 $25,000,000.00
0004 $ 25,000,000.00 $25,000,000.00
0005 $ 25,000,000.00 $25,000,000.00
0006 $ 25,000,000.00 $25,000,000.00
SECTION C – PERFORMANCE WORK STATEMENT
SECTION C
PERFORMANCE WORK STATEMENT (PWS)
DECEMBER 16, 2020
Table of Contents
Table of Contents............................................................................................................................................................i
1 PART 1 – General information:
1.1 Description of Work:
1.2 Scope of Work:
1.3 Work Scope, Contractor Capability, and Experience:
1.4 Potential Additional Work Scope:
1.5 Background Information:
1.6 Description of Task Order:
1.7 Cost Reimbursement Task Orders:
1.7.1 General
1.7.2 Management Organization, Responsibilities, and Authorities
1.7.3 Mobilization
1.7.4 Management Information Systems (MIS)
1.7.5 Work Allocation Document (WAD)
1.7.6 Procurement and Subcontracting
1.7.7 Technical Changes and Claims
1.7.8 Closeout Procedures
1.8 Site-Specific Submittals:
1.8.1 Work Plan
1.8.2 Health and Safety Plan
1.8.3 Schedule
1.8.4 Technical and Regulatory Reports
1.8.5 Conference/Meeting Notes
1.9 Sustainable Practices:
1.10 Submittals:
1.10.1 Submittal Procedures
1.10.2 Approved Submittals
1.10.3 Disapproved Submittals
1.10.4 Withholding of Payment
1.10.5 Approval of Submittals
1.10.6 Deviations
1.10.7 Control of Submittals
1.10.8 Information Only Submittals
1.10.9 Partial Submittals
1.10.10 Revisions and Addenda
1.10.11 Review of Progress and Technical Adequacy
1.10.12 Distribution
1.10.13 As-Built Drawings
1.11 Veterans Employment Emphasis for US Army Corps of Engineers Contracts
1.12 Contract Performance Requirements
1.12.1 Investigation and Field Studies (Both on-site and off-site work)
1.12.2 Analytical Testing
1.12.3 Engineering Support and Remedial Design
1.12.4 Response Actions, Removals, and Operations and Maintenance
1.12.5 Planning Documentation Deliverables (Sampling and Analysis Plan (SAP), Field Sampling Plan
(FSP) and Quality Assurance Project Plan (QAPP) or similar planning documentation)
2 PART 2 – Products (not applicable)
3 PART 3 – Execution
3.1 Environmental Requirements:
3.2 Permits/Licenses:
3.3 Transportation, Storage, Treatment, and/or Disposal of Hazardous Wastes:
3.3.3 Transportation and Disposal Reporting Requirements
3.3.4 Contractor Responsibilities
3.3.5 Government Responsibilities
3.3.6 Regulator Notices of Non-Compliance
3.3.7 Subcontractor Coordination
3.4 Radiological Equipment:
3.5 Safety and Health:
3.5.1 General
3.5.2 Accident Prevention Plan
3.5.3 Approval of Accident Prevention Plan APP
3.5.4 Regulations
3.5.5 Responsibility
3.6 Engineering Requirements:
3.7 Project Personnel:
3.7.1 Program Manager
3.7.2 Project Manager(s)
3.7.3 On-Site Contractor Quality Control Supervisor (CQCS)
3.7.4 Safety and Health Professionals
3.7.5 Geologist
3.7.6 Chemist
3.7.7 Engineer
3.7.8 Process Engineer
3.7.9 Regulatory Specialist
3.7.10 Mechanical/Electrical Engineer
3.7.11 Multi-Disciplined Technical Staff
3.8 Physical Security:
3.9 Foreign Nationals:
3.10 Operational Security (OPSEC):
3.11 Contractor Manpower Reporting:
3.12 Task Order Specific Requirements:
SECTION C
PERFORMANCE WORK STATEMENT (PWS)
DECEMBER 16, 2020
1 PART 1 – GENERAL INFORMATION:
1.1 Description of Work: This solicitation will be for the award of Environmental Remediation Services (ERS)
Multiple Task Order Contracts (MATOCs) that will support USACE Seattle District’s existing customers along with new customers within the Northwestern Division Area of Responsibility (AOR) under NAICS Code
562910.
Work anticipated under these MATOCs includes, but is not limited to, full environmental remediation/ restoration services, including incidental construction associated with remedial actions, and other incidental professional type services, to include site characterization and assessment.
Projects may also include incidental demolition, hazardous and toxic waste remediation and disposal services per requirements set forth at the task order level. Incidental hazardous and toxic waste remediation may include asbestos/lead abatement or removal services. Projects will also focus on Per- and
Polyfluoroalkyl Substances (PFAS) site investigations, remedial investigations and/or remedial actions.
This contract for environmental response actions will include service and construction activities mandated by the Defense Environmental Restoration Program (DERP), Superfund, environmental compliance and pollution prevention projects under the Department of Defense Environmental Quality Program, Brownfields, Formerly Utilized Sites Remedial Action Program (FUSRAP), environmental cleanup activities under the Base Realignment and Closure (BRAC) Program, Department of Homeland Security and the Federal Emergency Management Agency (FEMA), and other environmental and homeland security laws and regulations requiring support activities for military installations, Corps' civil works projects, and work for other federal agencies. The DERP projects will include Installation Restoration
Program (IRP) activities
1.2 Scope of Work: The contracts to be awarded will require personnel, plant and equipment to respond to numerous requests for environmental support for the USACE Northwestern Division customers. Use of these
MATOCs for work by other USACE Districts within the continental U.S. may be approved by Seattle District, after consultation with the Multiple Environmental Government Acquisition (MEGA) Strategy Team.
1.3 Work Scope, Contractor Capability, and Experience: The majority of the task orders that will be issued under these ERS MATOCs will be to provide services and related construction to meet the requirements of the
Resource Conservation and Recovery Act (RCRA), the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), the National Oil and Hazardous Substances Pollution
Contingency Plan (NCP), the Clean Water Act, the Clean Air Act, and other related Federal Programs in addition to State/Local specific regulations/requirements dealing with hazardous waste management/disposal, Underground Storage Tanks (USTs), and other fuels-related issues. Remedial actions may address both regulated and non- regulated toxic substances. Construction efforts necessary to implement environmental remediation services is included in this scope of work.
The Contractors selected for this work shall have the capability and experience to perform or provide a wide range of Long-term Response Action and Remedial Action services at hazardous waste sites. These efforts may include environmental removal actions, remedial actions, and other remediation activities as well as related activities necessary to complete a successful remediation. Construction efforts necessary to implement environmental remediation services is included in this scope of work. Remedial activities may include, but are not limited to: excavation, transportation, and disposal of hazardous or toxic waste;
asbestos and lead-based paint remediation; building remediation and demolition; construction and operation of groundwater treatment plants and extraction systems; installation and operation of in-situ treatment technologies including but not limited to air sparging: chemical oxidation, chemical reduction, bioremediation, ground-water circulating wells, permeable reactive barriers, soil vapor extraction, and thermal treatment; water line installations/service connections hookups; and utility line replacement and/or remediation along utility lines; and erosion, sewer, and storm water controls for the purpose of compliance and/or pollution prevention.
Supporting activities include but are not limited to: Sampling and laboratory analysis of soil, groundwater, surface water, air, and sediments; preparation of work plans, reports, studies, and ability to conduct studies to support RCRA, CERCLA and other programs listed above; public participation such as presentation of both written and visual material; data analysis/interpretation/modeling, and data management; special studies such as Remedial System Evaluation (RSE), Monitored Natural Attenuation (MNA), State Historic
Preservation Offices studies, wetlands delineations, value engineering studies, energy studies, schedule analysis, and cost estimating.
1.4 Potential Additional Work Scope: The Contractors selected for this work may also be called upon to provide services and construction to support Department of Homeland Security and Federal Emergency Management
Agency (FEMA) initiatives in the event of a terrorist threat, an actual terrorist incident, or other incident. This will require capabilities which may include, but not be limited to, implementing measures to reduce environmental vulnerabilities, deterring terrorism and development of capabilities to combat and manage consequences and/or responding to hazardous, toxic, or radiological threats or incidents. These activities may involve weapons of mass destruction (WMD) or other terrorist weapons. Additionally, contractors selected may also be called upon to provide services for planning, design, and construction of measures required for population, area, and infrastructure and other protection efforts to include security engineering, vulnerability surveys, application of engineering evaluations and/or modifications of facilities to deter, defend against, and mitigate the effects of environmental threats, disasters, and attacks.
1.5 Background Information: The Contractor will receive from the Contracting Officer all necessary back-up data. For example, the Contractor will be provided with the remedial investigation/feasibility study and record of decision, if documentation exists, and plans and specifications, for an individual Task Order. It is the option of the Contracting Officer to require a site inspection with a representative of the Contractor before the negotiation of the Task Order/price.
1.6 Description of Task Order: The Contracting Officer or their authorized representative will provide the
Contractor with a Scope of Work or a Performance Work Statement for work or service required. Non-performance based Task Orders will be issued against the awarded MATOCs pending the required approval is received in accordance with USACE Acquisition Instruction (UAI) 5137.170-2. The Contractor shall provide the Government with a cost estimate within 30 days of the request unless specifically requested otherwise, depending on the work/Task Order. Task Orders awarded under this MATOC may be Fixed-Price contracts in accordance with FAR Subpart 16.2 or Cost-Reimbursement contracts in accordance with FAR Subpart 16.3.
The Government expects firm-fixed price contracts will be the primary type of task order awarded. For cost contracts valued at $20,000,000 or more, DFARS clause 252.234-7002 Earned Value Management System applies. Optional tasks to be included in an individual Task Order shall be proposed by the Contractor in accordance with FAR Clause 52.236-28, DFARS 252.236-7000 and other applicable sections within the contract. The Contractor's proposal shall be supported by necessary documentation such as drawings, calculations, catalog cuts, specifications, and architectural renderings, to indicate that adequate engineering and planning to accomplish the requirement has been done. Task Orders will be competed among all members of the MATOC pool. All Task Orders will be solicited and competed in accordance with procedures in FAR
16.505. The Contractor will not be reimbursed for the cost of Task Order proposal preparation.
1.7 Cost Reimbursement Task Orders: This section outlines Government policies, procedures, practices, and requirements as it relates to cost reimbursement contracting mechanisms.
1.7.1 General. Cost control is important in cost reimbursement task orders. It is imperative that the Contractor be capable of estimating, budgeting, accounting, and reporting costs by individual funding source as well as work item. In accordance with FAR 16.104(h), the Contractor must be capable to track costs on cost-reimbursable actions. To the extent practical, the Government will attempt to segregate Task Orders or other work authorizations to a sole funding source for administrative convenience. The Contractor shall make available, upon request, supporting documents and provide for physical inspection or demonstration at the appropriate office, of its accounting system capabilities to support cost reimbursement contract accounting needs.
1.7.2 Management Organization, Responsibilities, and Authorities. The objective of cost reimbursement
Task Orders is to obtain the specified work or service on time at the least possible cost. As such, the
Contractor must demonstrate a management team and organization capable of performing its own management and subcontract management effectively and efficiently. Managers identified as key personnel must have the relevant experience and education to perform the possible scope of services. The primary
Government authority under the contract is the Contracting Officer (KO).
Representatives of the Contracting Officer appointed in writing as authorized Contracting Officer's
Representative (COR) or Administrative Contracting Officer (ACO) also serve as personnel of authority.
Only the KO or ACO may cause an increase in the contract obligation amount or schedule. Technical direction under a cost reimbursement Task Order may also be made by the COR as long as it does not impact cost or schedule.
1.7.3 Mobilization. Mobilization is a non-recurring cost unique to individual work sites for a given Task Order.
Costs for mobilization will be reimbursed, if incurred, after formal execution of the relevant cost reimbursement Task Order. Mobilization costs prior to formal Task Orders are not reimbursable.
Contractors are encouraged to segregate non-recurring costs such as mobilization when submitting task order proposals.
1.7.4 Management Information Systems (MIS). Compliance with Department of Defense Instruction (DODI)
7000.2, Cost Schedule and Control System Criteria is not required; however, the principles of defining and maintaining a performance measurement baseline for comparison against the current estimate at completion and schedule are expected to be incorporated in some fashion in the Contractor's MIS. The MIS must be capable of integrating cost and recording progress payments for fixed-price and/or cost reimbursement type subcontracts. The Contractor shall provide personnel with successful experience in using the MIS tools.
1.7.4.1 This MIS must be capable of integrating cost and schedule information to provide, at a minimum: daily tracking of costs incurred, daily tracking of costs scheduled, projection of cost and schedules, earned value, and time phased budget and spending curves. Automated information should be remotely accessible at the work site and other locations to allow for daily cost tracking of actual labor (both on-site and home office), equipment, purchases, subcontracts, other commitments, obligations, and expenditures. This system should be able to be used as a project management tool to capture committed or obligated costs as they occur, not when reconciled at invoice.
1.7.4.2 As a minimum the system must have the following capabilities. All of these capabilities may not be required on every Task Order and will be required for each specifically based upon the need;
however, if the minimum requirements of the system area not specified in the Task Order, the following apply:
• The cost tracking system shall be maintained on-site and shall provide real time ability to capture costs and time phased budget and spending curves.
• The cost tracking system shall have the ability to forecast costs.
• The cost tracking system shall provide a daily report for review and approval by the
Government.
• The cost tracking system shall allow for active management and budgeting of Task
Order costs, including but not limited to home office costs, direct field costs, indirect costs, subcontractor costs, equipment costs, and other project costs.
• The cost tracking system shall have the ability to provide a weekly cost comparison/cost variance report. This report shall capture all committed/expended costs and shall allow the comparison of the forecasted total Task Order cost with the budgeted cost. It shall also show the overruns/under runs on the individual Task Order tasks.
1.7.5 Work Allocation Document (WAD).
1.7.5.1 The Work Allocation Document system may be used to allocate previously obligated contract funds by the Government to the Contractor and to further control the obligation or expenditures of funds for identified work. It is a series of numbered documents directly related to the Work
Breakdown Structure (WBS) prepared by the Contractor, and approved by the KO, ACO, or
COR.
1.7.5.2 After Task Order issuance, the Government may request the Contractor to submit WAD budgets in the government-specified WAD system format. This format will include: a) an approved
WBS; b) a cost estimate keyed to the WBS; c) a schedule for the task; and d) a narrative description of the scope of work. The Government will review the submitted WAD/WADs and approve/disapprove as necessary. The budget estimates of costs for the work orders submitted for each WAD shall not exceed the total budget for that order.
1.7.5.3 If a WAD request includes work that is beyond the scope of work/services, a Task Order modification is required. When a modification is necessary, the Contractor must revise the WAD request to include this work.
1.7.5.4 Once WAD approval has been obtained, the Contractor will submit requests to the Government for the release of budget for one or more work orders/work elements within each WAD. No work will be performed until Government approval has been received and the budget is established for the task. The Contractor is authorized to expend and/or obligate funds under the order up to the dollar value authorized by the individual WAD. The Government may not reimburse the Contractor for costs incurred in excess of WAD allocations. Only allowable, allocable and reasonable costs will be considered for payment.
1.7.5.5 Transfer of funds between WADs due to overruns/under-runs will be strictly controlled by the
Government. It is possible that WADs could have more than one funding source. If this is the case, the WBS for that WAD will identify and segregate funding sources into separate work elements for tracking and control.
1.7.5.6 The Government will not automatically utilize the WAD process on cost reimbursement Task
Orders. Depending on the size, complexity, dollar value, and duration of a cost reimbursement
Task Order, the Government may elect to control costs while still authorizing the Contractor to expend and/or obligate funds up to the full Task Order estimated cost. In either event, the
Contractor is expected to utilize its cost control procedures to deliver to the Government at the least possible cost for the duration and work specified.
1.7.5.7 Work Variation Notice (WVN) and Authority To Proceed (ATP) documents may be utilized at the Government’s discretion. These documents will be initiated by the Contractor, signed by personnel with authority, and submitted to the USACE Project Manager, and other designated personnel, for review and approval. The formats for these documents are available upon request.
These documents are to be used for cost reimbursement Task Orders. Copies of these documents are included in Section J.
1.7.6 Procurement and Subcontracting. The contractor shall follow the requirements of FAR Part 44 and FAR
Clause 52.244-2 when buying materials or when obtaining subcontracting support for Cost Reimbursement
Task Orders.
1.7.6.1 Just as the Government clearly defines its procurement policy, the Contractor's procurement policy shall be clearly delineated. The Contractor shall utilize procurement and subcontracting procedures consistent with good faith principles and fair dealing. Further, where required, the
Contractor will employ the principles and requirements of the Federal Acquisition Regulation.
1.7.6.2 The objective of the Government is to select Contractors that will raise the standards of subcontract administration while incorporating integrity and peer respect. Adequate staffing to perform subcontract management is required. Detailed Contractor procurement procedures and subcontract program plans are critical to the successful implementation of this contract. In accordance with FAR 44.203(a), the Contracting Officer’s consent to a subcontract or approval of the Contractor’s purchasing system does not constitute a determination of the acceptability of the subcontract terms or price, or of the allowability of costs, unless the consent or approval specifies otherwise.
1.7.7 Technical Changes and Claims. Contract clauses for changes and disputes are included for cost reimbursement Task Orders. The Contractor shall minimize subcontract disputes and effectively and efficiently control and process subcontract changes. Pre-pricing of subcontract changes is preferred, as is a formal system of issuing subcontract changes where obligations are recorded in advance of issuance of drawing changes or Task Orders issued to the Contractor.
1.7.8 Closeout Procedures. All cost reimbursement Task Orders may require a final audit by the cognizant audit office of the Federal Government based on the final cost of the Task Order. The Contractor is expected to demonstrate procedures and processes that facilitate quick subcontract and supplier closeout and resolution of disputes.
1.8 Site-Specific Submittals: Site work shall not commence on a project until the Government, the Project
Manager (PM), Contracting Officer’s Representative (COR) and other appropriate management personnel, as required, has approved all of the site-specific submittals required for each specific Task Order to include
Insurance Certificates and Payment and Performance Bonds, if applicable. Submittals will be identified within each Task Order. Following are standard submittals for all Task Orders unless otherwise specified:
1.8.1 Work Plan. A comprehensive Work Plan shall be prepared, as required, to fully describe all aspects of the work to be completed. The Work Plan shall contain, when relevant, but not be limited to the following:
1.8.1.1 Work to be accomplished.
1.8.1.2 Discussion of implementation of the project including the method of operation, type of equipment, personnel required, data available, contaminant characterization, and other special considerations.
1.8.1.3 Schedule that presents the requirements to complete the required field work and key milestones.
1.8.1.4 Permits, licenses, and certificates, identification number, and locations of the disposal facility, if necessary
1.8.1.5 For projects where waste will be generated, whether it is hazardous or non-hazardous waste, a work plans shall cover procedures outlining the safe handling of contaminated material, drummed material, and contaminated liquids in addition to procedures for off-site transportation and disposal of materials. Manifesting, DOT shipping papers, and chain-of- custody procedures should also be included.
1.8.1.6 Key personnel to be used on the project and their responsibilities.
1.8.1.7 Logs, reports, and record keeping to be utilized
1.8.1.8 Site specific assumptions and clarifications
1.8.1.9 Site Control measures
1.8.1.10 Plans as listed below, as required.
1.8.2 Health and Safety Plan. A Site-specific health and safety plan including safety practices, procedures, and equipment is required. The Contractor shall develop, implement, and enforce an Accident Prevention Plan
(APP). The plan shall incorporate the requirements of 29 CFR 1910, Corps of Engineers EM 385-1-1
(Safety and Health Requirements, latest version) and ER385-1-92, (Safety and Occupational Health
Requirements for Hazardous, Toxic, and Radioactive Waste (HTRW) Activities). The Health and Safety
Manager shall sign and date the APP prior to submittal for approval.
1.8.3 Schedule. The Contractor shall prepare a project schedule for each individual Task Order. The schedule should show the proposed sequence to perform the work and dates contemplated for starting and completing all schedule activities. Provide a schedule that is a forward planning, as well as a project monitoring tool. Use the Critical Path Method (CPM) of network calculation to generate all Project
Schedules. Prepare each Project Schedule using the Precedence Diagram Method (PDM). The schedule will be approved by the USACE Contracting Officer or the USACE Project Manager/COR. The status of activities in the schedule will be updated by the Contractor to reflect the actual status. The schedule status will be included with Contractor Progress Reports as specified in the Task Order(s). The Progress Report shall discuss target and actual completion dates for each element of activity including project completion and provide an explanation of any deviation from the milestones in the work plan schedule. Where applicable, the Contractor shall establish and prepare a payment milestone schedule for each individual
Task Order. This milestone schedule shall be approved by the Project Manager/COR.
1.8.4 Technical and Regulatory Reports. Technical and regulatory reports shall be prepared and submitted by the Contractor to the Contracting Officer for each project. All reports shall have a title page/header identifying the Contract and Task Order number; Contractor name; project name; location of project; report type; and date of submittal. The Task Order statement of work will further specify the submittals for each project. The submittal requirements may vary with the project or site. The Contractor shall provide CD
ROM files for all submittals in original editable form (i.e. Microsoft Word, Excel, etc.). All native files including graphics, photographs, data acquisition, and files for geophysical quality assurance shall be included in addition to Word and Excel files. All final documents shall be provided as a bookmarked PDF file. Partial submittals will not be accepted without prior approval from the USACE Project Manager.