A.03 Quality Assurance Surveillance Plan_2024.pdf
PDF 159 KB Posted
- Solicitation number
- W9127N24Q0106
About this file
This document is a Quality Assurance Surveillance Plan (QASP) for a federal contract opportunity at The Dalles Lock and Dam to provide fire extinguisher, emergency equipment, and maintenance services.
The QASP outlines the government's plans to monitor the contractor's performance to ensure the required services and performance levels are met. It describes the roles and responsibilities of the Contracting Officer and Contracting Officer's Technical Representative, the performance standards and quality levels, the surveillance methods, quality assurance documentation requirements, and the process for analyzing quality assurance assessments and reporting performance. The key performance objectives include inspecting and maintaining fire extinguishers, escape air packs, emergency showers, self-contained breathing apparatus, automatic external defibrillators, and other emergency equipment on a monthly or annual basis. The government will use a combination of 100% inspections, periodic inspections, and customer feedback to assess the contractor's performance against the defined standards.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan (QASP)
The Dalles Lock and Dam Fire Extinguisher and Emergency Maintenance Services
Contract Number:
The services in this contract are to provide all labor, equipment, and materials necessary for the inspection, maintenance and servicing of the Fire Extinguisher and Emergency Maintenance Services at
The Dalles Lock and Dam.
Issued: 2024
Quality Assurance Surveillance Plan (QASP)
1.0 Introduction
This quality assurance surveillance plan (QASP) is pursuant to the requirements listed in the performance work statement (PWS) entitled The Dalles Project Fire Extinguisher and Emergency Maintenance Services. This plan sets for the procedures and guidelines The Dalles Dam will use in ensuring the required performance standards or services levels are achieved by the contractor.
1.1 Purpose
The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the PWS and the contractor’s quality control plan (QCP), and to ensure that the government pays only for the level of services received.
This QASP defines the roles and responsibilities of all members of the integrated project team (IPT), identifies the performance objectives, describes the methodologies used to monitor and evaluate the contractor’s performance, describes quality assurance documentation requirements, and describes the analysis of quality assurance monitoring results.
1.2 Performance Management Approach
The PWS structures the acquisition around “what” service or quality level is required, as opposed to “how” the contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by The Dalles Dam to monitor and manage the contractor’s performance to ensure the expected outcomes or performance objectives communicated in the PWS are achieved.
Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether expected outcomes for the project are being achieved by the contractor.
Performance management represents a significant shift from the more traditional quality assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the contactor to play a large role in how the work is performed, if the proposed processes are within the stated constraints. The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A “results” focus provides the contractor flexibility to continuously improve and innovate over the course of the contact if the critical outcomes expected are being achieved and/or the desired performance levels are being met.
1.3 Performance Management Strategy
The contractor is responsible for the quality of all work performed. The contractor measures that quality through the contractor’s own quality control (QC) program. QC is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by contractor employees or by subcontractors. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. The contractor will develop and implement a performance management system with processes to assess and report its performance to the designated government representative. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. This QASP enables government to take advantage of the contractor’s QC program.
The government representative(s) will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against communicated performance objective. The government will make determination regarding incentives based on performance measurement metric data and notify the contractor of those decisions. The contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.
2.0 Roles and Responsibilities
2.1 The Contracting Officer
The contracting officer (KO) is responsible for monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by the Contracting Officer’s Representative (COR), Quality
Assurance Representative (QAR), and the contractor. The KO will designate one full-time COR as the government authority for performance management. The number of additional representatives serving as technical inspectors depends on the complexity of the services measured, as well as the contractor’s performance, and must be identified and designated by the KO.
2.2 Contracting Officer’s Technical Representative
The contracting officer’s technical representative (COTR) is designated in writing by the KO to act as his/her authorized representative to assist in administering a contract.
COTR limitations are contained in the written appointment letter. The COTR is responsible for technical administration of the project and ensures proper government surveillance of the contractor’s performance. The COTR is not empowered to make any contractual commitments or to authorize any contractual changes on the government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the KO for action. The COTR will have the responsibility for completing QA monitoring forms used to document the inspection and evaluation of the contractor’s work performance. Government surveillance may occur under the inspection of services clause for any service relating to the contract.
3.0 Identification of Required Performance Standards/Quality Levels The required performance standards and/or quality levels are included in the PWS and in Attachment 1, “Performance Requirements Summary.” [Adjust the following sentences to reflect the instant acquisition.] If the contract meets the required service or performance level, it will be paid the monthly amount agreed on in the contract. If the contractor exceeds the service or performance level, it is eligible to receive an incentive or award fee as stated in the contract. Failure to meet the required service or performance level will result in a deduction from the monthly amount.
4.0 Methodologies to Monitor Performance
Surveillance Techniques To minimize the performance management burden, simplified surveillance methods shall be used by the government to evaluate contractor performance when appropriate.
The primary methods of surveillance are (include those that apply)
• Random monitoring, which shall be performed by the COTR/COR designated inspector
• 100% Inspection-Each month, the COTR/COR, shall review the generated documentation and enter summary results into Surveillance Activity Checklist
• Periodic Inspection-COTR/COR typically perform the monthly periodic inspection
4.2 Customer Feedback
The contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measure through customer complaints.
Performance management drives the contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems but the customer always has the option to communicate complaints to the COR, as opposed to the contractor.
Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed, and must be forwarded to the COTR/COR. The COTR/COR will accept those customer complaints and investigate using the Quality Assurance Monitoring Form-identified in Attachment 2.
Customer feedback may also be obtained either from the results of formal customer satisfaction surveys or from random customer complaints.
4.3 Acceptable Quality Levels
The acceptable quality levels (AQLs) included in Attachment 1, Performance Requirements Summary Table, for contractor performance are structured to allow the contractor to manage how the work is performed while providing negative incentives for performance shortfalls. For certain critical activities the desired performance level is established at 100 percent. Other levels of performance are keyed to the relative importance of the task to the overall mission performance at The Dalles Dam.
5.0 Quality Assurance Documentation
The Performance Management Feedback Loop
The performance management feedback loop begins with the communication of expected outcomes. Performance standards are expressed in the PWS and are assessed using the performance monitoring techniques shown in Attachment 1.
5.2 Monitoring Forms
The government’s QA surveillance, accomplished by the COR, will be reported using the monitoring form in Attachments 2. The form, when completed, will document the government’s assessment of the contractor’s performance under the contract to ensure that the required results of the Project Fire Extinguisher and Emergency Equipment Services are being achieved.
The COR will retain a copy of all completed QA surveillance forms. (Electronic records filing or in CORT)
6.0 Analysis of Quality Assurance Assessment
6.1 Determining Performance
Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels.
6.2 Reporting
Upon completion of the work, the COR will prepare a written report summarizing the overall results of the quality assurance surveillance of the contractor’s performance.
This written report, which includes the contractor’s submitted monthly report and the completed quality assurance monitoring forms (Attachment 2), will become part of the QA documentation. It will enable the government to demonstrate whether the contractor is meeting the stated objectives and/or performance standards, including cost/technical/scheduling objectives.
6.3 Reviews and Resolution
The COR may require the contractor’s project manager, or a designated alternate, to meet with the COR and other government IPT personnel as deemed necessary to discuss performance evaluation. The COR will define a frequency of in-depth reviews with the contractor, including appropriate self-assessments by the contractor; however, if the need arises, the contractor will meet with COR as often as required or per the contractor’s request. The agenda of the reviews may include:
• Monthly performance assessment data and trend analysis
• Issues and concerns of both parties
• Projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis
• Recommendations for improved efficiency and/or effectiveness
The QAR must coordinate and communicate with the contractor to resolve issues and concerns regarding marginal or unacceptable performance.
The COR and contractor should jointly formulate tactical and long-term courses of action. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented. Changes to service levels, procedures, and metrics will be incorporated as a contract modification at the convenience of the PCO/ACO.
ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY
PERFORMANCE REQUIREMENTS SUMMARY
Performance
Objective Performance
Standard Surveillance Performance
Standard Fire extinguishers List and report the status of each fire extinguisher-annually
Periodic inspection 100%
Fire extinguisher Inspect portable fire extinguishers, include facilities, vehicles, boats, and cranes-monthly
Periodic inspection 100%
EBA’s Inspect escape air packs to ensure they are serviceable and have unobstructed access-monthly
Periodic inspection 100%
Eye wash/emergency showers
Inspect and operate plumbed eyewash, emergency shower and self-contained eyewash stations.
Change cartridge as necessary-monthly
Periodic inspection 100%
Self-contained breathing apparatus
(SCBA)
Inspect SCBA for access, serviceable and bottle is fully charged-monthly
Periodic inspection 100%
Self-contained breathing apparatus
(SCBA)
Inspect each SCBA component to ensure good working order-annually
Periodic inspection 100%
Automatic external defibrillator (AED)
Inspect and operate each AED component to ensure good
Periodic inspection 100% working order.
Change battery and pads as necessary-monthly
Fixed CO2 fire systems
Inspect fixed automatic fire systems-annually
Periodic inspection 100%
Dry chemical sprinkler system
Inspect dry chemical sprinklers system-annually
Periodic inspection 100%
Water hydrant services
Inspect and operate water hydrants-annually
Periodic inspection 100%
ATTACHMENT 2: SAMPLE QUALITY ASSURANCE MONITORING FORM
SERVICE OR STANDARD:
SURVEY PERIOD: __________________________________________________________
SURVEILLANCE METHOD (Check):
� 100% inspection � Periodic inspection � Customer complaint
LEVEL OF SURVEILLANCE (Check):
� Monthly � Quarterly � As needed
PERCENTAGE OF ITEMS INSPECTED DURING SURVEY PERIOD: _____________%
ANALYSIS OF RESULTS:
Observed service provider performance measurement rate: ___________% Service provider’s performance (Check):
� Meets standards � Does not meet standards
NARRATIVE OF PERFORMANCE DURING SURVEY PERIOD:
PREPARED BY: ___________________________ DATE: ________________________
| Quality Assurance Surveillance Plan (QASP) |
| 1.0 Introduction |
| 1.1 Purpose |
| 1.2 Performance Management Approach |
| 1.3 Performance Management Strategy |
| 2.0 Roles and Responsibilities |
| 2.1 The Contracting Officer |
| 2.2 Contracting Officer’s Technical Representative |
| 3.0 Identification of Required Performance Standards/Quality Levels |
| 4.0 Methodologies to Monitor Performance |
| Surveillance Techniques |
| 4.2 Customer Feedback |
| 4.3 Acceptable Quality Levels |
| 5.0 Quality Assurance Documentation |
| The Performance Management Feedback Loop |
| 5.2 Monitoring Forms |
| 6.0 Analysis of Quality Assurance Assessment |
| 6.1 Determining Performance |
| 6.2 Reporting |
| 6.3 Reviews and Resolution |
File details come from the government source that posted it. Updated .