A.03.20 PRS_Elevator.pdf

PDF 36 KB Posted

Attached to
Elevator Inspections and Maintenance Services Federal contract opportunity
Solicitation number
W9123721Q0001
Issued by
Department of the Army Corps of Engineers Engineering District Huntington

View the file

Other files for this federal contract opportunity

Other files attached to Elevator Inspections and Maintenance Services, newest first.
File Type Posted
B.08.02 W9123721Q0001.pdf PDF
A.03.09 GSA Form 376.pdf PDF
FORM PPQ-0.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE REQUIREMENTS SUMMARY

Required

Task

Standards Remedy QA Check by USACE Monitoring

Method

Full Load Elevator Tests

The Contractor shall perform all work as specified in the individual Task

Orders. For all identified deficiencies, the

Contractor will be allowed to reperform if the

Task Order and contract specifications allow.

Any test deemed questionable, inaccurate, or out of scope shall be reanalyzed at no cost to the

USACE.

The inspector will get a copy of the Task Order, scope of work, and technical instruments needed to verify work and record all aspects of the work on an inspection checklist form. The contractor will be informed of deficiencies in his performance.

100% inspection of work by

USACE

Annual Elevator

Inspections

The Contractor shall perform all work as specified in the individual

Task Orders. For all identified deficiencies, the

Contractor will be allowed to reperform if the

Task Order and contract specifications allow.

Any inspection deemed questionable, inaccurate, or out of scope shall be reanalyzed at no cost to the

USACE.

The inspector will get a copy of the Task Order, scope of work, and technical instruments needed to verify work and record all aspects of the work on an inspection checklist form. The contractor will be informed of deficiencies in his performance.

100% inspection of work by

USACE

Routine

Service/

Maintenance and/or

Repairs

The Contractor shall perform all work as specified in the individual Task

Orders. For all identified deficiencies, the

Contractor will be allowed to reperform if the

Task Order and contract specifications allow. Defects in

Contractor performance may be addressed by issuance of a CDR.

A CDR will be issued should the

Contractor fail to

Any service/maintena nce and/or repairs deemed questionable, inaccurate, or out of scope shall be redone at no cost to the USACE.

The inspector will get a copy of the Task Order, scope of work, and technical instruments needed to verify work and record all aspects of the work on an inspection checklist form. The contractor will be informed of deficiencies in his performance.

100% inspection of work by

USACE

correct deficiencies by reperformance.