A.03.20 PRS_Elevator.pdf
PDF 36 KB Posted
- Attached to
- Elevator Inspections and Maintenance Services Federal contract opportunity
- Solicitation number
- W9123721Q0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B.08.02 W9123721Q0001.pdf | ||
| A.03.09 GSA Form 376.pdf | ||
| FORM PPQ-0.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE REQUIREMENTS SUMMARY
Required
Task
Standards Remedy QA Check by USACE Monitoring
Method
Full Load Elevator Tests
The Contractor shall perform all work as specified in the individual Task
Orders. For all identified deficiencies, the
Contractor will be allowed to reperform if the
Task Order and contract specifications allow.
Any test deemed questionable, inaccurate, or out of scope shall be reanalyzed at no cost to the
USACE.
The inspector will get a copy of the Task Order, scope of work, and technical instruments needed to verify work and record all aspects of the work on an inspection checklist form. The contractor will be informed of deficiencies in his performance.
100% inspection of work by
USACE
Annual Elevator
Inspections
The Contractor shall perform all work as specified in the individual
Task Orders. For all identified deficiencies, the
Contractor will be allowed to reperform if the
Task Order and contract specifications allow.
Any inspection deemed questionable, inaccurate, or out of scope shall be reanalyzed at no cost to the
USACE.
The inspector will get a copy of the Task Order, scope of work, and technical instruments needed to verify work and record all aspects of the work on an inspection checklist form. The contractor will be informed of deficiencies in his performance.
100% inspection of work by
USACE
Routine
Service/
Maintenance and/or
Repairs
The Contractor shall perform all work as specified in the individual Task
Orders. For all identified deficiencies, the
Contractor will be allowed to reperform if the
Task Order and contract specifications allow. Defects in
Contractor performance may be addressed by issuance of a CDR.
A CDR will be issued should the
Contractor fail to
Any service/maintena nce and/or repairs deemed questionable, inaccurate, or out of scope shall be redone at no cost to the USACE.
The inspector will get a copy of the Task Order, scope of work, and technical instruments needed to verify work and record all aspects of the work on an inspection checklist form. The contractor will be informed of deficiencies in his performance.
100% inspection of work by
USACE
correct deficiencies by reperformance.