PERFORMANCE REQUIREMENTS SUMMARY
Required Task
Standards
Remedy
QA Check by USACE
Monitoring Method
Analysis of samples submitted by the USACE
The Contractor shall perform sample analysis to the specifications described in the Scope of Work document and associated bid schedule. This includes utilizing specified test methods and/or instruments, meeting accepted holding times, and reaching required MDLs.
Any sample result deemed questionable, inaccurate, or out of scope shall be reanalyzed at no cost to the USACE.
All Contractor-generated products shall be inspected by the Water Quality Technical Lead and any discrepancies shall be brought to the attention of the Contractor.
100% inspection of work by USACE
Generation of analysis report
The Contractor shall generate a report of sample analysis results as described in the Scope of Work document. This report shall include at a minimum: sample results and associated metadata, data qualifiers and their descriptions, internal quality control results, and chain of custody documents.
Any missing information shall be supplied by the Contractor as requested by the USACE.
All Contractor-generated products shall be inspected by the Water Quality Technical Lead and any discrepancies shall be brought to the attention of the Contractor.
100% inspection of work by USACE
Generation of analysis EDD
The Contractor shall generate an electronic data deliverable (EDD) spreadsheet of sample analysis results as described in the Scope of Work document within the designated time period. This spreadsheet shall be generated in the proper format and submitted on or before the due date as listed on the chain of custody documents submitted with each sample set.
Any missing information shall be supplied by the Contractor as requested by the USACE. The Contractor shall re-format or re-generate the EDD to the satisfaction of the USACE.
All Contractor-generated products shall be inspected by the Water Quality Technical Lead and any discrepancies shall be brought to the attention of the Contractor.
100% inspection of work by USACE