A.03.09 Tables and Figures.pdf
PDF 11 MB Posted
- Solicitation number
- W9123721Q0044
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W9123721Q0044.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TABLE 2
GROUNDWATER MONITORING AND EXTRACTION WELLS
TO BE MOWED AND INSPECTED AT WVOW
Well Condition Bollard Condition Concrete Pad Condition Number Condition Other Comments 1 ACDGW-001 ESI-2 1648794.53 695926.05 Monitoring Well
2 BGEGW-006 OU-1 Former Burning Grounds 1659253.00 694532.10 Monitoring Well
3 BGEGW-007 OU-1 Former Burning Grounds 1658714.00 693990.70 Monitoring Well
4 BGEGW-008 OU-1 Former Burning Grounds 1659066.00 693378.10 Monitoring Well
5 BGELW-002 OU-1 Former Burning Grounds 1658278.35 693555.59 Monitoring Well
6 BGELW-007 OU-1 Former Burning Grounds 1658456.83 693864.60 Monitoring Well
7 BGWGW-003 OU-1 Former Burning Grounds 1658437.00 694744.30 Monitoring Well
8 BGWGW-004 OU-1 Former Burning Grounds 1658262.91 694573.12 Monitoring Well
9 BGWLW-008 OU-1 Former Burning Grounds 1657973.13 694394.54 Monitoring Well
10 YWREW-501A OU-4 1661051.00 700666.00 Extraction Well Green Well Head 11 YWREW-501B OU-4 1661073.00 700691.00 Extraction Well Green Well Head 12 YWREW-502A OU-4 1659852.00 701423.00 Extraction Well Green Well Head 13 YWREW-502B OU-4 1659838.00 701435.00 Extraction Well Green Well Head
14 IWSLGW-001I Industrial Wastewater Sewer Line 1662230.52 700995.82 Monitoring Well
15 IWSLGW-001S Industrial Wastewater Sewer Line 1662235.89 700987.35 Monitoring Well
16 IWSLGW-002I Industrial Wastewater Sewer Line 1660993.74 702601.19 Monitoring Well
17 MCYGW-001 ESI-9 1656433.05 699231.07 Monitoring Well Flush Mount 18 MCYGW-002 ESI-9 1657842.81 699872.56 Monitoring Well Flush Mount 19 MCYGW-002D ESI-9 1657833.04 699863.73 Monitoring Well Flush Mount
20 MZAGW-001 Industrial Wastewater Sewer Line 1661200.73 702361.70 Monitoring Well
21 MZAGW-002 ESI-1 1660551.59 703366.35 Monitoring Well
22 NAAGW-001 Industrial Wastewater Sewer Line 1661819.00 701614.00 Monitoring Well
23 NAAGW-001D Industrial Wastewater Sewer Line 1661824.00 701606.90 Monitoring Well
24 NGMW-001 SLTMP 1651552.06 697255.27 Monitoring Well 25 NGMW-002 SLTMP 1651432.80 697201.64 Monitoring Well
26 NPHGW-002 OU-3 Former Yellow Water Reservoir 1659045.13 701842.17 Monitoring Well Located Fairgrounds
Remarks/Mowing Frequency Well Inspection Comments - For Contractor to Complete During InspectionNo. Well ID Operable Unit ID/Location X Coord Y Coord Well Type
TO BE MOWED AND INSPECTED AT WVOW
Well Condition Bollard Condition Concrete Pad Condition Number Condition Other Comments Remarks/Mowing Frequency
Well Inspection Comments - For Contractor to Complete During InspectionNo. Well ID Operable Unit ID/Location X Coord Y Coord Well Type
27 NPHGW-002D OU-3 Former Yellow Water Reservoir 1659040.01 701836.46 Monitoring Well Located Fairgrounds
28 NPHGW-034 OU-12 1659118.00 702468.90 Monitoring Well 29 NPHGW-034D OU-12 1659134.00 702491.20 Monitoring Well
30 P03GW-018 Industrial Wastewater Sewer Line 1662805.00 701308.30 Monitoring Well
31 P13EW-402 OU-5 1663441.78 698120.66 Extraction Well Green Well Head 32 P13EW-403 OU-5 1663437.07 698078.81 Extraction Well Green Well Head 33 P13GW-022 OU-5 1663847.00 697806.80 Monitoring Well 34 P13GW-022D OU-5 1663839.00 697823.80 Monitoring Well
35 P13GW-023I Industrial Wastewater Sewer Line 1663622.00 697989.80 Monitoring Well
36 P13GW-023S OU-5 1663557.00 698056.40 Monitoring Well 37 P13GW-048D OU-5 1663485.00 698455.90 Monitoring Well 38 P13GW-049 OU-5 1664052.00 698140.50 Monitoring Well 39 P13MW-002 OU-5 1663386.69 698076.34 Monitoring Well 40 P13MW-003 OU-5 1663461.59 698082.12 Monitoring Well 41 P13MW-004 OU-5 1663445.71 698033.79 Monitoring Well 42 P13MW-005 OU-5 1663460.03 697976.49 Monitoring Well 43 P13MW-006 OU-5, Pond 13 1663619.14 698067.80 Monitoring Well 44 P13MW-007 OU-5, Pond 13 1663302.50 698088.44 Monitoring Well 45 P13MW-008 OU-5, Pond 13 1663591.60 697927.72 Monitoring Well 46 P13MW-009 OU-5, Pond 13 1663358.77 698163.42 Monitoring Well 47 P13MW-010 OU-5, Pond 13 1663399.37 698033.98 Monitoring Well 48 P13MW-011 OU-5, Pond 13 1663511.61 697999.46 Monitoring Well 49 P13MW-012 OU-5, Pond 13 1663579.12 698157.74 Monitoring Well 50 P13OB-003 OU-5 1663388.00 697974.10 Monitoring Well 51 P13OB-004 OU-5 1663357.00 697993.30 Monitoring Well 52 P13PT-001 OU-5 1663420.00 697953.90 Monitoring Well
53 P17GW-038 OU-1 Former TNT Manufacturing Area 1664402.00 696603.50 Monitoring Well
54 PASGW-005 ESI-2 1648132.00 696283.70 Monitoring Well Flush Mount
55 PASGW-008 Inside National Guard Facility
1651065.00 697420.50
Monitoring Well Flush Mount
56 PPLGW-008 AOC-3 1659375.98 704996.56 Monitoring Well 57 PPLGW-008D AOC-3 1659367.44 705009.28 Monitoring Well 58 PPLGW-009 AOC-3 1659436.44 704793.88 Monitoring Well 59 PPLGW-009D AOC-3 1659446.11 704776.20 Monitoring Well 60 PPLGW-010 OU-1 Point Pleasant Landfill 1659676.56 704942.43 Monitoring Well 61 PPLGW-010D OU-1 Point Pleasant Landfill 1659681.25 704936.48 Monitoring Well 62 PPLGW-011 AOC-3 1659635.23 704529.23 Monitoring Well 63 PPLGW-011D AOC-3 1659640.28 704512.44 Monitoring Well 64 PPLGW-012 AOC-3 1659326.37 704207.42 Monitoring Well 65 PPLGW-012D AOC-3 1659332.92 704216.46 Monitoring Well 66 PPLGW-013 AOC-3 1659703.36 705380.88 Monitoring Well 67 PPLGW-013D AOC-3 1659714.70 705381.31 Monitoring Well 68 PPLGW-014 ESI-9 1660743.18 703386.08 Monitoring Well 69 PPLGW-032 OU-7 1658281.00 704580.60 Monitoring Well 70 PPLGW-032D OU-7 1658280.00 704594.30 Monitoring Well 71 PPLLF-001 OU-7 1662637.00 703413.80 Monitoring Well 72 PPLLF-002 OU-7 1660808.00 704489.80 Monitoring Well 73 PPLLF-003 Industrial Wastewater Sewer Line 1660056.00 704717.80 Monitoring Well 74 PPLLF-004 Industrial Wastewater Sewer Line 1660094.00 704100.80 Monitoring Well 75 PPLLF-005 Industrial Wastewater Sewer Line 1660417.00 703531.00 Monitoring Well 76 PPLLF-006 OU-7 1659520.00 705041.40 Monitoring Well 77 PPLLF-007 OU-7 1659550.00 704002.10 Monitoring Well 78 PPLLW-003D Industrial Wastewater Sewer Line 1660031.12 704630.37 Monitoring Well 79 PPWGW-002A OU-1 Sentry Wells 1653432.00 698028.90 Monitoring Well
TO BE MOWED AND INSPECTED AT WVOW
Well Condition Bollard Condition Concrete Pad Condition Number Condition Other Comments Remarks/Mowing Frequency
Well Inspection Comments - For Contractor to Complete During InspectionNo. Well ID Operable Unit ID/Location X Coord Y Coord Well Type
80 PPWGW-003 OU-1 Sentry Wells 1653698.00 701770.30 Monitoring Well 81 PPWGW-004 OU-1 Sentry Wells 1654325.00 699309.70 Monitoring Well 82 PPWGW-005 OU-1 Sentry Wells 1655457.00 698580.40 Monitoring Well 83 PPWGW-011 OU-1 Sentry Wells 1653092.44 696904.74 Monitoring Well Flush Mount 84 PPWGW-012 OU-1 Sentry Wells 1653179.82 700145.59 Monitoring Well Flush Mount 85 PPWGW-013 OU-1 Sentry Wells 1653322.08 699780.24 Monitoring Well Flush Mount 86 PWSGW-001 SLTMP 1650533.48 699972.63 Monitoring Well Flush Mount 87 PWSGW-002 SLTMP 1651677.44 699679.97 Monitoring Well Flush Mount 88 PWSGW-003 OU-1 Sentry Wells 1653244.78 699963.83 Monitoring Well Flush Mount 89 RMFLW-001 OU-1 1663107.70 704015.93 Monitoring Well 90 RWLGW-001D AOC-21 1662041.76 701341.74 Monitoring Well 91 RWLGW-001I Industrial Wastewater Sewer Line 1662049.88 701335.45 Monitoring Well 92 RWLGW-001S AOC-21 1662050.39 701344.89 Monitoring Well 93 RWLGW-002D AOC-22 1661607.45 701062.95 Monitoring Well 94 RWLGW-002I AOC-22 1661599.48 701064.45 Monitoring Well 95 RWLGW-002S AOC-22 1661610.62 701053.52 Monitoring Well 96 RWLGW-024 Industrial Wastewater Sewer Line 1662954.00 699449.90 Monitoring Well 97 RWLGW-026 Industrial Wastewater Sewer Line 1660992.00 702610.70 Monitoring Well 98 RWLLW-004D Industrial Wastewater Sewer Line 1660988.22 702623.35 Monitoring Well 99 RWRDW-001 OU-2 1658069.00 706068.80 Monitoring Well 100 RWREW-101 OU-1 Former Red Water Reservoir 1657680.00 706533.00 Extraction Well Green Well Head 101 RWREW-103 OU-1 Former Red Water Reservoir 1657673.00 706665.00 Extraction Well Green Well Head 102 RWREW-105 OU-1 Former Red Water Reservoir 1657708.00 706806.00 Extraction Well Green Well Head 103 RWREW-107 OU-1 Former Red Water Reservoir 1657843.00 706769.00 Extraction Well Green Well Head 104 RWREW-109 OU-1 Former Red Water Reservoir 1657979.00 706733.00 Extraction Well Green Well Head 105 RWRGW-002 OU-1 Former Red Water Reservoir 1657420.96 706372.10 Monitoring Well Flush Mount 106 RWRGW-003 OU-1 Former Red Water Reservoir 1658395.18 705274.77 Monitoring Well 107 RWRGW-003D OU-1 Former Red Water Reservoir 1658388.69 705262.94 Monitoring Well 108 RWRGW-004 OU-1 Former Red Water Reservoir 1657698.44 706902.97 Monitoring Well Flush Mount 109 RWRGW-004D OU-1 Former Red Water Reservoir 1657710.05 706900.70 Monitoring Well Flush Mount 110 RWRGW-005 Industrial Wastewater Sewer Line 1657173.30 706756.94 Monitoring Well Flush Mount 111 RWRGW-029 OU-1 Former Red Water Reservoir 1659407.00 706272.50 Monitoring Well 112 RWRGW-030 OU-2 1658513.00 705461.00 Monitoring Well 113 RWRGW-031 OU-1 Former Red Water Reservoir 1659302.00 705498.10 Monitoring Well 114 RWRGW-033 ESI-4 1656773.00 706406.70 Bedrock Well Christmas Tree Farm 115 RWRGW-045 OU-1 Former Red Water Reservoir 1658694.27 705906.47 Monitoring Well 116 RWRGW-045D OU-1 Former Red Water Reservoir 1658703.00 705897.30 Monitoring Well 117 RWRGW-046 OU-1 Former Red Water Reservoir 1658442.00 706314.30 Monitoring Well 118 RWRGW-047 OU-1 Former Red Water Reservoir 1657943.00 706231.80 Monitoring Well 119 RWRGW-048 OU-1 Former Red Water Reservoir 1657865.33 706582.14 Monitoring Well 120 RWRGW-049 OU-1 Former Red Water Reservoir 1657312.69 706097.59 Monitoring Well 121 RWRGW-050 OU-1 Former Red Water Reservoir 1658718.79 706608.34 Monitoring Well 122 RWRGW-051 OU-1 Former Red Water Reservoir 1657693.52 706593.02 Monitoring Well 123 RWRGW-052 OU-1 Former Red Water Reservoir 1657689.82 706533.74 Monitoring Well 124 RWRGW-053 OU-1 Former Red Water Reservoir 1657393.92 706951.54 Monitoring Well Flush Mount, next to cornfield 125 RWRGW-054 OU-1 Former Red Water Reservoir 1657772.66 707104.67 Monitoring Well Flush Mount 126 RWRGW-055 OU-1 Former Red Water Reservoir 1657932.20 706818.82 Monitoring Well Flush Mount 127 RWRMW-001 OU-2 1658319.00 705708.60 Monitoring Well 128 RWRMW-002 OU-2 1657505.00 705534.80 Monitoring Well Flush Mount 129 RWRPT-001 OU-1 Former Red Water Reservoir 1658041.00 705994.90 Monitoring Well 130 SAAGW-001D OU-3 Former Yellow Water Reservoir 1660146.93 699983.19 Monitoring Well 131 SAAGW-002 OU-10 1659230.74 700499.10 Monitoring Well 132 SAAGW-005 OU-10 1659777.16 700973.53 Monitoring Well 133 SAAGW-042 OU-3 Former Yellow Water Reservoir 1660136.00 699978.60 Monitoring Well 134 TNTGW-005 OU-9 1659591.00 692909.60 Monitoring Well 135 TNTGW-009D OU-9 1658826.00 692562.90 Monitoring Well 136 TNTGW-010 OU-1 Former TNT Manufacturing Area 1660862.00 694502.90 Monitoring Well 137 TNTGW-010D OU-1 Former TNT Manufacturing Area 1660862.00 694502.90 Monitoring Well 138 TNTGW-011 OU-1 Former TNT Manufacturing Area 1662248.00 696380.30 Monitoring Well 139 TNTGW-012D OU-1 Former TNT Manufacturing Area 1663159.00 697597.70 Monitoring Well 140 TNTGW-013 OU-1 Former TNT Manufacturing Area 1663556.00 696937.80 Monitoring Well 141 TNTGW-014 OU-1 Former TNT Manufacturing Area 1662594.00 695883.90 Monitoring Well 142 TNTGW-015 OU-1 Former TNT Manufacturing Area 1661009.00 693800.60 Monitoring Well 143 TNTGW-016 OU-1 Former TNT Manufacturing Area 1660303.00 693723.50 Monitoring Well 144 TNTGW-017 OU-1 Former TNT Manufacturing Area 1661484.87 694292.59 Monitoring Well 145 TNTGW-019 OU-9 1662020.00 695976.00 Monitoring Well 146 TNTGW-020 OU-9 1661570.00 696506.70 Monitoring Well 147 TNTGW-021 Southeast Area 1661181.00 693075.60 Monitoring Well 148 TNTGW-037 OU-1 Former TNT Manufacturing Area 1661674.00 695562.40 Monitoring Well 149 TNTGW-043 OU-1 Former TNT Manufacturing Area 1663190.00 697608.10 Monitoring Well
TO BE MOWED AND INSPECTED AT WVOW
Well Condition Bollard Condition Concrete Pad Condition Number Condition Other Comments Remarks/Mowing Frequency
Well Inspection Comments - For Contractor to Complete During InspectionNo. Well ID Operable Unit ID/Location X Coord Y Coord Well Type
150 TNTGW-045 OU-1 Former TNT Manufacturing Area 1660291.12 693711.94 Monitoring Well 151 TNTGW-047 Pond Road Area 1662049.26 693742.22 Monitoring Well 152 TNTGW-048 Pond Road Area 1663777.44 696121.44 Monitoring Well 153 TNTGW-049 Pond Road Area 1663600.50 696027.76 Monitoring Well 154 TNTGW-050 Pond Road Area 1664061.73 695754.04 Monitoring Well 155 TNTGW-051 Pond Road Area 1663790.24 695669.24 Monitoring Well 156 TNTGW-052 OU-1 Former TNT Manufacturing Area 1661906.16 695843.46 Monitoring Well 157 TNTGW-053D OU-1 Former TNT Manufacturing Area 1660516.75 693262.22 Monitoring Well 158 TNTGW-054 OU-1 Former TNT Manufacturing Area 1660057.30 693694.27 Monitoring Well 159 TNTGW-055 OU-1 Former TNT Manufacturing Area 1660100.75 693562.16 Monitoring Well 160 TNTGW-056 OU-1 Former TNT Manufacturing Area 1660347.23 693644.97 Monitoring Well 161 TNTGW-057 OU-1 Former TNT Manufacturing Area 1660448.64 693443.89 Monitoring Well 162 TNTGW-058 OU-1 Former TNT Manufacturing Area 1661988.69 695802.17 Monitoring Well 163 TNTGW-059 OU-1 Former TNT Manufacturing Area 1659870.02 693785.25 Monitoring Well 164 TNTGW-060 OU-1 Former TNT Manufacturing Area 1659818.03 693613.83 Monitoring Well 165 TNTLW-005D OU-1 Former TNT Manufacturing Area 1661852.01 694527.67 Monitoring Well 166 TNTLW-006 OU-1 Former TNT Manufacturing Area 1660191.42 694519.91 Monitoring Well 167 TNTLW-006D OU-1 Former TNT Manufacturing Area 1660166.42 694514.56 Monitoring Well 168 TNTTW-002 OU-9 1661147.94 696477.63 Monitoring Well 169 TNTTW-002D OU-9 1661146.82 696493.72 Monitoring Well 170 TNTTW-004 OU-1 Former TNT Manufacturing Area 1662119.78 695056.56 Monitoring Well 171 TNTTW-004D OU-1 Former TNT Manufacturing Area 1662133.89 695047.81 Monitoring Well 172 TNTTW-005 OU-9 1661261.49 695887.93 Monitoring Well 173 TNTTW-006 Industrial Wastewater Sewer Line 1661599.69 696278.64 Monitoring Well 174 TNTTW-007 OU-1 Former TNT Manufacturing Area 1662538.20 697330.91 Monitoring Well 175 TNTTW-009 OU-9 1662747.20 697783.40 Monitoring Well 176 TNTTW-010 OU-9 1660446.86 693564.57 Monitoring Well 177 TNTTW-011 OU-9 1660828.02 695105.55 Monitoring Well 178 TNTTW-012 OU-9 1661180.19 695520.24 Monitoring Well 179 W07GW-002 OU-6 1664395.40 697998.67 Monitoring Well 180 W21GW-003 OU-1 Former Burning Grounds 1657412.27 693646.44 Monitoring Well 181 YWLGW-025 Industrial Wastewater Sewer Line 1662245.00 700051.10 Monitoring Well 182 YWLGW-025D Industrial Wastewater Sewer Line 1662232.00 700065.80 Monitoring Well 183 YWRDW-001 OU-3 Former Yellow Water Reservoir 1660762.00 700993.60 Monitoring Well 184 YWRGW-002 OU-3 Former Yellow Water Reservoir 1661195.20 699905.63 Monitoring Well 185 YWRGW-002D OU-3 Former Yellow Water Reservoir 1661200.87 699899.62 Monitoring Well 186 YWRGW-027 OU-3 Former Yellow Water Reservoir 1661336.00 700360.30 Monitoring Well 187 YWRGW-027D OU-3 Former Yellow Water Reservoir 1661265.00 700406.30 Monitoring Well 188 YWRGW-028 OU-3 Former Yellow Water Reservoir 1659913.00 702099.30 Monitoring Well 189 YWRGW-041 OU-3 Former Yellow Water Reservoir 1660118.00 701273.60 Monitoring Well 190 YWRGW-044 OU-3 Former Yellow Water Reservoir 1660869.00 700203.80 Monitoring Well 191 YWRGW-045 OU-3 Former Yellow Water Reservoir 1660552.47 701654.85 Monitoring Well 192 YWRGW-046 OU-3 Former Yellow Water Reservoir 1661052.93 700656.22 Monitoring Well 193 YWRGW-047 OU-3 Former Yellow Water Reservoir 1659862.09 701419.12 Monitoring Well 194 YWRGW-048 OU-3 Former Yellow Water Reservoir 1660559.70 700558.93 Monitoring Well 195 YWRGW-048D OU-3 Former Yellow Water Reservoir 1660554.89 700564.67 Monitoring Well 196 YWRGW-049 OU-3 Former Yellow Water Reservoir 1659463.40 701076.69 Monitoring Well 197 YWRGW-049D OU-3 Former Yellow Water Reservoir 1659457.04 701083.90 Monitoring Well Flush Mount 198 YWRGW-050 OU-3 Former Yellow Water Reservoir 1660533.47 701002.44 Monitoring Well 199 YWRGW-050D OU-3 Former Yellow Water Reservoir 1661106.71 700644.22 Monitoring Well 200 YWRGW-051 OU-3 Former Yellow Water Reservoir 1661342.49 700851.37 Monitoring Well 201 YWRGW-051D OU-3 Former Yellow Water Reservoir 1659789.83 701420.33 Monitoring Well 202 YWRGW-052 OU-3 Former Yellow Water Reservoir 1662024.37 700643.77 Monitoring Well 203 YWRGW-053 OU-3 Former Yellow Water Reservoir 1661234.04 701437.22 Monitoring Well 204 YWRGW-054 OU-3 Former Yellow Water Reservoir 1660632.68 701338.08 Monitoring Well 205 YWRMW-001A OU-3 Former Yellow Water Reservoir 1660836.26 701027.17 Monitoring Well 206 YWRPT-001 OU-3 Former Yellow Water Reservoir 1660025.00 701142.10 Monitoring Well
RMFLW-001RMFLW-001
COLOR INDEX
WATER-BEARING ZONES
PERCHED
DEEP CLAY SAND
DEEP
INTERMEDIATE / DEEP
INTERMEDIATE
SHALLOW
MNGR
PROJECTCHKDDRAWNCHKDINITIATOR
DATE
STARTING
AREA JOB NO. DRAWING NO. REV
A
12345678910111213
B
C
D
E
F
G s a m m c c a w le y lt m w p .d g n
:1
:4
A M
.0 f t in s e i_ t e x t s u b o n ly .t b l
P D
F w it h
L e v e ls .p lt
141516
H
I
J
K
L
M
X
YWRGW-054YWRGW-054
TNTGW-053DTNTGW-053D
RWRGW-049RWRGW-049
P13MW-003
P13MW-005
P13GRW-402
P13GRW-403
P13MW-003
P13MW-005
P13GRW-402
P13GRW-403
YWRGW-051D
RWRGW-053
RWRGW-055
TNTGW-052
RWRGW-048
RWRGW-051
YWRGW-051D
RWRGW-053
RWRGW-055
TNTGW-052
RWRGW-048
RWRGW-051
YWRGW-050
RWRGW-054
YWRGW-051
RWRGW-052
YWRGW-045
YWRGW-046
YWRGW-047
YWRGW-048
YWRGW-048D
YWRGW-049
YWRGW-049D
YWRGW-050D
RWRGW-050
YWRGW-050
RWRGW-054
YWRGW-051
RWRGW-052
YWRGW-045
YWRGW-046
YWRGW-047
YWRGW-048
YWRGW-048D
YWRGW-049
YWRGW-049D
YWRGW-050D
RWRGW-050
IWSLGW-002IIWSLGW-002I
IWSLGW-001S
IWSLGW-001I
IWSLGW-001S
IWSLGW-001I
TNTGW-054TNTGW-054
TNTGW-055TNTGW-055
N 700,500
N 703,500
N 706,500
E
,6
,0
,6
,0
,6
,0
,6
,0
,6
,0
KC S.DOWNEY
SCALE
1000 FEET 500
N 697,500
N 694,500
500112
CA SAM SAM
MASON COUNTY, WEST VIRGINIA
WEST VIRGINIA ORDNANCE WORKS
12MAY15
500112-LTM15-10
ACTIVE WELLS AT WVOW
FIGURE 2-9
LEGEND:
RWRGW-030
ZONES ARE ABSENT.
AGED BEDROCK OUTCROPS. WATER-BEARING
GENERALIZED AREAS OF PENNSYLVANIAN
POND & POND DESIGNATION
CREEK, RIVER, STREAM
RAILROAD
ROADS
TOPOGRAPHY
EXTRACTION WELL
MONITORING WELL
N 700,500
,6
,0
,6
,0
,6
,0
,6
,0
,6
,0
N 697,500
N 694,500
ACDGW-001
ACDGW-002
BGEGW-006
BGEGW-007
BGEGW-008
BGELW-002
BGELW-007
BGWGW-003
BGWGW-004
BGWLW-008
MCYGW-001
MCYGW-002MCYGW-002D
MZAGW-001
MZAGW-002
NGMW-001NGMW-002
NGMW-003
NPHGW-002NPHGW-002D
NPHGW-034 NPHGW-034D
P03GW-018
P13GW-022
P13GW-022D
P13GW-023I
P13GW-023S
P13GW-048D
P13GW-049
P13OB-004
PASGW-001
PASGW-002
PASGW-004
PASGW-005
PASGW-006
PASGW-007
PASGW-008
PCWGW-001
PCWGW-002
PCWGW-003
PCWGW-004
PCWGW-005
PCWGW-006
PCWGW-007
PCWGW-008
PCWGW-009
PCWGW-010
PPLGW-008
PPLGW-008D
PPLGW-009
PPLGW-009D
PPLGW-010
PPLGW-010D
PPLGW-011
PPLGW-011D
PPLGW-012 PPLGW-012D
PPLGW-013
PPLGW-013D
PPLGW-014
PPLGW-032PPLGW-032D
PPLLF-001
PPLLF-002
PPLLF-003
PPLLF-004
PPLLF-005
PPLLF-006
PPLLF-007
PPLLW-003D
PPWGW-002A
PPWGW-004
PPWGW-005
PPWGW-011
PPWGW-012
PPWGW-013
PWSGW-001
PWSGW-002
PWSGW-003
RWLGW-001D
RWLGW-001S
RWLGW-002D
RWLGW-002I
RWLGW-002S
RWLGW-024
RWLGW-026
RWLLW-004D
RWRDW-001
RWREW-101
RWREW-103
RWREW-105
RWREW-107
RWREW-109
RWRGW-002
RWRGW-003
RWRGW-003D
RWRGW-004
RWRGW-004D
RWRGW-005
RWRGW-029
RWRGW-030
RWRGW-031
RWRGW-033
RWRGW-045 RWRGW-045D
RWRGW-046
RWRGW-047
RWRMW-001
RWRMW-002
RWRPT-001
SAAGW-001D
SAAGW-002
SAAGW-005
SAAGW-042
TNTGW-005
TNTGW-009D
TNTGW-010
TNTGW-010D
TNTGW-011
TNTGW-013
TNTGW-014
TNTGW-015
TNTGW-016
TNTGW-017
TNTGW-019
TNTGW-020
TNTGW-021
TNTGW-037
TNTGW-043
TNTGW-045
TNTGW-048
TNTLW-005D
TNTLW-006
TNTLW-006D
TNTTW-002
TNTTW-002D
TNTTW-004
TNTTW-004D
TNTTW-006
TNTTW-007
TNTTW-009
TNTTW-010
TNTTW-011
TNTTW-012
W07GW-002
W21GW-003
YWLGW-025
YWLGW-025D
YWRGW-002
YWRGW-002D
YWRGW-027
YWRGW-027D
YWRGW-028
YWRGW-041
YWRGW-044
YWRMW-001A
TNTGW-049
TNTGW-050
TNTGW-051
PPWGW-003
TNTGW-047
P17GW-038
P13PT-001
TNTGW-012D
NAAGW-001
NAAGW-001D
RWLGW-001I
YWRDW-001
TNTTW-005
MCYGW-001
ACDGW-001
ACDGW-002
BGEGW-006
BGEGW-007
BGEGW-008
BGELW-002
BGELW-007
BGWGW-003
BGWGW-004
BGWLW-008
MCYGW-001
MCYGW-002MCYGW-002D
MZAGW-001
MZAGW-002
NGMW-001NGMW-002
NGMW-003
NPHGW-002NPHGW-002D
NPHGW-034 NPHGW-034D
P03GW-018
P13GW-022
P13GW-022D
P13GW-023I
P13GW-023S
P13GW-048D
P13GW-049
P13OB-004
PASGW-001
PASGW-002
PASGW-004
PASGW-005
PASGW-006
PASGW-007
PASGW-008
PCWGW-001
PCWGW-002
PCWGW-003
PCWGW-004
PCWGW-005
PCWGW-006
PCWGW-007
PCWGW-008
PCWGW-009
PCWGW-010
PPLGW-008
PPLGW-008D
PPLGW-009
PPLGW-009D
PPLGW-010
PPLGW-010D
PPLGW-011
PPLGW-011D
PPLGW-012 PPLGW-012D
PPLGW-013
PPLGW-013D
PPLGW-014
PPLGW-032PPLGW-032D
PPLLF-001
PPLLF-002
PPLLF-003
PPLLF-004
PPLLF-005
PPLLF-006
PPLLF-007
PPLLW-003D
PPWGW-002A
PPWGW-004
PPWGW-005
PPWGW-011
PPWGW-012
PPWGW-013
PWSGW-001
PWSGW-002
PWSGW-003
RWLGW-001D
RWLGW-001S
RWLGW-002D
RWLGW-002I
RWLGW-002S
RWLGW-024
RWLGW-026
RWLLW-004D
RWRDW-001
RWREW-101
RWREW-103
RWREW-105
RWREW-107
RWREW-109
RWRGW-002
RWRGW-003
RWRGW-003D
RWRGW-004
RWRGW-004D
RWRGW-005
RWRGW-029
RWRGW-030
RWRGW-031
RWRGW-033
RWRGW-045 RWRGW-045D
RWRGW-046
RWRGW-047
RWRMW-001
RWRMW-002
RWRPT-001
SAAGW-001D
SAAGW-002
SAAGW-005
SAAGW-042
TNTGW-005
TNTGW-009D
TNTGW-010
TNTGW-010D
TNTGW-011
TNTGW-013
TNTGW-014
TNTGW-015
TNTGW-016
TNTGW-017
TNTGW-019
TNTGW-020
TNTGW-021
TNTGW-037
TNTGW-043
TNTGW-045
TNTGW-048
TNTLW-005D
TNTLW-006
TNTLW-006D
TNTTW-002
TNTTW-002D
TNTTW-004
TNTTW-004D
TNTTW-006
TNTTW-007
TNTTW-009
TNTTW-010
TNTTW-011
TNTTW-012
W07GW-002
W21GW-003
YWLGW-025
YWLGW-025D
YWRGW-002
YWRGW-002D
YWRGW-027
YWRGW-027D
YWRGW-028
YWRGW-041
YWRGW-044
YWRMW-001A
TNTGW-049
TNTGW-050
TNTGW-051
PPWGW-003
TNTGW-047
P17GW-038
P13PT-001
TNTGW-012D
NAAGW-001
NAAGW-001D
RWLGW-001I
YWRDW-001
TNTTW-005
MCYGW-001
YWREW-502B
YWREW-502A
YWREW-502B
YWREW-502A
YWREW-501BYWREW-501B
YWREW-501AYWREW-501A
YWRPT-001YWRPT-001
P13MW-012P13MW-012
P13MW-011
P13MW-010
P13MW-011
P13MW-010
CB&I Federal Services LLC
RWREW-101
YWRGW-052YWRGW-052
YWRGW-053YWRGW-053
P13MW-004P13MW-004
P13MW-002P13MW-002
TNTGW-059TNTGW-059
TNTGW-060TNTGW-060
P13OB-003P13OB-003
TNTGW-058TNTGW-058
TNTGW-057TNTGW-057
TNTGW-056TNTGW-056
P13MW-009
P13MW-006
P13MW-008
P13MW-009
P13MW-006
P13MW-008
P13MW-007P13MW-007
FIGURE 7
ACTIVE WELLS AND PIEZOMETERS
wvow
Mowing Contract Figure 8
Barricades North WVOW
(locations and dimensions are approximate)
Guardrail gate
Chain-link gate
G
DNR
gate
Tank trap
US Army Corps of
Engineers Huntington
District wvow
Contract Figure 9
Barricades SouthWVOW
(locations and dimensions are approximate)
Guardrail gate
Chain-link gate
G
DNR
gate
Tank trap r:'P'r.'I
US Army Corps of
Engineers Huntington
District
WVOW
Contract Figure 10
Well Inspection Checklist Example
Flush Mount Well Standpipe with Bollards and Concrete base
Extraction Well with Bollards
Standpipe with Paint Removed Well Standpipe and Bollards with primer
WVOW
Mowing Contract Figure 11
Photographs
Contract Figure 12
Photographs Soil Covers/ Soil Caps Red Water Reservoir RCRA Caps TNT Washer Flaker House Cap 6
TNT Washer Flaker House Cap 8 Burning Grounds Cap
Contract
Figure 13a Photographs Main Access Roads and RWR Area
Main Access Road North of Yellow Water Treatment Building
Main Access Road leading to Red Water Reservoir
Red Water Reservoir Levy (winter) Red Water Reservoir Levy (summer)
Contract
Figure 13b Photographs Main Access Roads and RWR Area
Example of a faded warning sign Main Access Road leading to Red Water Reservoir, mow and clear vertically all access roads and paths
Access road from Burning Grounds to Pond 30 Monitoring well prior to string trimming
Contract Figure 14 Roads &
Paths to be Mowed -
RWR
Red Water Reservoir Area
Contract Figure 15 Roads &
Paths to be Mowed -
YWR
Yellow Water Reservoir Area
Contract Figure 16 Roads &
Paths to be Mowed -
BG, TNT
MfA, ESI-8
Burning Grounds, TNT Manufacturing Area and ESI-8
Contract Figure 17 Roads &
Paths to be Mowed -
Airport Area
Wells, Roads and Paths near Mason County Airport
Contract
Figure 18a Drainage Areas @
RWR to be Mowed
Red Water Reservoir Drainage Ditches, See also Figure 18b
Contract
Figure 18b Drainage Areas @
RWR to be Mowed
Red Water Reservoir Drainage Areas
Underdrain at RWR Cap
RWR Pond
Contract Figure
19a
YWR
Outfall Ditch
Yellow Water Reservoir Outfall Ditch, See also Figure 19b
Treatment Building
Contract
Figure 19b
YWR
Outfall Ditch
Yellow Water Reservoir Outfall Ditch
YWR outfall
15 foot clearance on this side of ditch
Access road
GATE
Item Description Yes No N/A
1. Signature sheet
a. Includes the name, signature, and title of the Plan Preparer (Qualmed person, i.e. corporate safety staff person, QC)
b. Includes the name, signature,and tiUe of the Plan Approver {e.g.
owner, company president, regional vice presiden
c. Includes the name{s), signature(s), and title{s) for Plan Concurrence (provide concurrence of other applicable corporate and project personnel(contractor))
2.Background information
a. Includes the Contractor Name.
b. Includes the Contract Number.
c. Includes the Project Name.
d. Includes the Brief Project Description.
e. Includes the Location of the Project {map).
f. Includes a means to evaluate the work being done (see AHA requirements in 01.A.13) and associated hazards involved.
g. Addresses the identified hazards involved and the control measures to be taken.
3. Statement of Safety and Health Policy detailing their commitment to providing a safe and healthfulworkplace for all employees.
4.Responsibilities and Lines of Authorities a.Includes the identification and job responsibilities of personnel responsible for safety - at both corporate and project level - including their resumes.
b.Includes the lines of authority.
5. Training- new hire SOH orientation training at the time of initial hire of each new employee and any periodic retraining/recertification requirements 6.Procedures for job site inspections - assignment of responsibilities and frequency CESO Checklist A-01,Sep 14
U.S.Army Corps of Engineers Safety Inspection Checklist
Abbreviated Accident Prevention Plan
Inspector Name (Print) Inspector Signature
This checklist serves as a guide only. It does not replace or eliminate the need to comply with the requirements set forth in Engineering Manual 385-1-1, Safety and Health Requirements Manual, dated XX September 2014.The references Included In this checklist correspond to the applicablesections of EM 385-1-1.
If service, supply and R&D contracts with limited scopes are awarded, the contractor may submit an abbreviated Accident Prevention Plan. This APP shall address the following areas at a minimum. If other areas of the EM 385-1-1 are pertinent to the contract, the contractor must assure these areas are addressed as well.
Remarks (Any NO or N/A Item)
Date of Inspection
Location (Plant or Facility) Contract Number
Contractor Name Project Name
FIGURE 20
Date of Inspection
7.Procedures for reporting man-hours worked and reporting and investigating any accidents as soon as possible but not more than 24 hours afterwards to the Contracting Officer/Representative
(CO/COR).
8.Emergency Planning. Employees working alone shall be provided an effective means of emergency communication. This may be cellular phone, two-way radio or other acceptable means. The selected means of communication must be readily available and must be in working condition.
9.Drinking Water provisions, toilet and washing facilities.
10.First Aid and CPR training (at least two employees on each shift shall be qualified/certified to administer first aid and CPR) and provision of first aid kit (types/size).
11.Personal Protective Equipment
a. Work Clothing - Minimum Requirements. Employees to wear clothing suitable for the weather; minimum requirements for work shall be short-sleeve shirt, long pants (excessively long or baggy pants are prohibited) and leather work shoes. If AHA determines safety-toed (or other protective) footwear is necessary (i.e., mowing, weed eating, chain saw use, etc), they shall be wom.
b.Eye and Face Protection. Eye and face protection shall be worn as determined by an analysis of the operations being performed HOWEVER, all involved in chain saw use, chipping,stump grinding, pruning operations, grass mowing, weed eating and blowing operations shall be provided safety eyewear (Z87.1) as a minimum.
c. Hearing Protection. Hearing protection must be worn by all exposed to high noise activities {includes grass mowing/trimming, chainsaw operations, tree chipping, stump grinding and pruning) d.Head Protection. Hard hats shall comply with ANSIZ89.1 and shall be wom by all workers when a head hazard exists. At a minimum, hard hats shall be worn when performing activities identified in {b) above e.High Visibility Apparel shall comply with ANSI/ISEA 107, Class 2 requirements at a minimum and shall be worn by all workers exposed to vehicular or equipment traffic.
f.Protective Leg chaps shall be wom by all chainsaw operators.
g. Gloves of the proper type shall be worn by persons involved in activities that expose the hands to cuts,abrasions, punctures, bums and chemicalirritants.
h. If work is being performed around water and drowning is a hazard, PFD's must be provided and worn as appropriate.
12.Machine Guards and safety devices. Lawn maintenance equipment must have appropriate guards and safety devices in place and operational.
CESO Checklist A-01,Sep 14
U.S.Army Corps of Engineers Safety Inspection Checklist
Abbreviated Accident Prevention Plan Remarks (Any NO or N/A item)
Date of Inspection
13. Hazardous Substances. When any hazardous substances are procured, used, stored or disposed, a hazard communication program must be in effect and MSDSs shall be available at the worksite. Employees shall have received training in hazardous substances being used. When the eyes or body of any person may be exposed to corrosives, irritants or toxic chemicals, suitable facilities for quick drenching or flushing of the eyes and body shall be provided within 10 seconds of the worksite.
14. Traffic control shall be accomplished in accordance with DOrs
MUTCD.
15. Control of Hazardous Energy (Lockout/Tagout). Before an employee perfonns any servicing or maintenance on any equipment where the unexpected unergizing or startup of the equipment could occur, procedures must be in place to ensure adequate control of
16. Driving, working on (i.e., working with equipmenUmowers) while on slopes, working from/in boats/skiffs, etc shall also be considered and dealt with accordingly.
Other Remarks
CESO Checklist A-01,Sep 14
Remarks (Any NO or N/A Item)
U.S.Army Corps of Engineers Safety Inspection Checklist
Abbreviated Accident Prevention Plan
EXAMPLE FOR CONTRACTOR’S USE
QUALITY CONTROL PLAN
FOR
MOWING OF VARIOUS LOCATIONS AND PERFORMING GROUNDWATER
MONITORING WELL INSPECTION AND REPAIR
FORMER WEST VIRGINIA ORDNANCE WORKS
POINT PLEASANT, MASON COUNTY, WEST VIRGINIA
CONTRACT NO. ______________________________
1.0 PURPOSE
The Contractor shall state the purpose of the Quality Control Plan (QCP). Basically describe the policy and specific actions that the Contractor shall implement to insure that high quality products are furnished to the Government. Specifically, the preparation, internal quality control review and revision, and revision following Government comments for all submittals that prepared for this project. The Contractor shall also state actions he shall implement to assure quality repair of the groundwater monitoring wells.
2.0 REFERENCES
The Contractor shall cite the following references:
• ER 1110-1-12 Quality Management, 1 June 1993
• CEORDR 1110-1-9, Quality Control and Quality Assurance, 3 March 1995
• CEORH Regulation No. 1110-2-4, Quality Management Plan
• CELRHR 5-2-7, Quality Management Plan,1 May 1999
• Appendix B, Engineering Sub plan; Paragraph 8, Contractor Quality Control Plan
• Applicable ISO 9001 processes developed for this type of work
The following website is provided to the Contractor to gain information on the Quality Control, Quality Management, and ISO 9001 requirements of the Huntington District:
http://www.lrh.usace.army.mil/Articles/index.cfm?id=2236&pge_prg_id=10438&pge_id=1284
3.0 GENERAL
Information shall be provided as to:
• Project type, e.g., DERP-FUDS program
• Project location, e.g., West Virginia Ordnance Works, Point Pleasant, WV
• Project customer, e.g., USACE, Huntington District
• General project description, e.g., mowing of various sites and performing groundwater monitoring well inspection and repair
FIGURE 21
http://www.lrh.usace.army.mil/Articles/index.cfm?id=2236&pge_prg_id=10438&pge_id=1284
• Project objectives, e.g., perform maintenance and repair in accordance with the approved O&M Plan, February 2008, and per the contract scope of work.
4.0 TRAINING
List any special training that field personnel have that is applicable for this specific project.
Certifications and/or proof or training shall be referenced and attached in an appendix to the
QCP.
5.0 RESPONSIBILITIES/INTERNAL QUALITY CONTROL
Responsibilities. State the responsibilities of the various individuals who shall provide services for this project. At a minimum, responsibilities range from preparation and internal review of the submittals, performing the groundwater monitoring well inspection, preparing and submitting the groundwater monitoring well inspection report, and repairing the groundwater monitoring wells.
Internal Quality Control. The Contractor shall list all individuals performing the work as well as the individuals who shall oversee the work and review the submittals (the Internal Quality Control Team, IQCT) prior to submission to the Government. Tasks that shall be performed by these individuals shall also be noted. Quality control review checklists for each submittal shall be prepared and included in an appendix to the QCP. These checklists shall list the items of work that the IQCT member was responsible for reviewing. Example checklists are included in CELRHR 5-2-7, Quality Management Plan. Note: Individuals preparing the various reports or plans CANNOT be the same individual who performs the internal quality control review; IQCT members must be independent and not directly involved with the report and/or plan preparation.
6.0 PROJECT SCHEDULE
The proposed schedule of work shall be stated: planned timeframes for submittals, performing the mowing operations, performing the groundwater monitoring well inspection, and repairing the groundwater monitoring wells.
7.0 RESUMES
The Contractor shall provide abbreviated resumes for all individuals performing work and internal quality reviews for this project. These should be included in an appendix to the QCP.
DD FORM 2772, SEP 1998 REPLACES MT FORM 352-R, WHICH IS OBSOLETE. Adobe Professional 8.0
FIGURE 22
FIGURE 23
SOURCE OF INJURY NAME
6+((7 2)
, FHUWLI\ WKDW WKH DERYH VXEPLWWHG LWHPV KDYH EHHQ UHYLHZHG
LQ GHWDLO DQG DUH FRUUHFW DQG LQ VWULFW FRQIRUPDQFH ZLWK WKH
FRQWUDFW GUDZLQJV DQG VSHFLILFDWLRQV H[FHSW DV RWKHU ZLVH
VWDWHG�
&+(&. 21(�
7+,6 ,6 $ 1(: 75$160,77$/
7+,6 ,6 $ 5(68%0,77$/ 2)
75$160,77$/
'$7(
5(0$5.6
&2175$&7 5()(5(1&(
'2&80(17
63(&,),&$7,21 6(&� 12� �&RYHU RQO\ RQH VHFWLRQ ZLWK
HDFK WUDQVPLWWDO�
72� )520�
352-(&7 7,7/( $1' /2&$7,21
&2175$&7 12�
(1&/2685(6 5(7851(' �/LVW E\ ,WHP 1R��
75$160,77$/ 2) 6+23 '5$:,1*6� (48,30(17 '$7$� 0$7(5,$/ 6$03/(6� 25
0$18)$&785(5 6 &(57,),&$7(6 2) &203/,$1&(
�5HDG LQVWUXFWLRQV RQ WKH UHYHUVH VLGH SULRU WR LQLWLDWLQJ WKLV IRUP�
6(&7,21 , � 5(48(67 )25 $33529$/ 2) 7+( )2//2:,1* ,7(06 �7KLV VHFWLRQ ZLOO EH LQLWLDWHG E\ WKH FRQWUDFWRU�
75$160,77$/ 12�
1$0(� 7,7/( $1' 6,*1$785( 2) $33529,1* $87+25,7< '$7(
6(&7,21 ,, � $33529$/ $&7,21
,7(0
12�
D�
'(6&5,37,21 2) ,7(0 68%0,77('
�7\SH VL]H� PRGHO QXPEHU�HWF��
E�
0)* 25 &2175�
&$7�� &859(
'5$:,1* 25
%52&+85( 12�
�6HH LQVWUXFWLRQ QR� ��
F�
12�
2)
&23,(6
G�
63(&�
3$5$� 12�
H�
'5$:,1*
6+((7 12�
I�
)25
&2175$&725
86( &2'(
J�
9$5,$7,21
�6HH
LQVWUXFWLRQ
1R� ��
K�
)25
86(
&2'(
L�
1$0( $1' 6,*1$785( 2) &2175$&725
(1* )250 �����5� 0$5 �� �3URSRQHQW� &(03�&(�(',7,21 2) 6(3 �� ,6 2%62/(7(��(5 ���������
&+(&. 21(� 7+,6 75$160,77$/ ,6
)25 ),2 *29 7� $33529$/
FIGURE 24
,16758&7,216
�� 6HFWLRQ , ZLOO EH LQLWLDWHG E\ WKH &RQWUDFWRU LQ WKH UHTXLUHG QXPEHU RI FRSLHV�
�� (DFK WUDQVPLWWDO VKDOO EH QXPEHUHG FRQVHFXWLYHO\ LQ WKH VSDFH SURYLGHG IRU �7UDQVPLWWDO 1R��� 7KLV QXPEHU� LQ DGGLWLRQ WR WKH FRQWUDFW QXPEHU� ZLOO IRUP D VHULDO
QXPEHU IRU LGHQWLI\LQJ HDFK VXEPLWWDO� )RU QHZ VXEPLWWDOV RU UHVXEPLWWDOV PDUN WKH DSSURSULDWH ER[� RQ UHVXEPLWWDOV� LQVHUW WUDQVPLWWDO QXPEHU RI ODVW VXEPLVVLRQ DV
ZHOO DV WKH QHZ VXEPLWWDO QXPEHU�
�� 7KH �,WHP 1R�� ZLOO EH WKH VDPH �,WHP 1R�� DV LQGLFDWHG RQ (1* )250 �����5 IRU HDFK HQWU\ RQ WKLV IRUP�
�� 6XEPLWWDOV UHTXLULQJ H[SHGLWLRXV KDQGOLQJ ZLOO EH VXEPLWWHG RQ D VHSDUDWH IRUP�
�� 6HSDUDWH WUDQVPLWWDO IRUP ZLOO EH XVHG IRU VXEPLWWDOV XQGHU VHSDUDWH VHFWLRQV RI WKH VSHFLILFDWLRQV�
�� $ FKHFN VKDOO EH SODFHG LQ WKH �9DULDWLRQ� FROXPQ ZKHQ D VXEPLWWDO LV QRW LQ DFFRUGDQFH ZLWK WKH SODQV DQG VSHFLILFDWLRQV��DOVR� D ZULWWHQ VWDWHPHQW WR WKDW HIIHFW
VKDOO EH LQFOXGHG LQ WKH VSDFH SURYLGHG IRU �5HPDUNV��
�� )RUP LV VHOI�WUDQVPLWWDO� OHWWHU RI WUDQVPLWWDO LV QRW UHTXLUHG�
�� :KHQ D VDPSOH RI PDWHULDO RU 0DQXIDFWXUHU
V &HUWLILFDWH RI &RPSOLDQFH LV WUDQVPLWWHG� LQGLFDWH �6DPSOH� RU �&HUWLILFDWH� LQ FROXPQ F� 6HFWLRQ ,�
�� 8�6� $UP\ &RUSV RI (QJLQHHUV DSSURYLQJ DXWKRULW\ ZLOO DVVLJQ DFWLRQ FRGHV DV LQGLFDWHG EHORZ LQ VSDFH SURYLGHG LQ 6HFWLRQ ,� FROXPQ L WR HDFK LWHP VXEPLWWHG� ,Q
DGGLWLRQ WKH\ ZLOO HQVXUH HQFORVXUHV DUH LQGLFDWHG DQG DWWDFKHG WR WKH IRUP SULRU WR UHWXUQ WR WKH FRQWUDFWRU� 7KH &RQWUDFWRU ZLOO DVVLJQ DFWLRQ FRGHV DV LQGLFDWHG EHORZ
LQ 6HFWLRQ ,� FROXPQ J� WR HDFK LWHP VXEPLWWHG�
7+( )2//2:,1* $&7,21 &2'(6 $5( *,9(1 72 ,7(06 68%0,77('
$ �� $SSURYHG DV VXEPLWWHG�
% �� $SSURYHG� H[FHSW DV QRWHG RQ GUDZLQJV�
& �� $SSURYHG� H[FHSW DV QRWHG RQ GUDZLQJV�
5HIHU WR DWWDFKHG VKHHW UHVXEPLVVLRQ UHTXLUHG�
' �� :LOO EH UHWXUQHG E\ VHSDUDWH FRUUHVSRQGHQFH�
��� $SSURYDO RI LWHPV GRHV QRW UHOLHYH WKH FRQWUDFWRU IURP FRPSO\LQJ ZLWK DOO WKH UHTXLUHPHQWV RI WKH FRQWUDFW SODQV DQG VSHFLILFDWLRQV�
�5HYHUVH RI (1* )RUP �����5�
( �� 'LVDSSURYHG �6HH DWWDFKHG��
) �� 5HFHLSW DFNQRZOHGJHG�
); �� 5HFHLSW DFNQRZOHGJHG� GRHV QRW FRPSO\
DV QRWHG ZLWK FRQWUDFW UHTXLUHPHQWV�
* �� 2WKHU �6SHFLI\�
ENG FORM 93, MAR 2014 REPLACES ENG FORM 93, JAN 2014 AND JUN 2013, AND ENG FORM 93-1, OCT 2013, WHICH ARE OBSOLETE. Page 1 of 2
US ARMY CORPS OF ENGINEERS
PAYMENT ESTIMATE - CONTRACT PERFORMANCE
For use of this form, see ER 37-1-30; the proponent agency is CERM-FC.
1. DATE (YYYYMMDD)
2. CONTRACTOR AND ADDRESS 3. CONTRACT NUMBER 4. DISTRICT
5. DESCRIPTION OF WORK 6. APPROPRIATION AND PROJECT 7. REQUIRED COMPLETION DATE (YYYYMMDD)
8. LOCATION 9. PERIOD COVERED BY THIS ESTIMATE (YYYYMMDD)
FROM THRU
10. JOB ORDER NUMBER 11. ESTIMATE NUMBER
b. CONTRACT c. TOTAL TO DATE
ITEM
NUMBER
DESCRIPTION
(1)
QUANTITY AND UNIT
(2)
UNIT PRICE
(3)
AMOUNT
(1)
QUANTITY AND UNIT
(2)
AMOUNT
d. INCLUDES MODIFICATION THRU (YYYYMMDD): e. TOTAL CONTRACT > f. TOTAL EARNINGS TO DATE >
13. PRESENTED FOR PAYMENT
a. PAYEE (Firm ) b. TITLE
c. DATE (YYYYMMDD) d. PAYEE SIGNATURE
14. APPROVED FOR PAYMENT
I CERTIFY THAT I HAVE CHECKED THE QUANTITIES COVERED BY THIS BILL OR ESTIMATE;
THAT THE WORK WAS ACTUALLY PERFORMED; AND THE QUANTITIES ARE CORRECT AND
CONSISTENT WITH ALL PREVIOUS COMPUTATIONS AS ACTUALLY CHECKED; THAT THE
QUANTITIES AND AMOUNTS ARE WHOLLY CONSISTENT WITH THE REQUIREMENTS OF
THE CONTRACT OR OTHER INSTRUMENT INVOLVED.
a. TITLE b. DATE (YYYYMMDD) c. SIGNATURE
15a. DATE (YYYYMMDD) b. CONTRACTING OFFICER APPROVAL SIGNATURE
16a. PREVIOUS DEDUCTIONS OTHER THAN RETAINED PERCENTAGE** (**Page 2)
b. PREVIOUS RETAINED PERCENTAGE
c. PREVIOUS PAYMENTS
d. PREVIOUS EARNINGS (a+b+c)
e. EARNINGS THIS PERIOD (Total Earnings to date minus d)
f. LESS RETAINED PERCENTAGE
h. TOTAL DEDUCTIONS FOR THIS PERIOD (f + g)
g. LESS DEDUCTIONS OTHER THAN
RETAINED PERCENTAGE FOR
i. RETAINAGE REFUNDED
j. OTHER REFUNDS
k. TOTAL REFUNDS THIS PERIOD (i + j)
FIGURE 25
ENG FORM 93, MAR 2014 Page 2 of 2
SECTION 16 (Continuation)
l. AMOUNT DUE CONTRACTOR (e-h+k)
17. RECAPITULATION:
a. TOTAL RETAINED PCTG. (b + f - i)
b. TOTAL PAID (c + l)
18. **DETAILED EXPLANATION AND OR REMARKS (Page 1 Item 16a.)
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
WEST VIRGINIA ORDNANCE WORKS
MOWING OF VARIOUS LOCATIONS AND PERFORMING
GROUNDWATER MONITORING WELL INSPECTION AND REPAIR
Date Contracting Officer
FIGURE 26
TABLE OF CONTENTS
SECTION I. INTRODUCTION …………………………………………………………………………1
A. General …………………………………………………………………………………………..1
B. Acronyms and Definitions ………………………………………………………………………2
SECTION II. Acceptance/Rejection of Services
C. General ………………………………………………………………………………………….3
D. Acceptance ……………………………………………………………………………………...3
E. Rejection ………………………………………………………………………………………..4
SECTION III. Calculating Deductions
F. General …………………………………………………………………………………………4
SECTION IV. Performance Requirements ………………………………………………………………5
SECTION V. Sampling Guides …………………………………………………………………………7
SECTION VI. Inspection Checklist……………………………………………………………………13
QUALITY ASSURANCE SURVEILLANCE PLAN
(QASP)
SECTION 1. INTRODUCTION
This quality assurance surveillance plan (QASP) is pursuant to the requirements listed in the Performance Work Statement (PWS). This plan sets forth the procedures and guidelines required performance standards or services levels are achieved by the contractor.
A. General. This plan will be used to assure the government that work specified under this contract is completed satisfactorily. The plan is included for information purposes only. It does not supersede any of the requirements in other sections of the contract. Surveillance or inspections will be primarily conducted in three ways; however, the Government has the right to change or modify inspection methods at its discretion. The three principle inspection methods are random, one-hundred percent, and planned. In conjunction with describing the principle methods used for providing surveillance (i.e., inspecting), this plan defines common terms and acronyms; summarizes in table form the performance requirements for each contract section; summarizes in table form a "sampling guide" for each contract section; explains how deductions are calculated; and, provides examples of Inspection Checklists.
B. Acronyms and Definitions.
1. List of Acronyms.
a. AQL . . . . . Acceptable Quality Level
b. CDR . . . . . Contract Discrepancy Report
c. COR . . . . . Contracting Officer Representative
d. CO. . . . . . Contracting Officer
e. PRS . . . . . Performance Requirements Summary
f. PWS . . . . . Performance Work Statement
g. QA. . . . . . Quality Assurance
h. QAE . . . . . Quality Assurance Evaluator
i. QASP. . . . . Quality Assurance Surveillance Plan
j. QC. . . . . . Quality Control
k. QCP . . . . . Quality Control Plan
l. N/A . . . . . Non-Applicable
2. Definitions.
a. Acceptable Quality Level. Predetermined value used by the Government to distinguish between satisfactory and unsatisfactory performance. AQL may be stated in percent and is the maximum number of defects per 100 units that can be considered satisfactory. As long as the defective performance does not exceed the AQL, the total service will not be rejected by the Government. The contractor, however, must re-perform the defective service.
b. Defect. Any deficiency determined to be significant as to render the unit unsatisfactory.
c. Deficiency. Any inspection unit which does not meet the Contract requirements in their entirety.
d. Inspection Unit. The inspection unit is the job. The inspection unit may include several tasks.
e. Inspector. Individual designated by the COR to perform Quality Assurance.
f. Item. The term item, when used with the Contract, refers to the Bid Items contained in Section B of the Contract.
g. Job. A job describes an individual, separate, and defined element of work to be performed. “ Mowing the Sedimentation Basin" or "Repainting Wells and Bollards" are examples of jobs.
h.100% Inspection. An inspection method requiring the examination of each completed job. It is not required that the inspector be at the job site 100 percent of the time while the job is occurring. This approach is best suited for monitoring contract requirements that occur infrequently or are of great importance.
i. Percent of Sample Found Defective. Determined by dividing the number of defects by the sample size.
j. Periodic Inspection. An evaluation method designed to inspect some part but not necessarily all of the contract requirements. Sample selection is based on some subjective rationale and sample size is usually arbitrarily determined.
k. Quality Assurance. Those actions taken by the Government to insure goods or services meet the requirements of the contract.
l. Quality Assurance Evaluator. A Government official responsible for evaluating contractor's performance. Also, known as an inspector.
m. Quality Control. Those actions taken by a contractor to control the production of goods or services to insure that they meet the requirements of the contract.
n. Random Sample. A sampling method whereby each service output in a lot has an equal chance of being selected, or where any occurrence of a contract requirement is as likely to be evaluated as any other occurrence.
o. Random Sampling. A method of looking at a few individual items in a lot to determine the quality of that lot against a standard.
r. Reject Level. The number of defects beyond which the total service for that lot is rejected by the Government and deductions are made. The contractor must re-perform defective services, when possible, even if the number of defects is less than the reject level.
s. Sample. A sample consists of one or more service outputs drawn from a lot, the outputs being chosen at random. The number of outputs in the sample is the sample size.
t. Service Requirement. A job to be performed to the specified standard and within the acceptable quality level. The contractor must do the specific job, meet the standard, and meet the acceptable quality level before performance is acceptable and contractor will be paid.
v. Surveillance Plan. An organized written Government Document used for quality assurance surveillance.
x. Unscheduled Inspection. Impromptu inspections of contract requirements without a pre-planned schedule.
y. Work. The general scope of services covered under the specifications of this contract.
SECTION II. Acceptance/Rejection of Services
A. General. Inspection of all services performed under this contract will primarily be done in accordance with a schedule developed by the Government, and will primarily be done by using one or a combination of the surveillance methods cited in this plan. The purpose of inspection is to document contractor performance and the quality of services or goods produced. Documentation of contractor performance will be done on the appropriate Inspection Checklist (see Section VI of this plan).
B. Acceptance. In an effort to minimize the performance management burden, simplified surveillance methods shall be used by the government to evaluate contractor performance when appropriate. The primary methods of surveillance are as follows:
1. Random monitoring, which shall be performed by the COTR/COR designated inspector.
2. 100% Inspection – Each month, the COTR/COR designated inspector, will inspect that all work that is performed in accordance with the Work Order.
3. Periodic Inspection – COTR/COR designated inspector typically performs the periodic inspection on a monthly basis.
C. Rejection.
The Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels.
Failure to meet the AQL may result in a deduction from the monthly payment, using the deduction percentages.
SECTION III. Calculating Deductions
A. General. Whenever work or parts of work are rejected, deductions may be made. The following hypothetical example is given to demonstrate how deductions for deficiencies would be calculated if the contractor fails to remedy those deficiencies.
B. Examples.
1. One-hundred Percent Sampling. One hypothetical situation involving a fixed price (e.g., mowing) contract have been selected for demonstrating how a deduction would be calculated where the inspection mode is 100%.
a. Mowing (Fixed Price).
IF: Contract specifies the mowing and trimming of areas for one season.
AND: Contract price is $10,000 per complete mowing.
AND: By the expiration of the completion date given on the contract, the contractor has successfully mowed and trimmed all areas as indicated by inspection, no deductions shall occur.
AND: By the expiration of the completion date given on the contract, the contractor has successfully mowed and trimmed all areas, but has not begun work on the Yellow Water area. The Contractor failed to mow the Yellow Water area after the deficiency was made known by the government.
THEN: The contractor shall stop all mowing operations, a CDR may be issued, and the services of another contractor would normally be employed by the Government to complete the mowing and trimming of the Yellow Water area. Actual costs incurred by the Government to obtain the services of another contractor to correct the deficiencies in the Yellow Water area shall be deducted from the contractor's invoice amount.
IF: The actual cost to the Government to correct the deficiencies is $2,000.00 which will be deducted from the Contractor's invoice for mowing.
THEN: $2,000.00 will be deducted from the contractor's invoice of $10,000.00.
SECTION IV
PERFORMANCE REQUIREMENTS SUMMARY
PERFORMANCE SUMMARY REQUIREMENTS
Required Services Section
Number Maximum allowable Degree of Deviation from
Requirement
(AQL)
Method of Surveillance
Deduction
Mowing, trimming , weeding and fallen tree removal of caps, drainage ditches, monitoring wells, extraction wells, pump & treat buildings, Red Water Sedimentation Basin levee, and
ESI8.
C-2.3 C-2.3.1 C-2.3.2 c-2.3.3 C-2.3.5 C-2.3.6 C-2.3.7 C-2.3.8
All work must be performed in accordance with the contract
100% Inspection N/A
Mowing, trimming, weeding and fallen tree removal of main access roads and paths
C-2.3.4 All work must be performed in accordance with the contract
100% Inspection N/A
Maintenance and Repair of Monitoring and Extraction Wells
C-2.5 C-2.5.1
All work must be performed in accordance with the contract
100% Inspection N/A
Inspection of Monitoring and Extraction Wells, replacement of damaged locks, lubrication of existing locks and Draft and Final Inspection Report
C-2.5 C-2.5.2
All work must be performed in accordance with the contract
100% Inspection N/A
Sign Installation C-2.4 All work must be performed in accordance with the contract
100% Inspection N/A
SECTION V
SAMPLING GUIDES
1. Service Requirement: Mowing, Trimming, Weeding, and fallen tree removal of caps, drainage ditches, monitoring…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .