This document provides details for a federal solicitation seeking a transformer monitoring system. The U.S. Army Corps of Engineers Engineering District Walla Walla is soliciting proposals for installation of a T2 Transformer Monitoring System at the Little Goose Dam. Interested vendors should review the attached solicitation, drawings, wage determinations, and brand name justification for full requirements and specifications. Proposals are due by the date listed in the solicitation documentation. The selected contractor will be responsible for installation of monitoring equipment and software to oversee transformer performance and prevent potential issues at the dam.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
g2hdcbjb Rectangle g2hdcbjb Line g2hdcbjb Text Box T2 Bank g2hdcbjb Text Box Proposed location for transformer monitors in transformer containment vault against wall g2hdcbjb Line g2hdctc9 Text Box T2A and T2B Transformer Outline
T2A and T2B Transformer Outline
Typewritten Text
T2A and T2B HV Bushing
T2A and T2B LV Bushing
T2A and T2B HVN Bushing
Pencil g2hdctc9 Pencil g2hdctc9 Line g2hdctc9 Typewritten Text
QTMS
OUTPUT 1
g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Typewritten Text
QTMS
OUTPUT 6
g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Typewritten Text
QTMS
OUTPUT 5
g2hdctc9 Typewritten Text
QTMS
OUTPUT 2
g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Typewritten Text
QTMS
OUTPUT 3
g2hdctc9 Line g2hdctc9 Typewritten Text
QTMS
OUTPUT 4
g2hdctc9 Pencil g2hdctc9 Text Box
QTMS
INPUT 3
g2hdctc9 Pencil g2hdctc9 Text Box
QTMS
INPUT 4
g2hdctc9 Pencil g2hdctc9 Pencil g2hdctc9 Text Box
QTMS
INPUT 5
g2hdctc9 Pencil g2hdctc9
T2A and T2B Transformer Schematics
T2A and T2B Transformer Wiring Diagram
T2C Transformer Outline
Transformer T2C Outline g2hdctc9 Line g2hdctc9 Pencil g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Typewritten Text
QTMS
OUTPUT 1
g2hdctc9 Typewritten Text
QTMS
OUTPUT 4
g2hdctc9 Pencil g2hdctc9 Text Box
QTMS
INPUT 5
g2hdctc9 Pencil g2hdctc9 Line g2hdctc9 Line g2hdctc9 Text Box
QTMS
INPUT 6
g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Typewritten Text g2hdctc9 Line g2hdctc9
Transformer T2C Schematic g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Line g2hdctc9 Typewritten Text
QTMS
OUTPUT 6
g2hdctc9 Typewritten Text
QTMS
OUTPUT 2
g2hdctc9 Typewritten Text
QTMS
OUTPUT 3
g2hdctc9
T2C Annunciation
T2C Wiring Diagram
TB1
MODULE TERMINAL BLOCK FUNCTION
CPU MODULE - COMMUNICATIONS BOARD
TB2
TB3
TB4
TB5
TB6
TB7
TB8
ANALOG INPUT MODULE
INPUT 1 (TERM. 1,2,3)
INPUT 2 (TERM. 4,5,6)
INPUT 3 (TERM. 7,8,9)
INPUT 4 (TERM. 10,11,12)
INPUT 5 (TERM. 13,14,15)
INPUT 6 (TERM. 16,17,18)
INPUT 7 (TERM. 19,20,21)
INPUT 8 (TERM. 22,23,24)
DIGITAL INPUT MODULE
INPUT 1 (TERM. 1,2)
INPUT 2 (TERM. 3,4)
INPUT 3 (TERM. 5,6)
INPUT 4 (TERM. 7,8)
INPUT 5 (TERM. 9,10)
INPUT 6 (TERM. 11,12)
INPUT 7 (TERM. 13,14)
INPUT 8 (TERM. 15,16)
INPUT 9 (TERM. 17,18)
INPUT 10 (TERM. 19,20)
INPUT 11 (TERM. 21,22)
INPUT 12 (TERM. 23,24)
INPUT 13 (TERM. 25,26)
INPUT 14 (TERM. 27,28)
TOP OIL TEMPERATURE SENSOR (RTD)
TRANSFORMER TEMPERATURE MONITOR FUNCTIONAL REQUIREMENTS
X-WINDING LOW VOLTAGE BUSHING CURRENT TRANSFORMER SENSING
Y-WINDING LOW VOLTAGE BUSHING CURRENT TRANSFORMER SENSING
MODE NAMEPLATE
FAILSAFE
RELAY SETPOINT
FAILSAFE
___ A
COOLING FANS ON
WINDING OVERTEMP
TOP OIL OVERTEMP
COOLING TROUBLE
INPUT
OTI-RTD
FCT
NON-FAILSAFE
NON-FAILSAFE
WINDING TEMP TRIPNON-FAILSAFE115C
TEMPERATURE MONITOR RELAY SETTINGS
TB1
RS 485
TB2
REMOTE DISPLAY
TB3
ETHERNET
MAIN
TB4
RS 485
TB5
FX
ETHERNET
TB6
COMMUNICATIONS BOARD
CPU MODULE
CPU
5TX+
TX1
RX+
RX-
SGND
TX+
TX1
RX+
RX-
SGND
RELAY
STATUS
TB7 1
NC
C
NO
24 VDC
POWER
MAIN
TB8
MODULE
INPUT
ANALOG
MODULE
INPUT
DIGITAL
(SEE NOTE 1)
QTMS
TRANSFORMER MONITORING SYSTEM
ENTER
TEST
MENU
RESET
TRANSFORMER TEMPERATURE MONITORING SYSTEM
NOTES:
ANALOG
TB1
TB2
USB
ETHERNET1
TB1
TB2
DIGITAL
ANALOG
TB1
TB2
BUSHING INPUT
MODBUS INTERCONNECTION WITH GAS-IN-OIL MONITOR
TTM TROUBLE
FIBER OPTIC CONNECTION TO QPDM
AMBIENT AIR TEMPERATURE SENSOR (RTD)
LIQUID LEVEL (4-20mA INPUT)
ANALOG INPUT MODULE
INPUT 1 (TERM. 1,2,3)
INPUT 2 (TERM. 4,5,6)
INPUT 3 (TERM. 7,8,9)
INPUT 4 (TERM. 10,11,12)
INPUT 5 (TERM. 13,14,15)
INPUT 6 (TERM. 16,17,18)
INPUT 7 (TERM. 19,20,21)
INPUT 8 (TERM. 22,23,24)
BUSHING MODULE
INPUT 1
INPUT 2
INPUT 3
INPUT 4
INPUT 5
INPUT 6
HIGH VOLTAGE BUSHING H1 TAP
70 C
WTI
WTI
80 C
WTI
FAILSAFELLG___ LOW LIQUID LEVEL ALARM
SHALL BE DETERMINED IN THE FIELD.
THE SETPOINT FOR THE LIQUID LEVEL ALARM AND THE COOLING FAN TROUBLE 1.
90 C
TB1
TB2
OUTPUT
RELAY
MODULE
OUTPUT
RELAY
MODULE
INPUT
ANALOG BUSHING INPUT
125-250 Vdc or
100-240 Vac 50/60 Hz
75 Watts Max
T5A 250V 5x20mm
SUPPLY
POWER
POWER SUPPLY
MOD-679-1
24 VDC POWER SUPPLY MOD-679-1 PWS
FCT2 - COOLING FAN CURRENT SENSING (CT)
FCT1 - COOLING FAN CURRENT SENSING (CT)
OUTPUT 1
OUTPUT 2
OUTPUT 3
OUTPUT 4
OUTPUT 5
OUTPUT 6
COOLING FANS ON
TOP OIL OVERTEMP ALARM
WINDING OVERTEMP ALARM
WINDING OVERTEMP TRIP
COOLING TROUBLE ALARM
LOW LIQUID LEVEL ALARM
OUTPUT 7
OUTPUT 8
RELAY OUTPUT MODULE
NEUTRAL BUSHING TAP
File details come from the government source that posted it. Updated .