June 2022

Huntington District

Burnsville Lake Little Kanawha River Burnsville, Braxton County, WV Burnsville Lake Bulltown Historic Area Structure Repair Exhibits

Bulltown Historic Area Burnsville Dam and Riffle Run Areas Exit 67 - Convenience stores, Walmart, outlet mall, fast food, restaurants, motels, etc.

Exit 96 - Hospital Exit 79 – To Burnsville Dam and Riffle Run Areas Exit 99 - Walmart, convenience stores, grocery stores, fast food, restaurants, motels, etc.

Exit 62 - Hospital, convenience stores, grocery stores, fast food, restaurants, motel, etc.

Cunningham House Bulltown Historic Area

Cunningham House Pictures Follow

Johnson House Pictures Follow

General Notes

1. Any modification to the specification or changes to the work as shown in these specifications and drawings must have prior written approval of the Contracting Officer.

2. Compliance with the Occupational Safety and Health Act of 1970 is required of the contractor and all subcontractors on the project. The contractor shall comply with the current edition at contract award of the US Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1.

3. All items of work called for on the plans for which no specific item of construction is identified shall be performed by the contractor and the cost of same shall be incident al to the construction of identified items.

4. All waste, including waste construction materials, shall be disposed of at an approved sanitary landfill.

5. Upon completion of construction, the contractor shall clean up all debris and materials resulting from his operation and restore all surfaces, structures, ditches, and property to its original condition to the satisfaction of the Government representative.

6. The contractor shall maintain a clear and safe means of ingress and egress from the work area in accordance with the requirements of all applicable agencies.

7. The use of the site for construction staging or other operations shall be coordinated with the Government representative. The contractor shall not block or adversely impact any road or travelway.

8. The contractor shall repair or replace in like kind any existing property damaged during construction, to the satisfaction of the Government representative, including pavements, lawns, and structures.

9. Field verify all existing conditions, dimensions, and elevations before proceeding with the work. Any discrepancies between the contract documents and the actual field conditions must be reported immediately to the Government representative.

10. All products and equipment shall be installed per the specifications, professional methods common to the historic restoration trade, and manufacturer's recommendations unless noted otherwise. Any deviation in the plans from the manufacturer's recommendation shall be reported to the government representative as soon as possible.

11. The contractor shall obtain all necessary permits not obtained by the government prior to the start of any work.

12. The contractor shall be responsible for payment of fees associated with all permits, application, and/or notices obtained by the contractor, and payment of all fines/fees for violation or non-compliance with federal, state, regional and local laws and regulations are the contractor's responsibility.

13. All work is located on lands owned by the United States Government.

Construction Sequence

1. The contractor shall coordinate the construction sequence with the government representative at weekly project meetings. Project meetings shall occur every Monday morning.

2. At each project meeting, the contractor shall inform the government representative about the areas of work for that week and the construction sequence that will be followed that week.

Seeding Requirements

1. The contractor shall restore all disturbed areas to its final state (graded, seeded, and mulched) within seven (7) days of the end of construction activities in a work area. Work area shall be defined as any areas adjacent to the Cunningham House.

2. Seed mixture shall contain perennial grasses as required in the specifications and not contain any invasive or genetically modified species. Seed mixture shall be submitted for approval prior to completion of line work.

3. In the event construction activities proceed outside of the normal growing season (after September 30th), the contractor shall provide annual rye grass in addition to the perennial grass required such that ground cover is established as soon as possible. No reduction in application rate shall be made to the perennial seed mixture due to the addition of annual rye.

4. Seeding operations shall not take place when the wind velocity will prevent uniform seed distribution. Seed shall be uniformly broadcast at the rate of 5 pounds per 100 SY by hand or using broadcast seeders. Seed applied by broadcast seeders shall be covered by a maximum 1/4-inch soil depth by rake, disk harrow, steel mat drag, cultivator, or other appropriate device.

5. Straw / mulch shall be free from weeds, mold, and other deleterious materials. Mulch shall be composed of straw native to the region. Hay shall not be used as mulch.

6. Straw / mulch shall be spread uniformly at the rate of 50 pounds per 1000 square feet. Mulch shall be spread by hand, blower-type mulch spreader, or other approved method. Mulch shall not be bunched or clumped, and shall not be so thick as to completely block sunlight penetration to the ground surf ace. All areas installed with seed shall be mulched on the same day as the seeding. The contractor shall be responsible for protecting embankments and ditches from surf ace erosion; and protecting installed areas from foot traffic.

image3.png image4.jpeg image5.png image6.png image7.png image8.jpg image9.jpg image10.png image11.png image12.png image13.jpg image14.jpg image15.jpg image16.jpg image17.jpg image18.jpg image19.jpg image20.jpg image21.jpg image22.jpg image23.png image24.jpg image25.jpeg image26.jpeg image27.jpeg image1.png image2.png