A.03.09 Attachment C- Current Workskiff Electrical System.pdf
PDF 1 MB Posted
- Attached to
- Workskiff Outboard Motor Replacement Federal contract opportunity
- Solicitation number
- W912EF22Q0013
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A.03.09 Attachment A - Existing Workskiff Outboard System.pdf | ||
| B.04.30 Wage Determination Walla Walla WA 17.pdf | ||
| B.08.02 Solicitation 22Q0013.pdf | ||
| A.03.09 Attachment B - Workskiff Fuel System.pdf | ||
| A.03.09 Attachment D - Offshore Bracket Examples.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment C
Current Workskiff Electrical System
Figure C-1. Batteries that are located in the stern port-side compartment
Figure C-2. Perko switch located in the battery compartment.
Figure C-3. Second set of Perko switches located in the starboard fuel switch compartment.
Figure C-4. Perko switch and breaker box located under the port console
Figure C-5. Port console electrical controls
Figure C-6. DC power supply and battery charger located under port-side console.
Figure C-7. Composite photo of starboard mounted helm and control panel
Figure C-8. Current duel throttle controls.
Figure C-9. Captain’s seat and throttle controls.
Figure C-10. Locations of the auxiliary GPS, radar, and sonar modules.
Figure C-11. Location of the port -side VHF radio.
Figure C-12. Locations of the existing gauges on the control panel.
C-13. Horn button, main breaker panel, and spot-light controls
File details come from the government source that posted it. Updated .