A.02 SOW_Att 3_Conceptual Floor Plans.pdf
PDF 1 MB Posted
- Attached to
- Birzai Fire and Rescue Station Reno, Lithuania
- Solicitation number
- IEU-25-0024
- Issued by
-
Department of the Army European Command
About this file
This file contains architectural floor plans showing the basement, first floor, second floor and attic layouts for the renovation of a Fire and Rescue Station in Birzai, Lithuania. The plans are labeled as attachments to an RFP, Section 011010, SOW, Att. 3.
The renovation work includes several major components across all floors: new thermal insulation and waterproofing of basement exterior walls, new exterior drainage around the building perimeter, new EIFS (Exterior Insulation Finishing System) for all exterior walls, replacement of all windows and exterior doors including vehicle overhead doors, repair of existing balconies, and new roof and attic thermal insulation. The first floor plans show specific interior modifications including converting an existing room to a new communications room, blocking an existing door and demolishing existing stairs, and providing a new interior door, door opening and steps. The building consists of a main section and an annex, with dimensions clearly marked on each floor plan. The existing annex bituminous roofing must remain in place according to the attic plan notes.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASEMENT PLAN – RENOVATION OF FIRE AND RESCUE STATION ‐ BIRZAI, LITHUANIA – RFP, SEC. 011010, SOW, ATT. 3
‐ PROVIDE NEW THERMAIL INSULATION
AND WATERPROOFING OF BASEMENT
EXTERIOR WALLS
‐ PROVIDE NEW EXTERIOR DRAINAGE
AROUND BUILDING PERIMETER
NOTES
17.52
7.00
5.90
6.72 4.90
FIRST FLOOR PLAN – RENOVATION OF FIRE AND RESCUE STATION ‐ BIRZAI, LITHUANIA – RFP, SEC. 011010, SOW, ATT. 3
CONVERT EXISTING
ROOM TO NEW
COM ROOM
BLOCK EXISTING DOOR
AND DEMO EXIST. STAIRS
PROVIDE NEW INT. DOOR,
DOOR OPENING, AND STEPS
LEGEND
‐ PROVIDE ALL NEW WINDOWS,
EXTERIOR DOORS, AND VEHICLE
OVERHEAD DOORS
‐ PROVIDE NEW EIFS FOR
ALL EXTERIOR WALLS
NOTES
MOVE EXIST. COM BOX
TO NEW COM ROOM
6.33
9.50
6.72 5.90 4.90
7.00 9.40
7.00
5.90
6.72 4.90
7. 15 6.75
MAIN BUILDING ANNEX
SECOND FLOOR PLAN – RENOVATION OF FIRE AND RESCUE STATION ‐ BIRZAI, LITHUANIA – RFP, SEC. 011010, SOW, ATT. 3
‐ PROVIDE ALL NEW WINDOWS AND
REPAIR EXIST. BALCONIES
‐ PROVIDE NEW EIFS FOR
ALL EXTERIOR WALLS
NOTES
6.72 5.90 4.90
7.00 9.40
7.00
5.90
6.72 4.90
BALC.
BALC.
ATTIC PLAN – RENOVATION OF FIRE AND RESCUE STATION ‐ BIRZAI, LITHUANIA – RFP, SEC. 011010, SOW, ATT. 3
‐ PROVIDE ALL NEW WINDOWS AND
REPAIR EXIST. BALCONIES
‐ PROVIDE NEW EIFS FOR
ALL EXTERIOR WALLS
NOTES
‐ PROVIDE NEW ROOF AND
ATTIC THERMAL INSULATION
‐ EXISTING ANNEX BITUMINOUS
ROOFING MUST REMAIN
6.00 7.00
1.003.40 3.60
7.00
File details come from the government source that posted it. Updated .