A.02 Shaw AFB FY26 ORC - Draft SubCLIN Structure_v2.2.1_20250418.xlsx
XLSX spreadsheet 49 KB Posted
- Attached to
- Sources Sought for Fiscal Year (FY) 26 Shaw Air Force Base Optimized Remediation Contract (ORC)
- Solicitation number
- W912HN25S1001
About this file
This Excel file is a draft SubCLIN Structure for the Fiscal Year 2026 Shaw Air Force Base (AFB) Optimized Remediation Contract (ORC), detailing a comprehensive environmental remediation contract with a projected award date of July 18, 2026, and a contract period of performance ending on July 17, 2033. The contract encompasses 43 primary CLINs and numerous sub-CLINs covering a wide range of environmental restoration activities across 23 Installation Restoration Program (IRP) sites, including project management, integrated master scheduling, quality program plans, groundwater treatment plant operations, well installations and abandonments, site investigations, corrective measures, and site closeout activities.
Key technical scope includes operation and maintenance of two groundwater treatment plants (GWTP 1 and GWTP 2), conducting remedial actions, performing long-term monitoring, achieving site-specific objectives, and implementing various environmental investigation and restoration tasks at multiple sites with varying complexity. The contract is structured with base year and optional year components, with most programmatic sub-CLINs set at one-year intervals and compliance sub-CLINs set at three-year intervals. The contract will be executed by the United States Army Corps of Engineers (USACE) Savannah District at Shaw AFB in South Carolina, with activities spanning environmental site investigation, design, remedial system construction, system optimization, and achieving specific performance objectives across multiple sites.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A.02 Shaw AFB FY26 ORC_Draft PWS_v2.2.1_20250418.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FY26 SHAW ORC
| Installation | Site | CLIN/Sub-CLIN Number | CLIN/Sub-CLIN Description | Projected Award Date | |||||||
| (Pending availability of funding and bona fide need) | Section F Date Start | Section F Date End | Notes | Contract Award Date | 18-Jul-26 | ||||||
| Shaw AFB | N/A | 0001 | Complete Project Management Plan (PMP) | Contract POP End Date | 17-Jul-33 | ||||||
| Shaw AFB | N/A | 0001CA | Complete PMP | Base Year | 7/18/26 | 7/17/27 | Per current guidance, Programmatic Sub-CLINs should be set at one year (minus one day). | ||||
| Shaw AFB | N/A | 0001CB | Update PMP | Optional Task | |||||||
| Shaw AFB | N/A | 0001CC | Complete ORC Transition Plan - OY6 | Optional Task | |||||||
| Shaw AFB | N/A | 0002 | Develop Integrated Master Schedule (IMS)/Milestone Payment Schedule (MPS) and Update Monthly | ||||||||
| Shaw AFB | N/A | 0002CA | Develop IMS/MPS and Update Monthly - Base Year | Base Year | 7/18/26 | 7/17/27 | Per current guidance, Programmatic Sub-CLINs should be set at one year (minus one day). | ||||
| Shaw AFB | N/A | 0002CB | Update IMS/MPS Monthly - OY1 | OY1 | FY27 | ||||||
| Shaw AFB | N/A | 0002CC | Update IMS/MPS Monthly - OY2 | OY2 | FY28 | ||||||
| Shaw AFB | N/A | 0002CD | Update IMS/MPS Monthly - OY3 | OY3 | FY29 | ||||||
| Shaw AFB | N/A | 0002CE | Update IMS/MPS Monthly - OY4 | OY4 | FY30 | ||||||
| Shaw AFB | N/A | 0002CF | Update IMS/MPS Monthly - OY5 | OY5 | FY31 | ||||||
| Shaw AFB | N/A | 0002CG | Update IMS/MPS Monthly - OY6 | OY6 | FY32 | ||||||
| Shaw AFB | N/A | 0003 | Complete IRP Basewide Quality Program Plans (QPPs) | ||||||||
| Shaw AFB | N/A | 0003CA | Complete IRP Basewide QPP - Base Year | Base Year | 7/18/26 | 7/17/27 | Per current guidance, Programmatic Sub-CLINs should be set at one year (minus one day). | ||||
| Shaw AFB | N/A | 0003CB | Update IRP Basewide QPP | Optional Task | |||||||
| Shaw AFB | N/A | 0004 | Prepare, Revise, and Update Land Use Control Implementation Plan (LUCIP) | ||||||||
| Shaw AFB | N/A | 0004CA | Complete LUCIP - Base Year | Base Year | 7/18/26 | 7/17/27 | Per current guidance, Programmatic Sub-CLINs should be set at one year (minus one day). | ||||
| Shaw AFB | N/A | 0004CB | Update LUCIP | Optional Task | |||||||
| Shaw AFB | N/A | 0004CC | Update LUCIP | Optional Task | |||||||
| Shaw AFB | N/A | 0005 | Provide Base Support - Base Well Split Samples, Utility Locates for Permits, etc. | ||||||||
| Shaw AFB | N/A | 0005CA | Provide Base Support - (Base Well Split Samples, Utility Locates, Surveys, Off-Base Support) - Base Year | Base Year | 7/18/26 | 7/17/27 | Per current guidance, Programmatic Sub-CLINs should be set at one year (minus one day). | ||||
| Shaw AFB | N/A | 0005CB | Provide Base Support - (Base Well Split Samples, Utility Locates, Surveys, Off-Base Support) - OY1 | Optional Task | |||||||
| Shaw AFB | N/A | 0005CC | Provide Base Support - (Base Well Split Samples, Utility Locates, Surveys, Off-Base Support) - OY2 | Optional Task | |||||||
| Shaw AFB | N/A | 0005CD | Provide Base Support - (Base Well Split Samples, Utility Locates, Surveys, Off-Base Support) - OY3 | Optional Task | |||||||
| Shaw AFB | N/A | 0005CE | Provide Base Support - (Base Well Split Samples, Utility Locates, Surveys, Off-Base Support) - OY4 | Optional Task | |||||||
| Shaw AFB | N/A | 0005CF | Provide Base Support - (Base Well Split Samples, Utility Locates, Surveys, Off-Base Support) - OY5 | Optional Task | |||||||
| Shaw AFB | N/A | 0005CG | Provide Base Support - (Base Well Split Samples, Utility Locates, Surveys, Off-Base Support) - OY6 | Optional Task | |||||||
| Shaw AFB | N/A | 0006 | Update Community Involvement Plan | ||||||||
| Shaw AFB | All Open Sites (IRP, MMRP, PFAS, etc) | 0006CA | Update Community Involvement Plan | OY1 | |||||||
| Shaw AFB | All Open Sites (IRP, MMRP, PFAS, etc) | 0006CB | Update Community Involvement Plan | OY4 | |||||||
| Shaw AFB | All Open Sites (IRP, MMRP, PFAS, etc) | 0006CC | Update Community Involvement Plan | OY7 | |||||||
| Shaw AFB | N/A | 0007 | Restoration Advisory Board (RAB) Support | ||||||||
| Shaw AFB | N/A | 0007CA | Restoration Advisory Board Support _ Base Year | Base Year | 7/18/26 | 7/17/27 | Per current guidance, Programmatic Sub-CLINs should be set at one year (minus one day). | ||||
| Shaw AFB | N/A | 0007CB | Restoration Advisory Board Support - OY1 | OY1 | |||||||
| Shaw AFB | N/A | 0007CC | Restoration Advisory Board Support - OY2 | OY2 | |||||||
| Shaw AFB | N/A | 0007CD | Restoration Advisory Board Support - OY3 | OY3 | |||||||
| Shaw AFB | N/A | 0007CE | Restoration Advisory Board Support - OY4 | OY4 | |||||||
| Shaw AFB | N/A | 0007CF | Restoration Advisory Board Support - OY5 | OY5 | |||||||
| Shaw AFB | N/A | 0007CG | Restoration Advisory Board Support - OY6 | OY6 | |||||||
| Shaw AFB | N/A | 0008 | Complete Tier I Meeting Facilitation and Support | ||||||||
| Shaw AFB | N/A | 0008CA | Support and facilitate Tier I Meetings - Base Year | Base Year | 7/18/26 | 7/17/27 | Per current guidance, Programmatic Sub-CLINs should be set at one year (minus one day). | ||||
| Shaw AFB | N/A | 0008CB | Support and facilitate Tier I Meetings - OY1 | OY1 | |||||||
| Shaw AFB | N/A | 0008CC | Support and facilitate Tier I Meetings - OY2 | OY2 | |||||||
| Shaw AFB | N/A | 0008CD | Support and facilitate Tier I Meetings - OY3 | OY3 | |||||||
| Shaw AFB | N/A | 0008CE | Support and facilitate Tier I Meetings - OY4 | OY4 | |||||||
| Shaw AFB | N/A | 0008CF | Support and facilitate Tier I Meetings - OY5 | OY5 | |||||||
| Shaw AFB | N/A | 0008CG | Support and facilitate Tier I Meetings - OY6 | OY6 | |||||||
| Shaw AFB | N/A | 0009 | Support 2029 Renewal of the Installation RCRA Permit | OY1 | |||||||
| Shaw AFB | N/A | 0010 | Perform Well Survey, Inventory, and Condition Assessment | ||||||||
| Shaw AFB | N/A | 0010CA | Complete Well Survey, Inventory, and Condition Assessment - Base Year | Base Year | 7/18/26 | 7/17/27 | Per current guidance, Programmatic Sub-CLINs should be set at one year (minus one day). | ||||
| Shaw AFB | N/A | 0010CB | Update Well Survey, Inventory, and Condition Assessment - OY1 | OY1 | |||||||
| Shaw AFB | N/A | 0010CC | Update Well Survey, Inventory, and Condition Assessment - OY2 | OY2 | |||||||
| Shaw AFB | N/A | 0010CD | Update Well Survey, Inventory, and Condition Assessment - OY3 | OY3 | |||||||
| Shaw AFB | N/A | 0010CE | Update Well Survey, Inventory, and Condition Assessment - OY4 | OY4 | |||||||
| Shaw AFB | N/A | 0010CF | Update Well Survey, Inventory, and Condition Assessment - OY5 | OY5 | |||||||
| Shaw AFB | N/A | 0010CG | Update Well Survey, Inventory, and Condition Assessment - OY6 | OY6 | |||||||
| Shaw AFB | N/A | 0011 | Complete Basewide Well Repairs and LUC Inspection Repairs | ||||||||
| Shaw AFB | N/A | 0011CA | Repair Basewide Wells and LUC Sign Repair/Replacement - Base Year | Optional Task | Per current guidance, Programmatic Sub-CLINs should be set at one year (minus one day). | ||||||
| Shaw AFB | N/A | 0011CB | Repair Basewide Wells and LUC Sign Repair/Replacement - OY1 | Optional Task | |||||||
| Shaw AFB | N/A | 0011CC | Repair Basewide Wells and LUC Sign Repair/Replacement - OY2 | Optional Task | |||||||
| Shaw AFB | N/A | 0011CD | Repair Basewide Wells and LUC Sign Repair/Replacement - OY3 | Optional Task | |||||||
| Shaw AFB | N/A | 0011CE | Repair Basewide Wells and LUC Sign Repair/Replacement - OY4 | Optional Task | |||||||
| Shaw AFB | N/A | 0011CF | Repair Basewide Wells and LUC Sign Repair/Replacement - OY5 | Optional Task | |||||||
| Shaw AFB | N/A | 0011CG | Repair Basewide Wells and LUC Sign Repair/Replacement - OY6 | Optional Task | |||||||
| Shaw AFB | N/A | 0012 | Perform Well Installations | ||||||||
| Shaw AFB | N/A | 0012CA | Install one (1) Basewide Well - between 0 to 75 ft bgs (Shallow) | Optional Task | Per current guidance, Programmatic Sub-CLINs should be set at one year (minus one day). | ||||||
| Shaw AFB | N/A | 0012CB | Install one (1) Basewide Well - between 0 to 75 ft bgs (Shallow) | Optional Task | |||||||
| Shaw AFB | N/A | 0012CC | Install one (1) Basewide Well - between 0 to 75 ft bgs (Shallow) | Optional Task | |||||||
| Shaw AFB | N/A | 0012CD | Install one (1) Basewide Well - between 0 to 75 ft bgs (Shallow) | Optional Task | |||||||
| Shaw AFB | N/A | 0012CE | Install one (1) Basewide Well - between 0 to 75 ft bgs (Shallow) | Optional Task | |||||||
| Shaw AFB | N/A | 0012CF | Install one (1) Basewide Wells - between 75 to 175 ft bgs (Medium) | Optional Task | |||||||
| Shaw AFB | N/A | 0012CG | Install one (1) Basewide Wells - between 75 to 175 ft bgs (Medium) | Optional Task | |||||||
| Shaw AFB | N/A | 0012CH | Install one (1) Basewide Wells - between 75 to 175 ft bgs (Medium) | Optional Task | |||||||
| Shaw AFB | N/A | 0012CJ | Install one (1) Basewide Wells - between 75 to 175 ft bgs (Medium) | Optional Task | |||||||
| Shaw AFB | N/A | 0012CK | Install one (1) Basewide Wells - between 75 to 175 ft bgs (Medium) | Optional Task | |||||||
| Shaw AFB | N/A | 0012CL | Install one (1) Basewide Wells - greater than 300 ft bgs (Deep) | Optional Task | |||||||
| Shaw AFB | N/A | 0012CM | Install one (1) Basewide Wells - greater than 300 ft bgs (Deep) | Optional Task | |||||||
| Shaw AFB | N/A | 0012CN | Install one (1) Basewide Wells - greater than 300 ft bgs (Deep) | Optional Task | |||||||
| Shaw AFB | N/A | 0012CO | Install one (1) Basewide Wells - greater than 300 ft bgs (Deep) | Optional Task | |||||||
| Shaw AFB | N/A | 0012CP | Install one (1) Basewide Wells - greater than 300 ft bgs (Deep) | Optional Task | |||||||
| Shaw AFB | N/A | 0012CQ | Install three (3) Basewide Wells - between 0 to 75 ft bgs (Shallow) | Optional Task | |||||||
| Shaw AFB | N/A | 0012CR | Install three (3) Basewide Wells - between 0 to 75 ft bgs (Shallow) | Optional Task | |||||||
| Shaw AFB | N/A | 0012CS | Install three (3) Basewide Wells - between 75 to 175 ft bgs (Medium) | Optional Task | |||||||
| Shaw AFB | N/A | 0012CT | Install three (3) Basewide Wells - between 75 to 175 ft bgs (Medium) | Optional Task | |||||||
| Shaw AFB | N/A | 0012CU | Install three (3) Basewide Wells - greater than 300 ft bgs (Deep) | Optional Task | |||||||
| Shaw AFB | N/A | 0012CV | Install three (3) Basewide Wells - greater than 300 ft bgs (Deep) | Optional Task | |||||||
| Shaw AFB | N/A | 0013 | Perform Well Replacements and Repairs of existing Monitoring Wells | ||||||||
| Shaw AFB | N/A | 0013CA | Replace and/or Repair ten (10) Damaged Monitoring Well Completions | Optional Task | Per current guidance, Programmatic Sub-CLINs should be set at one year (minus one day). | ||||||
| Shaw AFB | N/A | 0013CB | Replace and/or Repair ten (10) Damaged Monitoring Well Completions | Optional Task | |||||||
| Shaw AFB | N/A | 0013CC | Replace and/or Repair five (5) Damaged Monitoring Well Completions | Optional Task | |||||||
| Shaw AFB | N/A | 0013CD | Replace and/or Repair five (5) Damaged Monitoring Well Completions | Optional Task | |||||||
| Shaw AFB | N/A | 0013CE | Replace and/or Repair three (3) Damaged Monitoring Well Completions | Optional Task | |||||||
| Shaw AFB | N/A | 0013CF | Replace and/or Repair three (3) Damaged Monitoring Well Completions | Optional Task | |||||||
| Shaw AFB | N/A | 0013CG | Replace and/or Repair one (1) Damaged Monitoring Well Completions | Optional Task | |||||||
| Shaw AFB | N/A | 0013CH | Replace and/or Repair one (1) Damaged Monitoring Well Completions | Optional Task | |||||||
| Shaw AFB | N/A | 0013CJ | Replace and/or Repair one (1) Damaged Monitoring Well Completions | Optional Task | |||||||
| Shaw AFB | N/A | 0014 | Perform Well Abandonments | ||||||||
| Shaw AFB | N/A | 0014CA | Abandon one (1) Basewide Well - between 0 to 75 ft bgs (Shallow) | Optional Task | Per current guidance, Programmatic Sub-CLINs should be set at one year (minus one day). | ||||||
| Shaw AFB | N/A | 0014CB | Abandon one (1) Basewide Well - between 0 to 75 ft bgs (Shallow) | Optional Task | |||||||
| Shaw AFB | N/A | 0014CC | Abandon one (1) Basewide Well - between 0 to 75 ft bgs (Shallow) | Optional Task | |||||||
| Shaw AFB | N/A | 0014CD | Abandon one (1) Basewide Wells - between 75 to 175 ft bgs (Medium) | Optional Task | |||||||
| Shaw AFB | N/A | 0014CE | Abandon one (1) Basewide Wells - between 75 to 175 ft bgs (Medium) | Optional Task | |||||||
| Shaw AFB | N/A | 0014CF | Abandon one (1) Basewide Wells - between 75 to 175 ft bgs (Medium) | Optional Task | |||||||
| Shaw AFB | N/A | 0014CG | Abandon one (1) Basewide Wells - greater than 300 ft bgs (Deep) | Optional Task | |||||||
| Shaw AFB | N/A | 0014CH | Abandon one (1) Basewide Wells - greater than 300 ft bgs (Deep) | Optional Task | |||||||
| Shaw AFB | N/A | 0014CJ | Abandon one (1) Basewide Wells - greater than 300 ft bgs (Deep) | Optional Task | |||||||
| Shaw AFB | N/A | 0014CK | Abandon three (3) Basewide Wells - between 0 to 75 ft bgs (Shallow) | Optional Task | |||||||
| Shaw AFB | N/A | 0014CL | Abandon three (3) Basewide Wells - between 0 to 75 ft bgs (Shallow) | Optional Task | |||||||
| Shaw AFB | N/A | 0014CM | Abandon three (3) Basewide Wells - between 75 to 175 ft bgs (Medium) | Optional Task | |||||||
| Shaw AFB | N/A | 0014CN | Abandon three (3) Basewide Wells - between 75 to 175 ft bgs (Medium) | Optional Task | |||||||
| Shaw AFB | N/A | 0014CO | Abandon three (3) Basewide Wells - greater than 300 ft bgs (Deep) | Optional Task | |||||||
| Shaw AFB | N/A | 0014CP | Abandon three (3) Basewide Wells - greater than 300 ft bgs (Deep) | Optional Task | |||||||
| Shaw AFB | N/A | 0014CQ | Abandon five (5) Basewide Wells - between 0 to 75 ft bgs (Shallow) | Optional Task | |||||||
| Shaw AFB | N/A | 0014CR | Abandon five (5) Basewide Wells - between 75 to 175 ft bgs (Medium) | Optional Task | |||||||
| Shaw AFB | N/A | 0014CS | Abandon five (5) Basewide Wells - greater than 300 ft bgs (Deep) | Optional Task | |||||||
| Shaw AFB | N/A | 0015 | Finalize Site Reports from the previous contractor - FY20 Shaw ORC | ||||||||
| Shaw AFB | N/A | 0015CA | Finalize transitioned ORC site documents | Base Year | 7/18/26 | 7/17/29 | Per current guidance, Programmatic Sub-CLINs should be set at one year (minus one day). | ||||
| Shaw AFB | SS035, SS036 | 0016 | Evaluate the Air Stripper effectiveness and recommend upgrades in the quarterly performance reports IAW Section 1.3.2.a | ||||||||
| Shaw AFB | SS035, SS036 | 0016CA | Quarterly Sampling and Performance Reports - Base Year | Base Year | 7/18/26 | 7/17/29 | Compliance Sub-CLINs should be set at three years from award. | ||||
| Shaw AFB | SS035, SS036 | 0016CB | Quarterly Sampling and Performance Reports - OY1 | Optional Task | |||||||
| Shaw AFB | SS035, SS036 | 0016CC | Quarterly Sampling and Performance Reports - OY2 | Optional Task | |||||||
| Shaw AFB | SS035, SS036 | 0016CD | Quarterly Sampling and Performance Reports - OY3 | Optional Task | |||||||
| Shaw AFB | SS035, SS036 | 0016CE | Quarterly Sampling and Performance Reports - OY4 | Optional Task | |||||||
| Shaw AFB | SS035, SS036 | 0016CF | Quarterly Sampling and Performance Reports - OY5 | Optional Task | |||||||
| Shaw AFB | SS035, SS036 | 0016CG | Quarterly Sampling and Performance Reports - OY6 | Optional Task | |||||||
| Shaw AFB | OT016B, SS035, SS036 | 0017 | O&M of Groundwater Treatment Plant 1 (GWTP 1) IAW Section 1.3.2.i | ||||||||
| Shaw AFB | OT016B, SS035, SS036 | 0017CA | O&M of GWTP1 - Base Year | Base Year | 7/18/26 | 7/17/29 | Compliance Sub-CLINs should be set at three years from award. | ||||
| Shaw AFB | OT016B, SS035, SS036 | 0017CB | O&M of GWTP1 - OY1 | Optional Task | |||||||
| Shaw AFB | OT016B, SS035, SS036 | 0017CC | O&M of GWTP1 - OY2 | Optional Task | |||||||
| Shaw AFB | OT016B, SS035, SS036 | 0017CD | O&M of GWTP1 - OY3 | Optional Task | |||||||
| Shaw AFB | OT016B, SS035, SS036 | 0017CE | O&M of GWTP1 - OY4 | Optional Task | |||||||
| Shaw AFB | OT016B, SS035, SS036 | 0017CF | O&M of GWTP1 - OY5 | Optional Task | |||||||
| Shaw AFB | OT016B, SS035, SS036 | 0017CG | O&M of GWTP1 - OY6 | Optional Task | |||||||
| Shaw AFB | FT001P-SUB, FT006P-SUB, FT007P-SUB | 0018 | O&M of Groundwater Treatment Plant 2 (GWTP 2) IAW Section 1.3.2.i | ||||||||
| Shaw AFB | FT001P-SUB, FT006P-SUB, FT007P-SUB | 0018CA | O&M of GWTP2 - Base Year | Base Year | 7/18/26 | 7/17/29 | Compliance Sub-CLINs should be set at three years from award. | ||||
| Shaw AFB | FT001P-SUB, FT006P-SUB, FT007P-SUB | 0018CB | O&M of GWTP2 - OY1 | Optional Task | |||||||
| Shaw AFB | FT001P-SUB, FT006P-SUB, FT007P-SUB | 0018CC | O&M of GWTP2 - OY2 | Optional Task | |||||||
| Shaw AFB | FT001P-SUB, FT006P-SUB, FT007P-SUB | 0018CD | O&M of GWTP2 - OY3 | Optional Task | |||||||
| Shaw AFB | FT001P-SUB, FT006P-SUB, FT007P-SUB | 0018CE | O&M of GWTP2 - OY4 | Optional Task | |||||||
| Shaw AFB | FT001P-SUB, FT006P-SUB, FT007P-SUB | 0018CF | O&M of GWTP2 - OY5 | Optional Task | |||||||
| Shaw AFB | FT001P-SUB, FT006P-SUB, FT007P-SUB | 0018CG | O&M of GWTP2 - OY6 | Optional Task | |||||||
| Shaw AFB | OT016P-SUB | 0019 | Achieve One-time Site PFAS Sampling Tech Memo (Extraction Well) | Optional Task | |||||||
| Shaw AFB | SS035P-SUB | 0020 | Achieve One-time Site PFAS Sampling Tech Memo (Extraction Well) | Optional Task | |||||||
| Shaw AFB | OT016A, OT016B, SS035, and SS036 | 0021 | Maintain Right of Entry (ROE) access agreements and Off-Base LUCs | ||||||||
| Shaw AFB | OT016A, OT016B, SS035, and SS036 | 0021CA | Annual ROE updates and Off Base LUC report | Base Year | 7/18/26 | 7/17/29 | Compliance Sub-CLINs should be set at three years from award. | ||||
| Shaw AFB | OT016A, OT016B, SS035, and SS036 | 0021CB | Annual ROE updates and Off Base LUC report | Optional Task | |||||||
| Shaw AFB | OT016A, OT016B, SS035, and SS036 | 0021CC | Annual ROE updates and Off Base LUC report | Optional Task | |||||||
| Shaw AFB | OT016A, OT016B, SS035, and SS036 | 0021CD | Annual ROE updates and Off Base LUC report | Optional Task | |||||||
| Shaw AFB | OT016A, OT016B, SS035, and SS036 | 0021CE | Annual ROE updates and Off Base LUC report | Optional Task | |||||||
| Shaw AFB | OT016A, OT016B, SS035, and SS036 | 0021CF | Annual ROE updates and Off Base LUC report | Optional Task | |||||||
| Shaw AFB | OT016A, OT016B, SS035, and SS036 | 0021CG | Annual ROE updates and Off Base LUC report | Optional Task | |||||||
| Shaw AFB | CG038 | ||||||||||
| (AOC O) | 0022 | Conduct RA-O and Achieve Alternate Objectives | |||||||||
| Shaw AFB | CG038 | ||||||||||
| (AOC O) | 0022AA | Achieve Supplemental Site Investigation Work Plan | Base Year | 7/18/26 | 7/17/33 | Performance Sub-CLINs should be set in accordance with Table 1. | |||||
| Shaw AFB | CG038 | ||||||||||
| (AOC O) | 0022AB | Achieve Supplemental Site Investigation Report (to include CSM Update) | Optional Task | ||||||||
| Shaw AFB | CG038 | ||||||||||
| (AOC O) | 0022AC | Achieve Supplemental Human Health Risk Assessment | Optional Task | ||||||||
| Shaw AFB | CG038 | ||||||||||
| (AOC O) | 0022AD | Achieve Corrective Measures Study (to include existing remedy) | Optional Task | ||||||||
| Shaw AFB | CG038 | ||||||||||
| (AOC O) | 0022AE | Achieve Revised Statement of Basis/RCRA Permit Modification | Optional Task | ||||||||
| Shaw AFB | CG038 | ||||||||||
| (AOC O) | 0022AF | Achieve Corrective Measures Implementation Work Plan (CMI WP) | Optional Task | ||||||||
| Shaw AFB | CG038 | ||||||||||
| (AOC O) | 0022AG | Achieve Demolition of existing ISCO system (including infrastructure) and System Decommissioning Report | Optional Task | ||||||||
| Shaw AFB | CG038 | ||||||||||
| (AOC O) | 0022CA | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model | Base Year | 7/18/26 | 7/17/29 | Compliance Sub-CLINs should be set at three years from award. | |||||
| Shaw AFB | CG038 | ||||||||||
| (AOC O) | 0022CB | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY1 | OY1 | ||||||||
| Shaw AFB | CG038 | ||||||||||
| (AOC O) | 0022CC | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY2 | OY2 | ||||||||
| Shaw AFB | CG038 | ||||||||||
| (AOC O) | 0022CD | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY3 | OY3 | ||||||||
| Shaw AFB | CG038 | ||||||||||
| (AOC O) | 0022CE | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY4 | OY4 | ||||||||
| Shaw AFB | CG038 | ||||||||||
| (AOC O) | 0022CF | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY5 | OY5 | ||||||||
| Shaw AFB | CG038 | ||||||||||
| (AOC O) | 0022CG | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY6 | OY6 | ||||||||
| Shaw AFB | DP039 | ||||||||||
| (SWMU 101, AOC 32) | 0023 | Conduct LTM | |||||||||
| Shaw AFB | DP039 | ||||||||||
| (SWMU 101, AOC 32) | 0023CA | Conduct LTM in accordance with the approved CMI Work plan and RCRA Permit | Base Year | 7/18/26 | 7/17/29 | Compliance Sub-CLINs should be set at three years from award. | |||||
| Shaw AFB | DP039 | ||||||||||
| (SWMU 101, AOC 32) | 0023CB | Conduct LTM in accordance with the approved CMI Work Plan and RCRA Permit - OY1 | OY1 | ||||||||
| Shaw AFB | DP039 | ||||||||||
| (SWMU 101, AOC 32) | 0023CC | Conduct LTM in accordance with the approved CMI Work Plan and RCRA Permit - OY2 | OY2 | ||||||||
| Shaw AFB | DP039 | ||||||||||
| (SWMU 101, AOC 32) | 0023CD | Conduct LTM in accordance with the approved CMI Work Plan and RCRA Permit - OY3 | OY3 | ||||||||
| Shaw AFB | DP039 | ||||||||||
| (SWMU 101, AOC 32) | 0023CE | Conduct LTM in accordance with the approved CMI Work Plan and RCRA Permit - OY4 | OY4 | ||||||||
| Shaw AFB | DP039 | ||||||||||
| (SWMU 101, AOC 32) | 0023CF | Conduct LTM in accordance with the approved CMI Work Plan and RCRA Permit - OY5 | OY5 | ||||||||
| Shaw AFB | DP039 | ||||||||||
| (SWMU 101, AOC 32) | 0023CG | Conduct LTM in accordance with the approved CMI Work Plan and RCRA Permit - OY6 | OY6 | ||||||||
| Shaw AFB | FT001 | ||||||||||
| (SWMU 59) | 0024 | Conduct RA-O and Achieve Alternate Objectives | |||||||||
| Shaw AFB | FT001 | ||||||||||
| (SWMU 59) | 0024AA | Achieve Supplemental Site Investigation Work Plan | Base Year | 7/18/26 | 7/17/33 | Performance Sub-CLINs should be set in accordance with Table 1. | |||||
| Shaw AFB | FT001 | ||||||||||
| (SWMU 59) | 0024AB | Achieve Supplemental Site Investigation Report (to include CSM Update) | Optional Task | ||||||||
| Shaw AFB | FT001 | ||||||||||
| (SWMU 59) | 0024AC | Achieve Corrective Measures Study (to include existing remedy) | Optional Task | ||||||||
| Shaw AFB | FT001 | ||||||||||
| (SWMU 59) | 0024AD | Achieve Revised Statement of Basis/ RCRA Permit Modification | Optional Task | ||||||||
| Shaw AFB | FT001 | ||||||||||
| (SWMU 59) | 0024AE | Achieve Corrective Measures Implementation Work Plan (CMI WP) | Optional Task | ||||||||
| Shaw AFB | FT001 | ||||||||||
| (SWMU 59) | 0024AF | Achieve Corrective Measures Implementation Work Plan (CMI WP) - Phase 2 | Optional Task | ||||||||
| Shaw AFB | FT001 | ||||||||||
| (SWMU 59) | 0024AG | Achieve Demolition of existing ISCO system (including infrastructure) and System Decommissioning Report | Optional Task | ||||||||
| Shaw AFB | FT001 | ||||||||||
| (SWMU 59) | 0024CA | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model | Base Year | 7/18/26 | 7/17/29 | Compliance Sub-CLINs should be set at three years from award. | |||||
| Shaw AFB | FT001 | ||||||||||
| (SWMU 59) | 0024CB | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY1 | OY1 | ||||||||
| Shaw AFB | FT001 | ||||||||||
| (SWMU 59) | 0024CC | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY2 | OY2 | ||||||||
| Shaw AFB | FT001 | ||||||||||
| (SWMU 59) | 0024CD | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY3 | OY3 | ||||||||
| Shaw AFB | FT001 | ||||||||||
| (SWMU 59) | 0024CE | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY4 | OY4 | ||||||||
| Shaw AFB | FT001 | ||||||||||
| (SWMU 59) | 0024CF | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY5 | OY5 | ||||||||
| Shaw AFB | FT001 | ||||||||||
| (SWMU 59) | 0024CG | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY6 | OY6 | ||||||||
| Shaw AFB | FT001P-SUB | 0025 | IRA-O with Optimization | ||||||||
| Shaw AFB | FT001P-SUB | 0025AA | Prepare Performance Model and achieve the performance goals per the performance model years 1, 2 and 3 | Base Year | 7/18/26 | 7/17/33 | Performance Sub-CLINs should be set in accordance with Table 1. | ||||
| Shaw AFB | FT001P-SUB | 0025AB | Achieve the performance goals per the performance model years 4, and 5 and develop an Optimization Summary and Forecasting Report in year 5 | Optional Task | |||||||
| Shaw AFB | FT001P-SUB | 0025AC | Achieve the performance goal per the performance model year 6 and final performance goal year 7 | Optional Task | |||||||
| Shaw AFB | FT001P-SUB | 0025CA | Conduct IRA-O in accordance with the approved CMI Work Plan and RCRA Permit | Base Year | 7/18/26 | 7/17/29 | Compliance Sub-CLINs should be set at three years from award. | ||||
| Shaw AFB | FT001P-SUB | 0025CB | Conduct IRA-O in accordance with the approved CMI Work Plan and RCRA Permit - OY1 | OY1 | |||||||
| Shaw AFB | FT001P-SUB | 0025CC | Conduct IRA-O in accordance with the approved CMI Work Plan and RCRA Permit - OY2 | OY2 | |||||||
| Shaw AFB | FT001P-SUB | 0025CD | Conduct IRA-O in accordance with the approved CMI Work Plan and RCRA Permit - OY3 | OY3 | |||||||
| Shaw AFB | FT001P-SUB | 0025CE | Conduct IRA-O in accordance with the approved CMI Work Plan and RCRA Permit - OY4 | OY4 | |||||||
| Shaw AFB | FT001P-SUB | 0025CF | Conduct IRA-O in accordance with the approved CMI Work Plan and RCRA Permit - OY5 | OY5 | |||||||
| Shaw AFB | FT001P-SUB | 0025CG | Conduct IRA-O in accordance with the approved CMI Work Plan and RCRA Permit - OY6 | OY6 | |||||||
| Shaw AFB | FT006P-SUB | 0026 | IRA-O with Optimization | ||||||||
| Shaw AFB | FT006P-SUB | 0026AA | Prepare Performance Model and achieve the performance goals per the performance model years 1, 2 and 3 | Base Year | 7/18/26 | 7/17/33 | Performance Sub-CLINs should be set in accordance with Table 1. | ||||
| Shaw AFB | FT006P-SUB | 0026AB | Achieve the performance goals per the performance model years 4, and 5 and develop an Optimization Summary and Forecasting Report in year 5 | Optional Task | |||||||
| Shaw AFB | FT006P-SUB | 0026AC | Achieve the performance goal per the performance model year 6 and final performance goal year 7 | Optional Task | |||||||
| Shaw AFB | FT006P-SUB | 0026CA | Conduct IRA-O in accordance with the approved CMI Work Plan and RCRA Permit | Base Year | 7/18/26 | 7/17/29 | Compliance Sub-CLINs should be set at three years from award. | ||||
| Shaw AFB | FT006P-SUB | 0026CB | Conduct IRA-O in accordance with the approved CMI Work Plan and RCRA Permit - OY1 | OY1 | |||||||
| Shaw AFB | FT006P-SUB | 0026CC | Conduct IRA-O in accordance with the approved CMI Work Plan and RCRA Permit - OY2 | OY2 | |||||||
| Shaw AFB | FT006P-SUB | 0026CD | Conduct IRA-O in accordance with the approved CMI Work Plan and RCRA Permit - OY3 | OY3 | |||||||
| Shaw AFB | FT006P-SUB | 0026CE | Conduct IRA-O in accordance with the approved CMI Work Plan and RCRA Permit - OY4 | OY4 | |||||||
| Shaw AFB | FT006P-SUB | 0026CF | Conduct IRA-O in accordance with the approved CMI Work Plan and RCRA Permit - OY5 | OY5 | |||||||
| Shaw AFB | FT006P-SUB | 0026CG | Conduct IRA-O in accordance with the approved CMI Work Plan and RCRA Permit - OY6 | OY6 | |||||||
| Shaw AFB | FT007P-SUB | 0027 | IRA-O with Optimization | ||||||||
| Shaw AFB | FT007P-SUB | 0027AA | Prepare Performance Model and achieve the performance goals per the performance model years 1, 2 and 3 | Base Year | 7/18/26 | 7/17/33 | Performance Sub-CLINs should be set in accordance with Table 1. | ||||
| Shaw AFB | FT007P-SUB | 0027AB | Achieve the performance goals per the performance model years 4, and 5 and develop an Optimization Summary and Forecasting Report in year 5 | Optional Task | |||||||
| Shaw AFB | FT007P-SUB | 0027AC | Achieve the performance goal per the performance model year 6 and final performance goal year 7 | Optional Task | |||||||
| Shaw AFB | FT007P-SUB | 0027CA | Conduct IRA-O in accordance with the approved CMI Work Plan and RCRA Permit | Base Year | 7/18/26 | 7/17/29 | Compliance Sub-CLINs should be set at three years from award. | ||||
| Shaw AFB | FT007P-SUB | 0027CB | Conduct IRA-O in accordance with the approved CMI Work Plan and RCRA Permit - OY1 | OY1 | |||||||
| Shaw AFB | FT007P-SUB | 0027CC | Conduct IRA-O in accordance with the approved CMI Work Plan and RCRA Permit - OY2 | OY2 | |||||||
| Shaw AFB | FT007P-SUB | 0027CD | Conduct IRA-O in accordance with the approved CMI Work Plan and RCRA Permit - OY3 | OY3 | |||||||
| Shaw AFB | FT007P-SUB | 0027CE | Conduct IRA-O in accordance with the approved CMI Work Plan and RCRA Permit - OY4 | OY4 | |||||||
| Shaw AFB | FT007P-SUB | 0027CF | Conduct IRA-O in accordance with the approved CMI Work Plan and RCRA Permit - OY5 | OY5 | |||||||
| Shaw AFB | FT007P-SUB | 0027CG | Conduct IRA-O in accordance with the approved CMI Work Plan and RCRA Permit - OY6 | OY6 | |||||||
| Shaw AFB | LF003 | ||||||||||
| (SWMU 58) | 0028 | Conduct LTM | |||||||||
| Shaw AFB | LF003 | ||||||||||
| (SWMU 58) | 0028CA | Conduct LTM in accordance with the approved CMI Work plan and RCRA Permit | Base Year | 7/18/26 | 7/17/29 | Compliance Sub-CLINs should be set at three years from award. | |||||
| Shaw AFB | LF003 | ||||||||||
| (SWMU 58) | 0028CB | Conduct LTM in accordance with the approved CMI Work Plan and RCRA Permit - OY1 | OY1 | ||||||||
| Shaw AFB | LF003 | ||||||||||
| (SWMU 58) | 0028CC | Conduct LTM in accordance with the approved CMI Work Plan and RCRA Permit - OY2 | OY2 | ||||||||
| Shaw AFB | LF003 | ||||||||||
| (SWMU 58) | 0028CD | Conduct LTM in accordance with the approved CMI Work Plan and RCRA Permit - OY3 | OY3 | ||||||||
| Shaw AFB | LF003 | ||||||||||
| (SWMU 58) | 0028CE | Conduct LTM in accordance with the approved CMI Work Plan and RCRA Permit - OY4 | OY4 | ||||||||
| Shaw AFB | LF003 | ||||||||||
| (SWMU 58) | 0028CF | Conduct LTM in accordance with the approved CMI Work Plan and RCRA Permit - OY5 | OY5 | ||||||||
| Shaw AFB | LF003 | ||||||||||
| (SWMU 58) | 0028CG | Conduct LTM in accordance with the approved CMI Work Plan and RCRA Permit - OY6 | OY6 | ||||||||
| Shaw AFB | LF008 | ||||||||||
| (SWMU 85) | 0029 | Conduct LTM | |||||||||
| Shaw AFB | LF008 | ||||||||||
| (SWMU 85) | 0029CA | Conduct LTM in accordance with the approved CMI Work plan and RCRA Permit | Base Year | 7/18/26 | 7/17/29 | Compliance Sub-CLINs should be set at three years from award. | |||||
| Shaw AFB | LF008 | ||||||||||
| (SWMU 85) | 0029CB | Conduct LTM in accordance with the approved CMI Work Plan and RCRA Permit - OY1 | OY1 | ||||||||
| Shaw AFB | LF008 | ||||||||||
| (SWMU 85) | 0029CC | Conduct LTM in accordance with the approved CMI Work Plan and RCRA Permit - OY2 | OY2 | ||||||||
| Shaw AFB | LF008 | ||||||||||
| (SWMU 85) | 0029CD | Conduct LTM in accordance with the approved CMI Work Plan and RCRA Permit - OY3 | OY3 | ||||||||
| Shaw AFB | LF008 | ||||||||||
| (SWMU 85) | 0029CE | Conduct LTM in accordance with the approved CMI Work Plan and RCRA Permit - OY4 | OY4 | ||||||||
| Shaw AFB | LF008 | ||||||||||
| (SWMU 85) | 0029CF | Conduct LTM in accordance with the approved CMI Work Plan and RCRA Permit - OY5 | OY5 | ||||||||
| Shaw AFB | LF008 | ||||||||||
| (SWMU 85) | 0029CG | Conduct LTM in accordance with the approved CMI Work Plan and RCRA Permit - OY6 | OY6 | ||||||||
| Shaw AFB | LF009 | ||||||||||
| (SWMU 52) | 0030 | Conduct LTM and Reduce LCC | |||||||||
| Shaw AFB | LF009 | ||||||||||
| (SWMU 52) | 0030CA | Conduct LTM in accordance with the approved CMI Work plan and RCRA Permit | Base Year | 7/18/26 | 7/17/29 | Compliance Sub-CLINs should be set at three years from award. | |||||
| Shaw AFB | LF009 | ||||||||||
| (SWMU 52) | 0030CB | Conduct LTM in accordance with the approved CMI Work Plan and RCRA Permit - OY1 | OY1 | ||||||||
| Shaw AFB | LF009 | ||||||||||
| (SWMU 52) | 0030CC | Conduct LTM in accordance with the approved CMI Work Plan and RCRA Permit - OY2 | OY2 | ||||||||
| Shaw AFB | LF009 | ||||||||||
| (SWMU 52) | 0030CD | Conduct LTM in accordance with the approved CMI Work Plan and RCRA Permit - OY3 | OY3 | ||||||||
| Shaw AFB | LF009 | ||||||||||
| (SWMU 52) | 0030CE | Conduct LTM in accordance with the approved CMI Work Plan and RCRA Permit - OY4 | OY4 | ||||||||
| Shaw AFB | LF009 | ||||||||||
| (SWMU 52) | 0030CF | Conduct LTM in accordance with the approved CMI Work Plan and RCRA Permit - OY5 | OY5 | ||||||||
| Shaw AFB | LF009 | ||||||||||
| (SWMU 52) | 0030CG | Conduct LTM in accordance with the approved CMI Work Plan and RCRA Permit - OY6 | OY6 | ||||||||
| Shaw AFB | OT016A | ||||||||||
| (SWMU 78) | 0031 | Conduct RA-O and Achieve Alternate Objectives | |||||||||
| Shaw AFB | OT016A | ||||||||||
| (SWMU 78) | 0031AA | Achieve Supplemental Site Investigation Work Plan | Base Year | 7/18/26 | 7/17/33 | Performance Sub-CLINs should be set in accordance with Table 1. | |||||
| Shaw AFB | OT016A | ||||||||||
| (SWMU 78) | 0031AB | Achieve Supplemental Site Investigation Report (to include CSM Update) | Optional Task | ||||||||
| Shaw AFB | OT016A | ||||||||||
| (SWMU 78) | 0031AC | Achieve Supplemental Human Health Risk Assessment | Optional Task | ||||||||
| Shaw AFB | OT016A | ||||||||||
| (SWMU 78) | 0031AD | Achieve Corrective Measures Study (to include existing remedy) | Optional Task | ||||||||
| Shaw AFB | OT016A | ||||||||||
| (SWMU 78) | 0031AE | Achieve Revised Statement of Basis/RCRA Permit Modification | Optional Task | ||||||||
| Shaw AFB | OT016A | ||||||||||
| (SWMU 78) | 0031AF | Achieve Corrective Measures Implementation Work Plan (CMI WP) | Optional Task | ||||||||
| Shaw AFB | OT016B | ||||||||||
| (AOC F) | 0031AG | Achieve Demolition of existing ISCO system (including infrastructure) and System Decommissioning Report | Optional Task | ||||||||
| Shaw AFB | OT016A | ||||||||||
| (SWMU 78) | 0031CA | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model | Base Year | 7/18/26 | 7/17/29 | Compliance Sub-CLINs should be set at three years from award. | |||||
| Shaw AFB | OT016A | ||||||||||
| (SWMU 78) | 0031CB | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY1 | OY1 | ||||||||
| Shaw AFB | OT016A | ||||||||||
| (SWMU 78) | 0031CC | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY2 | OY2 | ||||||||
| Shaw AFB | OT016A | ||||||||||
| (SWMU 78) | 0031CD | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY3 | OY3 | ||||||||
| Shaw AFB | OT016A | ||||||||||
| (SWMU 78) | 0031CE | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY4 | OY4 | ||||||||
| Shaw AFB | OT016A | ||||||||||
| (SWMU 78) | 0031CF | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY5 | OY5 | ||||||||
| Shaw AFB | OT016A | ||||||||||
| (SWMU 78) | 0031CG | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY6 | OY6 | ||||||||
| Shaw AFB | OT016B | ||||||||||
| (AOC F) | 0032 | Conduct RA-O and Achieve Alternate Objectives | |||||||||
| Shaw AFB | OT016B | ||||||||||
| (AOC F) | 0032AA | Achieve Supplemental Site Investigation Work Plan | Base Year | 7/18/26 | 7/17/33 | Performance Sub-CLINs should be set in accordance with Table 1. | |||||
| Shaw AFB | OT016B | ||||||||||
| (AOC F) | 0032AB | Achieve Supplemental Site Investigation Report (to include CSM Update) for the SW lobe of the Off-Base Plume | Optional Task | ||||||||
| Shaw AFB | OT016B | ||||||||||
| (AOC F) | 0032AC | Achieve Corrective Measures Study (to include existing remedy) | Optional Task | ||||||||
| Shaw AFB | OT016B | ||||||||||
| (AOC F) | 0032AD | Achieve Revised Statement of Basis/RCRA Permit Modification | Optional Task | ||||||||
| Shaw AFB | OT016B | ||||||||||
| (AOC F) | 0032AE | Achieve Corrective Measures Implementation Work Plan (CMI WP) | Optional Task | ||||||||
| Shaw AFB | OT016B | ||||||||||
| (AOC F) | 0032AF | Achieve Demolition of existing ISCO system (including infrastructure) and System Decommissioning Report | Optional Task | ||||||||
| Shaw AFB | OT016B | ||||||||||
| (AOC F) | 0032CA | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model | Base Year | 7/18/26 | 7/17/29 | Compliance Sub-CLINs should be set at three years from award. | |||||
| Shaw AFB | OT016B | ||||||||||
| (AOC F) | 0032CB | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY1 | OY1 | ||||||||
| Shaw AFB | OT016B | ||||||||||
| (AOC F) | 0032CC | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY2 | OY2 | ||||||||
| Shaw AFB | OT016B | ||||||||||
| (AOC F) | 0032CD | Conduct Protectiveness Assessment in accordance with the approved CMI Work Plan and RCRA Permit | Optional Task | ||||||||
| Shaw AFB | OT016B | ||||||||||
| (AOC F) | 0032CE | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY3 | OY3 | ||||||||
| Shaw AFB | OT016B | ||||||||||
| (AOC F) | 0032CF | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY4 | OY4 | ||||||||
| Shaw AFB | OT016B | ||||||||||
| (AOC F) | 0032CG | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY5 | OY5 | ||||||||
| Shaw AFB | OT016B | ||||||||||
| (AOC F) | 0032CH | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY6 | OY6 | ||||||||
| Shaw AFB | OT016C | ||||||||||
| (AOC D) | 0033 | Conduct RA-O with Optimization | |||||||||
| Shaw AFB | OT016C | ||||||||||
| (AOC D) | 0033AA | Prepare Performance Model and achieve the performance goals per the performance model years 1, 2 and 3 | Base Year | 7/18/26 | 7/17/33 | Performance Sub-CLINs should be set in accordance with Table 1. | |||||
| Shaw AFB | OT016C | ||||||||||
| (AOC D) | 0033AB | Achieve the performance goals per the performance model years 4, and 5 and develop an Optimization Summary and Forecasting Report in year 5 | Optional Task | ||||||||
| Shaw AFB | OT016C | ||||||||||
| (AOC D) | 0033AC | Achieve the performance goal per the performance model year 6 and final performance goal year 7 | Optional Task | ||||||||
| Shaw AFB | OT016C | ||||||||||
| (AOC D) | 0033CA | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit | Base Year | 7/18/26 | 7/17/29 | Compliance Sub-CLINs should be set at three years from award. | |||||
| Shaw AFB | OT016C | ||||||||||
| (AOC D) | 0033CB | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit - OY1 | OY1 | ||||||||
| Shaw AFB | OT016C | ||||||||||
| (AOC D) | 0033CC | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit - OY2 | OY2 | ||||||||
| Shaw AFB | OT016C | ||||||||||
| (AOC D) | 0033CD | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit - OY3 | OY3 | ||||||||
| Shaw AFB | OT016C | ||||||||||
| (AOC D) | 0033CE | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit - OY4 | OY4 | ||||||||
| Shaw AFB | OT016C | ||||||||||
| (AOC D) | 0033CF | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit - OY5 | OY5 | ||||||||
| Shaw AFB | OT016C | ||||||||||
| (AOC D) | 0033CG | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit - OY6 | OY6 | ||||||||
| Shaw AFB | OT016D | ||||||||||
| (AOC W) | 0034 | Achieve Site Closeout | |||||||||
| Shaw AFB | OT016D | ||||||||||
| (AOC W) | 0034AA | Achieve RCRA Facility Site Investigation Work Plan | Base Year | 7/18/26 | 7/17/31 | Performance Sub-CLINs should be set in accordance with Table 1. | |||||
| Shaw AFB | OT016D | ||||||||||
| (AOC W) | 0034AB | Achieve RCRA Facility Site Investigation Report | Optional Task | ||||||||
| Shaw AFB | OT016D | ||||||||||
| (AOC W) | 0034AC | Achieve Supplemental Human Health Risk Assessment | Optional Task | ||||||||
| Shaw AFB | OT016D | ||||||||||
| (AOC W) | 0034AD | Achieve Corrective Measures Study (to include existing remedy and Pilot Study) | Optional Task | ||||||||
| Shaw AFB | OT016D | ||||||||||
| (AOC W) | 0034AE | Achieve Revised Statement of Basis/RCRA Permit Modification | Optional Task | ||||||||
| Shaw AFB | OT016D | ||||||||||
| (AOC W) | 0034AF | Achieve Corrective Measures Implementation Work Plan (CMI WP) | Optional Task | ||||||||
| Shaw AFB | OT016D | ||||||||||
| (AOC W) | 0034AG | Prepare Site Sampling Plan Update | Optional Task | ||||||||
| Shaw AFB | OT016D | ||||||||||
| (AOC W) | 0034AH | Achieve Response Complete | Optional Task | ||||||||
| Shaw AFB | OT016D | ||||||||||
| (AOC W) | 0034AJ | Achieve Site Closeout | Optional Task | ||||||||
| Shaw AFB | OT016D | ||||||||||
| (AOC W) | 0034CA | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model | Base Year | 7/18/26 | 7/17/29 | Compliance Sub-CLINs should be set at three years from award. | |||||
| Shaw AFB | OT016D | ||||||||||
| (AOC W) | 0034CB | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY1 | OY1 | ||||||||
| Shaw AFB | OT016D | ||||||||||
| (AOC W) | 0034CC | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY2 | OY2 | ||||||||
| Shaw AFB | OT016D | ||||||||||
| (AOC W) | 0034CD | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY3 | OY3 | ||||||||
| Shaw AFB | OT016D | ||||||||||
| (AOC W) | 0034CE | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY4 | OY4 | ||||||||
| Shaw AFB | OT016D | ||||||||||
| (AOC W) | 0034CF | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY5 | OY5 | ||||||||
| Shaw AFB | OT016D | ||||||||||
| (AOC W) | 0034CG | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY6 | OY6 | ||||||||
| Shaw AFB | SD033 | ||||||||||
| (SWMU 96) | 0035 | Conduct RA-O and Achieve Alternate Objectives | |||||||||
| Shaw AFB | SD033 | ||||||||||
| (SWMU 96) | 0035AA | Achieve Supplemental Site Investigation Work Plan | Base Year | 7/18/26 | 7/17/31 | Performance Sub-CLINs should be set in accordance with Table 1. | |||||
| Shaw AFB | SD033 | ||||||||||
| (SWMU 96) | 0035AB | Achieve Supplemental Site Investigation Report (to include CSM Update) | Optional Task | ||||||||
| Shaw AFB | SD033 | ||||||||||
| (SWMU 96) | 0035AC | Achieve Supplemental Human Health Risk Assessment | Optional Task | ||||||||
| Shaw AFB | SD033 | ||||||||||
| (SWMU 96) | 0035AD | Achieve Corrective Measures Study (to include existing remedy) | Optional Task | ||||||||
| Shaw AFB | SD033 | ||||||||||
| (SWMU 96) | 0035AE | Achieve Revised Statement of Basis/RCRA Permit Modification | Optional Task | ||||||||
| Shaw AFB | SD033 | ||||||||||
| (SWMU 96) | 0035AF | Achieve Corrective Measures Implementation Work Plan (CMI WP) | Optional Task | ||||||||
| Shaw AFB | SD033 | ||||||||||
| (SWMU 96) | 0035CA | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model | Base Year | 7/18/26 | 7/17/29 | Compliance Sub-CLINs should be set at three years from award. | |||||
| Shaw AFB | SD033 | ||||||||||
| (SWMU 96) | 0035CB | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY1 | OY1 | ||||||||
| Shaw AFB | SD033 | ||||||||||
| (SWMU 96) | 0035CC | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY2 | OY2 | ||||||||
| Shaw AFB | SD033 | ||||||||||
| (SWMU 96) | 0035CD | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY3 | OY3 | ||||||||
| Shaw AFB | SD033 | ||||||||||
| (SWMU 96) | 0035CE | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY4 | OY4 | ||||||||
| Shaw AFB | SD033 | ||||||||||
| (SWMU 96) | 0035CF | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY5 | OY5 | ||||||||
| Shaw AFB | SD033 | ||||||||||
| (SWMU 96) | 0035CG | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY6 | OY6 | ||||||||
| Shaw AFB | SS015 | ||||||||||
| (SWMU 2) | 0036 | Conduct RA-O and Achieve Alternate Objectives | |||||||||
| Shaw AFB | SS015 | ||||||||||
| (SWMU 2) | 0036AA | Achieve Supplemental Site Investigation Work Plan | Base Year | 7/18/26 | 7/17/33 | Performance Sub-CLINs should be set in accordance with Table 1. | |||||
| Shaw AFB | SS015 | ||||||||||
| (SWMU 2) | 0036AB | Achieve Supplemental Site Investigation Report (to include CSM Update) | Optional Task | ||||||||
| Shaw AFB | SS015 | ||||||||||
| (SWMU 2) | 0036AC | Achieve Supplemental Human Health Risk Assessment | Optional Task | ||||||||
| Shaw AFB | SS015 | ||||||||||
| (SWMU 2) | 0036AD | Achieve Corrective Measures Study (to include existing remedy) | Optional Task | ||||||||
| Shaw AFB | SS015 | ||||||||||
| (SWMU 2) | 0036AE | Achieve Revised Statement of Basis/RCRA Permit Modification | Optional Task | ||||||||
| Shaw AFB | SS015 | ||||||||||
| (SWMU 2) | 0036AF | Achieve Corrective Measures Implementation Work Plan (CMI WP) | Optional Task | ||||||||
| Shaw AFB | SS015 | ||||||||||
| (SWMU 2) | 0036CA | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model | Base Year | 7/18/26 | 7/17/29 | Compliance Sub-CLINs should be set at three years from award. | |||||
| Shaw AFB | SS015 | ||||||||||
| (SWMU 2) | 0036CB | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY1 | OY1 | ||||||||
| Shaw AFB | SS015 | ||||||||||
| (SWMU 2) | 0036CC | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY2 | OY2 | ||||||||
| Shaw AFB | SS015 | ||||||||||
| (SWMU 2) | 0036CD | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY3 | OY3 | ||||||||
| Shaw AFB | SS015 | ||||||||||
| (SWMU 2) | 0036CE | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY4 | OY4 | ||||||||
| Shaw AFB | SS015 | ||||||||||
| (SWMU 2) | 0036CF | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY5 | OY5 | ||||||||
| Shaw AFB | SS015 | ||||||||||
| (SWMU 2) | 0036CG | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY6 | OY6 | ||||||||
| Shaw AFB | SS035 | ||||||||||
| (AOC H) | 0037 | Conduct RA-O and Achieve Alternate Objectives | |||||||||
| Shaw AFB | SS035 | ||||||||||
| (AOC H) | 0037AA | Achieve Supplemental Site Investigation Work Plan | Base Year | 7/18/26 | 7/17/33 | Performance Sub-CLINs should be set in accordance with Table 1. | |||||
| Shaw AFB | SS035 | ||||||||||
| (AOC H) | 0037AB | Achieve Supplemental Site Investigation Report (to include CSM Update) | Optional Task | ||||||||
| Shaw AFB | SS035 | ||||||||||
| (AOC H) | 0037AC | Achieve Supplemental Human Health Risk Assessment | Optional Task | ||||||||
| Shaw AFB | SS035 | ||||||||||
| (AOC H) | 0037AD | Achieve Corrective Measures Study (to include existing remedy) | Optional Task | ||||||||
| Shaw AFB | SS035 | ||||||||||
| (AOC H) | 0037AE | Achieve Revised Statement of Basis/RCRA Permit Modification | Optional Task | ||||||||
| Shaw AFB | SS035 | ||||||||||
| (AOC H) | 0037AF | Achieve Corrective Measures Implementation Work Plan (CMI WP) | Optional Task | ||||||||
| Shaw AFB | SS035 | ||||||||||
| (AOC H) | 0037AG | Achieve Demolition of existing ISCO system (including infrastructure) and System Decommissioning Report | Optional Task | ||||||||
| Shaw AFB | SS035 | ||||||||||
| (AOC H) | 0037CA | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model | Base Year | 7/18/26 | 7/17/29 | Compliance Sub-CLINs should be set at three years from award. | |||||
| Shaw AFB | SS035 | ||||||||||
| (AOC H) | 0037CB | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY1 | OY1 | ||||||||
| Shaw AFB | SS035 | ||||||||||
| (AOC H) | 0037CC | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY2 | OY2 | ||||||||
| Shaw AFB | SS035 | ||||||||||
| (AOC H) | 0037CD | Conduct Protectiveness Assessment in accordance with the approved CMI Work Plan and RCRA Permit | Optional Task | ||||||||
| Shaw AFB | SS035 | ||||||||||
| (AOC H) | 0037CE | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY3 | OY3 | ||||||||
| Shaw AFB | SS035 | ||||||||||
| (AOC H) | 0037CF | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY4 | OY4 | ||||||||
| Shaw AFB | SS035 | ||||||||||
| (AOC H) | 0037CG | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY5 | OY5 | ||||||||
| Shaw AFB | SS035 | ||||||||||
| (AOC H) | 0037CH | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY6 | OY6 | ||||||||
| Shaw AFB | SS036 | ||||||||||
| (AOC N) | 0038 | Conduct RA-O and Achieve Alternate Objectives | |||||||||
| Shaw AFB | SS036 | ||||||||||
| (AOC N) | 0038AA | Achieve Supplemental Site Investigation Work Plan | Base Year | 7/18/26 | 7/17/33 | Performance Sub-CLINs should be set in accordance with Table 1. | |||||
| Shaw AFB | SS036 | ||||||||||
| (AOC N) | 0038AB | Achieve Supplemental Site Investigation Report (to include CSM Update) | Optional Task | ||||||||
| Shaw AFB | SS036 | ||||||||||
| (AOC N) | 0038AC | Achieve Supplemental Human Health Risk Assessment | Optional Task | ||||||||
| Shaw AFB | SS036 | ||||||||||
| (AOC N) | 0038AD | Achieve Corrective Measures Study (to include existing remedy) | Optional Task | ||||||||
| Shaw AFB | SS036 | ||||||||||
| (AOC N) | 0038AE | Achieve Revised Statement of Basis/RCRA Permit Modification | Optional Task | ||||||||
| Shaw AFB | SS036 | ||||||||||
| (AOC N) | 0038AF | Achieve Corrective Measures Implementation Work Plan (CMI WP) | Optional Task | ||||||||
| Shaw AFB | SS036 | ||||||||||
| (AOC N) | 0038CA | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model | Base Year | 7/18/26 | 7/17/29 | Compliance Sub-CLINs should be set at three years from award. | |||||
| Shaw AFB | SS036 | ||||||||||
| (AOC N) | 0038CB | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY1 | OY1 | ||||||||
| Shaw AFB | SS036 | ||||||||||
| (AOC N) | 0038CC | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY2 | OY2 | ||||||||
| Shaw AFB | SS036 | ||||||||||
| (AOC N) | 0038CD | Conduct Protectiveness Assessment in accordance with the approved CMI Work Plan and RCRA Permit | Optional Task | ||||||||
| Shaw AFB | SS036 | ||||||||||
| (AOC N) | 0038CE | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY3 | OY3 | ||||||||
| Shaw AFB | SS036 | ||||||||||
| (AOC N) | 0038CF | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY4 | OY4 | ||||||||
| Shaw AFB | SS036 | ||||||||||
| (AOC N) | 0038CG | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY5 | OY5 | ||||||||
| Shaw AFB | SS036 | ||||||||||
| (AOC N) | 0038CH | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY6 | OY6 | ||||||||
| Shaw AFB | ST018 | ||||||||||
| (SWMU 87) | 0039 | Achieve Response Complete | |||||||||
| Shaw AFB | ST018 | ||||||||||
| (SWMU 87) | 0039AA | Achieve Data Gap Investigation Report (to include CSM Update) | Base Year | 7/18/26 | 7/17/33 | Performance Sub-CLINs should be set in accordance with Table 1. | |||||
| Shaw AFB | ST018 | ||||||||||
| (SWMU 87) | 0039AB | Achieve Corrective Action Plan | Optional Task | ||||||||
| Shaw AFB | ST018 | ||||||||||
| (SWMU 87) | 0039AC | Achieve Vapor Intrusion Mitigation Work Plan | Optional Task | ||||||||
| Shaw AFB | ST018 | ||||||||||
| (SWMU 87) | 0039AD | Achieve Vapor Intrusion Mitigation Report | Optional Task | ||||||||
| Shaw AFB | ST018 | ||||||||||
| (SWMU 87) | 0039AE | Achieve Response Complete | Optional Task | ||||||||
| Shaw AFB | ST018 | ||||||||||
| (SWMU 87) | 0039CA | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model | Base Year | 7/18/26 | 7/17/29 | Compliance Sub-CLINs should be set at three years from award. | |||||
| Shaw AFB | ST018 | ||||||||||
| (SWMU 87) | 0039CB | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY1 | OY1 | ||||||||
| Shaw AFB | ST018 | ||||||||||
| (SWMU 87) | 0039CC | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY2 | OY2 | ||||||||
| Shaw AFB | ST018 | ||||||||||
| (SWMU 87) | 0039CD | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY3 | OY3 | ||||||||
| Shaw AFB | ST018 | ||||||||||
| (SWMU 87) | 0039CE | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY4 | OY4 | ||||||||
| Shaw AFB | ST018 | ||||||||||
| (SWMU 87) | 0039CF | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY5 | OY5 | ||||||||
| Shaw AFB | ST018 | ||||||||||
| (SWMU 87) | 0039CG | Conduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY6 | OY6 | ||||||||
| Shaw AFB | ST030 | ||||||||||
| (AOC M) | 0040 | Achieve Response Complete and Alternate Objectives | |||||||||
| Shaw AFB | ST030 | ||||||||||
| (AOC M) | 0040AA | Achieve RCRA Facility Site Investigation Work Plan | Base Year | 7/18/26 | 7/17/33 | Performance Sub-CLINs should be set in accordance with Table 1. | |||||
| Shaw AFB | ST030 | ||||||||||
| (AOC M) | 0040AB | Achieve RCRA Facility Site Investigation | Optional Task | ||||||||
| Shaw AFB | ST030 | ||||||||||
| (AOC M) | 0040AC | Achieve Supplemental Human Health Risk Assessment | Optional Task | ||||||||
| Shaw AFB | ST030 | ||||||||||
| (AOC M) | 0040AD | Achieve Corrective Measures Study (to include existing remedy) | Optional Task | ||||||||
| Shaw AFB | ST030 | ||||||||||
| (AOC M) | 0040AE | Achieve Revised Statement of Basis/RCRA Permit Modification | Optional Task | ||||||||
| Shaw AFB | ST030 | ||||||||||
| (AOC M) | 0040AF | Achieve Corrective Measures Implementation Work Plan (CMI WP) | Optional Task | ||||||||
| Shaw AFB | ST030 |