Sources Sought for Fiscal Year (FY) 26 Shaw Air Force Base Optimized Remediation Contract (ORC)
Solicitation number
W912HN25S1001
Issued by

About this file

This Excel file is a draft SubCLIN Structure for the Fiscal Year 2026 Shaw Air Force Base (AFB) Optimized Remediation Contract (ORC), detailing a comprehensive environmental remediation contract with a projected award date of July 18, 2026, and a contract period of performance ending on July 17, 2033. The contract encompasses 43 primary CLINs and numerous sub-CLINs covering a wide range of environmental restoration activities across 23 Installation Restoration Program (IRP) sites, including project management, integrated master scheduling, quality program plans, groundwater treatment plant operations, well installations and abandonments, site investigations, corrective measures, and site closeout activities.

Key technical scope includes operation and maintenance of two groundwater treatment plants (GWTP 1 and GWTP 2), conducting remedial actions, performing long-term monitoring, achieving site-specific objectives, and implementing various environmental investigation and restoration tasks at multiple sites with varying complexity. The contract is structured with base year and optional year components, with most programmatic sub-CLINs set at one-year intervals and compliance sub-CLINs set at three-year intervals. The contract will be executed by the United States Army Corps of Engineers (USACE) Savannah District at Shaw AFB in South Carolina, with activities spanning environmental site investigation, design, remedial system construction, system optimization, and achieving specific performance objectives across multiple sites.

View the file

Other files

File Type Posted
A.02 Shaw AFB FY26 ORC_Draft PWS_v2.2.1_20250418.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FY26 SHAW ORC

InstallationSiteCLIN/Sub-CLIN NumberCLIN/Sub-CLIN DescriptionProjected Award Date
(Pending availability of funding and bona fide need)Section F Date StartSection F Date EndNotesContract Award Date18-Jul-26
Shaw AFBN/A0001Complete Project Management Plan (PMP)Contract POP End Date17-Jul-33
Shaw AFBN/A0001CAComplete PMPBase Year7/18/267/17/27Per current guidance, Programmatic Sub-CLINs should be set at one year (minus one day).
Shaw AFBN/A0001CBUpdate PMPOptional Task
Shaw AFBN/A0001CCComplete ORC Transition Plan - OY6Optional Task
Shaw AFBN/A0002Develop Integrated Master Schedule (IMS)/Milestone Payment Schedule (MPS) and Update Monthly
Shaw AFBN/A0002CADevelop IMS/MPS and Update Monthly - Base YearBase Year7/18/267/17/27Per current guidance, Programmatic Sub-CLINs should be set at one year (minus one day).
Shaw AFBN/A0002CBUpdate IMS/MPS Monthly - OY1OY1FY27
Shaw AFBN/A0002CCUpdate IMS/MPS Monthly - OY2OY2FY28
Shaw AFBN/A0002CDUpdate IMS/MPS Monthly - OY3OY3FY29
Shaw AFBN/A0002CEUpdate IMS/MPS Monthly - OY4OY4FY30
Shaw AFBN/A0002CFUpdate IMS/MPS Monthly - OY5OY5FY31
Shaw AFBN/A0002CGUpdate IMS/MPS Monthly - OY6OY6FY32
Shaw AFBN/A0003Complete IRP Basewide Quality Program Plans (QPPs)
Shaw AFBN/A0003CAComplete IRP Basewide QPP - Base YearBase Year7/18/267/17/27Per current guidance, Programmatic Sub-CLINs should be set at one year (minus one day).
Shaw AFBN/A0003CBUpdate IRP Basewide QPPOptional Task
Shaw AFBN/A0004Prepare, Revise, and Update Land Use Control Implementation Plan (LUCIP)
Shaw AFBN/A0004CAComplete LUCIP - Base YearBase Year7/18/267/17/27Per current guidance, Programmatic Sub-CLINs should be set at one year (minus one day).
Shaw AFBN/A0004CBUpdate LUCIPOptional Task
Shaw AFBN/A0004CCUpdate LUCIPOptional Task
Shaw AFBN/A0005Provide Base Support - Base Well Split Samples, Utility Locates for Permits, etc.
Shaw AFBN/A0005CAProvide Base Support - (Base Well Split Samples, Utility Locates, Surveys, Off-Base Support) - Base YearBase Year7/18/267/17/27Per current guidance, Programmatic Sub-CLINs should be set at one year (minus one day).
Shaw AFBN/A0005CBProvide Base Support - (Base Well Split Samples, Utility Locates, Surveys, Off-Base Support) - OY1Optional Task
Shaw AFBN/A0005CCProvide Base Support - (Base Well Split Samples, Utility Locates, Surveys, Off-Base Support) - OY2Optional Task
Shaw AFBN/A0005CDProvide Base Support - (Base Well Split Samples, Utility Locates, Surveys, Off-Base Support) - OY3Optional Task
Shaw AFBN/A0005CEProvide Base Support - (Base Well Split Samples, Utility Locates, Surveys, Off-Base Support) - OY4Optional Task
Shaw AFBN/A0005CFProvide Base Support - (Base Well Split Samples, Utility Locates, Surveys, Off-Base Support) - OY5Optional Task
Shaw AFBN/A0005CGProvide Base Support - (Base Well Split Samples, Utility Locates, Surveys, Off-Base Support) - OY6Optional Task
Shaw AFBN/A0006Update Community Involvement Plan
Shaw AFBAll Open Sites (IRP, MMRP, PFAS, etc)0006CAUpdate Community Involvement PlanOY1
Shaw AFBAll Open Sites (IRP, MMRP, PFAS, etc)0006CBUpdate Community Involvement PlanOY4
Shaw AFBAll Open Sites (IRP, MMRP, PFAS, etc)0006CCUpdate Community Involvement PlanOY7
Shaw AFBN/A0007Restoration Advisory Board (RAB) Support
Shaw AFBN/A0007CARestoration Advisory Board Support _ Base YearBase Year7/18/267/17/27Per current guidance, Programmatic Sub-CLINs should be set at one year (minus one day).
Shaw AFBN/A0007CBRestoration Advisory Board Support - OY1OY1
Shaw AFBN/A0007CCRestoration Advisory Board Support - OY2OY2
Shaw AFBN/A0007CDRestoration Advisory Board Support - OY3OY3
Shaw AFBN/A0007CERestoration Advisory Board Support - OY4OY4
Shaw AFBN/A0007CFRestoration Advisory Board Support - OY5OY5
Shaw AFBN/A0007CGRestoration Advisory Board Support - OY6OY6
Shaw AFBN/A0008Complete Tier I Meeting Facilitation and Support
Shaw AFBN/A0008CASupport and facilitate Tier I Meetings - Base YearBase Year7/18/267/17/27Per current guidance, Programmatic Sub-CLINs should be set at one year (minus one day).
Shaw AFBN/A0008CBSupport and facilitate Tier I Meetings - OY1OY1
Shaw AFBN/A0008CCSupport and facilitate Tier I Meetings - OY2OY2
Shaw AFBN/A0008CDSupport and facilitate Tier I Meetings - OY3OY3
Shaw AFBN/A0008CESupport and facilitate Tier I Meetings - OY4OY4
Shaw AFBN/A0008CFSupport and facilitate Tier I Meetings - OY5OY5
Shaw AFBN/A0008CGSupport and facilitate Tier I Meetings - OY6OY6
Shaw AFBN/A0009Support 2029 Renewal of the Installation RCRA PermitOY1
Shaw AFBN/A0010Perform Well Survey, Inventory, and Condition Assessment
Shaw AFBN/A0010CAComplete Well Survey, Inventory, and Condition Assessment - Base YearBase Year7/18/267/17/27Per current guidance, Programmatic Sub-CLINs should be set at one year (minus one day).
Shaw AFBN/A0010CBUpdate Well Survey, Inventory, and Condition Assessment - OY1OY1
Shaw AFBN/A0010CCUpdate Well Survey, Inventory, and Condition Assessment - OY2OY2
Shaw AFBN/A0010CDUpdate Well Survey, Inventory, and Condition Assessment - OY3OY3
Shaw AFBN/A0010CEUpdate Well Survey, Inventory, and Condition Assessment - OY4OY4
Shaw AFBN/A0010CFUpdate Well Survey, Inventory, and Condition Assessment - OY5OY5
Shaw AFBN/A0010CGUpdate Well Survey, Inventory, and Condition Assessment - OY6OY6
Shaw AFBN/A0011Complete Basewide Well Repairs and LUC Inspection Repairs
Shaw AFBN/A0011CARepair Basewide Wells and LUC Sign Repair/Replacement - Base YearOptional TaskPer current guidance, Programmatic Sub-CLINs should be set at one year (minus one day).
Shaw AFBN/A0011CBRepair Basewide Wells and LUC Sign Repair/Replacement - OY1Optional Task
Shaw AFBN/A0011CCRepair Basewide Wells and LUC Sign Repair/Replacement - OY2Optional Task
Shaw AFBN/A0011CDRepair Basewide Wells and LUC Sign Repair/Replacement - OY3Optional Task
Shaw AFBN/A0011CERepair Basewide Wells and LUC Sign Repair/Replacement - OY4Optional Task
Shaw AFBN/A0011CFRepair Basewide Wells and LUC Sign Repair/Replacement - OY5Optional Task
Shaw AFBN/A0011CGRepair Basewide Wells and LUC Sign Repair/Replacement - OY6Optional Task
Shaw AFBN/A0012Perform Well Installations
Shaw AFBN/A0012CAInstall one (1) Basewide Well - between 0 to 75 ft bgs (Shallow)Optional TaskPer current guidance, Programmatic Sub-CLINs should be set at one year (minus one day).
Shaw AFBN/A0012CBInstall one (1) Basewide Well - between 0 to 75 ft bgs (Shallow)Optional Task
Shaw AFBN/A0012CCInstall one (1) Basewide Well - between 0 to 75 ft bgs (Shallow)Optional Task
Shaw AFBN/A0012CDInstall one (1) Basewide Well - between 0 to 75 ft bgs (Shallow)Optional Task
Shaw AFBN/A0012CEInstall one (1) Basewide Well - between 0 to 75 ft bgs (Shallow)Optional Task
Shaw AFBN/A0012CFInstall one (1) Basewide Wells - between 75 to 175 ft bgs (Medium)Optional Task
Shaw AFBN/A0012CGInstall one (1) Basewide Wells - between 75 to 175 ft bgs (Medium)Optional Task
Shaw AFBN/A0012CHInstall one (1) Basewide Wells - between 75 to 175 ft bgs (Medium)Optional Task
Shaw AFBN/A0012CJInstall one (1) Basewide Wells - between 75 to 175 ft bgs (Medium)Optional Task
Shaw AFBN/A0012CKInstall one (1) Basewide Wells - between 75 to 175 ft bgs (Medium)Optional Task
Shaw AFBN/A0012CLInstall one (1) Basewide Wells - greater than 300 ft bgs (Deep)Optional Task
Shaw AFBN/A0012CMInstall one (1) Basewide Wells - greater than 300 ft bgs (Deep)Optional Task
Shaw AFBN/A0012CNInstall one (1) Basewide Wells - greater than 300 ft bgs (Deep)Optional Task
Shaw AFBN/A0012COInstall one (1) Basewide Wells - greater than 300 ft bgs (Deep)Optional Task
Shaw AFBN/A0012CPInstall one (1) Basewide Wells - greater than 300 ft bgs (Deep)Optional Task
Shaw AFBN/A0012CQInstall three (3) Basewide Wells - between 0 to 75 ft bgs (Shallow)Optional Task
Shaw AFBN/A0012CRInstall three (3) Basewide Wells - between 0 to 75 ft bgs (Shallow)Optional Task
Shaw AFBN/A0012CSInstall three (3) Basewide Wells - between 75 to 175 ft bgs (Medium)Optional Task
Shaw AFBN/A0012CTInstall three (3) Basewide Wells - between 75 to 175 ft bgs (Medium)Optional Task
Shaw AFBN/A0012CUInstall three (3) Basewide Wells - greater than 300 ft bgs (Deep)Optional Task
Shaw AFBN/A0012CVInstall three (3) Basewide Wells - greater than 300 ft bgs (Deep)Optional Task
Shaw AFBN/A0013Perform Well Replacements and Repairs of existing Monitoring Wells
Shaw AFBN/A0013CAReplace and/or Repair ten (10) Damaged Monitoring Well CompletionsOptional TaskPer current guidance, Programmatic Sub-CLINs should be set at one year (minus one day).
Shaw AFBN/A0013CBReplace and/or Repair ten (10) Damaged Monitoring Well CompletionsOptional Task
Shaw AFBN/A0013CCReplace and/or Repair five (5) Damaged Monitoring Well CompletionsOptional Task
Shaw AFBN/A0013CDReplace and/or Repair five (5) Damaged Monitoring Well CompletionsOptional Task
Shaw AFBN/A0013CEReplace and/or Repair three (3) Damaged Monitoring Well CompletionsOptional Task
Shaw AFBN/A0013CFReplace and/or Repair three (3) Damaged Monitoring Well CompletionsOptional Task
Shaw AFBN/A0013CGReplace and/or Repair one (1) Damaged Monitoring Well CompletionsOptional Task
Shaw AFBN/A0013CHReplace and/or Repair one (1) Damaged Monitoring Well CompletionsOptional Task
Shaw AFBN/A0013CJReplace and/or Repair one (1) Damaged Monitoring Well CompletionsOptional Task
Shaw AFBN/A0014Perform Well Abandonments
Shaw AFBN/A0014CAAbandon one (1) Basewide Well - between 0 to 75 ft bgs (Shallow)Optional TaskPer current guidance, Programmatic Sub-CLINs should be set at one year (minus one day).
Shaw AFBN/A0014CBAbandon one (1) Basewide Well - between 0 to 75 ft bgs (Shallow)Optional Task
Shaw AFBN/A0014CCAbandon one (1) Basewide Well - between 0 to 75 ft bgs (Shallow)Optional Task
Shaw AFBN/A0014CDAbandon one (1) Basewide Wells - between 75 to 175 ft bgs (Medium)Optional Task
Shaw AFBN/A0014CEAbandon one (1) Basewide Wells - between 75 to 175 ft bgs (Medium)Optional Task
Shaw AFBN/A0014CFAbandon one (1) Basewide Wells - between 75 to 175 ft bgs (Medium)Optional Task
Shaw AFBN/A0014CGAbandon one (1) Basewide Wells - greater than 300 ft bgs (Deep)Optional Task
Shaw AFBN/A0014CHAbandon one (1) Basewide Wells - greater than 300 ft bgs (Deep)Optional Task
Shaw AFBN/A0014CJAbandon one (1) Basewide Wells - greater than 300 ft bgs (Deep)Optional Task
Shaw AFBN/A0014CKAbandon three (3) Basewide Wells - between 0 to 75 ft bgs (Shallow)Optional Task
Shaw AFBN/A0014CLAbandon three (3) Basewide Wells - between 0 to 75 ft bgs (Shallow)Optional Task
Shaw AFBN/A0014CMAbandon three (3) Basewide Wells - between 75 to 175 ft bgs (Medium)Optional Task
Shaw AFBN/A0014CNAbandon three (3) Basewide Wells - between 75 to 175 ft bgs (Medium)Optional Task
Shaw AFBN/A0014COAbandon three (3) Basewide Wells - greater than 300 ft bgs (Deep)Optional Task
Shaw AFBN/A0014CPAbandon three (3) Basewide Wells - greater than 300 ft bgs (Deep)Optional Task
Shaw AFBN/A0014CQAbandon five (5) Basewide Wells - between 0 to 75 ft bgs (Shallow)Optional Task
Shaw AFBN/A0014CRAbandon five (5) Basewide Wells - between 75 to 175 ft bgs (Medium)Optional Task
Shaw AFBN/A0014CSAbandon five (5) Basewide Wells - greater than 300 ft bgs (Deep)Optional Task
Shaw AFBN/A0015Finalize Site Reports from the previous contractor - FY20 Shaw ORC
Shaw AFBN/A0015CAFinalize transitioned ORC site documentsBase Year7/18/267/17/29Per current guidance, Programmatic Sub-CLINs should be set at one year (minus one day).
Shaw AFBSS035, SS0360016Evaluate the Air Stripper effectiveness and recommend upgrades in the quarterly performance reports IAW Section 1.3.2.a
Shaw AFBSS035, SS0360016CAQuarterly Sampling and Performance Reports - Base YearBase Year7/18/267/17/29Compliance Sub-CLINs should be set at three years from award.
Shaw AFBSS035, SS0360016CBQuarterly Sampling and Performance Reports - OY1Optional Task
Shaw AFBSS035, SS0360016CCQuarterly Sampling and Performance Reports - OY2Optional Task
Shaw AFBSS035, SS0360016CDQuarterly Sampling and Performance Reports - OY3Optional Task
Shaw AFBSS035, SS0360016CEQuarterly Sampling and Performance Reports - OY4Optional Task
Shaw AFBSS035, SS0360016CFQuarterly Sampling and Performance Reports - OY5Optional Task
Shaw AFBSS035, SS0360016CGQuarterly Sampling and Performance Reports - OY6Optional Task
Shaw AFBOT016B, SS035, SS0360017O&M of Groundwater Treatment Plant 1 (GWTP 1) IAW Section 1.3.2.i
Shaw AFBOT016B, SS035, SS0360017CAO&M of GWTP1 - Base YearBase Year7/18/267/17/29Compliance Sub-CLINs should be set at three years from award.
Shaw AFBOT016B, SS035, SS0360017CBO&M of GWTP1 - OY1Optional Task
Shaw AFBOT016B, SS035, SS0360017CCO&M of GWTP1 - OY2Optional Task
Shaw AFBOT016B, SS035, SS0360017CDO&M of GWTP1 - OY3Optional Task
Shaw AFBOT016B, SS035, SS0360017CEO&M of GWTP1 - OY4Optional Task
Shaw AFBOT016B, SS035, SS0360017CFO&M of GWTP1 - OY5Optional Task
Shaw AFBOT016B, SS035, SS0360017CGO&M of GWTP1 - OY6Optional Task
Shaw AFBFT001P-SUB, FT006P-SUB, FT007P-SUB0018O&M of Groundwater Treatment Plant 2 (GWTP 2) IAW Section 1.3.2.i
Shaw AFBFT001P-SUB, FT006P-SUB, FT007P-SUB0018CAO&M of GWTP2 - Base YearBase Year7/18/267/17/29Compliance Sub-CLINs should be set at three years from award.
Shaw AFBFT001P-SUB, FT006P-SUB, FT007P-SUB0018CBO&M of GWTP2 - OY1Optional Task
Shaw AFBFT001P-SUB, FT006P-SUB, FT007P-SUB0018CCO&M of GWTP2 - OY2Optional Task
Shaw AFBFT001P-SUB, FT006P-SUB, FT007P-SUB0018CDO&M of GWTP2 - OY3Optional Task
Shaw AFBFT001P-SUB, FT006P-SUB, FT007P-SUB0018CEO&M of GWTP2 - OY4Optional Task
Shaw AFBFT001P-SUB, FT006P-SUB, FT007P-SUB0018CFO&M of GWTP2 - OY5Optional Task
Shaw AFBFT001P-SUB, FT006P-SUB, FT007P-SUB0018CGO&M of GWTP2 - OY6Optional Task
Shaw AFBOT016P-SUB0019Achieve One-time Site PFAS Sampling Tech Memo (Extraction Well)Optional Task
Shaw AFBSS035P-SUB0020Achieve One-time Site PFAS Sampling Tech Memo (Extraction Well)Optional Task
Shaw AFBOT016A, OT016B, SS035, and SS0360021Maintain Right of Entry (ROE) access agreements and Off-Base LUCs
Shaw AFBOT016A, OT016B, SS035, and SS0360021CAAnnual ROE updates and Off Base LUC reportBase Year7/18/267/17/29Compliance Sub-CLINs should be set at three years from award.
Shaw AFBOT016A, OT016B, SS035, and SS0360021CBAnnual ROE updates and Off Base LUC reportOptional Task
Shaw AFBOT016A, OT016B, SS035, and SS0360021CCAnnual ROE updates and Off Base LUC reportOptional Task
Shaw AFBOT016A, OT016B, SS035, and SS0360021CDAnnual ROE updates and Off Base LUC reportOptional Task
Shaw AFBOT016A, OT016B, SS035, and SS0360021CEAnnual ROE updates and Off Base LUC reportOptional Task
Shaw AFBOT016A, OT016B, SS035, and SS0360021CFAnnual ROE updates and Off Base LUC reportOptional Task
Shaw AFBOT016A, OT016B, SS035, and SS0360021CGAnnual ROE updates and Off Base LUC reportOptional Task
Shaw AFBCG038
(AOC O)0022Conduct RA-O and Achieve Alternate Objectives
Shaw AFBCG038
(AOC O)0022AAAchieve Supplemental Site Investigation Work PlanBase Year7/18/267/17/33Performance Sub-CLINs should be set in accordance with Table 1.
Shaw AFBCG038
(AOC O)0022ABAchieve Supplemental Site Investigation Report (to include CSM Update)Optional Task
Shaw AFBCG038
(AOC O)0022ACAchieve Supplemental Human Health Risk AssessmentOptional Task
Shaw AFBCG038
(AOC O)0022ADAchieve Corrective Measures Study (to include existing remedy)Optional Task
Shaw AFBCG038
(AOC O)0022AEAchieve Revised Statement of Basis/RCRA Permit ModificationOptional Task
Shaw AFBCG038
(AOC O)0022AFAchieve Corrective Measures Implementation Work Plan (CMI WP)Optional Task
Shaw AFBCG038
(AOC O)0022AGAchieve Demolition of existing ISCO system (including infrastructure) and System Decommissioning ReportOptional Task
Shaw AFBCG038
(AOC O)0022CAConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance modelBase Year7/18/267/17/29Compliance Sub-CLINs should be set at three years from award.
Shaw AFBCG038
(AOC O)0022CBConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY1OY1
Shaw AFBCG038
(AOC O)0022CCConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY2OY2
Shaw AFBCG038
(AOC O)0022CDConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY3OY3
Shaw AFBCG038
(AOC O)0022CEConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY4OY4
Shaw AFBCG038
(AOC O)0022CFConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY5OY5
Shaw AFBCG038
(AOC O)0022CGConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY6OY6
Shaw AFBDP039
(SWMU 101, AOC 32)0023Conduct LTM
Shaw AFBDP039
(SWMU 101, AOC 32)0023CAConduct LTM in accordance with the approved CMI Work plan and RCRA PermitBase Year7/18/267/17/29Compliance Sub-CLINs should be set at three years from award.
Shaw AFBDP039
(SWMU 101, AOC 32)0023CBConduct LTM in accordance with the approved CMI Work Plan and RCRA Permit - OY1OY1
Shaw AFBDP039
(SWMU 101, AOC 32)0023CCConduct LTM in accordance with the approved CMI Work Plan and RCRA Permit - OY2OY2
Shaw AFBDP039
(SWMU 101, AOC 32)0023CDConduct LTM in accordance with the approved CMI Work Plan and RCRA Permit - OY3OY3
Shaw AFBDP039
(SWMU 101, AOC 32)0023CEConduct LTM in accordance with the approved CMI Work Plan and RCRA Permit - OY4OY4
Shaw AFBDP039
(SWMU 101, AOC 32)0023CFConduct LTM in accordance with the approved CMI Work Plan and RCRA Permit - OY5OY5
Shaw AFBDP039
(SWMU 101, AOC 32)0023CGConduct LTM in accordance with the approved CMI Work Plan and RCRA Permit - OY6OY6
Shaw AFBFT001
(SWMU 59)0024Conduct RA-O and Achieve Alternate Objectives
Shaw AFBFT001
(SWMU 59)0024AAAchieve Supplemental Site Investigation Work PlanBase Year7/18/267/17/33Performance Sub-CLINs should be set in accordance with Table 1.
Shaw AFBFT001
(SWMU 59)0024ABAchieve Supplemental Site Investigation Report (to include CSM Update)Optional Task
Shaw AFBFT001
(SWMU 59)0024ACAchieve Corrective Measures Study (to include existing remedy)Optional Task
Shaw AFBFT001
(SWMU 59)0024ADAchieve Revised Statement of Basis/ RCRA Permit ModificationOptional Task
Shaw AFBFT001
(SWMU 59)0024AEAchieve Corrective Measures Implementation Work Plan (CMI WP)Optional Task
Shaw AFBFT001
(SWMU 59)0024AFAchieve Corrective Measures Implementation Work Plan (CMI WP) - Phase 2Optional Task
Shaw AFBFT001
(SWMU 59)0024AGAchieve Demolition of existing ISCO system (including infrastructure) and System Decommissioning ReportOptional Task
Shaw AFBFT001
(SWMU 59)0024CAConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance modelBase Year7/18/267/17/29Compliance Sub-CLINs should be set at three years from award.
Shaw AFBFT001
(SWMU 59)0024CBConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY1OY1
Shaw AFBFT001
(SWMU 59)0024CCConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY2OY2
Shaw AFBFT001
(SWMU 59)0024CDConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY3OY3
Shaw AFBFT001
(SWMU 59)0024CEConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY4OY4
Shaw AFBFT001
(SWMU 59)0024CFConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY5OY5
Shaw AFBFT001
(SWMU 59)0024CGConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY6OY6
Shaw AFBFT001P-SUB0025IRA-O with Optimization
Shaw AFBFT001P-SUB0025AAPrepare Performance Model and achieve the performance goals per the performance model years 1, 2 and 3Base Year7/18/267/17/33Performance Sub-CLINs should be set in accordance with Table 1.
Shaw AFBFT001P-SUB0025ABAchieve the performance goals per the performance model years 4, and 5 and develop an Optimization Summary and Forecasting Report in year 5Optional Task
Shaw AFBFT001P-SUB0025ACAchieve the performance goal per the performance model year 6 and final performance goal year 7Optional Task
Shaw AFBFT001P-SUB0025CAConduct IRA-O in accordance with the approved CMI Work Plan and RCRA PermitBase Year7/18/267/17/29Compliance Sub-CLINs should be set at three years from award.
Shaw AFBFT001P-SUB0025CBConduct IRA-O in accordance with the approved CMI Work Plan and RCRA Permit - OY1OY1
Shaw AFBFT001P-SUB0025CCConduct IRA-O in accordance with the approved CMI Work Plan and RCRA Permit - OY2OY2
Shaw AFBFT001P-SUB0025CDConduct IRA-O in accordance with the approved CMI Work Plan and RCRA Permit - OY3OY3
Shaw AFBFT001P-SUB0025CEConduct IRA-O in accordance with the approved CMI Work Plan and RCRA Permit - OY4OY4
Shaw AFBFT001P-SUB0025CFConduct IRA-O in accordance with the approved CMI Work Plan and RCRA Permit - OY5OY5
Shaw AFBFT001P-SUB0025CGConduct IRA-O in accordance with the approved CMI Work Plan and RCRA Permit - OY6OY6
Shaw AFBFT006P-SUB0026IRA-O with Optimization
Shaw AFBFT006P-SUB0026AAPrepare Performance Model and achieve the performance goals per the performance model years 1, 2 and 3Base Year7/18/267/17/33Performance Sub-CLINs should be set in accordance with Table 1.
Shaw AFBFT006P-SUB0026ABAchieve the performance goals per the performance model years 4, and 5 and develop an Optimization Summary and Forecasting Report in year 5Optional Task
Shaw AFBFT006P-SUB0026ACAchieve the performance goal per the performance model year 6 and final performance goal year 7Optional Task
Shaw AFBFT006P-SUB0026CAConduct IRA-O in accordance with the approved CMI Work Plan and RCRA PermitBase Year7/18/267/17/29Compliance Sub-CLINs should be set at three years from award.
Shaw AFBFT006P-SUB0026CBConduct IRA-O in accordance with the approved CMI Work Plan and RCRA Permit - OY1OY1
Shaw AFBFT006P-SUB0026CCConduct IRA-O in accordance with the approved CMI Work Plan and RCRA Permit - OY2OY2
Shaw AFBFT006P-SUB0026CDConduct IRA-O in accordance with the approved CMI Work Plan and RCRA Permit - OY3OY3
Shaw AFBFT006P-SUB0026CEConduct IRA-O in accordance with the approved CMI Work Plan and RCRA Permit - OY4OY4
Shaw AFBFT006P-SUB0026CFConduct IRA-O in accordance with the approved CMI Work Plan and RCRA Permit - OY5OY5
Shaw AFBFT006P-SUB0026CGConduct IRA-O in accordance with the approved CMI Work Plan and RCRA Permit - OY6OY6
Shaw AFBFT007P-SUB0027IRA-O with Optimization
Shaw AFBFT007P-SUB0027AAPrepare Performance Model and achieve the performance goals per the performance model years 1, 2 and 3Base Year7/18/267/17/33Performance Sub-CLINs should be set in accordance with Table 1.
Shaw AFBFT007P-SUB0027ABAchieve the performance goals per the performance model years 4, and 5 and develop an Optimization Summary and Forecasting Report in year 5Optional Task
Shaw AFBFT007P-SUB0027ACAchieve the performance goal per the performance model year 6 and final performance goal year 7Optional Task
Shaw AFBFT007P-SUB0027CAConduct IRA-O in accordance with the approved CMI Work Plan and RCRA PermitBase Year7/18/267/17/29Compliance Sub-CLINs should be set at three years from award.
Shaw AFBFT007P-SUB0027CBConduct IRA-O in accordance with the approved CMI Work Plan and RCRA Permit - OY1OY1
Shaw AFBFT007P-SUB0027CCConduct IRA-O in accordance with the approved CMI Work Plan and RCRA Permit - OY2OY2
Shaw AFBFT007P-SUB0027CDConduct IRA-O in accordance with the approved CMI Work Plan and RCRA Permit - OY3OY3
Shaw AFBFT007P-SUB0027CEConduct IRA-O in accordance with the approved CMI Work Plan and RCRA Permit - OY4OY4
Shaw AFBFT007P-SUB0027CFConduct IRA-O in accordance with the approved CMI Work Plan and RCRA Permit - OY5OY5
Shaw AFBFT007P-SUB0027CGConduct IRA-O in accordance with the approved CMI Work Plan and RCRA Permit - OY6OY6
Shaw AFBLF003
(SWMU 58)0028Conduct LTM
Shaw AFBLF003
(SWMU 58)0028CAConduct LTM in accordance with the approved CMI Work plan and RCRA PermitBase Year7/18/267/17/29Compliance Sub-CLINs should be set at three years from award.
Shaw AFBLF003
(SWMU 58)0028CBConduct LTM in accordance with the approved CMI Work Plan and RCRA Permit - OY1OY1
Shaw AFBLF003
(SWMU 58)0028CCConduct LTM in accordance with the approved CMI Work Plan and RCRA Permit - OY2OY2
Shaw AFBLF003
(SWMU 58)0028CDConduct LTM in accordance with the approved CMI Work Plan and RCRA Permit - OY3OY3
Shaw AFBLF003
(SWMU 58)0028CEConduct LTM in accordance with the approved CMI Work Plan and RCRA Permit - OY4OY4
Shaw AFBLF003
(SWMU 58)0028CFConduct LTM in accordance with the approved CMI Work Plan and RCRA Permit - OY5OY5
Shaw AFBLF003
(SWMU 58)0028CGConduct LTM in accordance with the approved CMI Work Plan and RCRA Permit - OY6OY6
Shaw AFBLF008
(SWMU 85)0029Conduct LTM
Shaw AFBLF008
(SWMU 85)0029CAConduct LTM in accordance with the approved CMI Work plan and RCRA PermitBase Year7/18/267/17/29Compliance Sub-CLINs should be set at three years from award.
Shaw AFBLF008
(SWMU 85)0029CBConduct LTM in accordance with the approved CMI Work Plan and RCRA Permit - OY1OY1
Shaw AFBLF008
(SWMU 85)0029CCConduct LTM in accordance with the approved CMI Work Plan and RCRA Permit - OY2OY2
Shaw AFBLF008
(SWMU 85)0029CDConduct LTM in accordance with the approved CMI Work Plan and RCRA Permit - OY3OY3
Shaw AFBLF008
(SWMU 85)0029CEConduct LTM in accordance with the approved CMI Work Plan and RCRA Permit - OY4OY4
Shaw AFBLF008
(SWMU 85)0029CFConduct LTM in accordance with the approved CMI Work Plan and RCRA Permit - OY5OY5
Shaw AFBLF008
(SWMU 85)0029CGConduct LTM in accordance with the approved CMI Work Plan and RCRA Permit - OY6OY6
Shaw AFBLF009
(SWMU 52)0030Conduct LTM and Reduce LCC
Shaw AFBLF009
(SWMU 52)0030CAConduct LTM in accordance with the approved CMI Work plan and RCRA PermitBase Year7/18/267/17/29Compliance Sub-CLINs should be set at three years from award.
Shaw AFBLF009
(SWMU 52)0030CBConduct LTM in accordance with the approved CMI Work Plan and RCRA Permit - OY1OY1
Shaw AFBLF009
(SWMU 52)0030CCConduct LTM in accordance with the approved CMI Work Plan and RCRA Permit - OY2OY2
Shaw AFBLF009
(SWMU 52)0030CDConduct LTM in accordance with the approved CMI Work Plan and RCRA Permit - OY3OY3
Shaw AFBLF009
(SWMU 52)0030CEConduct LTM in accordance with the approved CMI Work Plan and RCRA Permit - OY4OY4
Shaw AFBLF009
(SWMU 52)0030CFConduct LTM in accordance with the approved CMI Work Plan and RCRA Permit - OY5OY5
Shaw AFBLF009
(SWMU 52)0030CGConduct LTM in accordance with the approved CMI Work Plan and RCRA Permit - OY6OY6
Shaw AFBOT016A
(SWMU 78)0031Conduct RA-O and Achieve Alternate Objectives
Shaw AFBOT016A
(SWMU 78)0031AAAchieve Supplemental Site Investigation Work PlanBase Year7/18/267/17/33Performance Sub-CLINs should be set in accordance with Table 1.
Shaw AFBOT016A
(SWMU 78)0031ABAchieve Supplemental Site Investigation Report (to include CSM Update)Optional Task
Shaw AFBOT016A
(SWMU 78)0031ACAchieve Supplemental Human Health Risk AssessmentOptional Task
Shaw AFBOT016A
(SWMU 78)0031ADAchieve Corrective Measures Study (to include existing remedy)Optional Task
Shaw AFBOT016A
(SWMU 78)0031AEAchieve Revised Statement of Basis/RCRA Permit ModificationOptional Task
Shaw AFBOT016A
(SWMU 78)0031AFAchieve Corrective Measures Implementation Work Plan (CMI WP)Optional Task
Shaw AFBOT016B
(AOC F)0031AGAchieve Demolition of existing ISCO system (including infrastructure) and System Decommissioning ReportOptional Task
Shaw AFBOT016A
(SWMU 78)0031CAConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance modelBase Year7/18/267/17/29Compliance Sub-CLINs should be set at three years from award.
Shaw AFBOT016A
(SWMU 78)0031CBConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY1OY1
Shaw AFBOT016A
(SWMU 78)0031CCConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY2OY2
Shaw AFBOT016A
(SWMU 78)0031CDConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY3OY3
Shaw AFBOT016A
(SWMU 78)0031CEConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY4OY4
Shaw AFBOT016A
(SWMU 78)0031CFConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY5OY5
Shaw AFBOT016A
(SWMU 78)0031CGConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY6OY6
Shaw AFBOT016B
(AOC F)0032Conduct RA-O and Achieve Alternate Objectives
Shaw AFBOT016B
(AOC F)0032AAAchieve Supplemental Site Investigation Work PlanBase Year7/18/267/17/33Performance Sub-CLINs should be set in accordance with Table 1.
Shaw AFBOT016B
(AOC F)0032ABAchieve Supplemental Site Investigation Report (to include CSM Update) for the SW lobe of the Off-Base PlumeOptional Task
Shaw AFBOT016B
(AOC F)0032ACAchieve Corrective Measures Study (to include existing remedy)Optional Task
Shaw AFBOT016B
(AOC F)0032ADAchieve Revised Statement of Basis/RCRA Permit ModificationOptional Task
Shaw AFBOT016B
(AOC F)0032AEAchieve Corrective Measures Implementation Work Plan (CMI WP)Optional Task
Shaw AFBOT016B
(AOC F)0032AFAchieve Demolition of existing ISCO system (including infrastructure) and System Decommissioning ReportOptional Task
Shaw AFBOT016B
(AOC F)0032CAConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance modelBase Year7/18/267/17/29Compliance Sub-CLINs should be set at three years from award.
Shaw AFBOT016B
(AOC F)0032CBConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY1OY1
Shaw AFBOT016B
(AOC F)0032CCConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY2OY2
Shaw AFBOT016B
(AOC F)0032CDConduct Protectiveness Assessment in accordance with the approved CMI Work Plan and RCRA PermitOptional Task
Shaw AFBOT016B
(AOC F)0032CEConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY3OY3
Shaw AFBOT016B
(AOC F)0032CFConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY4OY4
Shaw AFBOT016B
(AOC F)0032CGConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY5OY5
Shaw AFBOT016B
(AOC F)0032CHConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY6OY6
Shaw AFBOT016C
(AOC D)0033Conduct RA-O with Optimization
Shaw AFBOT016C
(AOC D)0033AAPrepare Performance Model and achieve the performance goals per the performance model years 1, 2 and 3Base Year7/18/267/17/33Performance Sub-CLINs should be set in accordance with Table 1.
Shaw AFBOT016C
(AOC D)0033ABAchieve the performance goals per the performance model years 4, and 5 and develop an Optimization Summary and Forecasting Report in year 5Optional Task
Shaw AFBOT016C
(AOC D)0033ACAchieve the performance goal per the performance model year 6 and final performance goal year 7Optional Task
Shaw AFBOT016C
(AOC D)0033CAConduct RA-O in accordance with the approved CMI Work Plan and RCRA PermitBase Year7/18/267/17/29Compliance Sub-CLINs should be set at three years from award.
Shaw AFBOT016C
(AOC D)0033CBConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit - OY1OY1
Shaw AFBOT016C
(AOC D)0033CCConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit - OY2OY2
Shaw AFBOT016C
(AOC D)0033CDConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit - OY3OY3
Shaw AFBOT016C
(AOC D)0033CEConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit - OY4OY4
Shaw AFBOT016C
(AOC D)0033CFConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit - OY5OY5
Shaw AFBOT016C
(AOC D)0033CGConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit - OY6OY6
Shaw AFBOT016D
(AOC W)0034Achieve Site Closeout
Shaw AFBOT016D
(AOC W)0034AAAchieve RCRA Facility Site Investigation Work PlanBase Year7/18/267/17/31Performance Sub-CLINs should be set in accordance with Table 1.
Shaw AFBOT016D
(AOC W)0034ABAchieve RCRA Facility Site Investigation ReportOptional Task
Shaw AFBOT016D
(AOC W)0034ACAchieve Supplemental Human Health Risk AssessmentOptional Task
Shaw AFBOT016D
(AOC W)0034ADAchieve Corrective Measures Study (to include existing remedy and Pilot Study)Optional Task
Shaw AFBOT016D
(AOC W)0034AEAchieve Revised Statement of Basis/RCRA Permit ModificationOptional Task
Shaw AFBOT016D
(AOC W)0034AFAchieve Corrective Measures Implementation Work Plan (CMI WP)Optional Task
Shaw AFBOT016D
(AOC W)0034AGPrepare Site Sampling Plan UpdateOptional Task
Shaw AFBOT016D
(AOC W)0034AHAchieve Response CompleteOptional Task
Shaw AFBOT016D
(AOC W)0034AJAchieve Site CloseoutOptional Task
Shaw AFBOT016D
(AOC W)0034CAConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance modelBase Year7/18/267/17/29Compliance Sub-CLINs should be set at three years from award.
Shaw AFBOT016D
(AOC W)0034CBConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY1OY1
Shaw AFBOT016D
(AOC W)0034CCConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY2OY2
Shaw AFBOT016D
(AOC W)0034CDConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY3OY3
Shaw AFBOT016D
(AOC W)0034CEConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY4OY4
Shaw AFBOT016D
(AOC W)0034CFConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY5OY5
Shaw AFBOT016D
(AOC W)0034CGConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY6OY6
Shaw AFBSD033
(SWMU 96)0035Conduct RA-O and Achieve Alternate Objectives
Shaw AFBSD033
(SWMU 96)0035AAAchieve Supplemental Site Investigation Work PlanBase Year7/18/267/17/31Performance Sub-CLINs should be set in accordance with Table 1.
Shaw AFBSD033
(SWMU 96)0035ABAchieve Supplemental Site Investigation Report (to include CSM Update)Optional Task
Shaw AFBSD033
(SWMU 96)0035ACAchieve Supplemental Human Health Risk AssessmentOptional Task
Shaw AFBSD033
(SWMU 96)0035ADAchieve Corrective Measures Study (to include existing remedy)Optional Task
Shaw AFBSD033
(SWMU 96)0035AEAchieve Revised Statement of Basis/RCRA Permit ModificationOptional Task
Shaw AFBSD033
(SWMU 96)0035AFAchieve Corrective Measures Implementation Work Plan (CMI WP)Optional Task
Shaw AFBSD033
(SWMU 96)0035CAConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance modelBase Year7/18/267/17/29Compliance Sub-CLINs should be set at three years from award.
Shaw AFBSD033
(SWMU 96)0035CBConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY1OY1
Shaw AFBSD033
(SWMU 96)0035CCConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY2OY2
Shaw AFBSD033
(SWMU 96)0035CDConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY3OY3
Shaw AFBSD033
(SWMU 96)0035CEConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY4OY4
Shaw AFBSD033
(SWMU 96)0035CFConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY5OY5
Shaw AFBSD033
(SWMU 96)0035CGConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY6OY6
Shaw AFBSS015
(SWMU 2)0036Conduct RA-O and Achieve Alternate Objectives
Shaw AFBSS015
(SWMU 2)0036AAAchieve Supplemental Site Investigation Work PlanBase Year7/18/267/17/33Performance Sub-CLINs should be set in accordance with Table 1.
Shaw AFBSS015
(SWMU 2)0036ABAchieve Supplemental Site Investigation Report (to include CSM Update)Optional Task
Shaw AFBSS015
(SWMU 2)0036ACAchieve Supplemental Human Health Risk AssessmentOptional Task
Shaw AFBSS015
(SWMU 2)0036ADAchieve Corrective Measures Study (to include existing remedy)Optional Task
Shaw AFBSS015
(SWMU 2)0036AEAchieve Revised Statement of Basis/RCRA Permit ModificationOptional Task
Shaw AFBSS015
(SWMU 2)0036AFAchieve Corrective Measures Implementation Work Plan (CMI WP)Optional Task
Shaw AFBSS015
(SWMU 2)0036CAConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance modelBase Year7/18/267/17/29Compliance Sub-CLINs should be set at three years from award.
Shaw AFBSS015
(SWMU 2)0036CBConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY1OY1
Shaw AFBSS015
(SWMU 2)0036CCConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY2OY2
Shaw AFBSS015
(SWMU 2)0036CDConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY3OY3
Shaw AFBSS015
(SWMU 2)0036CEConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY4OY4
Shaw AFBSS015
(SWMU 2)0036CFConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY5OY5
Shaw AFBSS015
(SWMU 2)0036CGConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY6OY6
Shaw AFBSS035
(AOC H)0037Conduct RA-O and Achieve Alternate Objectives
Shaw AFBSS035
(AOC H)0037AAAchieve Supplemental Site Investigation Work PlanBase Year7/18/267/17/33Performance Sub-CLINs should be set in accordance with Table 1.
Shaw AFBSS035
(AOC H)0037ABAchieve Supplemental Site Investigation Report (to include CSM Update)Optional Task
Shaw AFBSS035
(AOC H)0037ACAchieve Supplemental Human Health Risk AssessmentOptional Task
Shaw AFBSS035
(AOC H)0037ADAchieve Corrective Measures Study (to include existing remedy)Optional Task
Shaw AFBSS035
(AOC H)0037AEAchieve Revised Statement of Basis/RCRA Permit ModificationOptional Task
Shaw AFBSS035
(AOC H)0037AFAchieve Corrective Measures Implementation Work Plan (CMI WP)Optional Task
Shaw AFBSS035
(AOC H)0037AGAchieve Demolition of existing ISCO system (including infrastructure) and System Decommissioning ReportOptional Task
Shaw AFBSS035
(AOC H)0037CAConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance modelBase Year7/18/267/17/29Compliance Sub-CLINs should be set at three years from award.
Shaw AFBSS035
(AOC H)0037CBConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY1OY1
Shaw AFBSS035
(AOC H)0037CCConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY2OY2
Shaw AFBSS035
(AOC H)0037CDConduct Protectiveness Assessment in accordance with the approved CMI Work Plan and RCRA PermitOptional Task
Shaw AFBSS035
(AOC H)0037CEConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY3OY3
Shaw AFBSS035
(AOC H)0037CFConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY4OY4
Shaw AFBSS035
(AOC H)0037CGConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY5OY5
Shaw AFBSS035
(AOC H)0037CHConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY6OY6
Shaw AFBSS036
(AOC N)0038Conduct RA-O and Achieve Alternate Objectives
Shaw AFBSS036
(AOC N)0038AAAchieve Supplemental Site Investigation Work PlanBase Year7/18/267/17/33Performance Sub-CLINs should be set in accordance with Table 1.
Shaw AFBSS036
(AOC N)0038ABAchieve Supplemental Site Investigation Report (to include CSM Update)Optional Task
Shaw AFBSS036
(AOC N)0038ACAchieve Supplemental Human Health Risk AssessmentOptional Task
Shaw AFBSS036
(AOC N)0038ADAchieve Corrective Measures Study (to include existing remedy)Optional Task
Shaw AFBSS036
(AOC N)0038AEAchieve Revised Statement of Basis/RCRA Permit ModificationOptional Task
Shaw AFBSS036
(AOC N)0038AFAchieve Corrective Measures Implementation Work Plan (CMI WP)Optional Task
Shaw AFBSS036
(AOC N)0038CAConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance modelBase Year7/18/267/17/29Compliance Sub-CLINs should be set at three years from award.
Shaw AFBSS036
(AOC N)0038CBConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY1OY1
Shaw AFBSS036
(AOC N)0038CCConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY2OY2
Shaw AFBSS036
(AOC N)0038CDConduct Protectiveness Assessment in accordance with the approved CMI Work Plan and RCRA PermitOptional Task
Shaw AFBSS036
(AOC N)0038CEConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY3OY3
Shaw AFBSS036
(AOC N)0038CFConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY4OY4
Shaw AFBSS036
(AOC N)0038CGConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY5OY5
Shaw AFBSS036
(AOC N)0038CHConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY6OY6
Shaw AFBST018
(SWMU 87)0039Achieve Response Complete
Shaw AFBST018
(SWMU 87)0039AAAchieve Data Gap Investigation Report (to include CSM Update)Base Year7/18/267/17/33Performance Sub-CLINs should be set in accordance with Table 1.
Shaw AFBST018
(SWMU 87)0039ABAchieve Corrective Action PlanOptional Task
Shaw AFBST018
(SWMU 87)0039ACAchieve Vapor Intrusion Mitigation Work PlanOptional Task
Shaw AFBST018
(SWMU 87)0039ADAchieve Vapor Intrusion Mitigation ReportOptional Task
Shaw AFBST018
(SWMU 87)0039AEAchieve Response CompleteOptional Task
Shaw AFBST018
(SWMU 87)0039CAConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance modelBase Year7/18/267/17/29Compliance Sub-CLINs should be set at three years from award.
Shaw AFBST018
(SWMU 87)0039CBConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY1OY1
Shaw AFBST018
(SWMU 87)0039CCConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY2OY2
Shaw AFBST018
(SWMU 87)0039CDConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY3OY3
Shaw AFBST018
(SWMU 87)0039CEConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY4OY4
Shaw AFBST018
(SWMU 87)0039CFConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY5OY5
Shaw AFBST018
(SWMU 87)0039CGConduct RA-O in accordance with the approved CMI Work Plan and RCRA Permit and evaluate performance model - OY6OY6
Shaw AFBST030
(AOC M)0040Achieve Response Complete and Alternate Objectives
Shaw AFBST030
(AOC M)0040AAAchieve RCRA Facility Site Investigation Work PlanBase Year7/18/267/17/33Performance Sub-CLINs should be set in accordance with Table 1.
Shaw AFBST030
(AOC M)0040ABAchieve RCRA Facility Site InvestigationOptional Task
Shaw AFBST030
(AOC M)0040ACAchieve Supplemental Human Health Risk AssessmentOptional Task
Shaw AFBST030
(AOC M)0040ADAchieve Corrective Measures Study (to include existing remedy)Optional Task
Shaw AFBST030
(AOC M)0040AEAchieve Revised Statement of Basis/RCRA Permit ModificationOptional Task
Shaw AFBST030
(AOC M)0040AFAchieve Corrective Measures Implementation Work Plan (CMI WP)Optional Task
Shaw AFBST030