A.02_Apache Power Sources Sought Questionnaire_fillable.pdf

PDF 1 MB Posted

Attached to
Design and Build Apache Shore Power
Solicitation number
W912ER25R0003
Issued by

About this file

This is a Sources Sought notice issued by the U.S. Army Corps of Engineers Transatlantic Middle East District for market research purposes. The Government is seeking a Design-Build firm capable of designing and constructing an 11kV switchgear building, 11kV underground feeders, and supporting infrastructure at Ali Al Salem Air Base in Kuwait. The anticipated project cost is between $25-100 million, and the work must be completed within 625 calendar days. The Government may set the procurement aside for small businesses under NAICS code 237130, with a size standard of $45 million annual revenue. Qualified firms, including other than small businesses, are invited to submit capability statements responding to a questionnaire by the specified deadline. Responses will be used to determine potential acquisition strategies and understand market capabilities, but will not be considered offers or restrict the Government's approach.

View the file

Other files

File Type Posted
A.02_Apache Power Sources Sought Questionnaire.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CAPABILITY STATEMENT

W912ER25R0003

Design and Construct Apache Shore Power

SECTION 1. GENERAL

1. Business Name: ______________________________

2. Business Address: ______________________________

3. Cage Code: ______________________________

4. Unique Entity ID: ______________________________

5. Point of Contact:

a. Name: ______________________________

b. Telephone: ______________________________

c. Email: ______________________________

SECTION 2. CONTRACTOR ARRANGEMENT

1. Our firm will be proposing on this project as a:

□ Prime Contractor

□ Joint Venture with:

Business Name: ______________________________ Business Size: ______________________________ Cage Code: ______________________________ (See FAR Subpart 9.6 for Government policy on teaming arrangements)

SECTION 3. CAPABILITY

1. If awarded a contract, our firm can supply performance and payment bonds in accordance with FAR 52.228-15 and acquire Defense Base Act (DBA) Insurance in accordance with FAR 52.228-3.

Performance Bonds □ Yes □ No Payment Bonds □ Yes □ No DBA Insurance □ Yes □ No

2. If awarded a contract, the maximum bonding capacity in U.S. Dollars (USD) our firm can obtain in accordance with FAR 52.228-14 or 52.228-15 is:

Performance Bond _______________ Payment Bond _______________ (Please attach Surety letter indicating bonding amount per project and overall bonding amount for your company, if available.)

3. Our firm has the necessary Kuwait business license and ability to obtain the necessary badging / access to perform work on Ali Al Salem Air Base, Kuwait.

□ Yes □ No

4. Our firm is capable of handling numerous construction contracts simultaneously at

□ 1 □ 2-5 □ 6-10 □ 11-15 □ 16-20 geographically diverse locations.

5. Our firm has performed work in the following locations within the last five years:

□ Ali Al Salem Air Base □ Kuwait □ CENTCOM AOR

6. Our firm has constructed the following facility types / projects:

□ Construction projects

□ Warehouses

□ Utilities

□ Magazines

□ Helipads

□ Taxiways

7. Our firm □ does / □ does not have the above capabilities, qualifications, AND EXPERIENCE to perform design-bid-build (DBB) projects in an overseas environment to include CONSTRUCTION MANAGEMENT, LOGISTICAL SUPPORT for personnel, materials and equipment, in areas, including subcontractors and suppliers.

8. If awarded a contract our firm □ is / □ is not financially capable to perform the cost of the construction and related services.

9. Based on your previous experience as a prime contractor or joint venture, identify the percent of work effort you would expect to self-perform. __________

10. If your firm has successfully performed construction of facilities and associated services for U.S. or Foreign military commands / facilities / projects in Kuwait or the CENTCOM AOR, please list this experience in the below Construction of Similar Size Scope Projects template.

CAPABILITY STATEMENT - W912ER25R0003 Design and Construct Apache Shore Power

CONSTRUCTION OF SIMILAR SIZE SCOPE

PROJECTS PROJECT EXPERIENCE TEMPLATE

PROJECT 1

Project Title:

Location:

Address of Work Site:

Contract Number: Task Order Number Date of Performance: From To Total Contract Value:

Total Value to Date:

Procuring Activity:

Procurement Point of Contact: Name: Phone:

Email:

Type of Agency: □ Fed Gov □ State Gov □ Municipality □ Private □ Other (describe):

Performed as: □ Prime Contractor □ Subcontractor □ Other (describe):

General Description of Work:

Describe your specific duties/roles, being sure to list relevant criteria associate with this project in relation to those described in the market research; notice:

PROJECT 2

Project Title:

Location:

Address of Work Site:

Contract Number: Task Order Number Date of Performance: From To Total Contract Value:

Total Value to Date:

Procuring Activity:

Procurement Point of Contact: Name: Phone:

Email:

Type of Agency: □ Fed Gov □ State Gov □ Municipality □ Private □ Other (describe):

Performed as: □ Prime Contractor □ Subcontractor □ Other (describe):

General Description of Work:

Describe your specific duties/roles, being sure to list relevant criteria associate with this project in relation to those described in the market research; notice:

PROJECT 3

Project Title:

Location:

Address of Work Site:

Contract Number: Task Order Number Date of Performance: From To Total Contract Value:

Total Value to Date:

Procuring Activity:

Procurement Point of Contact: Name: Phone:

Email:

Type of Agency: □ Fed Gov □ State Gov □ Municipality □ Private □ Other (describe):

Performed as: □ Prime Contractor □ Subcontractor □ Other (describe):

General Description of Work:

Describe your specific duties/roles, being sure to list relevant criteria associate with this project in relation to those described in the market research; notice:

PROJECT 4

Project Title:

Location:

Address of Work Site:

Contract Number: Task Order Number Date of Performance: From To Total Contract Value:

Total Value to Date:

Procuring Activity:

Procurement Point of Contact: Name: Phone:

Email:

Type of Agency: □ Fed Gov □ State Gov □ Municipality □ Private □ Other (describe):

Performed as: □ Prime Contractor □ Subcontractor □ Other (describe):

General Description of Work:

Describe your specific duties/roles, being sure to list relevant criteria associate with this project in relation to those described in the market research; notice:

PROJECT 5

Project Title:

Location:

Address of Work Site:

Contract Number: Task Order Number Date of Performance: From To Total Contract Value:

Total Value to Date:

Procuring Activity:

Procurement Point of Contact: Name: Phone:

Email:

Type of Agency: □ Fed Gov □ State Gov □ Municipality □ Private □ Other (describe):

Performed as: □ Prime Contractor □ Subcontractor □ Other (describe):

General Description of Work:

Describe your specific duties/roles, being sure to list relevant criteria associate with this project in relation to those described in the market research; notice:

CAPABILITY STATEMENT
SECTION 1. GENERAL
SECTION 2. CONTRACTOR ARRANGEMENT
SECTION 3. CAPABILITY
1 Business Name:
2 Business Address 1:
2 Business Address 2:
2 Business Address 3:
undefined:
4 Unique Entity ID:
b Telephone:
1:
2:
Prime Contractor: Off
Joint Venture with: Off
Business Name:
Business Size:
Cage Code:
Ali Al Salem Air Base: Off
Kuwait: Off
CENTCOM AOR: Off
Construction projects: Off
Warehouses: Off
Utilities: Off
Magazines: Off
Helipads: Off
Taxiways: Off
does: Off
is: Off
Performance Bonds: Off
Payment Bonds: Off
DBA Insurance: Off
Performance Bond Capacity:
Payment Bond Capacity:
KuwaitBusinessLicense: Off
MultipleContracts: Off
does not: Off
is not: Off
PercentSelfPerformed:
Project Title1:
Location1:
Address of Work Site1:
Contract Number1:
Task Order Number1:
From1:
To1:
Total Contract Value1:
Total Value to Date1:
Procuring Activity1:
Name1:
Phone1:
Email1:
Agency Description1:
General Description of Work1:
Specific Duties1:
Performance Description1:
Project Title2:
Location2:
Address of Work Site2:
Contract Number2:
Task Order Number2:
From2:
To2:
Total Contract Value2:
Total Value to Date2:
Procuring Activity2:
Name2:
Phone2:
Email2:
Agency Description2:
General Description of Work2:
Specific Duties2:
Performance Description2:
Project Title3:
Location3:
Address of Work Site3:
Contract Number3:
Task Order Number3:
From3:
To3:
Total Contract Value3:
Total Value to Date3:
Procuring Activity3:
Name3:
Phone3:
Email3:
Agency Description3:
General Description of Work3:
Specific Duties3:
Performance Description3:
Project Title4:
Location4:
Address of Work Site4:
Contract Number4:
Task Order Number4:
From4:
To4:
Total Contract Value4:
Total Value to Date4:
Procuring Activity4:
Name4:
Phone4:
Email4:
Agency Description4:
General Description of Work4:
Specific Duties4:
Performance Description4:
Project Title5:
Location5:
Address of Work Site5:
Contract Number5:
Task Order Number5:
From5:
To5:
Total Contract Value5:
Total Value to Date5:
Procuring Activity5:
Name5:
Phone5:
Email5:
Agency Description5:
General Description of Work5:
Specific Duties5:
Performance Description5:
F1: Off
S1: Off
M1: Off
P1: Off
Other1: Off
Sub1: Off
Prime1: Off
F2: Off
S2: Off
P2: Off
O2: Off
Other2: Off
Sub2: Off
Prime2: Off
F3: Off
S3: Off
M3: Off
P3: Off
O3: Off
Other3: Off
Sub3: Off
Prime3: Off
F4: Off
S4: Off
M4: Off
P4: Off
O4: Off
Other4: Off
Sub4: Off
Prime4: Off
F5: Off
S5: Off
M5: Off
P5: Off
O5: Off
Other5: Off
Sub5: Off
Prime5: Off
M2: Off
O1: Off

File details come from the government source that posted it. Updated .