This document is a Sources Sought Questionnaire related to a pre-solicitation for a potential Design-Build construction contract to design and construct shore power infrastructure at Ali Al Salem Air Base in Kuwait. The anticipated contract would include designing and constructing an 11kV switchgear building, 11kV underground feeders, and other supporting utilities and site work. The Contract is estimated to be between $25-100 million and have a performance period of 625 calendar days. The anticipated NAICS code is 237130 - Power and Communication Line and Related Structures Construction, with a small business size standard of $45 million annual revenue. The Government intends to potentially set the acquisition aside for small businesses, requiring 15% self-performance under FAR 52.219-14. Respondents are asked to complete a detailed capability questionnaire including information on bonding capacity, licenses, relevant past performance, and construction management experience. The Government will use the responses for market research and acquisition planning purposes only.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CAPABILITY STATEMENT

W912ER25R0003

Design and Build Apache Shore Power

SECTION 1. GENERAL

1. Business Name: ______________________________

2. Business Address: ______________________________

3. Cage Code: ______________________________

4. Unique Entity ID: ______________________________

5. Point of Contact:

a. Name:______________________________
b. Telephone:______________________________
c. Email:______________________________

SECTION 2. CONTRACTOR ARRANGEMENT

1. Our firm will be proposing on this project as a:

· Prime Contractor

· Joint Venture with:

Business Name:______________________________
Business Size:______________________________
Cage Code:______________________________

(See FAR Subpart 9.6 for Government policy on teaming arrangements)

SECTION 3. CAPABILITY

1. If awarded a contract, our firm can supply performance and payment bonds in accordance with FAR 52.228-15 and acquire Defense Base Act (DBA) Insurance in accordance with FAR 52.228-3.

Performance Bonds□ Yes□ No
Payment Bonds□ Yes□ No
DBA Insurance□ Yes□ No

2. If awarded a contract, the maximum bonding capacity in U.S. Dollars (USD) our firm can obtain in accordance with FAR 52.228-14 or 52.228-15 is:

Performance Bond_______________
Payment Bond_______________

(Please attach Surety letter indicating bonding amount per project and overall bonding amount for your company, if available.)

3. Our firm has the necessary Kuwait business license and ability to obtain the necessary badging / access to perform work on Ali Al Salem Air Base, Kuwait.

□ Yes □ No

4. Our firm is capable of handling numerous construction contracts simultaneously at

□ 1 □ 2-5 □ 6-10 □ 11-15 □ 16-20 geographically diverse locations.

5. Our firm has performed work in the following locations within the last five years:

□ Ali Al Salem Air Base □ Kuwait □ CENTCOM AOR

6. Our firm has constructed the following facility types / projects:

□ Construction projects

□ Warehouses

□ Utilities

□ Magazines

□ Helipads

□ Taxiways

7. Our firm □ does / □ does not have the above capabilities, qualifications, AND EXPERIENCE to perform design-bid-build (DBB) projects in an overseas environment to include CONSTRUCTION MANAGEMENT, LOGISTICAL SUPPORT for personnel, materials and equipment, in areas, including subcontractors and suppliers.

8. If awarded a contract our firm □ is / □ is not financially capable to perform the cost of the construction and related services.

9. Based on your previous experience as a prime contractor or joint venture, identify the percent of work effort you would expect to self-perform. __________

10. If your firm has successfully performed construction of facilities and associated services for U.S. or Foreign military commands / facilities / projects in Kuwait or the CENTCOM AOR, please list this experience in the below Construction of Similar Size Scope Projects template.

CAPABILITY STATEMENT - W912ER25R0003 Design and Build Apache Shore Power

CONSTRUCTION OF SIMILAR SIZE SCOPE PROJECTS

PROJECT EXPERIENCE TEMPLATE

PROJECT 1

Project Title:

Location:

Address of Work Site:

Contract Number:

Task Order Number

Date of Performance:
From

To

Total Contract Value:

Total Value to Date:

Procuring Activity:

Procurement Point of Contact:
Name:

Phone:

Email:

Type of Agency:
□ Fed Gov□ State Gov□ Municipality□ Private□ Other (describe):
Performed as:
□ Prime Contractor□ Subcontractor□ Other (describe):

General Description of work:

Describe your specific duties/roles, being sure to list relevant criteria associate with this project in relation to those described in the market research; notice:

CONSTRUCTION OF SIMILAR SIZE SCOPE PROJECTS

PROJECT EXPERIENCE TEMPLATE

PROJECT 2

Project Title:

Location:

Address of Work Site:

Contract Number:

Task Order Number

Date of Performance:
From

To

Total Contract Value:

Total Value to Date:

Procuring Activity:

Procurement Point of Contact:
Name:

Phone:

Email:

Type of Agency:
□ Fed Gov□ State Gov□ Municipality□ Private□ Other (describe):
Performed as:
□ Prime Contractor□ Subcontractor□ Other (describe):

General Description of work:

Describe your specific duties/roles, being sure to list relevant criteria associate with this project in relation to those described in the market research; notice:

CONSTRUCTION OF SIMILAR SIZE SCOPE PROJECTS

PROJECT 3

Project Title:

Location:

Address of Work Site:

Contract Number:

Task Order Number

Date of Performance:
From

To

Total Contract Value:

Total Value to Date:

Procuring Activity:

Procurement Point of Contact:
Name:

Phone:

Email:

Type of Agency:
□ Fed Gov□ State Gov□ Municipality□ Private□ Other (describe):
Performed as:
□ Prime Contractor□ Subcontractor□ Other (describe):

General Description of work:

Describe your specific duties/roles, being sure to list relevant criteria associate with this project in relation to those described in the market research; notice:

CONSTRUCTION OF SIMILAR SIZE SCOPE PROJECTS

PROJECT 4

Project Title:

Location:

Address of Work Site:

Contract Number:

Task Order Number

Date of Performance:
From

To

Total Contract Value:

Total Value to Date:

Procuring Activity:

Procurement Point of Contact:
Name:

Phone:

Email:

Type of Agency:
□ Fed Gov□ State Gov□ Municipality□ Private□ Other (describe):
Performed as:
□ Prime Contractor□ Subcontractor□ Other (describe):

General Description of work:

Describe your specific duties/roles, being sure to list relevant criteria associate with this project in relation to those described in the market research; notice:

CONSTRUCTION OF SIMILAR SIZE SCOPE PROJECTS

PROJECT 5

Project Title:

Location:

Address of Work Site:

Contract Number:

Task Order Number

Date of Performance:
From

To

Total Contract Value:

Total Value to Date:

Procuring Activity:

Procurement Point of Contact:
Name:

Phone:

Email:

Type of Agency:
□ Fed Gov□ State Gov□ Municipality□ Private□ Other (describe):
Performed as:
□ Prime Contractor□ Subcontractor□ Other (describe):

General Description of work:

Describe your specific duties/roles, being sure to list relevant criteria associate with this project in relation to those described in the market research; notice:

File details come from the government source that posted it. Updated .