A-6_01_SF1442_12970224Q0050_07292024.pdf
PDF 679 KB Posted
- Attached to
- El Dorado NF Radio Shop Windows
- Solicitation number
- 12970224Q0050
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a solicitation for construction work to replace the windows, siding, doors, and motion sensors at the Eldorado National Forest Radio Shop in Placerville, California. The project is a total small business set-aside with an estimated cost between $100,000 and $250,000. The work includes testing for and abatement of any hazardous materials, installation of new vinyl-clad windows, replacement of aluminum siding and damaged lumber, and installation of new steel security doors and high-power LED security lights. Offers are due by 1400 MDT on August 23, 2024, and the performance period is 45 calendar days after the notice to proceed. The solicitation includes a Statement of Work, attachments for plans and elevations, photos of the damage, and other project-specific documents. The federal agency issuing this solicitation is the Department of Agriculture Forest Service.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A-6_J-1_SOI.xlsx | XLSX spreadsheet | |
| A-6_J-8_BiobasedStatementLetter.docx | DOCX document | |
| A-6_J-7_ProgressSched (FS 6300-7).rtf | RTF text file | |
| A-6_J-5_PicturesofDamageandRepairs.pdf | ||
| A-6_J-4_Plan and elevation.pptx | PPTX presentation | |
| A-6_J-2_SOW.docx | DOCX document | |
| A-6_J-10_WageDet_CA20240007_07122024.pdf | ||
| A-6_J-3_Fire Plan_GeorgetownDistrict.doc | DOC document | |
| A-6_J-6_Experience Questionnaire (FS 6300-27).docx | DOCX document | |
| A-6_J-9_DesignationofKTRKeyPersonnel-Reps.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
1125979
USDA FOREST SERVICE
SPOC SOUTHWEST
1400 INDEPENDENCE AVE SW MS-1138
WASHINGTON DC 20250-0001
BOB EBERLE 505-622-6516
107/31/2024
12970224Q0050
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Reference Solicitation: 12970224Q0050
Project Title: Eldorado NF Radio Shop Windows
Project Description: Replace Radio Shop Windows, siding, doors, motion sensors, and siding including necessary repairs and abatement of hazardous materials.
Project Location: See Section C.2
Set Aside: Total Small Business
Project Magnitude: $100,000 to $250,000
Wage Determination: CA20240007, El Dorado County, California 07/12/2024
11. The Contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
5 45 calendar days and complete it within ________________ ________________ calendar days after receiving
08/23/2024
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 8/2014)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
USDA FOREST SERVICE
SPOC SOUTHWEST
1400 INDEPENDENCE AVE SW MS-1138
WASHINGTON DC 20250-0001
KLENISE S. WALLACE
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 3304(a)
STANDARD FORM 1442 (REV. 8/2014) BACK
Continued...
Company Name:
Address:
UEI:
POC Name:
POC Email:
bobeberle Highlight bobeberle Highlight bobeberle Highlight bobeberle Highlight bobeberle Highlight bobeberle Highlight
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 39
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
12970224Q0050
Forest Service Solicitation Contacts:
Contract Specialist: Bob Eberle
COR: Steven Hall
Contracting Officer: Klenise Wallace
Delivery: 45 Days After Notice to Proceed
Delivery Location Code: 91V6
USDA FOREST SERVICE
ELDORADO NF RADIO SHOP
2350 CARSON RD
PLACERVILLE CA 95667 US
Mark For:
USDA FOREST SERVICE
SPOC SOUTHWEST
1400 INDEPENDENCE AVE SW MS-1138
WASHINGTON DC 20250-0001
0002 Repair and replace windows, siding and doors 1 EA
Product/Service Code: Y1QA
Product/Service Description: CONSTRUCTION OF
RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE)
The "Submit Invoice-to" address for USDA orders is the Department of Treasury's Invoice
Processing Platform (IPP), https://www.ipp.gov.
If the contractor lacks an IPP account, USDA will automatically initiate the enrollment process with Treasury using the contractor's SAM.gov
Accounts Receivable POC as the IPP account holder. Once the enrollment process is complete, the IPP account holder will receive notification and can being invoicing. More information about
IPP can be found at: https://www.ipp.gov
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Solicitation No: 12970224Q0050 Project Name: El Dorado NF Radio Shop Windows Location Name: El Dorado National Forest Page 4 of 39
Table of Contents
PART I—THE SCHEDULE
SECTION B—SUPPLIES OR SERVICES AND PRICES/COSTS
B.1 SCHEDULE OF ITEMS
B.2 SCHEDULE NOTES
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 SCOPE OF CONTRACT
C.2 PROJECT LOCATION
C.3 MAGNITUDE OF CONSTRUCTION PROJECT
C.4 TECHNICAL REQUIREMENTS
SECTION D—PACKAGING AND MARKING
D.1 PACKAGING AND MARKING
D.2 PROJECT LABELING FOR OFFICIAL CORRESPONDENCE
SECTION E--INSPECTION AND ACCEPTANCE
E.1 CLAUSES
SECTION F--DELIVERIES OR PERFORMANCE
F.1 CLAUSES
SECTION G--CONTRACT ADMINISTRATION DATA
G.1 CLAUSES
G.2 GOVRERNMENT REPRESENTATIVES
G.3 INVOICES
G.4 BONDING
G.5 LABOR INTERVIEWS
G.6 DEFINITIONS AND CONTRACT ADMINISTRATION DATA
SECTION H--SPECIAL CONTRACT REQUIREMENTS
H.1 CLAUSES
H.2 PERSONAL PROTECTIVE EQUIPMENT
H.3 SAFETY
H.4 WAGE DETERMINATION
H.5 SECURITY REQUIREMENTS
H.6 DATA RIGHTS ................................................................... Error! Bookmark not defined.
H.7 SECITON 508, ELECTRONIC AND INFORMATION TECHNOLOGY STAND
Error! Bookmark not defined.
H.8 CLAUSES ............................................................................ Error! Bookmark not defined.
Location Name: El Dorado National Forest Page 5 of 39
H.9 OTHER INFORMATION .................................................. Error! Bookmark not defined.
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES
I.1 CLAUSES
PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J--LIST OF ATTACHMENTS
J.1 ATTACHMENTS
PART IV--REPRESENTATIONS AND INSTRUCTIONS
SECTION K--REPRESENTATIONS, CERTIFICATIONS, AND
OTHER STATEMENTS OF OFFERORS OR RESPONDENTS
K.1 PROVISIONS
K.2 REPRESENATIONS
SECTION L--INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR
RESPONDENTS
L.1 PROVISIONS
SECTION M--EVALUATION FACTORS FOR AWARD
M.1 RESPONSIVENESS
M.2 QUOTE EVALUATION
M.3 AWARD DETERMINATION
Location Name: El Dorado National Forest Page 6 of 39
PART I - THE SCHEDULE
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
B.1 SCHEDULE OF ITEMS
Eldorado NF Radio Shop Windows
ITEM
NUMBER DESCRIPTION PAY UNIT
ES
T
QT
Y
UNIT
PRICE
TOTAL
PRICE
Repair and replace windows, siding and doors
Lead Paint and Asbestos testing LSF 1
Abatement of hazmat LSF 1
Remove and replace vinyl clad windows EA 6 $
Replace aluminum siding, 1st floor SF 350
Framing repairs (including infill of openings) SF 100
Replace 3'0"x7'0"steel insulated security door with lock EA 1 $
Replace 3'0"x7'0"steel insulated metal door with lock EA 2 $
Office painting, 10'x12' with 10' walls, drywall repair SF 150 $
Install new security lighting EA 3 $
Remove and replace 10' x 10' aluminum rollup door EA 4 $
Remove and replace 11'(h) x 10'(w) aluminum rollup door EA 1 $
Location Name: El Dorado National Forest Page 7 of 39
TOTAL
VENDOR
NAME:
BUSINESS
EMAIL:
SAM UEI #:
BUSINESS
PHONE:
AUTHORIZED TO SIGN: (NAME & TITLE)
SIGNATURE
DATE:
B.2 SCHEDULE NOTES
VENDOR INPUT REQUIRED - NOTE: VENDOR MUST COMPLETE, SIGN, AND
RETURN THE ATTACHED EXCEL SOI. QUOTES MUST BE VALID FOR 30
DAYS AFTER SOLICITATION DUE DATE.
2 EA - EACH, LSF - LINEAR SQUARE FEET, SF -
SQUARE FEET
3 ANY AWARD WILL BE TO
ONE QUOTER
4 ALL TAXES MUST BE INCLUDED IN PRICING
Location Name: El Dorado National Forest Page 8 of 39
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 SCOPE OF CONTRACT
The goal of this project is to replace the windows at the Radio Shop with modern vinyl clad windows.
Repairs will be made to the aluminum siding up to replacement of panels as needed. Repairs will be made to any damaged lumber found during replacement. The current door will be replaced with a steel security door. Replacement and/or repair of the door frame will be made as needed. At completion, there will be increased security for the radio shop with new windows, a steel security door, and repairs made to the exterior as needed.
C.2 PROJECT LOCATION
Eldorado National Forest Radio Shop 2350 Carson Rd Placerville, CA 95667
C.3 MAGNITUDE OF CONSTRUCTION PROJECT
Between $100,000 and $250,000
C.4 TECHNICAL REQUIREMENTS
1. Test for lead and asbestos. If present, the contractor will provide an abatement plan including cost.
Abatement to be performed by licensed contractors in the state of California and IAW state and local laws and regulations. Contractor to dispose of Hazmat IAW all local laws and regulations.
2. Remove and dispose of all windows except for one (a newer vinyl clad window located next to the Trails door, will be clearly marked).
3. Remove and replace all the aluminum siding for the entire building (including windows to be abandoned, over doors and under new window at front of radio shop) approximately 3000 SF. Remove and replace the 1’ fascia around building exterior, approximately 300 LSF.
4. Perform any framing repairs as a part of new windows and doors installation and damaged lumber behind siding. Infill all previous window openings and areas not flush with the building. Prep for siding installation over these areas.
5. Remove and replace existing door to radio shop (identified on sketch). Reframe for new door installation. New door to be Republic DL Level 3 flush door. Lock to be Trilogy (or equal) DL2700WP/26D Weatherproof Keypad Programmable Pushbutton Lock with handles.
6. Remove and replace 2 existing doors (for the Botany and Trails bays, identified on sketch). Reframe for new door installation. Frame opening to be flush with existing building and cover with new siding to match. New doors to be Republic DL Level 2 flush door or equal. Lock to be Trilogy (or equal) DL2700WP/26D Weatherproof Keypad Programmable Pushbutton Lock with handles.
7. Install 6 new windows for radio shop. This includes installation of weatherproofing, trim, and any framing needed. Windows to be Milgard Style Line V250 (or equal). Rough window opening 48”x48”.
Window model half vent.
8. Install trim (both interior and exterior) around doors, windows and new overhead doors. Repair drywall and interior office painting
Location Name: El Dorado National Forest Page 9 of 39
9. Install new Defiant (or equal) MaxDetect 240-Degree White Motion Activated Wired Outdoor 3-Head Dusk-to-Dawn LED Security Flood Light 3000 Lumens over radio shop door.
10. Remove and replace 4 EA 10’x10’ rollup doors. Doors to be the Amarr (or equal) 2042 Extra Heavy- Duty door with lock and manual chain hoist, with no window lites and must be the same design as previously installed doors. Install new trim.
11. Remove and replace 1 EA 11’(h)x10’(w) rollup doors. Door to be the Amarr (or equal) 2042 Extra Heavy-Duty door with lock and manual chain hoist, with no window lites and must be the same design as previously installed doors. Install new trim.
At the completion of the project, all hazardous material will have been tested for and abated. The windows will have been replaced with modern tempered glass vinyl windows that are trimmed out both inside and outside. The existing doors will be replaced with a new steel security door that will open outwards with new keypad deadbolt and locking door handle. New high power LED security lights will be operational. All debris will have been removed and disposed off-site IAW local laws and regulations.
AGAR 452.211-72 Statement of Work/Specifications (FEB 1988) The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
C.5 BIO-BASED/ SUSTAINABLE PRODUCTS
The contractor must comply with the Agriculture Act of 2014; the Food, Conservation and Energy Act of 2008 (FCEA), 7 U.S.C. 8102; the Farm Security and Rural Investment Act of 2002 9FSRIA), 7 U.S.C.
8102; the Federal Acquisition Regulation; Executive Order (EO) 13514, “Federal Leadership in Environmental, Energy and Economic Performance”, dated October 2, 2009; EO 13423, “Strengthening Federal Environmental, Energy and Transportation Management”, dated January 24, 2007; and Presidential Memorandum, “Driving Innovation and Creating Jobs in Rural America through Biobased and Sustainable Product Procurement,” dated February, 2012 to provide biobased products. All supplies and materials shall be of a type and quantity that conform to applicable Federal specifications and standards, and to the extent feasible and reasonable; include the exclusive use of biobased and recycled products.
In the performance of this contract, the Contractor shall make maximum use of biobased oils and lubricants that are designated by the United States Department of Agriculture unless the product cannot be acquired: (1) Competitively within a time frame providing for compliance with the contract performance schedule; (2) meeting contract performance requirements; or (3) at a reasonable price.
Information about these products is available at http://sftool.gov/green-products/1/construction-materials.
The Federal Acquisition Regulation (FAR) requires Contractors to report the purchase of biobased products under service and construction contracts during the previous Government fiscal year (October 1 thru September 30) and to submit this report no later than October 31 of each year during contract performance and at the end of contract performance (as applicable). Information about this requirement is available at https://www.biopreferred.gov/BioPreferred/faces/catalog/Catalog.xhtml#.
http://sftool.gov/green-products/1/construction-materials https://www.biopreferred.gov/BioPreferred/faces/catalog/Catalog.xhtml
Location Name: El Dorado National Forest Page 10 of 39
SECTION D—PACKAGING AND MARKING
D.1 PACKAGING AND MARKING
N/A
D.2 PROJECT LABELING FOR OFFICIAL CORRESPONDENCE
Location Name: El Dorado National Forest Page 11 of 39
SECTION E--INSPECTION AND ACCEPTANCE
E.1 CLAUSES
FAR 52.246-12 Inspection of Construction (AUG 1996) FAR 52.246-13 Inspection-Dismantling, Demolition, or Removal of Improvements (AUG 1996)
Location Name: El Dorado National Forest Page 12 of 39
SECTION F--DELIVERIES OR PERFORMANCE
F.1 CLAUSES
FAR 52.211.10 Commencement, Prosecution, and Completion of Work (APR 1984) The Contractor shall be required to (a) commence work under this contract within 5 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 45 calendar days. The time stated for completion shall include final cleanup of the premises.
(End of clause)
FAR 52.242-14 Suspension of Work (APR 1984)
F.2 OTHER REQUIREMENTS
Location Name: El Dorado National Forest Page 13 of 39
SECTION G--CONTRACT ADMINISTRATION DATA
G.1 CLAUSES
AGAR 452.204-70 Modification for Contract Closeout (DEVIATION JUN 2024)
AGAR 452.215-73 Post Award Conference (NOV 1996) A post award conference with the successful offeror is required. It will be scheduled and held within 10 days after the date of contract award. The anticipated location is via Microsoft TEAMS.
(End of clause)
G.1.1 PREWORK CONFERENCE
Prior to commencement of work the Contractor shall attend a meeting to discuss the contract terms, work performance requirements, and safety. Also, at this meeting such items as work progress schedule, quality control, and fire prevention plans shall be finalized in writing. The meeting will be held at a time and place determined by the Contracting Officer and/or Contracting Officer Representative.
G.2 GOVRERNMENT REPRESENTATIVES
The Contract Specialist (CS) for this solicitation/contract is Bob Eberle. The CS is the point of contact for all communication for administrative matters during the solicitation, contract award and post contract award until otherwise stated.
The contract technical point of contact/Contracting Officer Representative (COR) is Steven Hall The COR delegated authority, responsibilities and contact information will be defined on a delegation letter issued after contract award.
The Contracting Officer (CO) for this contract is Klenise Wallace. The Contracting Officer has full warrant authority and will be the signatory for award and post contract award actions unless otherwise stated.
G.3 INVOICES
All invoices are to be submitted via the electronic Invoice Processing Platform (IPP) System. Payments will be made from the Contractor’s invoice(s).
All invoices are to be submitted via the electronic Invoice Processing Platform (IPP) System. The "Submit Invoice-to" address for USDA orders is the Department of Treasury's Invoice Processing Platform (IPP). The contractor must follow the instructions on how to register and submit invoices via IPP as prescribed in previous communications from USDA and Treasury.
This is a mandatory requirement initiated by the U.S. Department of Treasury and you can find more information at this website https://www.ipp.gov/index.htm Ensure your company has registered at https://www.ipp.gov/vendors/enrollment-vendors.htm to establish your account. Offeror must have an established account prior to commencement of work.
Invoice Processing Platform (IPP) does not allow for the contractor to change the description of the line items being invoiced against and therefore an itemized invoice must be uploaded as an attachment(s).
G.3.1. Itemized Invoices. If the itemized invoice has not been reviewed and approved by the COR, the https://www.usda.gov/sites/default/files/documents/agar-class-deviation-contract-closeout-clause.pdf https://www.ipp.gov/index.htm https://www.ipp.gov/vendors/enrollment-vendors.htm
Location Name: El Dorado National Forest Page 14 of 39
IPP payment request will be rejected. Please follow the minimum requirements to ensure a successful payment process.
IPP Invoice shall have the following areas completed at a minimum:
Invoice Number Invoice Date Bill Period Start Date Bill Period End Date Supplier Contact Name Supplier Contact Phone Contract Number
Itemized invoice shall include at a minimum:
Contractor Name & Address Contract number Invoice Number Description of Services or work completed.
Date of services or completion.
G.3.2. Certified Payrolls. Certified payrolls for Construction: certified payrolls must also be uploaded as an attachment. Contractor and all subcontractors, through the contractor, shall furnish all certified payrolls covering payments to laborers and mechanics for on-site work.
G.3.3. Final Payment. Following completion and acceptance of the work (including return of Government-furnished property and site cleanup), Final payment will made within 30 calendar days after presentation of a properly executed invoice and if required by the contract, a release of all claims against the Government, other than claims arising under this contracted, in stated amounts, which the Contractor specifically accepts from the operation of the release.
G.4 BONDING
A bid bond and performance bond are not required for this contract. A payment bond or alternative payment protection to the payment bond is an anticipated requirement for this contract. Reference Section I, Clause 52.228-13 for acceptable alternatives to the SF 25A Bond document.
G.5 LABOR INTERVIEWS
The Government (via the Contracting Officer (CO), Contracts Specialist (CS) or Contracting Officer Representative (COR)) will conduct periodic interviews with workers on the job using the Stand Form (SF) 1445, Labor Standards Interview, which may be validated against submitted payroll data.
G.6 DEFINITIONS AND CONTRACT ADMINISTRATION DATA
Administrative Contracting Officer (ACO) - The ACO is a warranted Contracting Officer that has authority for the administration of the contract and may handle matters beyond the authority of the COR in the absence of the Contracting Officer (CO)). Generally, this includes the day-to-day administration of the contract, to include changes in contract price and time.
Changes (Modifications) The Contracting Officer is the only person authorized to approve changes in any of the requirements under this contract and notwithstanding any provisions contained elsewhere in this contract the said authority remains solely with the Contracting Officer. In the event the Contractor effects any such change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in costs incurred as a result thereof.
Contract Award A written award or acceptance of offer mailed or otherwise furnished to the Contractor shall result in a binding contract without further action by either party.
Location Name: El Dorado National Forest Page 15 of 39
Contracting Officer (CO) Has full authority for the administration of the contract and will personally handle all matters beyond the authority of the CS and COR. Contracting Officers are agents of the Government and are the only officials authorized to enter into any contract or agreement that binds the Government. If you are asked to perform additional work, or make changes not specified in the contract, DO NOT perform the work but immediately notify the Contracting Officer. A Contracting Officer holds a legal warrant, which is a designation of authority to bind the Government.
Contracting Officer’s Representative (COR) The Contracting Officer’s Representative (COR) is the person most responsible for technical advice. The COR is also responsible for maintaining property records, outlining work, material approvals, inspecting work in progress, estimating completed work for partial or progress payments, and conducting pre-final and final inspections. In addition, the COR oversees administrative matters (e.g., submittals, etc.). Also ensures elements of contract requirements are met in accordance with terms and conditions. The COR is NOT authorized to direct changes or bind the Government to any contractual agreement. NOTE: The COR Designation form outlines functions the COR can and cannot perform.
Contract Specialist (CS) - The CS has delegated authority from the Contracting Officer for the administration of the contract and will handle all matters beyond the authority of the COR. Generally, this includes the day-to-day administration of the contract, except for matters pertaining to changes in contract price and time. Any contractual documents that bind the Government must have Contracting Officer approval and signature.
Designation of Authorized Representative of the Contractor The Contractor shall assign a member or employee who will act as Project Manager during the course of this contract or during the course of this project. The official shall be responsible for affording liaison between the contract forces and the contracting offices. This designation shall be in writing and a copy furnished to the Contracting Officer.
Designation of Contracting Officer’s Representative (COR) Designation will be made upon contract issuance and a copy of the designation letters will be furnished to the Contractor. Limits of authority are described in each designation letter.
Government Technical Monitor (GTM) A Government Employee may be designated in writing to assists the CO and/or COR as a technical advisor/inspector to monitor contractor performance and answer basic contract questions. This person exists only to shadow or advise the COR in his/her area of expertise.
A GTM has no contractual authority.
Inspector(s) An Inspector may be assigned to the contract by the CO in writing authorized to inspect the progress and certify completion of work on behalf of the COR. The inspector is the most likely person to coordinate with on matters involving conduct of work within the scope of the contract. If a disagreement or dispute arises, the contracting officer must be notified immediately for resolution of such issues. The Contractor will receive a copy of the inspection designation (form R6-6320-32, or equivalent).
Notice to Proceed (NTP) The Contractor shall commence work upon receipt of a properly executed Notice to Proceed.
Unauthorized Instructions from Government or Other Personnel The Contractor shall not accept instructions issued by any person employed by the U.S. Government or otherwise other than the Contracting Officer, or the authorized representative of the Contracting Officer acting within the limits of his/her authority.
Location Name: El Dorado National Forest Page 16 of 39
SECTION H--SPECIAL CONTRACT REQUIREMENTS
H.1 CLAUSES
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements.
As prescribed in 36.509 , insert the following clause:
Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr 1984)
(a) The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.
(b) The Contractor shall protect from damage all existing improvements and utilities (1)at or near the work site, and (2)on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.
(End of clause)
AGAR 452.237-74 Key Personnel (FEB 1988) Contractor shall be required to provide a roster of key contractor personnel. At minimum:
(a) The Contractor shall assign to this contract the following key personnel: Contractor Representative; Project Foreman.
(b) During the first ninety (90) days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.
(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.
(End of clause)
H.2 PERSONAL PROTECTIVE EQUIPMENT
The contractor shall train workers in the safe operation and use of equipment that the worker may use before the worker begins using such equipment.
Personal protective equipment, including personal protective equipment for eyes, face, head, and extremities shall be provided, used, and maintained in a sanitary and reliable condition wherever it is https://www.acquisition.gov/far/part-36#FAR_36_509
Location Name: El Dorado National Forest Page 17 of 39 necessary by reason of hazards or processes encountered which may cause injury or impairment in the function of any part of the body. Defective or damaged personal protective equipment shall not be used.
The contractor shall provide chain saw chaps to each employee who operates a chain saw, at no cost to the employee. These chaps must be approved by an Underwriters Laboratory or meet Forest Service specification 6170-47. The chaps shall cover the full length of the thigh and shall extend to the top of the boot on each leg.
The contractor shall assure that each employee wears foot protection that provides adequate traction and ankle support. Employees operating chain saws shall wear foot protection that is constructed with cut-resistant material which will protect the employee against contact with a running chain saw.
In any area where the worker is exposed to the potential for flying or falling objects, the contractor shall provide a hard hat, at no cost to the employee, and the contractor shall assure that the employee wears the hard hat. The hard hat must meet the minimum requirements of American National Standards Institute (ANSI) standard Z89.1-1997.
The contractor shall provide, at no cost to the employee, eye protection where there is potential for eye injury due to flying objects. This eye protection must meet the minimum requirements of ANSI standard Z87.1-2003.
The contractor shall provide, at no cost to the employee, hearing protection where there is a potential for hearing loss due to high intensity noise for example, chain saw operation.
H.3 SAFETY
H.3.1. Fire Prevention and Control.
The Contractor is responsible for controlling the work environment to prevent fires to the maximum extent practicable. The Contractor may be held liable for all damages and for all costs incurred by the Government for labor, subsistence, equipment, supplies, and transportation deemed necessary to control or suppress a fire set or caused by the Contractor or the Contractor's agents or employees.
H.3.1.1. Fire Reporting.
The Contractor shall immediately notify the Government of any fires sighted on or in the vicinity of the work site. The Contractor may be held liable for all damages and for all costs incurred by the Government for labor, subsistence, equipment, supplies, and transportation deemed necessary to control or suppress a fire set or caused by the Contractor or the Contractor's agents or employees.
H.3.1.3. Smoking.
Smoking is prohibited while operating tractors or open-type vehicles, or while walking or working in an area with flammable fuels.
H.3.2 OSHA Standards.
The Contractor is subject to all applicable State and Federal OSHA rules and regulations. At time of award the contractor shall submit to the COR the Material Safety Data Sheets (MSDS) with the intended use of each of the solutions the contractor proposes to use in the performance of work. MSDS sheets shall be supplied to the COR prior to using the items. The contractor shall not use any materials in which the COR determines to be unsuitable for the work, or harmful to the surfaces it is intended to be applied to.
This does not relieve the contractor of any damages resulting from the application of such materials. All
Location Name: El Dorado National Forest Page 18 of 39 containers used shall be clearly marked with manufacturer, type of chemical and intended usage. Mixing of chemicals is not allowed.
H.3.3 52.236-13 Accident Prevention
ACCIDENT PREVENTION (NOV 1991)
(a) The Contractor shall provide and maintain work environments and procedures which will-
(1) Safeguard the public and Government personnel, property, materials, supplies, and equipment exposed to Contractor operations and activities;
(2) Avoid interruptions of Government operations and delays in project completion dates; and
(3) Control costs in the performance of this contract.
(b) For these purposes on contracts for construction or dismantling, demolition, or removal of improvements, the Contractor shall-
(1) Provide appropriate safety barricades, signs, and signal lights;
(2) Comply with the standards issued by the Secretary of Labor at 29 CFR Part 1926 and 29 CFR Part 1910 ; and
(3) Ensure that any additional measures the Contracting Officer determines to be reasonably necessary for the purposes are taken.
(c) If this contract is for construction or dismantling, demolition or removal of improvements with any Department of Defense agency or component, the Contractor shall comply with all pertinent provisions of the latest version of U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, in effect on the date of the solicitation.
(d) Whenever the Contracting Officer becomes aware of any noncompliance with these requirements or any condition which poses a serious or imminent danger to the health or safety of the public or Government personnel, the Contracting Officer shall notify the Contractor orally, with written confirmation, and request immediate initiation of corrective action. This notice, when delivered to the Contractor or the Contractor’s representative at the work site, shall be deemed sufficient notice of the noncompliance and that corrective action is required. After receiving the notice, the Contractor shall immediately take corrective action. If the Contractor fails or refuses to promptly take corrective action, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. The Contractor shall not be entitled to any equitable adjustment of the contract price or extension of the performance schedule on any stop work order issued under this clause.
(e) The Contractor shall insert this clause, including this paragraph (e), with appropriate changes in the designation of the parties, in subcontracts.
(End of clause)
Location Name: El Dorado National Forest Page 19 of 39
H.4 WAGE DETERMINATION
The wage determination applicable to this work is CA20240007, Revision 7, Dated 04/12/2024.
H.5 SECURITY REQUIREMENTS
High value sensitive equipment is stored in building. Contractor to ensure all external openings to the office are secured before leaving job site each day.
H.6 DATA RIGHTS
Data that is to be produced, furnished, acquired, or used in meeting contract requirements shall be held by the Government. The Contractor may use the data in support of the project but cannot sell or provide the data to outside interested parties.
H.7 SECTION 508, ELECTRONIC AND INFORMATION TECHNOLOGY
STANDARDS
It is not expected that Information technology is to be acquired as part of this project.
H.8 CLAUSES
No additional clauses for this section.
H.9 OTHER INFORMATION
None at this time.
Location Name: El Dorado National Forest Page 20 of 39
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES
I.1 CLAUSES
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
Federal Acquisition Regulation (FAR): https://www.acquisition.gov/browse/index/far (Clauses are located at FAR part 52 and begin with 52)
Department of Agriculture Acquisition Regulation (AGAR):https://www.acquisition.gov/agar (Clauses are located at AGAR part 452 and begin with 452)
Deviations to clauses may be viewed at: Policies & Regulations | USDA
FAR 52.203-7 Anti-Kickback Procedures (JUN 2020) FAR 52.203-12 Limitation on Payments to Influence Certain Federal Transactions (JUN 2020) FAR 52.203-17 Contractor Employee Whistleblower Rights (NOV 2023) (Whistleblower
Guidance to contractor employees) FAR 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or
Statements (JAN 2017) FAR 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (JUN
2020) FAR 52.204-13 System for Award Management Maintenance (OCT 2018) FAR 52.204-18 Commercial and Government Entity Code Maintenance (AUG 2020) FAR 52.204-19 Incorporation by Reference of Representations and Certifications (DEC 2014) FAR 52.204-21 Basic Safeguarding of Covered Contractor Information Systems (NOV 2021) FAR 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or
Provided by Kaspersky Lab Covered Entities (DEC 2023) FAR 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video
Surveillance Services or Equipment (NOV 2021) FAR 52.204-27 Prohibition on a ByteDance Covered Application (JUN 2023) FAR 52.209-6 Protecting the Government's Interest when Subcontracting with Contractors
Debarred, Suspended, or Proposed for Debarment (NOV 2021) FAR 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015) FAR 52.215-8 Order of Precedence—Uniform Contract Format (OCT 1997) FAR 52.219-6 Notice of Total Small Business Set-Aside (NOV 2020) FAR 52.219-14 Limitations on Subcontracting (OCT 2022)
[Contracting Officer check as appropriate.]
☐ By the end of the base term of the contract and then by the end of each subsequent option period; or
By the end of the performance period for each order issued under the contract.
FAR 52.222-3 Convict Labor (JUN 2003) https://www.acquisition.gov/browse/index/far https://www.acquisition.gov/far/part-52 https://www.acquisition.gov/agar https://www.acquisition.gov/agar/part-452-solicitation-provisions-and-contract-clauses https://www.usda.gov/da/ocp/ppd/policies-regulations https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fcontent.govdelivery.com%2Fattachments%2FUSDAPSD%2F2023%2F04%2F04%2Ffile_attachments%2F2456937%2FWhistleblower%2520Guidance.docx&wdOrigin=BROWSELINK https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fcontent.govdelivery.com%2Fattachments%2FUSDAPSD%2F2023%2F04%2F04%2Ffile_attachments%2F2456937%2FWhistleblower%2520Guidance.docx&wdOrigin=BROWSELINK
Location Name: El Dorado National Forest Page 21 of 39
FAR 52.222-4 Contract Work Hours and Safety Standards -- Overtime Compensation (MAY
2018) FAR 52.222-6 Construction Wage Rate Requirement (AUG 2018) FAR 52.222-7 Withholding of Funds (MAY 2014) FAR 52.222-8 Payrolls and Basic Records (JUL 2021) FAR 52.222-9 Apprentices and Trainees (JUL 2005) FAR 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) FAR 52.222-11 Subcontracts (Labor Standards) (MAY 2014) FAR 52.222-12 Contract Termination - Debarment (MAY 2014) FAR 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations
(MAY 2014)
FAR 52.222-14 Disputes Concerning Labor Standards (FEB 1988) FAR 52.222-15 Certification of Eligibility (MAY 2014) FAR 52.222-21 Prohibition of Segregated Facilities (APR 2015) FAR 52.222-26 Equal Opportunity (APR 2016) FAR 52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015) FAR 52.222-35 Equal Opportunity for Veterans (JUN 2020) FAR 52.222-36 Equal Opportunity for Workers with Disabilities (JUN 2020) FAR 52.222-37 Employment Reports on Veterans (JUN 2020) FAR 52.222-50 Combating Trafficking in Persons (NOV 2021) FAR 52.222-54 Employment Eligibility Verification (MAY 2022) FAR 52.222-55 Minimum Wages for Contractor Workers under Executive Order 14026 (JAN
2022) FAR 52.222-62 Paid Sick Leave under Executive Order 13706 (JAN 2022) FAR 52.223-2 Reporting of Biobased Products Under Service and Construction Contracts (MAY
2024) FAR 52.223-3 Hazardous Material Identification and Material Safety Data (FEB 2021)-
Alternate l (JULY 1995) FAR 52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2024) FAR 52.223-23 Sustainable Products & Services (MAY 2024) FAR 52.225-13 Restrictions on Certain Foreign Purchases (FEB 2021) FAR 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving (MAY
2024) FAR 52.227-1 Authorization and Consent (JUN 2020) FAR 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (JUN 2020) FAR 52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007) FAR 52.227-17 Rights in Data-Special Works (DEC 2007) FAR 52.228-2 Additional Bond Security (OCT 1997) FAR 52.228-11 Individual Surety - Pledge of Assets (FEB 2021) (DEVIATION MAY 2023) FAR 52.228-12 Prospective Subcontractor Requests for Bonds (DEC 2022) FAR 52.228-14 Irrevocable Letter of Credit (NOV 2014) FAR 52.228-15 Performance and Payment Bonds -- Construction (JUN 2020) (DEVIATION MAY
2023) FAR 52.232-5 Payments under Fixed-Price Construction Contracts (MAY 2014) FAR 52.232-17 Interest (MAY 2014) FAR 52.232-23 Assignment of Claims (MAY 2014) FAR 52.232-27 Prompt Payment for Construction Contracts (JAN 2017) FAR 52.232-33 Payment by Electronic Funds Transfer – System for Award Management (OCT
2018) FAR 52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013) https://www.usda.gov/sites/default/files/documents/far-class-deviation-eliminate-hard-copy-original-documents-signatures-notarization-seals-bonds-other-seals.pdf https://www.usda.gov/sites/default/files/documents/far-class-deviation-eliminate-hard-copy-original-documents-signatures-notarization-seals-bonds-other-seals.pdf https://www.usda.gov/sites/default/files/documents/far-class-deviation-eliminate-hard-copy-original-documents-signatures-notarization-seals-bonds-other-seals.pdf
Location Name: El Dorado National Forest Page 22 of 39
FAR 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (MAR 2023) FAR 52.233-1 Disputes (MAY 2014) Alt 1 (DEC 1991) FAR 52.233-3 Protest after Award (AUG 1996) FAR 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) FAR 52.236-2 Differing Site Conditions (APR 1984) FAR 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) FAR 52.236-5 Material and Workmanship (APR 1984) FAR 52.236-6 Superintendence by the Contractor (APR 1984) FAR 52.236-7 Permits and Responsibilities (NOV 1991) FAR 52.236-14 Availability and Use of Utility Services (APR 1984) FAR 52.236-16 Quantity Surveys (APR 1984) Alternate 1 (APR 1984) FAR 52.243-5 Changes and Changed Conditions (APR 1984) FAR 52.244-6 Subcontracts for Commercial Products and Commercial Services (FEB 2024) FAR 52.248-3 Value Engineering – Construction (OCT 2020) FAR 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short Form)
(APR 1984)
Alternate I (SEP 1996) FAR 52.249-10 Default (Fixed-Price Construction) (APR 1984) FAR 52.253-1 Computer Generated Forms (JAN 1991) AGAR 452.232-70 Reimbursement for Bond Premiums – Fixed-Price Construction Contracts (NOV
1996) AGAR 452.236-71 Prohibition Against the Use of Lead-Based Paint (NOV 1996) AGAR 452.236-72 Use of Premises (NOV 1996) AGAR 452.236-76 Samples and Certificates (FEB 1988) AGAR 452.236-77 Emergency Response (NOV 1996)
FAR 52.225-9 Buy American Act-Construction Materials (OCT 2022)
(a) Definitions. As used in this clause— Commercially available off-the-shelf (COTS) item—
(1) Means any item of supply (including construction material) that is–
(i) A commercial product (as defined in paragraph (1) of the definition of “commercial product” at Federal Acquisition Regulation (FAR) 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
https://www.acquisition.gov/far/part-2#FAR_2_101
Location Name: El Dorado National Forest Page 23 of 39
Cost of components means—
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued);
or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Critical component means a component that is mined, produced, or manufactured in the United States and deemed critical to the U.S. supply chain. The list of critical components is at FAR 25.105.
Critical item means a domestic construction material or domestic end product that is deemed critical to U.S. supply chain resiliency. The list of critical items is at FAR 25.105.
Domestic construction material means—
(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-
(i) An unmanufactured construction material mined or produced in the United States; or
(ii) A construction material manufactured in the United States, if–
(A) The cost of its components mined, produced, or manufactured in the United States exceeds 60 percent of the cost of all its components, except that the percentage will be 65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic.
Components of unknown origin are treated as foreign; or
(B) The construction material is a COTS item; or
(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all component used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".
Fastener means a hardware device that mechanically joins or affixes two or more objects together.
Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.
Foreign construction material means a construction material other than a domestic construction material.
Foreign iron and steel means iron or steel products not produced in the United States.
This is the start of the file's text. The full file is on GovTribe.