A-2 NIST Requirements DepositionSystem_2 gs_0524.pdf
PDF 195 KB Posted
- Attached to
- Deposition System
- Solicitation number
- 1333ND22QNB680219
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment I.docx | DOCX document | |
| Amended_I_NIST Requirements DepositionSystem.docx | DOCX document | |
| Deposition System Combined Synopsis Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NIST Requirements Document Liquid Deposition System
I. Background The NIST Mass and Force Group, Small Mass and Force Metrology Project requires a liquid deposition system. As part of the TrueBq IMS project, a fluid dispensing balance is being constructed. The balance will deposit 1-5 milligram of liquid onto a surface and determine the liquid mass. The dispensing of the liquid must be automated and tightly controlled with minimum disturbance to the balance, requiring an electronic means of liquid dispensing without moving parts.
II. Minimum Requirements The system shall meet or exceed the minimum requirements identified below. All items must be new. Used or remanufactured equipment will not be considered for award.
Experimental, prototype, or custom items will not be considered. The use of “gray market” components not authorized for sale in the U.S. by the Contractor is not acceptable. All line items shall be shipped in the original manufacturer’s packaging and include all original documentation and software, when applicable.
The Contractor shall provide one (1) deposition system that meets the following minimum specifications:
• System must deposit 1 milligram (approximately 1 microliter) of aqueous solution of viscosity between 0.8 and 1.2 mPa.s within 30 seconds.
• System must include a custom transformer that is removable to facilitate higher dispensing rates if necessary.
• Dispenser mass less than 100 g .
• Size of system must fit in a cube of 80x80x60 mm. System should accommodate being fastened by a bolt or clamp produced by NIST.
• System must not require external pressure for dispensing.
• Electrical connection to dispenser must be accessible to allow connection to NIST’s custom low mechanical stiffness connectors (50-100 micrometer gold filament wire).
Access to bare electrical leads is acceptable.
• Disposable sample reservoir for dispenser is required to be compatible with 1 molar nitric acid.
• Disposable sample reservoir must have a volume of at least 50 microliters but not more than 80 microliters to allow deposition of multiple samples in the same run.
• To ensure continuity of operation, any custom disposable components must be provided in a quantity of at least 100.
• Mass distribution of solution in reservoir should be symmetrical to prevent changes in the location of the center of mass during deposition.
• System should offer a mostly reservoir system to prevent sample evaporation from the reservoir during deposition operations. Small (100 micrometer or less) openings for pressure equalization are acceptable.
• Dispenser will be loaded with radionuclide solution. Safety operation requires minimizing exposure of staff to radionuclides. Preference will be given to systems with convenient sample loading procedures.
• System must accommodate 1 cm underneath dispenser for loading of samples. Final deposition distance can be as small as 1 mm.
• Visualization system is required to image droplet generation and deposition process.
Visualization system must accommodate approximate calibration of droplet size.
• Software must be provided to interface with all essential components of the deposition system including the electronic waveforms used to generate the droplets, the visualization system, and the droplet deposition time to control the amount of solution deposited on the surface.
• When not in use, system should not generate electric or magnetic fields, as these may interfere with another simultaneous measurement (exception will be allowed for the custom transfoermer).
• When not in use, system should not generate any mechanical vibration, or offer an option to shut down the source of the vibration during other simultaneous measurement.
• Hardware and software must meet the following IT security requirements:
o DOC IT Security Program Policy ITSPP media sanitization requirements
(MP-6)
o FAR 39.101(d) regulations involving NIST common security configuration checklists including Federal Desktop Core Configuration (FDCC) or United States Government Configuration Baseline (USGCBB) initiative o Personal identity verification requirements from FAR 4.13302 and FIPSS PUB 201 [in accordance with Homeland Security Presidential Directive
(HSPD-12)]
o FARR part 11.002 requirements which state that unless the agency Chief Information Officer waives the requirement, when acquiring information technology using Internet Protocol, the requirements documents must include reference to the appropriate technical capabilities defined in the USGv6 Profile (NNIST Special Publication ((SP) 500-267)) and the corresponding declarations of conformance defined in the USGv6 Test Program. To meet this requirement each DOC acquisition of IPP protocol technology must express requirements for IPPv6 capabilities in terms off the USGv6 Profile (i.e., using the USGGV6 Capabilities Check List) and vendors must be required to document their product’s support of the requested capabilities through the USGv66 test program (reference hhttp://www.anntd.nist.gov/usgv6/) using the USGv6 Suppliers Declaration of Conformity.
III. Delivery Delivery shall be FOB Destination (or equivalent terms, such as INCOTERMS Delivered Duties Paid) are required and shall occur not later than (NLT) 6 weeks ARO.
FOB Destination means: The contractor shall pack and mark the shipment in conformance with carrier requirements, deliver the shipment in good order and condition to the point of delivery specified in the purchase order, be responsible for any loss of and/or damage to the goods occurring before receipt and acceptance of the shipment by the consignee at the delivery point specified in the purchase order; and pay all charges to the specified point of delivery. The contractor shall deliver all Line Items to:
The National Institute of Standards and Technology 100 Bureau Drive, Building 217 Rm E122 Gaithersburg, MD 20899-1640
IV. Inspection and Acceptance In addition to the inspection and acceptance terms articulated in 52.212-4, the Government reserves the right to perform such performance tests and evaluations as defined below to verify specified system performance. Such tests and evaluations, if performed, shall be conducted within the environment that the system is to be operated. The Contractor has the right to be present during the tests and evaluations, if performed, at the Contractor’s expense.
The liquid deposition system will be operated to verify deposition of 1 milligram of water within 30 seconds.
The Government will test, inspect, and accept the equipment onsite within 14 business days of the receipt of the liquid deposition system. A visual inspection of the liquid deposition system will be performed by the NIST TPOC to identify surface defects or any form of indication that the liquid deposition system was damaged during transport to NIST. The Government shall have sole discretion to require repair or replacement of damaged and/or nonconforming supplies at no cost to the Government. The Government at any time prior to acceptance shall reject the liquid deposition system due to defects and/or nonconformance.
V. Warranty The contractor shall warrant the entire system for a period of a minimum of one year after receipt of the equipment and shall be in accordance with terms in FAR 52.212-4
VI. Payment Schedule The Contractor shall be paid, in accordance with Net 30-day payment terms, upon receipt and acceptance of a proper invoice, in accordance with the following schedule:
1. 100% after installation and acceptance by the TPOC of fully installed system. (these are the standard terms used. If partial payment or a payment schedule are needed, adjust accordingly)
2. The Government anticipates inspection will occur upon:
a. After the testing procedures set forth in this document have been completed