A-10 PATS-70A Power Board Repair Statement of Work.pdf
PDF 146 KB Posted
- Attached to
- A-10 PATS-70A Power Board Repair
- Solicitation number
- FA822225QB007
About this file
This Statement of Work details requirements for repair, testing, evaluation, certification and delivery of two PATS-70A power board assemblies manufactured by Marvin Test Solutions (MTS) for the Air Force Sustainment Center at Hill AFB, Utah. The work supports the 516th Software Engineering Squadron's mission to replace aging legacy test equipment used for A-10 and E-3 aircraft maintenance.
The contractor must repair two MTS-207 Power Boards (serial numbers 065 and 076) according to manufacturer specifications, with delivery required within 22 weeks after receipt of order. The work includes test and evaluation services (CLIN 0001) and minor incremental repair services (CLIN 0002) for both boards. A 90-day warranty is required for workmanship defects starting upon MTS completion of repairs. The contractor must provide Certificates of Compliance after testing and ship all items FOB Destination to Hill AFB. The contractor is responsible for proper packaging to prevent damage and must coordinate all work through the PATS-70A team, with contract oversight by the Procuring Contracting Officer (PCO).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Combo Synopsis Solicitation.docx | DOCX document | |
| GFP spreadsheet.xlsx | XLSX spreadsheet | |
| FA822225QB007 - Clauses.pdf | ||
| SSJ_redacted_Redacted.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
FOR
Portable Automated Test Set (PATS) Power Board Repair
Prepared By:
Gregory Hernandez Air Force Sustainment Center Software Directorate Procurement (AFSC/SWP)
Hill Air Force Base, Utah 84056
December 19, 2024
1. SCOPE
The PATS-70A team of the 516th Software Engineering Squadron (516 SWES), a component of 309 SWEG, has been tasked with designing and producing automatic test systems to replace aging legacy test equipment. These test systems are used to perform troubleshooting and maintenance functions on the A-10 and E-3 aircraft on the flight line and backshop. These systems include avionics, weapons, radar, and flight planning. 516 SWES designed the PATS-70A Tester and is responsible for the sustainment of them for the Air Force.
This Statement of Work (SOW) defines contractor tasks and requirements for repair, testing and evaluation, certification, and delivery of two PATS-70A power board assemblies, manufactured by Marvin Test Solutions (MTS). Power board repair will be performed in accordance with (IAW) manufacturer specification and procedures.
2. SPECIAL CONSIDERATIONS
2.1. Program and Engineering Management
All contractor tasks and requirements covered by this document shall be coordinated with the PATS-70A team. Overall responsibility and approval of any changes to the contract or attachments resides with the Procuring Contracting Officer (PCO). If technical changes are required, they shall be communicated to the PCO, and updated documents will be provided in order to modify the contract for inclusion.
2.2. Contract Management
Overall responsibility and approval reside with the PCO. No conversation, recommendation, or direction, whether given directly or implied by Government personnel or representatives, that will affect the scope, schedule, or price of the program covered by this SOW, shall be acted upon by the contractor unless specifically directed in writing by the PCO.
2.3. Other Requested Deliverables
In addition to the repaired power boards, the below Contract Data Requirements List (CDRL) shall also be delivered as part of the contract.
2.3.1. The vendor shall provide a Certificate of Compliance after completion of testing and evaluation in accordance with (IAW) Data Item Description (DID) DI-MISC-81356A as described in
CDRL A001.
3. GOVERNMENT FURNISHED EQUIPMENT/INFORMATION
3.1. Government Furnished Equipment
The following parts will be furnished to the contractor to repair:
• 1 each, MTS-207 Power Board, Serial Number (SN) – 065
• 1 each, MTS-207 Power Board, Serial Number (SN) – 076
4. CONTRACTOR TASKING AND REQUIREMENTS
The contractor shall accomplish the following tasks and requirements during the repair, test, evaluation, and delivery of the two power boards listed above. Power board repair shall be performed IAW manufacturer specification and procedures as follows:
Line Item Description Manufacturer Part Number Quantity Unit of
Measure
Test & Evaluation for MTS-207 Power Board
Marvin Test Solutions
4100-100-00 (Test & Evaluation) 2 Each
Minor Incremental Repair Services for
Test Equipment
Marvin Test Solutions
Incremental- Repair-Services-I 4 Each
Note: Each unit servicing will include these items:
Qty 1, PN 4100-100-00 (Test & Evaluation) Qty 2, PN Incremental-Repair-Services-I
4.1. Contractor Management
The contractor shall plan, direct, coordinate, monitor, evaluate, and control contractor tasks specified in this statement of work. The contractor shall notify the PATS-70A team and the PCO, by email, of management problems requiring Government action.
4.2. Performance Requirements
Performance requirements are IAW manufacturer’s repair, testing and evaluation procedures. A certificate of compliance shall be provided (see paragraph 2.3 of the SOW).
4.3. Delivery Schedule
The minimum delivery schedule (advance delivery is acceptable) shall be as follows:
• 22 weeks IAW with manufacturer lead time. Estimated lead time is based on the date Marvin Test Solutions approves the purchase order and receives the hardware.
DELIVERY # CLIN # DESCRIPTION QUANTITY DELIVERY
1 0001 Test &
Evaluation for MTS-207 Power Board, SN: 065;
2 22 weeks after receipt of order (ARO) and delivery of GFE
1 0002 Minor Incremental Repair Services for Test Equipment
4 22 weeks after receipt of order (ARO) and delivery of GFE
2 0003 Certificate of Compliance
(CDRL A001)
2 ASGEN – one certificate will ship per part
4.3.1 The Contractor shall be responsible for all shipping costs associated with FOB Destination.
4.4. Packaging and Shipping
4.4.1. The Contractor shall ensure all parts are packaged separately to prevent damage to part features and finishes during shipment.
4.4.2. The Contractor shall ensure all parts are properly identified and shipped per the instructions provided in the contract (i.e., CLINs, Ship to DoDAAC and delivery instructions.)
4.4.3. The Contract will have the following address:
DoDAAC: F2DCCF
516 SWES/MXDPAD
Attn: Jason Fogarty 7278 4th St BLDG 100 Bay O Whs Hill AFB, UT 84056 Office: (801) 586-8496 Email: jason.fogarty@us.af.mil
5. WARRANTY AND PRODUCT REPAIR
Vendor shall provide a warranty covering defects in workmanship for a period of 90 days from the time of delivery in accordance with FAR 52.246-18.
Note: The 90-day warranty begins upon MTS completion of repairs and shipment to Hill AFB.
6. GENERAL INFORMATION
6.1. General Security Requirements
6.1.1. All requests for information shall be forwarded to the PATS-70A team and the PCO.
6.2. Item Unique Identification and Valuation
6.2.1 The items provided under the terms of this contract shall be subject to DFARS 252.211-7003, Item Unique Identification and Valuation.
6.3. All units produced and ordered through this contract are the property of the U.S. Government.
APPENDIX A
Summary of CDRLs
Item Title Subtitle Data Item Description SOW Para Reference
Delivery
A001 Certificate of Compliance N/A DI-MISC-81356A 2.3 ASGEN – one certificate will ship per part
File details come from the government source that posted it. Updated .